CN106869143A - For environmental combination bank protection and the construction method of the punishment of road runoff pollution - Google Patents

For environmental combination bank protection and the construction method of the punishment of road runoff pollution Download PDF

Info

Publication number
CN106869143A
CN106869143A CN201611201713.XA CN201611201713A CN106869143A CN 106869143 A CN106869143 A CN 106869143A CN 201611201713 A CN201611201713 A CN 201611201713A CN 106869143 A CN106869143 A CN 106869143A
Authority
CN
China
Prior art keywords
concrete
regeneration
regeneration concrete
sash
spread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611201713.XA
Other languages
Chinese (zh)
Inventor
吴正光
许珊珊
王二飞
杨宇轩
顾万
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CN201611201713.XA priority Critical patent/CN106869143A/en
Publication of CN106869143A publication Critical patent/CN106869143A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/28Treatment of water, waste water, or sewage by sorption
    • C02F1/281Treatment of water, waste water, or sewage by sorption using inorganic sorbents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/16Nitrogen compounds, e.g. ammonia
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2101/00Nature of the contaminant
    • C02F2101/10Inorganic compounds
    • C02F2101/20Heavy metals or heavy metal compounds

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of environmental combination bank protection and its construction method for the punishment of road runoff pollution.Combination bank protection includes primary protection slope, banket and two grades of protective slopes, the primary protection slope is assembled into sash and completely spreads using prefabricated regeneration concrete bar, each prefabricated regeneration concrete bar longitudinally reserves octagon duct, cast-in-place vegetation type diatomite regeneration concrete in sash, banket completely spreads protection using vegetation type regeneration concrete, and two grades of protective slopes completely spread protection using prefabricated hexagon regeneration concrete block.Construction method includes (10) domatic finishing, the assembling of (20) sash, (30) spread concrete, the plantation of (40) vegetation, (50) banket is completely spread concrete and (60) two grades of protective slopes are spread concrete block.Environmental combination bank protection of the invention, runoff pollution treatment effect is good and ecological friendly.

