CN106877817A - Solar components power test equipment - Google Patents

Solar components power test equipment Download PDF

Info

Publication number
CN106877817A
CN106877817A CN201710267149.XA CN201710267149A CN106877817A CN 106877817 A CN106877817 A CN 106877817A CN 201710267149 A CN201710267149 A CN 201710267149A CN 106877817 A CN106877817 A CN 106877817A
Authority
CN
China
Prior art keywords
test
solar components
test fixture
electrical connector
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710267149.XA
Other languages
Chinese (zh)
Other versions
CN106877817B (en
Inventor
翁诚彬
刘学文
余学军
郑礼华
伊明政
黄滕
庞朝江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Longi Solar Technology Co Ltd
Original Assignee
Zhejiang Lerri Solar Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Lerri Solar Technology Co Ltd filed Critical Zhejiang Lerri Solar Technology Co Ltd
Priority to CN201710267149.XA priority Critical patent/CN106877817B/en
Publication of CN106877817A publication Critical patent/CN106877817A/en
Application granted granted Critical
Publication of CN106877817B publication Critical patent/CN106877817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S50/00Monitoring or testing of PV systems, e.g. load balancing or fault identification
    • H02S50/10Testing of PV devices, e.g. of PV modules or single PV cells
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R13/00Details of coupling devices of the kinds covered by groups H01R12/70 or H01R24/00 - H01R33/00
    • H01R13/62Means for facilitating engagement or disengagement of coupling parts or for holding them in engagement
    • H01R13/629Additional means for facilitating engagement or disengagement of coupling parts, e.g. aligning or guiding means, levers, gas pressure electrical locking indicators, manufacturing tolerances
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R13/00Details of coupling devices of the kinds covered by groups H01R12/70 or H01R24/00 - H01R33/00
    • H01R13/62Means for facilitating engagement or disengagement of coupling parts or for holding them in engagement
    • H01R13/629Additional means for facilitating engagement or disengagement of coupling parts, e.g. aligning or guiding means, levers, gas pressure electrical locking indicators, manufacturing tolerances
    • H01R13/631Additional means for facilitating engagement or disengagement of coupling parts, e.g. aligning or guiding means, levers, gas pressure electrical locking indicators, manufacturing tolerances for engagement only
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

This application discloses a kind of solar components power test equipment, including:Test fixture, the test fixture is fixed on solar components, and test fixture is electrically connected with solar components, and the test fixture both sides have electrical connector interface;Pedestal, two groups of jacking cylinders are provided with the pedestal, the end of the jacking cylinder piston bar is provided with to inserting cylinder, electrical connector is installed on the described pair of piston rod of slotting cylinder, one end of the electrical connector connects for electrical connector interface corresponding with test fixture, and the other end is used to be electrically connected with detection main frame;Locating piece, the locating piece is arranged between two groups of jacking cylinders, and the locating piece bottom is provided with jacking cylinder, has connecting portion on the locating piece, for coordinating with test fixture bottom.Can be realized automatically to inserting using the solar components power test equipment of the technical program, so as to reduce operating personnel, improve the automaticity of equipment.

