CN102563599A - 快速自适应燃煤热值变化的超临界机组机炉协调控制方法 - Google Patents

快速自适应燃煤热值变化的超临界机组机炉协调控制方法 Download PDF

Info

Publication number
CN102563599A
CN102563599A CN2012100263633A CN201210026363A CN102563599A CN 102563599 A CN102563599 A CN 102563599A CN 2012100263633 A CN2012100263633 A CN 2012100263633A CN 201210026363 A CN201210026363 A CN 201210026363A CN 102563599 A CN102563599 A CN 102563599A
Authority
CN
China
Prior art keywords
coal
control
boiler
pressure
heat value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100263633A
Other languages
English (en)
Other versions
CN102563599B (zh
Inventor
刘友宽
卢勇
苏适
翟伟翔
李萍
赵明
杜景琦
李长更
唐立军
赵永辉
潘巾杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Electric Power Test and Research Institute Group Co Ltd
Original Assignee
Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute filed Critical Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute
Priority to CN201210026363.3A priority Critical patent/CN102563599B/zh
Publication of CN102563599A publication Critical patent/CN102563599A/zh
Application granted granted Critical
Publication of CN102563599B publication Critical patent/CN102563599B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

快速自适应燃煤热值变化的超临界机组机炉协调控制方法,先由汽机调节级压力、汽水分离器压力、给煤量、机组负荷等参数,结合超临界火电机组的协调控制对象特性快速实时的计算出燃煤热值;再通过计算的燃煤热值进行燃料、协调等主要控制系统燃煤热值自适应控制;最后通过改进的能量平衡方法计算锅炉负荷指令形成核心控制策略,结合快速的自适应燃煤热值控制,形成一种快速自适应燃煤热值变化的机炉协调控制方法。本发明计算的燃煤热值能在半分钟内响应燃煤热值的变化,两分钟之内自动调整机炉协调控制及子系统至相应的状态;即使在燃煤热值发生大阶跃扰动时,机炉协调控制及子系统在机组稳态、变负荷、变压力等各种工况及锅炉、汽机侧的各种扰动下,机组的协调及子系统控制不需要人工干预,仍然能控制机组负荷、压力等主参数在规定的范围内;机组的主要被控参数精度相对于原常规控制能大幅度提高,同时可提高机组的安全、经济运行水平。

