CN106870024A - 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法 - Google Patents

燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法 Download PDF

Info

Publication number
CN106870024A
CN106870024A CN201710197445.7A CN201710197445A CN106870024A CN 106870024 A CN106870024 A CN 106870024A CN 201710197445 A CN201710197445 A CN 201710197445A CN 106870024 A CN106870024 A CN 106870024A
Authority
CN
China
Prior art keywords
heating
coal
primary frequency
frequency modulation
steam turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710197445.7A
Other languages
English (en)
Other versions
CN106870024B (zh
Inventor
徐彤
刘金福
田雪沁
党东升
王新雷
程江南
万杰
宋崇明
李飞
罗家松
于达仁
黄宗宏
田星
董晓晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Xinrentong Technology Development Co ltd
Harbin Institute of Technology
State Grid Economic and Technological Research Institute
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Original Assignee
Harbin Zendroid Technology Development Co Ltd
Beijing Huajian Network Source Electric Power Design Institute
Harbin Institute of Technology
Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Zendroid Technology Development Co Ltd, Beijing Huajian Network Source Electric Power Design Institute, Harbin Institute of Technology, Economic and Technological Research Institute of State Grid Ningxia Electric Power Co Ltd filed Critical Harbin Zendroid Technology Development Co Ltd
Priority to CN201710197445.7A priority Critical patent/CN106870024B/zh
Publication of CN106870024A publication Critical patent/CN106870024A/zh
Application granted granted Critical
Publication of CN106870024B publication Critical patent/CN106870024B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D19/00Starting of machines or engines; Regulating, controlling, or safety means in connection therewith

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,涉及燃煤汽轮机发电机组采暖供热的一次调频能力补偿技术领域。本发明是为了解决目前燃煤汽轮机发电机组在汽轮机采暖供热的时候,机组一次调频能力也会改变的问题。本发明所述的燃煤汽轮机发电机组采暖供热的一次调频补偿方法,当汽轮机采暖供热后,针对性修改不等率设置,保证转速变化1%时,通过一次调频使发电功率变化20%。保证汽轮机在采暖供热后,燃煤汽轮机发电机组仍具有同样的一次调频能力。

Description

燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法
技术领域
本发明属于燃煤汽轮机发电机组采暖供热的一次调频能力补偿技术领域。
背景技术
近几年来,我国风电和光伏发电迅猛发展,随着国家推进能源结构转型升级,风电和光伏发电将继续保持着强劲的发展势头。然而,当风电、光伏比例较高时,等效负荷将呈现显著的随机波动特性,这将显著影响系统的频率安全,对系统的调频能力也提出了更高的要求。
燃煤汽轮机发电机组一次调频是当电网负荷发生变化时,汽轮机调节系统自动地根据转速的变化调整汽轮机的功率,进而将电网频率的变化限制在一定的限度内。燃煤汽轮机发电机组一次调频在保证电网的安全经济运行、提高电能质量和电网调频的控制水平、迅速消除由于电网负荷变化引起的频率波动等方面有着重要作用。
目前燃煤汽轮机发电机组一次调频因子设置的两个因素,频差死区和转速不等率都采用定值的方式,在汽轮机采暖供热的时候,这两个因素并不改变,在这种情况下,机组一次调频能力也会改变。
发明内容
本发明是为了解决目前燃煤汽轮机发电机组在汽轮机采暖供热的时候,机组一次调频能力也会改变的问题,现提供燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法。
燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,将汽轮机额定转速与实际转速的差值x经函数F(x)转换后生成一次调频因子K,
利用采暖期工况下采暖抽汽量GT、主蒸汽流量G与一次调频因子K,根据下式获得新的调频因子K*
其中,δ(GT,G)为不等率修正系数,由采暖期工况下采暖抽汽量GT、主蒸汽流量G决定,
将新的调频因子K*叠加到燃煤汽轮机的有功功率指令给定值M上,获得补偿后的有功功率指令以控燃煤制汽轮机的调门开度,完成燃煤汽轮机发电机组采暖供热的一次调频能力补偿。
采暖期工况下采暖抽汽量GT、主蒸汽流量G对一次调频的影响通过不等率修正系数δ(GT,G)进行补偿,不等率修正系数δ(GT,G)的获得方法如下:
进行参数测定试验,
将主蒸汽流量为G、采暖抽汽量为0时的燃煤汽轮机发电机组发电功率记为P0
相同工况下,将主蒸汽流量为G、采暖抽汽量为GT时的燃煤汽轮机发电机组发电功率记为P,
则不等率修正系数δ(GT,G)取:
不同的主蒸汽流量和采暖抽汽流量,对应不同的不等率修正系数δ(GT,G),取:
补偿后的有功功率指令的表达式如下:
本发明为了保证汽轮机采暖供热后,燃煤汽轮机发电机组仍具有同样的一次调频能力,提出了燃煤汽轮机发电机组采暖供热的一次调频补偿方法。该方法具有以下效果:
本发明所述的燃煤汽轮机发电机组采暖供热的一次调频补偿方法,当汽轮机采暖供热后,针对性修改不等率设置,保证转速变化1%时,通过一次调频使发电功率变化20%。保证汽轮机在采暖供热后,燃煤汽轮机发电机组仍具有同样的一次调频能力。
附图说明
图1为现有燃煤汽轮机发电机组一次调频设置流程图;
图2为本发明所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法流程图。
具体实施方式
如图1所示,目前,燃煤汽轮机发电机组一次调频功能是将汽轮机转速与额定转速的差值直接换算成调频后有功功率指令,具体的:
燃煤汽轮机额定转速(一般为3000r/min)与实际转速的差值x经函数F(x)转换后生成一次调频因子K,
函数F(x)的具体公式如下:
其中,del(x)表示x经过死区,δ为转速不等率。
将一次调频因子K直接叠加到燃煤汽轮机的有功功率指令给定值M上,获得调频后有功功率指令MK,以控制燃煤汽轮机的调门开度。
燃煤汽轮机发电机组一次调频功能,要求转速变化1%,通过一次调频要求发电功率变化20%。燃煤汽轮机发电机组一次调频不等率δ普遍设置为δ=0.05,在额定设计工况下,足以满足上述要求。但是,当汽轮机采暖供热后,不等率δ=0.05,不足以满足上述要求。
具体实施方式一:参照图2具体说明本实施方式,本实施方式所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,
利用采暖期工况下采暖抽汽量GT、主蒸汽流量G与一次调频因子K,根据下式获得新的调频因子K*
其中,δ(GT,G)为不等率修正系数,由采暖期工况下采暖抽汽量GT、主蒸汽流量G决定,
将新的调频因子K*叠加到燃煤汽轮机的有功功率指令给定值M上,获得补偿后的有功功率指令以控制燃煤汽轮机的调门开度。
本发明设计燃煤汽轮机发电机组采暖供热的一次调频补偿方法,当汽轮机采暖供热后,针对性修改不等率设置,保证转速变化1%时,通过一次调频使发电功率变化20%。
具体实施方式二:本实施方式是对具体实施方式一所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法作进一步说明,本实施方式中,
采暖期工况下采暖抽汽量GT、主蒸汽流量G对一次调频的影响通过不等率修正系数δ(GT,G)进行补偿,不等率修正系数δ(GT,G)的获得方法如下:
进行参数测定试验,
将主蒸汽流量为G、采暖抽汽量为0时的燃煤汽轮机发电机组发电功率记为P0
相同工况下,将主蒸汽流量为G、采暖抽汽量为GT时的燃煤汽轮机发电机组发电功率记为P,
则不等率修正系数δ(GT,G)取:
本实施方式中,不同的采暖期工况下采暖抽汽量GT、主蒸汽流量G,对应不同的不等率修正系数δ(GT,G),
取:
即可保证转速变化1%,通过一次调频使发电功率变化20%,保证燃煤汽轮机发电机组具有同样的一次调频能力。
具体实施方式三:本实施方式是对具体实施方式一所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法作进一步说明,本实施方式中,补偿后的有功功率指令的表达式如下:

Claims (3)

1.燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,将汽轮机额定转速与实际转速的差值x经函数F(x)转换后生成一次调频因子K,其特征在于,
利用采暖期工况下采暖抽汽量GT、主蒸汽流量G与一次调频因子K,根据下式获得新的调频因子K*
K * = K 1 δ Δ ( G T , G ) ,
其中,δ(GT,G)为不等率修正系数,由采暖期工况下采暖抽汽量GT、主蒸汽流量G决定,
将新的调频因子K*叠加到燃煤汽轮机的有功功率指令给定值M上,获得补偿后的有功功率指令以控燃煤制汽轮机的调门开度,完成燃煤汽轮机发电机组采暖供热的一次调频能力补偿。
2.根据权利要求1所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,其特征在于,采暖期工况下发电机功率P对一次调频的影响通过不等率修正系数δ(GT,G)进行补偿,不等率修正系数δ(GT,G)的获得方法如下:
进行参数测定试验,
将主蒸汽流量为G、采暖抽汽量为0时的燃煤汽轮机发电机组发电功率记为P0
相同工况下,将主蒸汽流量为G、采暖抽汽量为GT时的燃煤汽轮机发电机组发电功率记为P,
则不等率修正系数δ(GT,G)取:
δ Δ ( G T , G ) = P P 0 .
3.根据权利要求1所述的燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法,其特征在于,补偿后的有功功率指令的表达式如下:
M K * = M + K * .
CN201710197445.7A 2017-03-29 2017-03-29 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法 Active CN106870024B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710197445.7A CN106870024B (zh) 2017-03-29 2017-03-29 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710197445.7A CN106870024B (zh) 2017-03-29 2017-03-29 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法

Publications (2)

Publication Number Publication Date
CN106870024A true CN106870024A (zh) 2017-06-20
CN106870024B CN106870024B (zh) 2018-06-22

Family

ID=59159518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710197445.7A Active CN106870024B (zh) 2017-03-29 2017-03-29 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法

Country Status (1)

Country Link
CN (1) CN106870024B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107623327A (zh) * 2017-09-22 2018-01-23 国网山东省电力公司电力科学研究院 基于蒸汽焓降的发电机组一次调频动态补偿方法及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2285208A (en) * 1940-04-10 1942-06-02 Gen Electric Automatic turbine control system
JPS5820362B2 (ja) * 1979-06-20 1983-04-22 株式会社日立製作所 負荷制御装置
CN103089342A (zh) * 2011-11-04 2013-05-08 华北电力科学研究院有限责任公司 汽轮机及其调速系统模型参数修正方法
CN103412526A (zh) * 2013-07-12 2013-11-27 国家电网公司 一种供热机组在线负荷的调度方法与系统
CN105202519A (zh) * 2015-10-27 2015-12-30 国家电网公司 供热机组调频调峰全工况协调控制方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2285208A (en) * 1940-04-10 1942-06-02 Gen Electric Automatic turbine control system
JPS5820362B2 (ja) * 1979-06-20 1983-04-22 株式会社日立製作所 負荷制御装置
CN103089342A (zh) * 2011-11-04 2013-05-08 华北电力科学研究院有限责任公司 汽轮机及其调速系统模型参数修正方法
CN103412526A (zh) * 2013-07-12 2013-11-27 国家电网公司 一种供热机组在线负荷的调度方法与系统
CN105202519A (zh) * 2015-10-27 2015-12-30 国家电网公司 供热机组调频调峰全工况协调控制方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107623327A (zh) * 2017-09-22 2018-01-23 国网山东省电力公司电力科学研究院 基于蒸汽焓降的发电机组一次调频动态补偿方法及系统
CN107623327B (zh) * 2017-09-22 2019-09-10 国网山东省电力公司电力科学研究院 基于蒸汽焓降的发电机组一次调频动态补偿方法及系统

Also Published As

Publication number Publication date
CN106870024B (zh) 2018-06-22

Similar Documents

Publication Publication Date Title
CN108708775B (zh) 基于热电负荷转换模型的热电联产机组快速变负荷控制方法
CN106773681B (zh) 一种汽包锅炉火电机组一次调频控制优化方法
CN102611124B (zh) 适应智能电网的火力发电机组一次调频控制方法
CN101338892B (zh) 一种火电机组再热汽温控制方法
CN108683200B (zh) 一种压缩空气储能参与电网一次调频的方法
CN104793610B (zh) 协调系统前馈控制器参数的确定方法及装置
CN102654751A (zh) 基于非线性控制和模糊控制的协调控制方法
CN108227500A (zh) 一种火电机组快速调峰的协调控制方法及系统
CN101788155A (zh) 煤质自适应的火电机组协调与自动发电控制方法
CN112650169B (zh) 基于焓值及燃料在线热值计算的发电机组主参数控制系统
CN106899027B (zh) 汽轮机高调阀门流量动态非线性的一次调频能力补偿方法
CN102563599A (zh) 快速自适应燃煤热值变化的超临界机组机炉协调控制方法
CN105652663B (zh) 一种基于负荷区判别的滑压曲线深度优化的方法
CN107834564B (zh) 一种微电网系统的小干扰电压稳定性的控制方法
CN101871842B (zh) 汽轮机电液控制系统速度不等率、迟缓率直接测试方法
CN107989665B (zh) 供热发电机组的三侧一次调频控制方法及系统
CN106877410A (zh) 火电机组一次调频能力补偿方法
CN108039738A (zh) 一种水电机组负荷控制方法
CN106870024A (zh) 燃煤汽轮机发电机组采暖供热的一次调频能力补偿方法
CN107154645B (zh) 一种余压余热发电机组参与发电厂agc调节的方法
CN112594668A (zh) 一种火电机组启停磨中出现超温超压的解决方法及装置
CN106899028A (zh) 燃煤汽轮机发电机组一次调频能力背压变化的补偿方法
CN108005735B (zh) 一种汽轮机组最佳初压实时动态修正方法
CN105804810A (zh) 一种火力发电机组运行调控方法
Gao et al. Rotating speed pulling-back control and adaptive strategy of doubly-fed variable speed pumped storage unit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210804

Address after: 102200 5th and 6th floors, building a, 18 Binhe Avenue, future science and Technology City, Changping District, Beijing

Patentee after: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd.

Patentee after: HARBIN INSTITUTE OF TECHNOLOGY

Patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER Co.

Patentee after: HARBIN RANZHUO TECHNOLOGY DEVELOPMENT CO.,LTD.

Address before: 102209 State Grid office area a220, North District of future science and Technology City, Changping District, Beijing

Patentee before: BEIJING HUAJIAN NETWORK DESIGN INSTITUTE OF POWER SOURCE

Patentee before: HARBIN INSTITUTE OF TECHNOLOGY

Patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER Co.

Patentee before: HARBIN RANZHUO TECHNOLOGY DEVELOPMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230524

Address after: 102200 5th and 6th floors, building a, 18 Binhe Avenue, future science and Technology City, Changping District, Beijing

Patentee after: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd.

Patentee after: HARBIN INSTITUTE OF TECHNOLOGY

Patentee after: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER Co.

Patentee after: Harbin Xinrentong Technology Development Co.,Ltd.

Address before: 102200 5th and 6th floors, building a, 18 Binhe Avenue, future science and Technology City, Changping District, Beijing

Patentee before: STATE GRID ECONOMIC AND TECHNOLOGICAL RESEARCH INSTITUTE Co.,Ltd.

Patentee before: HARBIN INSTITUTE OF TECHNOLOGY

Patentee before: ECONOMIC TECHNOLOGY RESEARCH INSTITUTE OF STATE GRID NINGXIA ELECTRIC POWER Co.

Patentee before: HARBIN RANZHUO TECHNOLOGY DEVELOPMENT CO.,LTD.