Description

For environmental combination bank protection and the construction method of the punishment of road runoff pollution
Technical field
Particularly a kind of the invention belongs to road engineering technical field, runoff pollution treatment effect is good, and ecological close friend For environmental combination bank protection and the construction method of the punishment of road runoff pollution.
Background technology
While road and the various vehicles bring enormous benefits for human society, they are to natural landscape and ecology The various negative effects such as segmentation, interference, destruction and the pollution of system are also constantly being deepened and are being expanded.At present, environmental road is built The theory on road is more ripe, and permeable pavement is the important step in its construction.Restoring vegetation concrete have regulate and store, it is biological suitable raw, Various functions such as noise reduction, there is certain filtration, purification ability, but flourishing with transportation, road runoff to sewage In pollutant kind it is more complicated, pollutional load is further serious, and common restoring vegetation concrete can not meet present road footpath The requirement of stream pollution punishment.
At present, road slope protection form is mostly completely spread or simple grass planting protection using hardening.Protection side slope hardening Degree is too high so that landscape effect is poor.And simple grass planting protective slope acts on smaller, rain drop erosion easily causes side slope soil loss.
In a word, the problem of prior art presence is:Road slope protection runoff pollution punishment effect is poor.
The content of the invention
It is an object of the invention to provide a kind of environmental combination bank protection for the punishment of road runoff pollution, runoff pollution Regulation effect is good, and ecological friendly.
Another object of the present invention is to provide a kind of applying for environmental combination bank protection for the punishment of road runoff pollution Work method.
The technical solution for realizing the object of the invention is:
A kind of environmental combination bank protection for the punishment of road runoff pollution, including primary protection slope, banket and two grades Protective slope, the primary protection slope is assembled into sash and completely spreads using prefabricated regeneration concrete bar, each prefabricated regeneration concrete bar The reserved octagon duct in longitudinal direction, cast-in-place vegetation type diatomite regeneration concrete in sash;The banket uses vegetation type again Growing concrete completely spreads protection;Two grades of protective slopes completely spread protection using prefabricated hexagon regeneration concrete block.
The technical solution for realizing another object of the present invention is:
A kind of construction method of environmental combination bank protection for the punishment of road runoff pollution, comprises the following steps:
(10) domatic finishing:According to design slope than surveying setting-out, carry out cutting slope and finishing is domatic, by design altitude, width And depth, hand excavation bears down on one, pin groove, sash groove;
(20) sash assembling:After domatic finishing acceptance(check), prefabricated regeneration concrete bar is assembled into sash;
(30) spread concrete:The even vegetation type diatomite regeneration concrete that paves in rhombus sash;
(40) vegetation plantation:Soil is spread on the vegetation type diatomite regeneration concrete of hardening consolidation, grass seeds is broadcasted sowing, earthing, Maintenance;
(50) banket is completely spread concrete:Vegetation type regeneration concrete is completely spread in banket;
(60) two grades of protective slopes are spread concrete block:Hexagon regeneration concrete block is completely spread in two grades of protective slopes.
Compared with prior art, its remarkable advantage is the present invention:
(1) using vegetation type diatomite regeneration concrete as side slope protection form, concrete regenerating is used in engineering Aggregate, had both saved the processing cost of a large amount of building castoffs, and the consumption of natural resources is reduced again, and economic and environmental benefit is bright It is aobvious;
(2) will be combined with recycled concrete mixed with diatomaceous restoring vegetation concrete, can not only reach side slope The purpose of protection, while enhancing treatment effect of the side slope material to road runoff pollution.Result of the test shows, vegetation type diatom Native regeneration concrete has different degrees of raising to the clearance of every pollutant compared with common porous concrete, particularly to ammonia nitrogen And the clean-up effect of heavy metal is substantially, meets the demand for development of Eco-friendly road.
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
Brief description of the drawings
Fig. 1 is a kind of environmental combination protective slope structure schematic diagram for the punishment of road runoff pollution of the present invention.
Fig. 2 is cast-in-place vegetation type diatomite regeneration concrete protective slope structure schematic diagram of the invention.
Fig. 3 is assembled regeneration concrete prefabricated section structural representation of the present invention.
Fig. 4 completely spreads hexagon two grades of protective slope structural representations of regeneration concrete for the present invention.
Fig. 5 is hexagon regeneration concrete structural representation of the present invention.
Fig. 6 is environmental combination slope protection construction method flow chart of the present invention for the punishment of road runoff pollution.
In figure:
1- concrete spats, 2- hexagons regeneration concrete, bis- grades of bank protections of 3-, 4- bankets, 5- vegetation types regeneration coagulation Soil, 6- intercepting ditch, 7- bed courses, 8- vegetation type diatomite regeneration concrete, 9- vegetation, 10- assembled regeneration concretes prefabricated section, 11- curbs, 12- octagons duct.
Specific embodiment
As shown in figure 1, environmental combination bank protection of the present invention for the punishment of road runoff pollution, including primary protection slope, Banket and two grades of protective slopes, the primary protection slope are assembled into sash and completely spread using prefabricated regeneration concrete bar, and each is prefabricated Regeneration concrete bar longitudinally reserves octagon duct, as shown in figure 3, cast-in-place vegetation type diatomite regeneration concrete in sash, As shown in Figure 2;The banket completely spreads protection using vegetation type regeneration concrete;Two grades of protective slopes use prefabricated hexagon Regeneration concrete block completely spreads protection, as shown in Figure 4,5.
The duct of adjacent regeneration concrete prefabricated section is interconnected on the primary protection slope.
Octagon osculum is reserved on the wall of assembled regeneration concrete prefabricated section side, it is possessed certain storage draining Ability, regeneration concrete prefabricated section is built by laying bricks or stones successively on road slope, cast-in-place vegetation type diatomite regeneration concrete in sash, The osculum of adjacent sash is interconnected, and forms a drainage network for multipath.In the range of its drainability so that from road Oozed under face cross flow to the road runoff dispersing of side slope, reduce flow velocity and extend runoff flow through distance.
Preferably, in the prefabricated regeneration concrete bar and regeneration concrete used by prefabricated hexagon regeneration concrete block, Water:Cement:Sand:Regeneration aggregate is 185:370:738:1062.
In the cast-in-place vegetation type diatomite regeneration concrete, water:Cement:Diatomite:Regeneration aggregate:Outside concrete for plant growth Plus agent is 90.6:164.8:41.2:1470:5.15.
In the cast-in-place vegetation type diatomite regeneration concrete, regeneration aggregate particle diameter is 15mm-25mm, and diatomite fineness is 100 mesh, compound additive is ZS-2 type concrete for plant growth additives.
In the vegetation type regeneration concrete, water:Cement:Regeneration aggregate:Concrete for plant growth additive is 68.7:298.9: 1470:3.
As shown in fig. 6, construction method of the present invention for the environmental combination bank protection of road runoff pollution punishment, including such as Lower step:
(10) domatic finishing:According to design slope than surveying setting-out, carry out cutting slope and finishing is domatic, by design altitude, width And depth, hand excavation bears down on one, pin groove, sash groove;
(20) sash assembling:After domatic finishing acceptance(check), prefabricated regeneration concrete bar is assembled into sash;
(20) the sash installation step is specially:
After domatic finishing acceptance(check), construction survey setting-out is first carried out, along dike line direction, every 20 meters of arrangements, one control Section, position is driven piles respectively at the top of the toe, middle part, slope in each section, and marks bed course and regeneration concrete prefabricated section bank protection Thickness and toe, the position of slope drift angle, are tensed with nylon wire, check domatic thickness, upper and lower orientation placement of foot and depth, domatic symbol After closing design requirement, lay bed course and build prefabricated section by laying bricks or stones successively from bottom to top;Build by laying bricks or stones should by it is outer and in, between masonry snap fastener closely, The fissure of displacement without straight joint, must not bond and floating plug, surface should keep smooth, attractive in appearance.
(30) spread concrete:The even vegetation type diatomite regeneration concrete that paves in rhombus sash;
(30) the spread concrete step includes:
(31) concrete-agitating:By the proportioning of cast-in-place vegetation type diatomite regeneration concrete, regeneration aggregate, water are put into successively Mud, diatomite, after stir about makes its preliminary mixing for 30 seconds, then divide 2- by the water of ormal weight and concrete for plant growth additive mixed liquor 3 additions, continue stir about 1.5-2 minutes;
Diatomite porous regeneration concrete mixture reclaimed water mud fluidity is small and consumption is few, to ensure cement mortar equably Package aggregate, using forced mixer, mixer is put into during stirring in the regulation ratio and feeding sequence of material by material, first Cementitious matter, rubble stir about are made into its preliminary mixing for 30 seconds, then the moisture of ormal weight is added into continuation stir about 1.5-2 for 2-3 times Minute.Depending on the degree of stirring, can the proper extension churned mechanically time, it is but unsuitable long.
(32) concrete speading:Transport vegetation type diatomite regenerated concrete mixture time control within 10 minutes, Roadbed is moistened with water before pouring, diatomite regenerated concrete mixture is paved in rhombus sash even, it is smooth using flat board And pat closely knit, cast is continuously sprinkled water after 1 day and is conserved one week.
Diatomite porous regeneration concrete belongs to dryness concrete material, and initial set is fast, and according to weather conditions, haulage time is typically controlled Within 10 minutes, haulage time is 5 minutes to system during heat, to ensure the moisture in celluar concrete material.
Before pouring, roadbed first is moistened with water, between the otherwise diatomite porous quick dehydration of regeneration concrete will weaken aggregate Adhesion strength.Diatomite porous regenerated concrete mixture is paved in rhombus sash even, typically adopted in casting process It is smooth with flat board and pat closely knit, should not strongly vibrate or tamp.Cast starts watering maintenance after 1 day, pressure should not be used during water drenching Power water column flings concrete surface, preferably directly waters from the top down under normal conditions, and curing time is no less than 7 days.
(40) vegetation plantation:Soil is spread on the vegetation type diatomite regeneration concrete of hardening consolidation, grass seeds is broadcasted sowing, earthing, Maintenance;
(40) the vegetation plantation step is specially:
After after vegetation type diatomite regeneration concrete hardening consolidation, native thickness about 3-5cm is spread in rhombus sash, on native top layer Uniform broadcasting grass seeds, covers half centimeter thick soil, afterwards watering maintenance more than seven days, and sowing is chased after after 1 week and spreads grass seeds, topdresses one at 2 weeks It is secondary, to be sprinkled water after sprouting and conserve 2-3 days once, after 30-45 days curing cycle, vegetation can grow in its natural state.
After after diatomite porous regeneration concrete hardening consolidation, soil is spread inside rhombus sash, soil thickness about 3-5cm, Native top layer uniform broadcasting grass seeds, half centimeter of thickness of rear earthing prevents grass seeds from exposing in the sun.Watering maintenance is after planting carried out to connect It is continuous more than seven days, to ensure moisture necessary to grass seeds germination production.Plant germination rate is higher after sowing 1 week, is needing area Block is chased after and spreads grass seeds.Topdressed once at 2 weeks, after sprouting, watering may decrease to 2-3 days once.
(50) banket is completely spread concrete:Vegetation type regeneration concrete is completely spread in banket;
(60) two grades of protective slopes are spread concrete block:Hexagon regeneration concrete block is completely spread in two grades of protective slopes.

Claims (10)

1. it is a kind of to combine bank protection for the environmental of road runoff pollution punishment, including primary protection slope, banket and two grades are prevented Bank protection, it is characterised in that:
The primary protection slope is assembled into sash and completely spreads using prefabricated regeneration concrete bar, each prefabricated regeneration concrete bar longitudinal direction Reserved octagon duct, cast-in-place vegetation type diatomite regeneration concrete in sash;
The banket completely spreads protection using vegetation type regeneration concrete;
Two grades of protective slopes completely spread protection using prefabricated hexagon regeneration concrete block.
2. the ecotype according to claim 1 combines bank protection, it is characterised in that:
The duct of adjacent regeneration concrete prefabricated section is interconnected on the primary protection slope.
3. the ecotype according to claim 1 combines bank protection, it is characterised in that:
In the prefabricated regeneration concrete bar and regeneration concrete used by prefabricated hexagon regeneration concrete block, water:Cement:Sand: Regeneration aggregate is 185:370:738:1062.
4. the ecotype according to claim 1 combines bank protection, it is characterised in that:
In the cast-in-place vegetation type diatomite regeneration concrete, water:Cement:Diatomite:Regeneration aggregate:Concrete for plant growth additive It is 90.6:164.8:41.2:1470:5.15.
5. the ecotype according to claim 4 combines bank protection, it is characterised in that:
In the cast-in-place vegetation type diatomite regeneration concrete, regeneration aggregate particle diameter is 15mm-25mm, and diatomite fineness is 100 Mesh, compound additive is ZS-2 type concrete for plant growth additives.
6. the ecotype according to claim 1 combines bank protection, it is characterised in that:
In the vegetation type regeneration concrete, water:Cement:Regeneration aggregate:Concrete for plant growth additive is 68.7:298.9: 1470:3.
7. a kind of ecotype as described in claim 1 to 6 combines the construction method of bank protection, it is characterised in that including following step Suddenly:
(10) domatic finishing:According to design slope than surveying setting-out, carry out cutting slope and finishing is domatic, by design altitude, width and depth Degree, hand excavation bears down on one, pin groove, sash groove;
(20) sash assembling:After domatic finishing acceptance(check), prefabricated regeneration concrete bar is assembled into sash;
(30) spread concrete:The even vegetation type diatomite regeneration concrete that paves in rhombus sash;
(40) vegetation plantation:Soil is spread on the vegetation type diatomite regeneration concrete of hardening consolidation, grass seeds is broadcasted sowing, earthing, maintenance;
(50) banket is completely spread concrete:Vegetation type regeneration concrete is completely spread in banket;
(60) two grades of protective slopes are spread concrete block:Hexagon regeneration concrete block is completely spread in two grades of protective slopes.
8. construction method according to claim 7, it is characterised in that (20) the sash installation step is specially:
After domatic finishing acceptance(check), construction survey setting-out is first carried out, it is disconnected every 20 meters of arrangements, one control along dike line direction Face, position is driven piles respectively at the top of the toe, middle part, slope in each section, and marks bed course and regeneration concrete prefabricated section bank protection thickness Degree and toe, the position of slope drift angle, are tensed with nylon wire, check domatic thickness, upper and lower orientation placement of foot and depth, domatic to meet After design requirement, lay bed course and build prefabricated section by laying bricks or stones successively from bottom to top;Build by laying bricks or stones should by it is outer and in, snap fastener is closely, wrong between masonry Seam without straight joint, must not bond and floating plug, surface should keep smooth, attractive in appearance.
9. construction method according to claim 7, it is characterised in that (30) the spread concrete step includes:
(31) concrete-agitating:By the proportioning of cast-in-place vegetation type diatomite regeneration concrete, put into successively regeneration aggregate, cement, Diatomite, after stir about makes its preliminary mixing for 30 seconds, then the water of ormal weight and concrete for plant growth additive mixed liquor is divided 2-3 times Add, continue stir about 1.5-2 minutes;
(32) concrete speading:Transport vegetation type diatomite regenerated concrete mixture time control was poured within 10 minutes Preceding water moistens roadbed, diatomite regenerated concrete mixture is paved in rhombus sash even, smooth using flat board and clap Beat closely knit, cast is continuously sprinkled water after 1 day and conserved one week.
10. construction method according to claim 7, it is characterised in that (40) the vegetation plantation step is specially:
After after vegetation type diatomite regeneration concrete hardening consolidation, native thickness about 3-5cm is spread in rhombus sash, it is uniform on native top layer Grass seeds is broadcasted sowing, half centimeter thick soil is covered, afterwards watering maintenance more than seven days, sowing is chased after after 1 week and spreads grass seeds, is topdressed once at 2 weeks, is gone out Sprinkled water after bud and conserve 2-3 days once, after 30-45 days curing cycle, vegetation can grow in its natural state.
CN201611201713.XA 2016-12-23 2016-12-23 For environmental combination bank protection and the construction method of the punishment of road runoff pollution Pending CN106869143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611201713.XA CN106869143A (en) 2016-12-23 2016-12-23 For environmental combination bank protection and the construction method of the punishment of road runoff pollution

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611201713.XA CN106869143A (en) 2016-12-23 2016-12-23 For environmental combination bank protection and the construction method of the punishment of road runoff pollution

Publications (1)

Publication Number Publication Date
CN106869143A true CN106869143A (en) 2017-06-20

Family

ID=59164696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611201713.XA Pending CN106869143A (en) 2016-12-23 2016-12-23 For environmental combination bank protection and the construction method of the punishment of road runoff pollution

Country Status (1)

Country Link
CN (1) CN106869143A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107619229A (en) * 2017-09-15 2018-01-23 南京理工大学 Green plants wall and forming method
CN107935493A (en) * 2017-11-10 2018-04-20 淮安市水利勘测设计研究院有限公司 A kind of artificial swamp purified water type eco-concrete and preparation method and application
CN110258447A (en) * 2019-04-29 2019-09-20 水利部交通运输部国家能源局南京水利科学研究院 A kind of ecological afforestation concrete cast-in-situ slope protection construction method
CN110366986A (en) * 2019-08-22 2019-10-25 深圳市如茵生态环境建设有限公司 The plant generating layer structure and restoration methods of mine pollution barren rock stockyard slope vegetation restoration
CN110616666A (en) * 2019-08-27 2019-12-27 中国建筑一局(集团)有限公司 Combined ecological revetment and construction method thereof
CN111087080A (en) * 2019-12-20 2020-05-01 南京大学盐城环保技术与工程研究院 Efficient phosphorus removal ecological ditch aiming at farmland non-point source pollution and paving method thereof
CN114541426A (en) * 2022-02-18 2022-05-27 山东大学 Ecological and engineering integrated assembled slope protection structure and construction method
CN114956340A (en) * 2021-11-19 2022-08-30 广州城建职业学院 Ecological transformation method for hardened farmland drainage ditch
CN116693082A (en) * 2023-04-20 2023-09-05 扬州大学 Particle size mixed highway runoff high-efficiency seepage and storage purifying device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090047094A (en) * 2007-11-07 2009-05-12 에스케이건설 주식회사 Greening work method for rock slope
CN105544460A (en) * 2015-12-29 2016-05-04 深圳市福田建安建设集团有限公司 Construction method of cast-in-situ planting type ecological concrete slope protection
CN105645871A (en) * 2015-12-31 2016-06-08 扬州大学 Decontamination-type kieselguhr porous recycled concrete and preparation method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090047094A (en) * 2007-11-07 2009-05-12 에스케이건설 주식회사 Greening work method for rock slope
CN105544460A (en) * 2015-12-29 2016-05-04 深圳市福田建安建设集团有限公司 Construction method of cast-in-situ planting type ecological concrete slope protection
CN105645871A (en) * 2015-12-31 2016-06-08 扬州大学 Decontamination-type kieselguhr porous recycled concrete and preparation method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107619229A (en) * 2017-09-15 2018-01-23 南京理工大学 Green plants wall and forming method
CN107935493A (en) * 2017-11-10 2018-04-20 淮安市水利勘测设计研究院有限公司 A kind of artificial swamp purified water type eco-concrete and preparation method and application
CN110258447A (en) * 2019-04-29 2019-09-20 水利部交通运输部国家能源局南京水利科学研究院 A kind of ecological afforestation concrete cast-in-situ slope protection construction method
CN110366986A (en) * 2019-08-22 2019-10-25 深圳市如茵生态环境建设有限公司 The plant generating layer structure and restoration methods of mine pollution barren rock stockyard slope vegetation restoration
CN110616666A (en) * 2019-08-27 2019-12-27 中国建筑一局(集团)有限公司 Combined ecological revetment and construction method thereof
CN111087080A (en) * 2019-12-20 2020-05-01 南京大学盐城环保技术与工程研究院 Efficient phosphorus removal ecological ditch aiming at farmland non-point source pollution and paving method thereof
CN111087080B (en) * 2019-12-20 2022-06-03 南京大学盐城环保技术与工程研究院 Efficient phosphorus removal ecological ditch aiming at farmland non-point source pollution and paving method thereof
CN114956340A (en) * 2021-11-19 2022-08-30 广州城建职业学院 Ecological transformation method for hardened farmland drainage ditch
CN114956340B (en) * 2021-11-19 2023-09-12 广州城建职业学院 Ecological reconstruction method for hardened farmland drainage ditch
CN114541426A (en) * 2022-02-18 2022-05-27 山东大学 Ecological and engineering integrated assembled slope protection structure and construction method
CN116693082A (en) * 2023-04-20 2023-09-05 扬州大学 Particle size mixed highway runoff high-efficiency seepage and storage purifying device

Similar Documents

Publication Publication Date Title
CN106869143A (en) For environmental combination bank protection and the construction method of the punishment of road runoff pollution
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN110698222B (en) Composite vegetation concrete for ecological protection of stone slope and preparation method thereof
EP3234262B1 (en) Method of cooling a sports field
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN107963838A (en) A kind of ecology spray anchor protective slope structure and method
CN104499492A (en) Side slope surface guniting solidification protection method
CN107371432B (en) Method for comprehensively improving beach sandy soil by using biochar soil and building waste soil
KR101179582B1 (en) A Method for reinforcing soil ground slope by using improved soil
CN113396795B (en) Foreign soil and soil layer structure based on river and lake bottom mud and phosphorite solid waste and preparation method
US4826350A (en) Method for constructing water-permeable sports surface and the like
CN100406538C (en) Material for civil engineering work and its execution method
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN111484278A (en) Ecological concrete, ecological protection slope and construction method of ecological protection slope
CN109555135A (en) A kind of non-sintered haydite concrete of dredging silt plants raw building block and roadbed slope ecological protection construction method
KR101251440B1 (en) A method for hardened pavement using improved soil
KR101185626B1 (en) Environmentally-friendly construction method for mountain reservoir using solidified material
CN207749380U (en) Vegetation type eco-concrete
JP5705029B2 (en) Herbicide material using steelmaking slag
CN111501667B (en) Ecological slope protection structure for hydraulic engineering
CN106284278A (en) A kind of ecological reestablishment for soil-body landslide and evaluation methodology
CN109997564B (en) Ecological protection vegetation blanket and preparation method and application thereof
CN110776280A (en) Roadbed material and preparation method thereof
CN111501495A (en) Road construction method
CN110786095A (en) Salt-removing greening planting construction process for concealed conduit in heavy salt and alkali area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170620