Description

快速自适应燃煤热值变化的超临界机组机炉协调控制方法
技术领域
本发明属于火电厂热工自动控制领域,是一种能快速自适应燃煤热值变化的超临界机组机炉协调控制方法。
背景技术
目前我国电力仍以火力发电为主,此现状还将持续数十年。超临界机组具有大型化、热效率高等优点,目前我国新建与改建火电机组以超临界机组为主,随着小容量火电机组的逐步淘汰,超临界机组将成为主力发电机组。随着电力市场的发展,国内有不少火电机组的燃煤经常偏离设计值。煤质变差且变化较大,协调控制被控对象成为严重的时变非线性系统,使机组的协调控制与自动发电控制功能不能较好投用,严重影响电网对机组的调度。协调控制与自动发电控制功能在差煤质或煤质变化较大时,存在机组主参数波动大、负荷变动速率低、负荷控制精度低、锅炉稳燃性能差等安全与经济不利因素。
因此研究带煤质自适应的机组协调与自动发电控制方法是现实与迫切的要求。通过本发明的方法,实现超临界机组燃料、协调控制及风量等机组主要调节系统的煤质自适应,使煤质变化后在要求的负荷变化率与负荷变动范围内,能保证机组的协调控制与自动发电控制指标;同时在负荷变动中风、煤等主参数变化更平滑,稳态时风、煤等变化更平稳,进一步减小机组主参数的调节偏差,使机组的经济性更高;减小内、外部的扰动对协调控制与自动发电控制调节的影响,使机组运行稳定性更高。
目前,对于煤质测量与校核方法有以下几种:
1、  离线分析。通过定时取样燃煤,经烧灼法的分析仪测量计算出煤的灰份、水分、热值等重要指标。通过采样化验煤质的方法尽管具有很高的分析精度,但存在较大的采样误差,而且至少要数小时才能分析出结果,对实时燃烧调整和优化运行的促进作用非常有限。
2、  在线分析。是通过安装在煤场口、给煤机出口等地方的基于射线、微波等技术的在线分析仪,测量计算煤的热值、灰份、水分等值。煤质在线实时检测技术可以快速、准确地对入炉煤进行实时分析测量,达到有效把握和控制煤炭质量的目的,使燃煤质量更具科学性和可靠性,在提高电力生产的安全性和经济性、实现过程控制方面具有极其重要的意义和巨大的经济潜力。该技术从80年代中期开始就在美国、澳大利亚和欧洲得到了较快地发展,近10年才引入国内。设备多为进口,价格较高,多用于选煤厂和洗煤厂,在电厂的应用业绩也较少。
3、目前还有根据设计煤种的热值,所燃烧的煤量应该产生的热量与实际煤种产生热量的偏差对燃料进行补偿调节。这种BTU修正的方法在实际应用中往往造成系统的不稳定。燃料回路作为控制系统的内环应尽快克服燃料的扰动,其控制目的是在稳定的负荷工况下保证压力或负荷的稳定,任何汽机侧的外扰不应该构成对燃料的扰动。如果以蒸汽流量修正燃料量,当汽机调门发生扰动(如一次调频)使蒸汽流量发生变化,必然导致燃料的变化,使燃料控制系统不能稳定的运行。
发明内容
本发明的目的是克服现有技术的不足,提供一种煤质的快速实时软测量方法,对火电机组的燃料、协调及风量等主要控制系统进行煤质自适应控制。同时提供一种完善的协调控制方案,使机组在负荷变动中风、煤等主参数变化更平滑,稳态时风、煤等变化更平稳,进一步减小机组主参数的调节偏差,使机组的经济性更高;减小机组内、外部的扰动对协调与自动发电控制调节的影响,使机组运行稳定性更高。
本发明的目的是通过如下技术方案实现的:
快速自适应燃煤热值变化的超临界机组机炉协调控制方法,该方法包括下列步骤:
Figure 2012100263633100002DEST_PATH_IMAGE002
由汽机调节级压力、汽水分离器压力、给煤量、机组负荷参数综合快速计算出代表燃煤热值变化的参量;通过计算锅炉热量信号与煤量惯性环节、延时后的比值,经滤波后来快速代表燃煤热值参量,如式(1):
Figure 2012100263633100002DEST_PATH_IMAGE004
)                      (1)
式(1)中,HR—热量信号,MW;
M—给煤量,t/h;
—滤波模块;
LEADLAG—惯性环节模块;
τ—滞后时间,s;
R—燃煤热值参量;
热量信号用常规的算法如式(2):
Figure 2012100263633100002DEST_PATH_IMAGE008
                                   (2)
式(2)中,C b—锅炉蓄热系数,MW﹒s/MPa;
          PD'—锅炉汽水分离器压力变化率,MPa/s;
TEF—总能量流量,MW;用K1.P1来代表,P1为汽机调节级压力, K1为比例系数;
通过计算的燃煤热值进行燃料、协调等主要控制系统煤质自适应控制;
燃料调节被调量为热量信号,设定值为锅炉负荷指令,采用变参数调节,或变PID输入偏差增益等方式,实现煤质的自动校正,以保持闭环控制回路的特征函数不变,燃料调节的变P、I、D参数可以分别用式(3)、式(4)、式(5)来自动改变:
Figure 2012100263633100002DEST_PATH_IMAGE012
                                (3)
Figure 2012100263633100002DEST_PATH_IMAGE014
                                 (4)
                                 (5)
其中,KP、TI、TD—分别为并联型PID调节器的比例系数、积分时间、微分时间;
       k1~k3—整定的控制参数;
       f(TEF)—随负荷变化的机组效率曲线;
       R—燃煤热值参量;
对于无PID变参数的控制系统,采用在PID外的偏差输入端乘以R0/R或者R0/R/ f(TEF)实现燃料的煤质校正,R0为设计煤种下的燃煤热值参量;