Description

Solar components power test equipment
Technical field
The present invention relates to a kind of solar components power test equipment.
Background technology
Current solar photovoltaic assembly power test link is the vital link of whole production link.Current city Solar components power measuring on field be required for connecting manually in the case under examination solar components power measuring and Connecting line between solar components, so as to realize the test circuit between solar components power measuring and solar components Connection.
Usual factory realizes the test between solar components power measuring and solar components using artificial plug Circuit is connected, and operating personnel's operation labor intensity is big in operation process, and the high light that equipment sends is caused to the body of operator Injury, electric plug connector easily weares and teares, the defect such as influence equipment operation beat.
The content of the invention
The present invention is regarding to the issue above, it is proposed that a kind of solar components power test equipment.
The technical scheme that the present invention takes is as follows:A kind of solar components power test equipment, including:
Test fixture, the test fixture is fixed on solar components, and test fixture is electrically connected with solar components, institute Stating test fixture both sides has electrical connector interface;
Pedestal, is provided with two groups of jacking cylinders on the pedestal, the end of the jacking cylinder piston bar is provided with to inserting Cylinder, is provided with electrical connector on the described pair of piston rod of slotting cylinder, one end of the electrical connector is used for and test fixture pair The electrical connector interface answered is connected, and the other end is used to be electrically connected with detection main frame;
Locating piece, the locating piece is arranged between two groups of jacking cylinders, and the locating piece bottom is provided with jacking cylinder, There is connecting portion, for coordinating with test fixture bottom on the locating piece.
Can be realized automatically to inserting, so as to reduce operation people using the solar components power test equipment of the technical program Member, improves the automaticity of equipment, it is also possible to reduce the injury of high light that equipment sends to operating personnel.
Optionally, also include:Connecting gear, on the pedestal of test equipment, for transmitting solar components;Control Element, for controlling each cylinder and connecting gear to work;Detecting element, the detecting element set on the transfer mechanism, when After detecting element detects solar components, the detecting element sending signal control jacking cylinder is moved up, to inserting cylinder On magnet ring inductor is installed, test fixture is close to locating piece, when magnet ring inductor detects electrical connector and test fixture Electrical connector interface be located at same level height when, magnet ring inductor to control element sending signal control to insert cylinder to survey Trial work fills both sides horizontal movement, and achieve a butt joint action;After the completion of docking, magnet ring inductor sends connection and completes letter to control element Number, after control element receives signal, detector starts test;After the completion of test, magnet ring inductor sends survey to control element Examination completes signal, and control element control drives electrical connector to be separated with the interface of test fixture to inserting cylinder, detecting element detection To after component, sending signal control jacking cylinder is moved down.
Test fixture is fixed on the solar components back side, and the connecting line of test fixture is connected with solar components, When solar components are flowed on pedestal by connecting gear, after detecting element detects solar components, detecting element sends Signal, moves, in control element control jacking cylinder while the magnet ring inductor to inserting cylinder piston boom end detects electrical connection When part is located at same level height with the electrical connector interface of test fixture, magnet ring inductor sends signal to control element, control System achieves a butt joint to inserting electrical connector socket horizontal movement of the cylinder to test fixture both sides;After the completion of docking, magnet ring inductor Signal is sent to control element, detector starts test.After measuring related data, magnet ring inductor sends test and completes signal, Electrical connector is driven to be separated with the electrical connector interface of test fixture to inserting cylinder.The automatic technical scheme to inserting is reduced manually Cargo handling operation, reduces the working strength of staff, additionally, improve the productive temp of streamline.
Optionally, the test fixture includes:There is electrical connector to connect for test fixture main body, the both sides of the test fixture Mouthful;Test electrode, the test electrode is fixed in test fixture main body by fastener, and described test electrode one end has company Wiring, for being electrically connected with solar components;Guide holder, has pilot hole on the guide holder, the pilot hole is used to power Connector is electrically connected by realizing with the interface of test fixture.When being completed to inserting, the electrical connector is through pilot hole and tests The electrical connector interface connection of frock both sides.
Optionally, the test fixture main body is provided with groove, and described test electrode one end is arranged in groove, the survey The examination electrode other end has a draw-in groove, and described connecting line one end is stretched into draw-in groove and is connected with electrode is tested, the other end and solar components Connection.Connecting line is used for connecting test frock and solar components, before solar components inflow equipment, by connecting line and too Positive energy component electrical connection.
Optionally, also including manipulator, the manipulator is fixed on the end to inserting cylinder piston rod, the mechanical handbag Two lead columns are included, the gathering sill that power supply connector is passed through is provided between two lead columns, under mated condition, the electrical connection Part is connected through gathering sill with the electrical connector interface of test fixture.During docking, manipulator passes through guide holder, electrical connector to pass through Pilot hole in guide holder, lead column is divided into the first lead column and the second lead column, and during docking, the first lead column passes through guide holder Afterwards, the location hole on insertion test electrode.Realize electrical connector with electrical connector socket by shaping-orientation post and guide holder It is accurately positioned, increases the service life of electrical connector, reduces the use cost of equipment.
Optionally, also include:Slide rail, the slide rail is arranged on pedestal;Base, jacking cylinder is arranged on base;Bottom Seat locking device, is arranged on the two ends of base, and sliding block is fixed by fixture with base, and the sliding block is slidably matched with slide rail, Sliding block is connected with base locking device.
Slide rail is screwed on pedestal, and sliding block is slidably matched with slide rail.Under base locking device open mode, Base can be moved on slide rail, and under base locking device lock-out state, base is relatively fixed with slide rail.Base is on slide rail Mobile purpose is to realize the test of different size component.
Optionally, the connecting gear includes:Support;Conveyer belt, the conveyer belt is rotatably installed on runner, for defeated Sending component;Motor, for driving conveyer belt to rotate.
Optionally, the fastener is screw or bolt.
Optionally, the locating piece has adpting flange, and the adpting flange coordinates with the bottom of test fixture.Connection method Orchid is arranged on the end of jacking cylinder piston bar, and the effect of locating piece is to play support, the positioning action to solar components.
The beneficial effects of the invention are as follows:It is automatic right to be realized using the solar components power test equipment of the technical program Insert, so as to reduce operating personnel, improve the automaticity of equipment, it is also possible to reduce high light that equipment sends to operation The injury of personnel.
Brief description of the drawings:
Fig. 1 is the schematic diagram of solar components power test equipment of the present invention;
Fig. 2 is the explosive view of test fixture;
Fig. 3 is the partial schematic diagram of solar components power apparatus base of the present invention and electrical connector.
Each reference is in figure:
1st, test fixture;2nd, solar components;3rd, manipulator;4th, jacking cylinder;5th, to inserting cylinder;6th, electrical connector;7、 Locating piece;8th, pedestal;9th, detecting element;10th, base locking device;11st, test fixture main body;12nd, electrical connector interface;13、 Test electrode;14th, guide holder;15th, pilot hole;16th, groove;17th, draw-in groove;19th, location hole;31st, gathering sill;32nd, first it is oriented to Post;33rd, the second lead column;34th, connecting gear.
Specific embodiment:
With reference to each accompanying drawing, the present invention is described in detail.
As shown in FIG. 1 to 3:A kind of solar components power test equipment, including:
Test fixture 1, the test fixture 1 is fixed on solar components 2, and test fixture 1 is electrically connected with solar components 2 Connect, the both sides of the test fixture 1 have electrical connector interface 12;
Pedestal 8, is provided with two groups of jacking cylinders 4 on the pedestal 8, the end of the piston rod of the jacking cylinder 4 is provided with To inserting cylinder 5, electrical connector 6 is installed on the described pair of piston rod of slotting cylinder 5, one end of the electrical connector 6 is used for and survey Trial work fills 1 corresponding electrical connector interface 12 and connects, and the other end is used to be electrically connected with detection main frame;
Locating piece 7, the locating piece 7 is arranged between two groups of jacking cylinders 4, and the bottom of the locating piece 7 is provided with jacking Cylinder 4, has connecting portion on the locating piece 7, for coordinating with the bottom of test fixture 1.
Can be realized automatically to inserting, so as to reduce operation people using the power test equipment of solar components 2 of the technical program Member, improves the automaticity of equipment, it is also possible to reduce the injury of high light that equipment sends to operating personnel.
In the present embodiment, also include:Connecting gear 34, on the pedestal 8 of test equipment, for transmitting solar energy Component 2;Control element, for controlling each cylinder and connecting gear 34 to work;Detecting element 9, the detecting element 9 is arranged on On connecting gear 34, after detecting element 9 detects solar components 2, the sending signal of the detecting element 9 control jacking cylinder 4 are moved up, and magnet ring inductor is provided with cylinder 5 to inserting, and test fixture 1 is close to locating piece 7, when the detection of magnet ring inductor When being located at same level height with the electrical connector interface 12 of test fixture 1 to electrical connector 6, magnet ring inductor is to control element To inserting cylinder 5 to the both sides horizontal movement of test fixture 1, achieve a butt joint action for sending signal control;After the completion of docking, magnet ring sensing Device sends connection and completes signal to control element, and after control element receives signal, detector starts test;After the completion of test, Magnet ring inductor sends test and completes signal to control element, and control element control drives electrical connector 6 with test to inserting cylinder 5 The interface of frock 1 is separated, and after detecting element 9 detects component, sending signal control jacking cylinder 4 is moved down.
Test fixture 1 is fixed on the back side of solar components 2, and the connecting line of test fixture 1 is connected with solar components 2 Connect, when solar components 2 are flowed on pedestal 8 by connecting gear 34, after detecting element 9 detects solar components 2, detection The sending signal of element 9, moves in control element control jacking cylinder 4, while the magnet ring inductor inspection to inserting the piston rod end of cylinder 5 When measuring the electrical connector interface 12 of electrical connector 6 and test fixture 1 positioned at same level height, magnet ring inductor is to control unit Part sends signal, and control achieves a butt joint to inserting the socket horizontal movement of electrical connector 6 of the cylinder 5 to the both sides of test fixture 1;Docking After the completion of, magnet ring inductor sends signal to control element, and detector starts test.After measuring related data, magnet ring inductor Send test and complete signal, drive electrical connector 6 to be separated with the electrical connector interface 12 of test fixture 1 to inserting cylinder 5.It is automatic right Slotting technical scheme reduces manual work link, reduces the working strength of staff, additionally, improve the life of streamline Produce beat.
In the present embodiment, the test fixture 1 includes:Test fixture main body 11, the both sides of the test fixture 1 have Electrical connector interface 12;Test electrode 13, the test electrode 13 is fixed in test fixture main body 11 by fastener, described Test electrode 13 one end has connecting line, for being electrically connected with solar components 2;Guide holder 14, has on the guide holder 14 Pilot hole 15, the pilot hole 15 is electrically connected by realizing for connector 6 of powering with the interface of test fixture 1.To inserting completion When, the electrical connector 6 is connected through pilot hole 15 with the electrical connector interface 12 of the both sides of test fixture 1.
In the present embodiment, the test fixture main body 11 is provided with groove 16, and described test electrode 13 one end is arranged on In groove 16, the test other end of electrode 13 has draw-in groove 17, and draw-in groove 17 is stretched into test electrode 13 in described connecting line one end Connection, the other end is connected with solar components 2.Connecting line is used for connecting test frock 1 and solar components 2, in solar energy group Before the inflow equipment of part 2, connecting line is electrically connected with solar components 2.
In the present embodiment, also including manipulator 3, the manipulator 3 is fixed on the end to inserting the piston rod of cylinder 5, institute Stating manipulator 3 includes two lead columns, and the gathering sill 31 that power supply connector 6 is passed through is provided between two lead columns, docks shape Under state, the electrical connector 6 is connected through gathering sill 31 with the electrical connector interface 12 of test fixture 1.During docking, manipulator 3 Through guide holder 14, through the pilot hole 15 in guide holder 14, lead column is divided into the first lead column 32 and second leads electrical connector 6 To post 33, during docking, after the first lead column 32 passes through guide holder 14, the location hole 19 on insertion test electrode 13.By design Lead column and guide holder 14 realize being accurately positioned for electrical connector 6 and the socket of electrical connector 6, increase the use longevity of electrical connector 6 Life, reduces the use cost of equipment.
In the present embodiment, also include:Slide rail, the slide rail is arranged on pedestal 8;Base, jacking cylinder 4 is arranged on bottom On seat;Base locking device 10, is arranged on the two ends of base, and sliding block, the sliding block and slide rail are fixed by fixture with base It is slidably matched, sliding block is connected with base locking device 10.
Slide rail is screwed on pedestal 8, and sliding block is slidably matched with slide rail.In the open mode of base locking device 10 Under, base can be moved on slide rail, and under the lock-out state of base locking device 10, base is relatively fixed with slide rail.Base exists The purpose moved on slide rail is to realize the test of different size component.
In the present embodiment, the connecting gear 34 includes:Support;Conveyer belt, the conveyer belt is rotatably installed in runner On, for conveying assembly;Motor, for driving conveyer belt to rotate.
In the present embodiment, the fastener is screw or bolt.
In the present embodiment, the locating piece 7 has adpting flange, and the adpting flange is matched somebody with somebody with the bottom of test fixture 1 Close.Adpting flange is arranged on the end of the piston rod of jacking cylinder 4, and the effect of locating piece 7 is to play the branch to solar components 2 Support, positioning action.
The preferred embodiments of the present invention are the foregoing is only, not thereby scope of patent protection of the invention is limited, it is all It is the equivalent structure transformation made with description of the invention and accompanying drawing content, is directly or indirectly used in other related technologies Field, similarly includes within the scope of the present invention.

Claims (9)

1. a kind of solar components power test equipment, it is characterised in that including:
Test fixture, the test fixture is fixed on solar components, and test fixture is electrically connected with solar components, the survey Trial work dress both sides have electrical connector interface;
Pedestal, is provided with two groups of jacking cylinders on the pedestal, the end of the jacking cylinder piston bar is provided with to inserting cylinder, Electrical connector is installed, one end of the electrical connector is used for electricity corresponding with test fixture on the described pair of piston rod of slotting cylinder Connector interface is connected, and the other end is used to be electrically connected with detection main frame;
Locating piece, the locating piece is arranged between two groups of jacking cylinders, and the locating piece bottom is provided with jacking cylinder, described There is connecting portion, for coordinating with test fixture bottom on locating piece.
2. solar components power test equipment as claimed in claim 1, it is characterised in that also include:
Connecting gear, on the pedestal of test equipment, for transmitting solar components;
Control element, for controlling each cylinder and connecting gear to work;
Detecting element, the detecting element is set on the transfer mechanism, after detecting element detects solar components, the inspection Survey element sending signal control jacking cylinder to move up, to being provided with magnet ring inductor, test fixture and positioning on slotting cylinder Block is close to, when magnet ring inductor detects electrical connector is located at same level height with the electrical connector interface of test fixture, Magnet ring inductor is controlled to inserting cylinder to the horizontal movement of test fixture both sides to control element sending signal, and achieve a butt joint action; After the completion of docking, magnet ring inductor sends connection and completes signal to control element, and after control element receives signal, detector starts Test;After the completion of test, magnet ring inductor sends test and completes signal to control element, and control element control is to inserting cylinder band Dynamic electrical connector is separated with the interface of test fixture, and after detecting element detects component, sending signal control jacking cylinder is downward It is mobile.
3. solar components power test equipment as claimed in claim 1, it is characterised in that the test fixture includes:
Test fixture main body, the both sides of the test fixture have electrical connector interface;
Test electrode, the test electrode is fixed in test fixture main body by fastener, and described test electrode one end has Connecting line, for being electrically connected with solar components;
Guide holder, has pilot hole on the guide holder, the pilot hole is used to power connector by realization and test fixture Electrical connection.
4. solar components power test equipment as claimed in claim 1, it is characterised in that set in the test fixture main body Fluted, described test electrode one end is arranged in groove, and the test electrode other end has draw-in groove, described connecting line one end Stretch into draw-in groove to be connected with test electrode, the other end is connected with the interface of solar components.
5. solar components power test equipment as claimed in claim 1, it is characterised in that also including manipulator, the machine Tool hand is fixed on the end to inserting cylinder piston rod, and the manipulator includes two lead columns, is provided between two lead columns The gathering sill that power supply connector is passed through, under mated condition, the electrical connector passes through the electrical connector of gathering sill and test fixture Interface is connected.
6. solar components power test equipment as claimed in claim 1, it is characterised in that also include:
Slide rail, the slide rail is arranged on pedestal;
Base, jacking cylinder is arranged on base;
Base locking device, is arranged on the two ends of base, and sliding block is fixed by fixture with base, and the sliding block is slided with slide rail Coordinate, sliding block is connected with base locking device.
7. solar components power test equipment as claimed in claim 1, it is characterised in that the connecting portion of the locating piece is Adpting flange, the adpting flange coordinates with the bottom of test fixture.
8. solar components power test equipment as claimed in claim 2, it is characterised in that the connecting gear includes:
Support;
Conveyer belt, the conveyer belt is rotatably installed on runner, for conveying assembly;
Motor, for driving conveyer belt to rotate.
9. solar components power test equipment as claimed in claim 3, it is characterised in that the fastener is screw.
CN201710267149.XA 2017-04-21 2017-04-21 Solar components power test equipment Active CN106877817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710267149.XA CN106877817B (en) 2017-04-21 2017-04-21 Solar components power test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710267149.XA CN106877817B (en) 2017-04-21 2017-04-21 Solar components power test equipment

Publications (2)

Publication Number Publication Date
CN106877817A true CN106877817A (en) 2017-06-20
CN106877817B CN106877817B (en) 2019-08-27

Family

ID=59163731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710267149.XA Active CN106877817B (en) 2017-04-21 2017-04-21 Solar components power test equipment

Country Status (1)

Country Link
CN (1) CN106877817B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108490381A (en) * 2018-02-06 2018-09-04 国网浙江杭州市富阳区供电有限公司 A kind of ammeter detection device and its detection method
CN111863647A (en) * 2019-04-28 2020-10-30 汉能移动能源控股集团有限公司 Power detection device
CN112737502A (en) * 2020-11-24 2021-04-30 晶澳(邢台)太阳能有限公司 Production equipment of solar cell module and volt-ampere characteristic testing method
WO2021128664A1 (en) * 2019-12-23 2021-07-01 深圳市佛光照明有限公司 Display device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699221A (en) * 2012-06-19 2012-10-03 河北工业大学 Loading and unloading manipulator
CN102778637A (en) * 2011-05-10 2012-11-14 苏州晟成新能源科技有限公司 Tester of photovoltaic assembly
DE102014206412A1 (en) * 2014-04-03 2015-10-08 Siemens Aktiengesellschaft Device for receiving a test object, arrangement and method for testing a test object
CN106093667A (en) * 2016-08-11 2016-11-09 许继集团有限公司 Header box automatic matching test system and test fixture thereof
CN206712748U (en) * 2017-04-21 2017-12-05 浙江隆基乐叶光伏科技有限公司 Solar components power test equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102778637A (en) * 2011-05-10 2012-11-14 苏州晟成新能源科技有限公司 Tester of photovoltaic assembly
CN102699221A (en) * 2012-06-19 2012-10-03 河北工业大学 Loading and unloading manipulator
DE102014206412A1 (en) * 2014-04-03 2015-10-08 Siemens Aktiengesellschaft Device for receiving a test object, arrangement and method for testing a test object
CN106093667A (en) * 2016-08-11 2016-11-09 许继集团有限公司 Header box automatic matching test system and test fixture thereof
CN206712748U (en) * 2017-04-21 2017-12-05 浙江隆基乐叶光伏科技有限公司 Solar components power test equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108490381A (en) * 2018-02-06 2018-09-04 国网浙江杭州市富阳区供电有限公司 A kind of ammeter detection device and its detection method
CN108490381B (en) * 2018-02-06 2023-09-29 国网浙江杭州市富阳区供电有限公司 Ammeter detection device and detection method thereof
CN111863647A (en) * 2019-04-28 2020-10-30 汉能移动能源控股集团有限公司 Power detection device
WO2021128664A1 (en) * 2019-12-23 2021-07-01 深圳市佛光照明有限公司 Display device
CN112737502A (en) * 2020-11-24 2021-04-30 晶澳(邢台)太阳能有限公司 Production equipment of solar cell module and volt-ampere characteristic testing method

Also Published As

Publication number Publication date
CN106877817B (en) 2019-08-27

Similar Documents

Publication Publication Date Title
CN106877817A (en) Solar components power test equipment
CN108772308A (en) A kind of high-efficiency power adapter testing automatic material-feeding equipment
CN208840014U (en) A kind of high-efficiency power adapter testing automatic material-feeding equipment
CN108689111A (en) A kind of power supply adaptor test automatic charging equipment
CN208603251U (en) Automatic charging equipment is used in a kind of test of power supply adaptor
CN105562938A (en) Charger autotest and laser carving production line
CN107248686A (en) A kind of panel jack automatic assembling machine
CN108421725A (en) The automatic electric logging equipments of PCB
CN106785797A (en) USB joint automatic assembling and test system
CN205464825U (en) Charger automatic testing and radium carving production line
CN110370020A (en) A kind of Intelligent assembly production line
CN206834491U (en) Multi-functional cable assembles device
CN206712748U (en) Solar components power test equipment
CN103894806B (en) Automatic lifting horizontal sliding rotary work station
CN205406549U (en) EL detection device and automatic stringer
CN205880071U (en) Full -automatic power cord comprehensive test machine
CN205739442U (en) A kind of automotive trim panel detection pipeline system
CN206370234U (en) A kind of experimental bench based on robot
CN105805509B (en) Electric power network X-ray production apparatus wireless remote control digital control lifting bar apparatus
CN104808026A (en) Transport mechanism capable of rising and falling
CN207117573U (en) A kind of difunctional on-line detection device of defects for photovoltaic plant battery component
CN211740276U (en) Mobile phone screen detection device
CN105618893B (en) Cylinder and its lid arc welding equipment
CN110064714A (en) A kind of optical assembly pin bending and molding device
CN206505142U (en) Connector automatic test machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 324022, No. 2, bailing Road, Donggang Industrial Development Zone, Quzhou Economic Development Zone, Zhejiang, Quzhou

Applicant after: Zhejiang long base music Photovoltaic Technology Co., Ltd.

Address before: Braun road 324000 Zhejiang city of Quzhou province Donggang Development Zone No. 2

Applicant before: Zhejiang Leye Photovoltaic Science & Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant