CN106875111A - Project of transmitting and converting electricity cost Whole Course Management platform - Google Patents

Project of transmitting and converting electricity cost Whole Course Management platform Download PDF

Info

Publication number
CN106875111A
CN106875111A CN201710072319.9A CN201710072319A CN106875111A CN 106875111 A CN106875111 A CN 106875111A CN 201710072319 A CN201710072319 A CN 201710072319A CN 106875111 A CN106875111 A CN 106875111A
Authority
CN
China
Prior art keywords
data
cost
project
management
transmitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710072319.9A
Other languages
Chinese (zh)
Inventor
孔军
张宇蓉
张吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Taizhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN201710072319.9A priority Critical patent/CN106875111A/en
Publication of CN106875111A publication Critical patent/CN106875111A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of project of transmitting and converting electricity cost Whole Course Management platform, including cost process data and data management;Cost Index is managed;Cost is counted.Application of the invention can realize project of transmitting and converting electricity cost overall process data and Data Collection and analysis information system management, optimize cost management model, lift Cost Management operating efficiency and quality;Can realize that project of transmitting and converting electricity Cost Index intellectualityization is made a report on and net annual analysis of prices Data Collection needs with analysis, adaptation state, lifting Cost Index is collected and makes a report on operating efficiency, mitigation technical economy person works' amount.

Description

Project of transmitting and converting electricity cost Whole Course Management platform
Technical field
The present invention relates to a kind of project of transmitting and converting electricity cost Whole Course Management platform, belong to field of power.
Background technology
Due to lacking a Whole Course Management platform in the middle of project of transmitting and converting electricity cost Whole Course Management process, make power transmission and transformation Engineering Cost Management can not accomplish regulation and standardization and specialization.The research and development for carrying out project of transmitting and converting electricity Cost Management are conducive to Strengthen preliminary design review management, scientific arrangement evaluation plan improves preliminary design evaluation integral level;Be conducive to strengthening construction comprehensively Figure budget management, promotes 13 period working drawing budget management works to implement in full, efficiently carry out;Be conducive to further reinforcement Engineering Settlement is managed, and actively carries out Process of Engineering Construction clearing, in-depth Engineering Settlement management;By deepening project of transmitting and converting electricity cost Analysis and research, carry out transverse and longitudinal research, enrich analysis of prices content, are conducive to being carried for the cost management and control of similar projects from now on works For instructing;By improving quota management and charge standard, valuating basis and mark are improved in strengthened research " threeway one is marked ", lasting revision It is accurate;Be conducive to tamping the technical economy fundamentals of management, strengthen technical economy troop and service supporting capacity construction, cost is lifted with information-based means Management and control effect.
The content of the invention
The purpose of the present invention is directed to a kind of not enough project of transmitting and converting electricity cost Whole Course Management platform of offer of prior art.
The technical scheme that project of transmitting and converting electricity cost Whole Course Management platform of the present invention is taken is as follows:
(1)The technology path that the platform construction is taken is:Developed using webstarter2.1 platforms, front end uses Myfaces2.0+primeface5.1 are developed;The overall situation realizes data Layer using CommonObject universal model components Operation, all configurations are realized by configuration component and registry module;Database uses MySql 5.5.38;
( 2)The platform Cost System is broadly divided into 4 modules:Project/data management, Cost Index, the analysis of prices and configuration Management.Whole system is operated in Tomcat services, and less, database uses MySQL to the annual data volume of client;
(3)Management of the platform to project of transmitting and converting electricity cost overall process:
1)Cost process data and data management
Realize the centralized and unified management of project of transmitting and converting electricity cost overall process data and data, including basic data and data management, Process of construction management, management of being completed, including:
(A)Basic data and data management
Realize investment planning stage, feasibility study estimating stage, preliminary design budgetary estimate stage, working drawing budget stage, bidding stage data Report and submit and confirm, the concentration of optimized integration data, unified management:
Planning data and data:Project normative document, general item investment;Application for developing:Feasibility study reply file, feasibility study approximate of the cost, Feasibility study static investment, feasibility study dynamic investment;The preliminary design stage:Preliminary design reply file, reply bill of approximate estimate, budgetary estimate static investment, budgetary estimate Dynamic investment;The working drawing budget stage:Design of Construction Organization, working drawing budget data, budget static investment, budget are dynamically thrown Money;Bidding stage:Bidding document, bid contrul valency, offer by tender(Acceptance of the bid), notice on bid winning.
(B)Process of construction is managed
Realize reporting and submitting and confirming for data during electricity transmitting and converting construction, including change data, visa data, branch's clearing money Material.
Change data:Modification information(General change/major change), modification application table, change examination and approval document, change expense; Visa data:Visa contact list, visa process list, fee for a visa;Branch's settlement information:Submit to a higher level for approval or revision branch clearing book, authorization branch Careful opinion in clearing book, branch's clearing.
(C)It is completed and manages
Realize that project of transmitting and converting electricity final account for completed project, financial final accounts data are reported and submitted and confirmed;Final account for completed project data and data:Be completed knot Calculate report, completion examination and approval document, final account for completed project static investment;Financial final accounts data and data:Without clear and definite data and list.
2) Cost Index management
According to data and data that cost overall process is reported and submitted, valency index selection path and verification rule are built, realize that cost refers to Target is made a report on automatically, and as requested, outputting standard form form, auxiliary is carried out Cost Index and collects and make a report on work.
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget are examined Situation, the statistics of process of construction cost condition are looked into analysis.
3)Cost is counted
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget examine feelings Condition, the statistics of process of construction cost condition and analysis.
Beneficial effects of the present invention:The application of platform of the present invention can realize project of transmitting and converting electricity cost overall process data And Data Collection and analysis information system management, optimize cost management model, lift Cost Management operating efficiency and quality;Can be real Existing project of transmitting and converting electricity Cost Index intellectualityization is made a report on and nets annual analysis of prices Data Collection needs, lifting with analysis, adaptation state Cost Index is collected and makes a report on operating efficiency, mitigates technical economy person works amount.
Specific embodiment
The technical scheme that project of transmitting and converting electricity cost Whole Course Management platform of the present invention is taken is as follows:
(1)The technology path that the platform construction is taken is:Developed using webstarter2.1 platforms, front end uses Myfaces2.0+primeface5.1 are developed;The overall situation realizes data Layer using CommonObject universal model components Operation, all configurations are realized by configuration component and registry module;Database uses MySql 5.5.38;
( 2)The platform Cost System is broadly divided into 4 modules:Project/data management, Cost Index, the analysis of prices and configuration Management.Whole system is operated in Tomcat services, and less, database uses MySQL to the annual data volume of client;
(3)Management of the platform to project of transmitting and converting electricity cost overall process:
1)Cost process data and data management
Realize the centralized and unified management of project of transmitting and converting electricity cost overall process data and data, including basic data and data management, Process of construction management, management of being completed, including:
(A)Basic data and data management
Realize investment planning stage, feasibility study estimating stage, preliminary design budgetary estimate stage, working drawing budget stage, bidding stage data Report and submit and confirm, the concentration of optimized integration data, unified management:
Planning data and data:Project normative document, general item investment;Application for developing:Feasibility study reply file, feasibility study approximate of the cost, Feasibility study static investment, feasibility study dynamic investment;The preliminary design stage:Preliminary design reply file, reply bill of approximate estimate, budgetary estimate static investment, budgetary estimate Dynamic investment;The working drawing budget stage:Design of Construction Organization, working drawing budget data, budget static investment, budget are dynamically thrown Money;Bidding stage:Bidding document, bid contrul valency, offer by tender(Acceptance of the bid), notice on bid winning.
(B)Process of construction is managed
Realize reporting and submitting and confirming for data during electricity transmitting and converting construction, including change data, visa data, branch's clearing money Material.
Change data:Modification information(General change/major change), modification application table, change examination and approval document, change expense; Visa data:Visa contact list, visa process list, fee for a visa;Branch's settlement information:Submit to a higher level for approval or revision branch clearing book, authorization branch Careful opinion in clearing book, branch's clearing.
(C)It is completed and manages
Realize that project of transmitting and converting electricity final account for completed project, financial final accounts data are reported and submitted and confirmed;Final account for completed project data and data:Be completed knot Calculate report, completion examination and approval document, final account for completed project static investment;Financial final accounts data and data:Without clear and definite data and list.
2) Cost Index management
According to data and data that cost overall process is reported and submitted, valency index selection path and verification rule are built, realize that cost refers to Target is made a report on automatically, and as requested, outputting standard form form, auxiliary is carried out Cost Index and collects and make a report on work.
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget are examined Situation, the statistics of process of construction cost condition are looked into analysis.
3)Cost is counted
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget examine feelings Condition, the statistics of process of construction cost condition and analysis.

Claims (1)

1. a kind of project of transmitting and converting electricity cost Whole Course Management platform, it is characterised in that:
The technical scheme that the project of transmitting and converting electricity cost Whole Course Management platform is taken is as follows:
(1)The technology path that the platform construction is taken is:Developed using webstarter2.1 platforms, front end uses Myfaces2.0+primeface5.1 are developed;The overall situation realizes data Layer using CommonObject universal model components Operation, all configurations are realized by configuration component and registry module;Database uses MySql 5.5.38;
( 2)The platform Cost System is broadly divided into 4 modules:Project/data management, Cost Index, the analysis of prices and configuration Management;
Whole system is operated in Tomcat services, and less, database uses MySQL to the annual data volume of client;
(3)Management of the platform to project of transmitting and converting electricity cost overall process:
1)Cost process data and data management
Realize the centralized and unified management of project of transmitting and converting electricity cost overall process data and data, including basic data and data management, Process of construction management, management of being completed, including:
(A)Basic data and data management
Realize investment planning stage, feasibility study estimating stage, preliminary design budgetary estimate stage, working drawing budget stage, bidding stage data Report and submit and confirm, the concentration of optimized integration data, unified management:
Planning data and data:Project normative document, general item investment;Application for developing:Feasibility study reply file, feasibility study approximate of the cost, Feasibility study static investment, feasibility study dynamic investment;The preliminary design stage:Preliminary design reply file, reply bill of approximate estimate, budgetary estimate static investment, budgetary estimate Dynamic investment;The working drawing budget stage:Design of Construction Organization, working drawing budget data, budget static investment, budget are dynamically thrown Money;Bidding stage:Bidding document, bid contrul valency, offer by tender(Acceptance of the bid), notice on bid winning;
(B)Process of construction is managed
Realize reporting and submitting and confirming for data during electricity transmitting and converting construction, including change data, visa data, branch's clearing money Material;
Change data:Modification information(General change/major change), modification application table, change examination and approval document, change expense;Visa Data:Visa contact list, visa process list, fee for a visa;Branch's settlement information:Submit to a higher level for approval or revision branch clearing book, authorization branch clearing Careful opinion in book, branch's clearing;
(C)It is completed and manages
Realize that project of transmitting and converting electricity final account for completed project, financial final accounts data are reported and submitted and confirmed;Final account for completed project data and data:Be completed knot Calculate report, completion examination and approval document, final account for completed project static investment;Financial final accounts data and data:Without clear and definite data and list;
2) Cost Index management
According to data and data that cost overall process is reported and submitted, valency index selection path and verification rule are built, realize that cost refers to Target is made a report on automatically, and as requested, outputting standard form form, auxiliary is carried out Cost Index and collects and make a report on work;
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget examine feelings Condition, the statistics of process of construction cost condition and analysis;
3)Cost is counted
According to the cost overall process data collected, realize that each stage key fee item of project of transmitting and converting electricity, working drawing budget examine feelings Condition, the statistics of process of construction cost condition and analysis.
CN201710072319.9A 2017-02-10 2017-02-10 Project of transmitting and converting electricity cost Whole Course Management platform Pending CN106875111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710072319.9A CN106875111A (en) 2017-02-10 2017-02-10 Project of transmitting and converting electricity cost Whole Course Management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072319.9A CN106875111A (en) 2017-02-10 2017-02-10 Project of transmitting and converting electricity cost Whole Course Management platform

Publications (1)

Publication Number Publication Date
CN106875111A true CN106875111A (en) 2017-06-20

Family

ID=59166016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710072319.9A Pending CN106875111A (en) 2017-02-10 2017-02-10 Project of transmitting and converting electricity cost Whole Course Management platform

Country Status (1)

Country Link
CN (1) CN106875111A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977717A (en) * 2017-11-24 2018-05-01 国网内蒙古东部电力有限公司 A kind of grid maintenance project cost difference automatic adjusting method
CN108256821A (en) * 2017-12-14 2018-07-06 中国航空规划设计研究总院有限公司 A kind of management method of construction project overall process various dimensions cost management system
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN110135874A (en) * 2018-02-08 2019-08-16 国网山东省电力公司滨州供电公司 Power transmission and transformation Whole Process Cost method
CN110570121A (en) * 2019-09-10 2019-12-13 南宁职业技术学院 engineering cost progress management device
CN110659878A (en) * 2019-09-20 2020-01-07 国网上海市电力公司 Power transmission and transformation project cost supervises detecting system
CN110859424A (en) * 2019-11-26 2020-03-06 浙江求真工程管理咨询有限公司 Full life cycle engineering cost management method
CN111738760A (en) * 2020-06-19 2020-10-02 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Power grid cost overall process management system
CN112036815A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Method for establishing power distribution network engineering cost index system
CN113743990A (en) * 2021-09-03 2021-12-03 国网经济技术研究院有限公司 Multidimensional analysis method for power distribution network engineering cost

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107977717A (en) * 2017-11-24 2018-05-01 国网内蒙古东部电力有限公司 A kind of grid maintenance project cost difference automatic adjusting method
CN108256821A (en) * 2017-12-14 2018-07-06 中国航空规划设计研究总院有限公司 A kind of management method of construction project overall process various dimensions cost management system
CN110135874A (en) * 2018-02-08 2019-08-16 国网山东省电力公司滨州供电公司 Power transmission and transformation Whole Process Cost method
CN108921508A (en) * 2018-06-23 2018-11-30 广东人信工程咨询有限公司 Overall process Engineering Cost Management system
CN110570121A (en) * 2019-09-10 2019-12-13 南宁职业技术学院 engineering cost progress management device
CN110659878A (en) * 2019-09-20 2020-01-07 国网上海市电力公司 Power transmission and transformation project cost supervises detecting system
CN110859424A (en) * 2019-11-26 2020-03-06 浙江求真工程管理咨询有限公司 Full life cycle engineering cost management method
CN111738760A (en) * 2020-06-19 2020-10-02 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Power grid cost overall process management system
CN112036815A (en) * 2020-08-20 2020-12-04 湖北四位元电力有限公司 Method for establishing power distribution network engineering cost index system
CN113743990A (en) * 2021-09-03 2021-12-03 国网经济技术研究院有限公司 Multidimensional analysis method for power distribution network engineering cost

Similar Documents

Publication Publication Date Title
CN106875111A (en) Project of transmitting and converting electricity cost Whole Course Management platform
CN104850940A (en) Completion settlement making method and completion settlement making system based on project whole-process management
CN106557857A (en) Project of transmitting and converting electricity amount bill compilation and pricing method
CN107423917A (en) Construction project cost auditing system based on big data
CN101377844A (en) System and method for discharge of debt
KR20200033074A (en) Business improvement device and method through the optimal layout system of renewable energy power generation facilities with converting structure of project cost to resident participation amount
Tian et al. Water rights trading: A new approach to dealing with trans-boundary water conflicts in river basins
CN101877104A (en) Taxation service function system based on online banking and running method thereof
CN102063687A (en) Credit business processing method based on credit business levying system
Anghel et al. Analysis of the effect of accessing the Community funds for financing investments on Romania’s economic growth
CN111861543A (en) Method and device for calculating and allocating double-track unbalance expense of plan and market
Windisch et al. Supply chain management application for forest fuel procurement-cost or benefit?
CN201622652U (en) Taxation service system based on online banking
Harutyunyan Alternative partnership models for water governance: a case study in Armenia
Cham The Philippine power sector: issues and solutions
Pirvu et al. Implications of the introduction of the Common Consolidated Corporate tax Base for tax revenues in Romania
UNICEF Sanitation and water for all
Hirn Private sector participation in the ugandan water sector: A review of ten years of private management of small town water systems
CN108764816A (en) Petty cash line closed loop management method
Chen An enquiry into Investment Control of Engineering Projects
Yu et al. Investment decision model of wastewater treatment public–private partnership projects based on value for money
Rentschler et al. Principles for designing effective fossil fuel subsidy reforms
Li Discussion on Design Control and Management of Construction Cost
CN108846624A (en) Immediately reimbursement closed-loop management method
JP2006119783A (en) Fluidization business proxy system for bulk factoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170620