通过锅炉负荷指令核心控制策略,形成完善的超临界机组机炉协调控制方法;
协调控制方案,锅炉指令NRGD为: 
Figure 2012100263633100002DEST_PATH_IMAGE020
 (6)
式(6)中,WT=TEF.PTSP/PT,C1、C2、C3、C4为系数,UNITD为机组当前负荷指令, PT为机前压力,PTSP为机前压力设定值,PTSP′为机前压力变化率;式6中:WT项是主量,燃料调节使锅炉热量信号HR与汽机负荷TEF稳态时一致,就保证了机前压力与设定值一致;C1. UNITD′项用于机组变负荷中补偿锅炉负荷对燃料的滞后及燃料调节斜坡变化时的稳态偏差;C2.PTSP′项用于补偿锅炉滑压的蓄热量变化, C3.(PTSP-PT)′+ C4.(PTSP-PT)项解决了传统DEB协调控制中压力控制较慢且精度较低问题。
本发明采用目前火电机组主控制系统已有的数据,研究燃煤热值相对量快速实时计算的方法,来自动修正因煤质变化对火电机组自动调节及投入自动发电控制后形成的影响。这种方法计算的燃煤热值是快速与实时的,并不增加购置设备的费用。同时可以计算出机组燃煤实时的参考热值,供运行、调整参考应用。
本发明是基于火电机组协调控制对象特性提出的一种燃煤热值快速计算方法,计算的燃煤热值能在半分钟内响应燃煤热值的变化,两分钟之内自动调整机炉协调控制及子系统至相应的状态;机炉协调控制采用改进的能量平衡方法,结合自适应燃煤热值控制,即使在燃煤热值发生大阶跃扰动时,机炉协调控制及子系统在机组稳态、变负荷、变压力等各种工况及锅炉、汽机侧的各种扰动下,机组的协调及子系统控制不需要人工干预,仍然能控制机组负荷、压力等主参数在规定的范围内;机组的主要被控参数精度相对于原常规控制能大幅度提高,同时可提高机组的安全、经济运行水平。
附图说明
图1为本发明煤质自适应的燃料控制框图;
图2为本发明协调控制框图。
具体实施方式
见图1,图2,快速自适应燃煤热值变化的超临界机组机炉协调控制方法,该方法包括下列步骤:
Figure 831143DEST_PATH_IMAGE002
由汽机调节级压力、汽水分离器压力、给煤量、机组负荷参数综合快速计算出代表燃煤热值变化的参量; 
通过计算锅炉热量信号与煤量惯性环节、延时后的比值,经滤波后来快速代表燃煤热值参量:
Figure 217125DEST_PATH_IMAGE004
)                      (1)
HR—热量信号(MW);
M—给煤量,t/h;
Figure 652654DEST_PATH_IMAGE006
—滤波模块;
LEADLAG—惯性环节模块;
τ—滞后时间,s;
R—燃煤热值参量;
热量信号用常规的算法:
                                   (2)
          C b—锅炉蓄热系数(MW﹒s/MPa);
          PD'—锅炉汽水分离器压力变化率(MPa/s);
TEF—总能量流量(MW),用K1.P1来代表,P1为汽机调节级压力, K1为比例系数;
Figure 393394DEST_PATH_IMAGE010
通过计算的燃煤热值进行燃料、协调等主要控制系统煤质自适应控制;
燃料调节被调量为热量信号,设定值为锅炉负荷指令,采用变参数调节,或变PID输入偏差增益等方式,实现煤质的自动校正,以保持闭环控制回路的特征函数不变,燃料调节的变P、I、D参数可以用下式来自动改变:
Figure 310797DEST_PATH_IMAGE012
                                (3)
Figure 640147DEST_PATH_IMAGE014
                                 (4)
                                 (5)
其中,KP、TI、TD—分别为并联型PID调节器的比例系数、积分时间、微分时间;
       k1~k3—整定的控制参数;
       f(TEF)—随负荷变化的机组效率曲线;
       R—燃煤热值参量;
对于无PID变参数的控制系统,采用在PID外的偏差输入端乘以R0/R或者R0/R/ f(TEF)实现燃料的煤质校正,R0为设计煤种下的燃煤热值参量;
Figure 632559DEST_PATH_IMAGE018
通过锅炉负荷指令核心控制策略,形成完善的超临界机组机炉协调控制方法;
协调控制方案,锅炉指令NRGD为: 
Figure 2012100263633100002DEST_PATH_IMAGE022
 (6)
其中WT=TEF.PTSP/PT,C1、C2、C3、C4为系数,UNITD为机组当前负荷指令, PT为机前压力,PTSP为机前压力设定值,PTSP′为机前压力变化率;式6中:WT项是主量,燃料调节使锅炉热量信号HR与汽机负荷TEF稳态时一致,就保证了机前压力与设定值一致;C1. UNITD′项用于机组变负荷中补偿锅炉负荷对燃料的滞后及燃料调节斜坡变化时的稳态偏差;C2.PTSP′项用于补偿锅炉滑压的蓄热量变化, C3.(PTSP-PT)′+ C4.(PTSP-PT)项解决了传统DEB协调控制中压力控制较慢且精度较低问题。
本发明实施的平台为超临界火电机组的主控制系统,包括DCS、FCS、PLC等平台,实施方式包括下列步骤:
(1)针对主控系统的具体型号进行控制功能组态及试验;
(2)在机组运行时进行控制功能的调试与投用;
(3)进行机组的煤质、锅炉与汽机的扰动试验;
(4)进行机组的负荷变动与自动发电控制试验。

Claims (1)

1. 快速自适应燃煤热值变化的超临界机组机炉协调控制方法,其特征在于,该方法包括下列步骤:
Figure 2012100263633100001DEST_PATH_IMAGE002
由汽机调节级压力、汽水分离器压力、给煤量、机组负荷参数综合快速计算出代表燃煤热值变化的参量;通过计算锅炉热量信号与煤量惯性环节、延时后的比值,经滤波后来快速代表燃煤热值参量,如式(1):
Figure 2012100263633100001DEST_PATH_IMAGE004
)                      (1)
式(1)中,HR—热量信号,MW;
M—给煤量,t/h;
Figure 2012100263633100001DEST_PATH_IMAGE006
—滤波模块;
LEADLAG—惯性环节模块;
τ—滞后时间,s;
R—燃煤热值参量;
热量信号用常规的算法如式(2):
Figure 2012100263633100001DEST_PATH_IMAGE008
                                   (2)
式(2)中,C b—锅炉蓄热系数,MW﹒s/MPa;
         PD'—锅炉汽水分离器压力变化率,MPa/s;
TEF—总能量流量,MW;用K1.P1来代表,P1为汽机调节级压力, K1为比例系数;
Figure 2012100263633100001DEST_PATH_IMAGE010
通过计算的燃煤热值进行燃料、协调等主要控制系统煤质自适应控制;
燃料调节被调量为热量信号,设定值为锅炉负荷指令,采用变参数调节,或变PID输入偏差增益等方式,实现煤质的自动校正,以保持闭环控制回路的特征函数不变,燃料调节的变P、I、D参数可以分别用式(3)、式(4)、式(5)来自动改变:
Figure 2012100263633100001DEST_PATH_IMAGE012
                                (3)
Figure 2012100263633100001DEST_PATH_IMAGE014
                                 (4)
                                 (5)
其中,KP、TI、TD—分别为并联型PID调节器的比例系数、积分时间、微分时间;
       k1~k3—整定的控制参数;
       f(TEF)—随负荷变化的机组效率曲线;
       R—燃煤热值参量;
对于无PID变参数的控制系统,采用在PID外的偏差输入端乘以R0/R或者R0/R/ f(TEF)实现燃料的煤质校正,R0为设计煤种下的燃煤热值参量;
Figure 2012100263633100001DEST_PATH_IMAGE018
通过锅炉负荷指令核心控制策略,形成完善的超临界机组机炉协调控制方法;
协调控制方案,锅炉指令NRGD为: 
Figure 2012100263633100001DEST_PATH_IMAGE020
 (6)
式(6)中,WT=TEF.PTSP/PT,C1、C2、C3、C4为系数,UNITD为机组当前负荷指令, PT为机前压力,PTSP为机前压力设定值,PTSP′为机前压力变化率;式6中:WT项是主量,燃料调节使锅炉热量信号HR与汽机负荷TEF稳态时一致,就保证了机前压力与设定值一致;C1. UNITD′项用于机组变负荷中补偿锅炉负荷对燃料的滞后及燃料调节斜坡变化时的稳态偏差;C2.PTSP′项用于补偿锅炉滑压的蓄热量变化, C3.(PTSP-PT)′+ C4.(PTSP-PT)项解决了传统DEB协调控制中压力控制较慢且精度较低问题。
CN201210026363.3A 2012-02-07 2012-02-07 快速自适应燃煤热值变化的超临界机组机炉协调控制方法 Active CN102563599B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210026363.3A CN102563599B (zh) 2012-02-07 2012-02-07 快速自适应燃煤热值变化的超临界机组机炉协调控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210026363.3A CN102563599B (zh) 2012-02-07 2012-02-07 快速自适应燃煤热值变化的超临界机组机炉协调控制方法

Publications (2)

Publication Number Publication Date
CN102563599A true CN102563599A (zh) 2012-07-11
CN102563599B CN102563599B (zh) 2014-04-30

Family

ID=46409741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210026363.3A Active CN102563599B (zh) 2012-02-07 2012-02-07 快速自适应燃煤热值变化的超临界机组机炉协调控制方法

Country Status (1)

Country Link
CN (1) CN102563599B (zh)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216827A (zh) * 2013-05-13 2013-07-24 北京和隆优化科技股份有限公司 一种循环流化床锅炉快速稳定负荷控制方法
CN103217946A (zh) * 2013-03-07 2013-07-24 上海外高桥第二发电有限责任公司 基于凝泵变频机组的协调变负荷控制方法
CN103513640A (zh) * 2013-10-11 2014-01-15 国家电网公司 一种燃煤机组自动发电控制系统整体优化方法及系统
CN104390234A (zh) * 2014-10-30 2015-03-04 国家电网公司 带双进双出磨煤机的超超临界发电机组协调控制方法
CN106773669A (zh) * 2016-11-21 2017-05-31 华北电力大学(保定) 一种燃料热值实时自适应校正的火电机组协调控制方法
CN107368049A (zh) * 2017-07-17 2017-11-21 华能海南发电股份有限公司 基于电厂dcs系统的机组变负荷下给煤量的控制方法
CN108919642A (zh) * 2018-06-28 2018-11-30 东南大学 一种炉跟机协调控制系统控制器参数优化整定方法
CN110762507A (zh) * 2019-12-05 2020-02-07 福建华电永安发电有限公司 一种掺烧工业废料时的锅炉产气均衡系统
CN111308886A (zh) * 2020-04-07 2020-06-19 兰州陇能电力科技有限公司 一种燃煤机组协调控制方法及系统
CN111649313A (zh) * 2020-06-16 2020-09-11 上海明华电力科技有限公司 抑制超临界锅炉垂直管圈水冷壁传热恶化的控制方法
CN111963265A (zh) * 2020-08-25 2020-11-20 鄂尔多斯市君正能源化工有限公司热电分公司 一种发电用锅炉燃烧过程及机组协调控制优化的方法
CN112594668A (zh) * 2020-12-15 2021-04-02 华能武汉发电有限责任公司 一种火电机组启停磨中出现超温超压的解决方法及装置
CN112650169A (zh) * 2020-12-16 2021-04-13 河北冀研能源科学技术研究院有限公司 基于焓值及燃料在线热值计算的发电机组主参数控制系统
CN113189862A (zh) * 2021-04-29 2021-07-30 中国大唐集团科学技术研究院有限公司中南电力试验研究院 一种火电厂pid控制回路品质评价方法
CN113311772A (zh) * 2021-06-07 2021-08-27 西安热工研究院有限公司 火电机组协调控制系统中燃料热值自校正系统及方法
CN113515040A (zh) * 2021-04-24 2021-10-19 西安热工研究院有限公司 火力发电单元机组自适应煤种变化的协调控制系统及方法
CN113915601A (zh) * 2021-09-09 2022-01-11 中国五环工程有限公司 燃油燃气锅炉空燃比自动控制系统及控制方法
CN114655924A (zh) * 2022-04-27 2022-06-24 西安交通大学 一种用于煤炭超临界水气化制氢的产量调控系统及方法
CN115309048A (zh) * 2022-08-08 2022-11-08 哈尔滨工业大学 利用负荷偏差逆向动态修正锅炉储能系数的逻辑设计方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105955030A (zh) * 2016-06-08 2016-09-21 江苏南热发电有限责任公司 一种基于改进输入加权预测控制器的机炉协调控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614998A (zh) * 2008-06-27 2009-12-30 浙江省电力试验研究院 火力发电机机炉直接指令平衡协调控制方法
JP2010096482A (ja) * 2008-10-20 2010-04-30 Chugoku Electric Power Co Inc:The ボイラ装置における石炭カロリ制御システム
CN101788155A (zh) * 2010-01-22 2010-07-28 云南电力试验研究院(集团)有限公司 煤质自适应的火电机组协调与自动发电控制方法
JP2011021758A (ja) * 2009-07-13 2011-02-03 Jfe Engineering Corp ボイラの燃料投入量補正方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614998A (zh) * 2008-06-27 2009-12-30 浙江省电力试验研究院 火力发电机机炉直接指令平衡协调控制方法
JP2010096482A (ja) * 2008-10-20 2010-04-30 Chugoku Electric Power Co Inc:The ボイラ装置における石炭カロリ制御システム
JP2011021758A (ja) * 2009-07-13 2011-02-03 Jfe Engineering Corp ボイラの燃料投入量補正方法
CN101788155A (zh) * 2010-01-22 2010-07-28 云南电力试验研究院(集团)有限公司 煤质自适应的火电机组协调与自动发电控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘友宽等: "煤质自适应的火电机组 AGC控制仿真与应用", 《云南电力技术》 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103217946A (zh) * 2013-03-07 2013-07-24 上海外高桥第二发电有限责任公司 基于凝泵变频机组的协调变负荷控制方法
CN103216827B (zh) * 2013-05-13 2016-01-20 北京和隆优化科技股份有限公司 一种循环流化床锅炉快速稳定负荷控制方法
CN103216827A (zh) * 2013-05-13 2013-07-24 北京和隆优化科技股份有限公司 一种循环流化床锅炉快速稳定负荷控制方法
CN103513640A (zh) * 2013-10-11 2014-01-15 国家电网公司 一种燃煤机组自动发电控制系统整体优化方法及系统
CN103513640B (zh) * 2013-10-11 2015-10-07 国家电网公司 一种燃煤机组自动发电控制系统整体优化方法及系统
CN104390234B (zh) * 2014-10-30 2016-08-31 国家电网公司 带双进双出磨煤机的超超临界发电机组协调控制方法
CN104390234A (zh) * 2014-10-30 2015-03-04 国家电网公司 带双进双出磨煤机的超超临界发电机组协调控制方法
CN106773669A (zh) * 2016-11-21 2017-05-31 华北电力大学(保定) 一种燃料热值实时自适应校正的火电机组协调控制方法
CN107368049A (zh) * 2017-07-17 2017-11-21 华能海南发电股份有限公司 基于电厂dcs系统的机组变负荷下给煤量的控制方法
CN107368049B (zh) * 2017-07-17 2019-11-05 华能海南发电股份有限公司 基于电厂dcs系统的机组变负荷下给煤量的控制方法
CN108919642B (zh) * 2018-06-28 2021-03-26 东南大学 一种炉跟机协调控制系统控制器参数优化整定方法
CN108919642A (zh) * 2018-06-28 2018-11-30 东南大学 一种炉跟机协调控制系统控制器参数优化整定方法
CN110762507A (zh) * 2019-12-05 2020-02-07 福建华电永安发电有限公司 一种掺烧工业废料时的锅炉产气均衡系统
CN111308886A (zh) * 2020-04-07 2020-06-19 兰州陇能电力科技有限公司 一种燃煤机组协调控制方法及系统
CN111308886B (zh) * 2020-04-07 2023-06-02 兰州陇能电力科技有限公司 一种燃煤机组协调控制方法及系统
CN111649313A (zh) * 2020-06-16 2020-09-11 上海明华电力科技有限公司 抑制超临界锅炉垂直管圈水冷壁传热恶化的控制方法
CN111963265A (zh) * 2020-08-25 2020-11-20 鄂尔多斯市君正能源化工有限公司热电分公司 一种发电用锅炉燃烧过程及机组协调控制优化的方法
CN112594668A (zh) * 2020-12-15 2021-04-02 华能武汉发电有限责任公司 一种火电机组启停磨中出现超温超压的解决方法及装置
CN112650169A (zh) * 2020-12-16 2021-04-13 河北冀研能源科学技术研究院有限公司 基于焓值及燃料在线热值计算的发电机组主参数控制系统
CN113515040A (zh) * 2021-04-24 2021-10-19 西安热工研究院有限公司 火力发电单元机组自适应煤种变化的协调控制系统及方法
CN113515040B (zh) * 2021-04-24 2022-06-17 西安热工研究院有限公司 火力发电单元机组自适应煤种变化的协调控制系统及方法
CN113189862B (zh) * 2021-04-29 2023-05-26 中国大唐集团科学技术研究院有限公司中南电力试验研究院 一种火电厂pid控制回路品质评价方法
CN113189862A (zh) * 2021-04-29 2021-07-30 中国大唐集团科学技术研究院有限公司中南电力试验研究院 一种火电厂pid控制回路品质评价方法
CN113311772A (zh) * 2021-06-07 2021-08-27 西安热工研究院有限公司 火电机组协调控制系统中燃料热值自校正系统及方法
CN113915601A (zh) * 2021-09-09 2022-01-11 中国五环工程有限公司 燃油燃气锅炉空燃比自动控制系统及控制方法
CN114655924A (zh) * 2022-04-27 2022-06-24 西安交通大学 一种用于煤炭超临界水气化制氢的产量调控系统及方法
CN115309048A (zh) * 2022-08-08 2022-11-08 哈尔滨工业大学 利用负荷偏差逆向动态修正锅炉储能系数的逻辑设计方法

Also Published As

Publication number Publication date
CN102563599B (zh) 2014-04-30

Similar Documents

Publication Publication Date Title
CN102563599B (zh) 快速自适应燃煤热值变化的超临界机组机炉协调控制方法
CN101788155A (zh) 煤质自适应的火电机组协调与自动发电控制方法
CN108708775B (zh) 基于热电负荷转换模型的热电联产机组快速变负荷控制方法
CN102853419A (zh) 一种煤粉炉智能优化控制系统
CN102654751B (zh) 基于非线性控制和模糊控制的协调控制方法
CN103437838B (zh) 一种有效提高发电机组快速响应外界负荷变化的方法
CN110026068B (zh) 一种基于神经网络逆控制的大型燃煤电站co2捕集系统及前馈控制方法
CN202032549U (zh) 热电厂锅炉母管压力协调控制系统
CN112650169B (zh) 基于焓值及燃料在线热值计算的发电机组主参数控制系统
CN102778880B (zh) 基于能量平衡的整体煤气化联合循环电站协调控制方法
CN104865830A (zh) 一种机组负荷双重智能优化控制方法
CN108710356B (zh) 一种有效的燃烧后co2捕集燃煤发电系统运行控制方法
CN106410860B (zh) 多燃料混烧直流炉发电机组一次调频方法
CN107368049A (zh) 基于电厂dcs系统的机组变负荷下给煤量的控制方法
CN103727531B (zh) 一种裤衩腿型循环流化床锅炉床料平衡的控制方法
CN109668139B (zh) 一种超临界火电机组机炉协调控制方法
CN103697454A (zh) 燃煤锅炉直流发电机组的控制方法和控制装置
CN105289830B (zh) 一种基于煤量在线补偿的中速磨煤机启停控制方法
CN103423740A (zh) 循环流化床锅炉燃烧过程自动控制系统及方法
CN109631007B (zh) 一种发电机组锅炉主控系统燃料反馈信号优化处理方法
CN106019929A (zh) 双进双出直吹式制粉系统协调控制方法
CN113390099A (zh) 一种燃煤热电联产机组自适应btu下的协调控制方法
CN106705034B (zh) 一种超临界循环流化床锅炉机组快速变负荷控制方法
CN208986614U (zh) 一种igcc电站自动发电控制系统
CN115981154A (zh) 一种适用于电厂机组协调控制系统低碳寻优的试验方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220705

Address after: 650217 yundian science and Technology Park, No.105, Yunda West Road, economic development zone, Kunming City, Yunnan Province

Patentee after: YUNNAN ELECTRIC POWER TEST & RESEARCH INSTITUTE (GROUP) Co.,Ltd.

Address before: 650217 Yunnan Kunming Economic and Technological Development Zone Yunda West Road Middle Yundian Science Park

Patentee before: YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE