CN106868993B - Town road kerbstone prefabricated construction method - Google Patents
Town road kerbstone prefabricated construction method Download PDFInfo
- Publication number
- CN106868993B CN106868993B CN201710000714.6A CN201710000714A CN106868993B CN 106868993 B CN106868993 B CN 106868993B CN 201710000714 A CN201710000714 A CN 201710000714A CN 106868993 B CN106868993 B CN 106868993B
- Authority
- CN
- China
- Prior art keywords
- finished product
- kerbstone
- semi
- concrete
- shake table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/50—Removable forms or shutterings for road-building purposes; Devices or arrangements for forming individual paving elements, e.g. kerbs, in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B1/00—Hand carts having only one axis carrying one or more transport wheels; Equipment therefor
- B62B1/10—Hand carts having only one axis carrying one or more transport wheels; Equipment therefor in which the load is intended to be transferred totally to the wheels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B5/00—Accessories or details specially adapted for hand carts
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C19/00—Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
- E01C19/52—Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
Abstract
The invention discloses a kind of town road kerbstone prefabricated construction method, shake table and transfer car(buggy)s, and the semi-finished product placement region of precast curb is used for by dividing in municipal road construction scene;Kerb mould is placed on to the shake table for being used for vibrated concrete;The concreting stirred evenly is entered in Kerb mould and is vibrated by shake table to the concrete in Kerb mould;The Kerb mould for pouring concrete is delivered together with shake table to putting in semi-finished product placement region using semi-finished product transfer vehicle.Town road kerbstone prefabricated construction method, shake table and transfer car(buggy) provided by the invention are used for the semi-finished product placement region of precast curb by dividing in municipal road construction scene, and place, transport and cost of labor are low;Supplied materials is unified, improves construction quality;And transfer car(buggy) is used in handling process, spoilage is low.
Description
Technical field
The present invention relates to municipal road construction fields, particularly, are related to a kind of town road kerbstone prefabricated construction
Method.
Background technique
Kerbstone, which mostly uses, currently on the market concentrates factory's system, and the smooth semi-finished product in prefabricated place is needed to place curing field
Ground, prefabricated processing site and finished product stack place.Entire town road kerbstone prefabricated construction manufacturing process are as follows: 1, artificial shovel it is mixed
Solidifying earth material enters mould;2, the lift of the concrete material after mould will be entered and is transported to relatively-stationary shock platforms;3, manually semi-finished product lift is transported
Transfer car(buggy) is transported to maintenance place by transfer car(buggy);4, it is conserved by manually unloading placement;5, demoulding is carried out after 2~3 days;6,
Bunch carries out piling up lasting maintenance after demoulding;7, artificial entrucking transport when supplying;8, the unloading of descendant's work point heap is arrived at the destination;9,
Target location need to be transported to using trolley again when installation carry out assembly.Existing town road kerbstone prefabricated construction side
There are defects below for method:
One, the place as needed for factory's system is larger, and especially in urban sector, land for building is expensive, and is located in partially with construction site
Far, have inconvenient traffic, lead to that venue cost is high, transportation cost is high and jolt damage it is more.
Two, by cost impact, the general dimension-limited of producer, mostly based on individual workship.And because remoteness lacks supervision pipe
The quality assurance measures such as system, raw material and process maintenance are difficult to implement completely, and leading to concrete used in prefabricated component is mostly without standard
Or substandard is from mixing, What is more retains all kinds of clouts of multiple commerical ready-mixed concrete companies different labels using improper channel,
Cause Prefabricated intensity irregular, color is multifarious.
Three, due to remoteness, transport of having inconvenient traffic is affected by weather and traffic control, and place is limited in addition,
Production capacity and quantity in stock are smaller, and often resulting in supply or run out of goods in time, and the construction site work holdup is caused to wait.
Four, production, pile, handling transport links cost are artificial more, and cost of labor is big, and spoilage is high.
Therefore, being transported using place caused by concentration factory's system in the prefabricated construction of existing town road kerbstone
It is a technical problem urgently to be resolved with spoilage height and kerbstone supplied materials disunity in high labor cost, transportational process.
Summary of the invention
The present invention provides a kind of town road kerbstone prefabricated construction methods, to solve existing town road road
Using spoilage in place transport caused by concentration factory's system and high labor cost, transportational process in the prefabricated construction of kerb
The high and skimble-scamble technical problem of kerbstone supplied materials.
The technical solution adopted by the invention is as follows:
According to the present invention on one side, a kind of town road kerbstone prefabricated construction method is provided, comprising steps of
The semi-finished product placement region for being used for precast curb is divided in municipal road construction scene;
Kerb mould is placed on to the shake table for being used for vibrated concrete;
The concreting stirred evenly is entered in Kerb mould and by shake table to the coagulation in Kerb mould
Soil vibrates;
The Kerb mould for pouring concrete is delivered together with shake table to semi-finished product using semi-finished product transfer vehicle
It is put in placement region.
Further, the Kerb mould for pouring concrete is delivered together with shake table using semi-finished product transfer vehicle
After the step of being put on to semi-finished product placement region further include:
It is levelling to the concrete-face closure in the Kerb mould after semi-finished product transfer vehicle delivery using trowel.
Further, the Kerb mould for pouring concrete is delivered together with shake table using semi-finished product transfer vehicle
After the step of being put on to semi-finished product placement region further include:
To pour in Kerb mould receive face it is levelling after concrete carry out maintenance demoulding;
The concrete block-by-block after conserving demoulding is transported to kerbstone installation region using finished product transfer car(buggy).
Further, the side of kerbstone installation region is arranged in semi-finished product placement region.
Further, template is also equipped in semi-finished product placement region, kerbstone semi-finished product, Kerb mould are together with vibration
Platform is placed in template.
Further, template is longitudinally continuous laying along semi-finished product placement region.
Further, shake table is placed in semi-finished product placement region periphery.
According to another aspect of the present invention, it additionally provides a kind of applied to above-mentioned town road kerbstone prefabricated construction
Shake table in method, the shake table include for fix the pedestal of Kerb mould, multiple springs that base bottom is set,
And setting makes spring that elastic deformation occur to carry out to the concrete in Kerb mould for generating exciting force on the base
The vibrator to vibrate.
According to another aspect of the present invention, it additionally provides a kind of applied to above-mentioned town road kerbstone prefabricated construction
Semi-finished product transfer vehicle in method, including for levering up and placing shake table flat gear shaping, be connected with flat gear shaping for pair
The first in command and the junction of flat gear shaping and the first in command are set for flat slotting to stating that flat gear shaping exerts a force
Tooth and the first in command rise force fulcrum and by the Kerb mould for pouring concrete together with shake table deliver to half at
The first wheel put in product placement region.
According to another aspect of the present invention, it additionally provides a kind of applied to above-mentioned town road kerbstone prefabricated construction
Finished product transfer car(buggy) in method shovels including the sled for the concrete of maintenance demoulding to be levered up and placed, is connected with sled shovel
Bottom for facilitating the second handle of support and be arranged in sled shovel is used to the concrete block-by-block for conserving demoulding being transported to road
Second wheel of kerb installation region.
The invention has the following advantages:
Town road kerbstone prefabricated construction method, shake table and transfer car(buggy) provided by the invention, by municipal administration
In road construction site divide be used for precast curb semi-finished product placement region, solve place transport and high labor cost,
Spoilage height and the skimble-scamble technical problem of kerbstone supplied materials in transportational process;The concreting stirred evenly is entered into kerbstone
The Kerb mould of concrete is vibrated and will poured in mold and by shake table to the concrete in Kerb mould
It delivers together with shake table to being put in semi-finished product placement region, solves that spoilage in transportational process is high and kerbstone
The skimble-scamble technical problem of supplied materials, town road kerbstone prefabricated construction method, shake table and transhipment provided by the invention
Vehicle, place, transport and cost of labor are low, supplied materials is unified and spoilage is low.
Other than objects, features and advantages described above, there are also other objects, features and advantages by the present invention.
Below with reference to figure, the present invention is described in further detail.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present invention, schematic reality of the invention
It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow diagram of town road kerbstone prefabricated construction method first embodiment of the present invention;
Fig. 2 is that preform region divides schematic diagram in town road kerbstone prefabricated construction method of the present invention;
Fig. 3 is that template is laid with schematic diagram in preform region in town road kerbstone prefabricated construction method of the present invention;
Fig. 4 is to put signal before kerbstone semi-finished product demoulding in town road kerbstone prefabricated construction method of the present invention
Figure;
Fig. 5 is to put signal after kerbstone semi-finished product demoulding in town road kerbstone prefabricated construction method of the present invention
Figure;
Fig. 6 is the flow diagram of town road kerbstone prefabricated construction method second embodiment of the present invention;
Fig. 7 is the flow diagram of town road kerbstone prefabricated construction method 3rd embodiment of the present invention;
Fig. 8 is the structural schematic diagram of shake table preferred embodiment of the present invention;
Fig. 9 is the structural schematic diagram of semi-finished product transfer vehicle preferred embodiment of the present invention;
Figure 10 is the structural schematic diagram of finished product transfer car(buggy) preferred embodiment of the present invention.
Drawing reference numeral explanation:
11, pedestal;111, postive stop baffle;112, slot is transported;12, spring;13, vibrator;14, protective plate;21, flat
Gear shaping;22, the first in command;23, the first wheel;31, sled shovel;32, second handle;33, the second wheel;41, kerbstone installing zone
Domain;42, semi-finished product placement region;43, reflective cone;44, road travel zone;45, template;46, kerbstone.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Referring to Fig.1, the preferred embodiment of the present invention provides a kind of town road kerbstone prefabricated construction method, packet
Include step:
Step S100, the semi-finished product placement region for being used for precast curb is divided in municipal road construction scene.
As shown in Fig. 2, in municipal road construction scene, predetermined manufactured operation region.It is marked off in prefabricated operating area
The semi-finished product placement region 42 of the kerbstone prefabricated for the length according to the kerbstone of installation, semi-finished product placement region 42 is with tight
By kerbstone installation region 41 and nearest, the longitudinal transport distance of sideways transfer distance is no more than 30m and delimited.Predetermined manufactured operation area
Construction site need to be closed when domain, be resumed traffic again after operating and completing and cleaned out to construction site, operating area
Width need to meet vehicle smoothly passage be advisable.Wherein, operating area includes the kerbstone installation region for installing kerbstone
41, for the road travel zone 44 of vehicle pass-through and setting kerbstone installation region 41 and road travel zone 44 it
Between for putting the semi-finished product placement regions 42 of kerbstone semi-finished product.Semi-finished product placement region 42 is close to road travel zone 44
The reflective cone 43 being provided with for playing safe warning function is placed outside.
Step S200, Kerb mould is placed on to the shake table for being used for vibrated concrete.
Concrete machining area is temporarily built in the edge side of semi-finished product placement region 42, by the shake table of vibrated concrete
It is fixed on concrete machining area, then Kerb mould is placed on a vibration table.The concrete machining area is mixed
After the completion of solidifying soil processing and fabricating, using semi-finished product transfer vehicle by shake table rapid transport to subsequent region, generator is with Che Yunzhi
Next region starts next work surface construction.Wherein, relatively inexpensive plastic mould, plastic mould can be used in Kerb mould
Intensity requirement is high, and deformation itself is extended out when plastic mould short side direction fills with concrete no more than code requirement range, and
The anti-sun is exposed to the sun, and deformation performance is good, durability is good.
Step S300, the concreting stirred evenly is entered in Kerb mould and by shake table to Kerb mould
Interior concrete vibrates.
The concreting stirred evenly is entered in Kerb mould by artificial or blender, and is satisfied the need using shake table
Concrete in kerb mold is compacted be closed flat after being vibrated.To ensure that concrete strength and presentation quality and color are unified, need
The stable commerical ready-mixed concrete supplier of one raw material supply of selection nearby, selects concrete strength compared with the high label of design
Concrete fixes same match to evade because working face is too big, the risk of Concrete intensity insufficient when conserving not in place once in a while
Composition and division in a proportion ensures that color is unified.
Step S400, the Kerb mould for pouring concrete is delivered together with shake table using semi-finished product transfer vehicle
It is put on to semi-finished product placement region.
The Kerb mould for pouring concrete is delivered together with shake table to semi-finished product using semi-finished product transfer vehicle
In placement region, and the shake table for being placed with Kerb mould is sequentially put in semi-finished product placement region, such as Fig. 5.
Town road kerbstone prefabricated construction method provided in this embodiment, by municipal road construction scene
The semi-finished product placement region for being used for precast curb is divided, solves and is damaged in place transport and high labor cost, transportational process
Rate height and the skimble-scamble technical problem of kerbstone supplied materials;The concreting stirred evenly is entered in Kerb mould and passes through vibration
Dynamic platform vibrates to the concrete in Kerb mould and will pour the Kerb mould of concrete together with shake table
It is put in delivery to semi-finished product placement region, solves spoilage height and the skimble-scamble skill of kerbstone supplied materials in transportational process
Art problem.Town road kerbstone prefabricated construction method provided by the invention, place, transport and cost of labor is low, supplied materials
Unified and spoilage is low.
Preferably, as shown in fig. 6, Fig. 6 is town road kerbstone prefabricated construction method second embodiment of the present invention
Flow diagram, on the basis of first embodiment, town road kerbstone provided in this embodiment prefabricated construction side
Method, after step S400 further include:
Step S500, levelling to the concrete-face closure in the Kerb mould after semi-finished product transfer vehicle delivery using trowel.
Since road has slope in length and breadth, and concrete itself has certain mobility, and Kerb mould is placed on road
Necessarily will appear on base face it is in uneven thickness, if difficulty is big, at high cost by the way of the leveling of bottom, therefore using primary
This problem is evaded in receipts face.In the present embodiment, it is pressed and is smeared repeatedly in concrete surface using plasterer's trowel or wooden float, Zhi Daoda
It is required to any surface finish needed for engineering.The key point of concrete operations is: a, the control of concrete grounding slump 140~
Between 170mm, to ensure that mold inner concrete will not be because of slope surface too spill losses greatly;B, to mold inner concrete close to just
When solidifying, mobility becomes smaller, and carries out secondary receipts face to mold inner concrete using its plasticity, thickness is adjusted uniform.
Town road kerbstone prefabricated construction method provided in this embodiment transports semi-finished product transfer vehicle using trowel
The concrete-face closure in Kerb mould after load is levelling, thus roughness pavement or light grade road surface by secondary receipts face come
It realizes that kerbstone is smooth prefabricated, provides guarantee for kerbstone in-situ precast.
Preferably, as shown in fig. 7, Fig. 7 is town road kerbstone prefabricated construction method 3rd embodiment of the present invention
Flow diagram, on the basis of second embodiment, town road kerbstone provided in this embodiment prefabricated construction side
Method, after step S500 further include:
S600, to pour in Kerb mould receive face it is levelling after concrete carry out maintenance demoulding.
As shown in Figure 4 and Figure 5, maintenance is divided into two stages, before demoulding and after demoulding, is covered using geotextiles and according to gas
Time situation is sprinkled water wet in due course.Demoulding is carried out after completing in 2 days, is stood up after demoulding in close to kerbstone installation position side
And continue maintenance and reach 7 days, Kerb mould week goes to next region.
Concrete block-by-block after conserving demoulding is transported to kerbstone installation region by S700, finished product transfer car(buggy).
The concrete block-by-block after conserving demoulding is transported to kerbstone installation region using finished product transfer car(buggy) and carries out assembly.Its
In, the concrete after conserving demoulding is finished product kerbstone, and finished product kerbstone only need to partially be transferred, and transports distance and be no more than
30m。
Town road kerbstone prefabricated construction method provided in this embodiment, will conserve demoulding by finished product transfer car(buggy)
Concrete block-by-block afterwards is transported to kerbstone installation region, dramatically saves manpower, improves efficiency.
Preferably, as shown in figure 3, in town road kerbstone prefabricated construction method provided in this embodiment, half at
The side of kerbstone installation region 41 is arranged in product placement region 42.Template 45, road are also equipped in semi-finished product placement region 42
Kerb semi-finished product, Kerb mould are placed in template 45 together with shake table.Template 45 connects along 42 longitudinal direction of semi-finished product placement region
It is continuous to be laid with.Shake table is placed in 42 periphery of semi-finished product placement region.
As shown in figure 3, the place mat template 45 in semi-finished product placement region 42, is longitudinally continuous place mat two rows template (short side phase
Connect) it is respectively used to semi-finished product placement before vertical curb and flush curb demoulding.Spacing between two rows of templates 45 is set as 1m, template
45 are arranged in semi-finished product placement region 42 and close to kerbstone installation region 41, convenient for semi-finished product after later period demoulding closer to road
41 position of kerb installation region.
The effect for being laid with template 45, which essentially consists in solution, leads to plastic mould base contact surface because basal plane is locally uneven
There is pit and then finished surface is caused the problem of pit occur.In addition, template 45 must fall its surface before having enough to meet the need every time
Concrete cleared up, guarantee surface it is clean.Wherein, template 45 selects the preferable glued board of non-deformability, as half at
Product place backing plate.
Town road kerbstone prefabricated construction method provided in this embodiment is laid with vertical in semi-finished product placement region
To the template of arrangement, to realize that kerbstone is smooth prefabricated by place mat template in roughness pavement or light grade road surface, it is
Kerbstone in-situ precast provides guarantee.
Preferably, as shown in figure 8, the present embodiment, which additionally provides one kind, is applied to the above-mentioned prefabricated installation of town road kerbstone
Shake table in construction method, the shake table include for fixing the pedestal 11 of Kerb mould, 11 bottom of pedestal being arranged in
Multiple springs 12 and setting make spring 12 that elastic deformation occur to Kerb mould for generating exciting force on the base 11
The vibrator 13 that interior concrete vibrates.Wherein, vibrator 13 uses plate vibrator.The making material of pedestal 11 is steel
Plate and square steel.
Shake table provided in this embodiment applied in above-mentioned town road kerbstone prefabricated construction method, weight
Gently, it is convenient for rapid transport, to greatly improve working efficiency.
Further, referring to Fig. 8, the present embodiment provides one kind to be applied to above-mentioned town road kerbstone prefabricated construction
Shake table in method, pedestal 11 include postive stop baffle 111 and transhipment slot 112, wherein postive stop baffle 111 is arranged in pedestal
On 11 outer edge, for limiting to the Kerb mould placed on a vibration table, prevent Kerb mould from falling.Transhipment
The bottom of pedestal 11 is arranged in slot 112, is adapted for the flat gear shaping with semi-finished product transfer vehicle, in order to which semi-finished product turn
It transports vehicle and transports Kerb mould.It further include being used on pedestal 11 and close to the protective plate 14 that vibrator 13 is arranged on shake table
It is protected in vibrator 13.
Further, as shown in figure 9, the present embodiment, which also provides one kind, is applied to the above-mentioned prefabricated installation of town road kerbstone
Semi-finished product transfer vehicle in construction method, the semi-finished product transfer vehicle include for lever up and place the flat gear shaping 21 of shake table,
It is connected the first in command 22 for exerting a force to flat gear shaping 21 and setting with flat gear shaping 21 in flat gear shaping 21 and the
The junction of leader 22 is used for stating flat gear shaping 21 and the first in command 22 plays force fulcrum and will pour concrete
Kerb mould is delivered together with shake table to the first wheel 23 put in semi-finished product placement region.Wherein, flat
Gear shaping 21 and the first in command 22 are made of band steel and steel pipe, and the first wheel 23 is made of bearing and small-sized rubber tire tire.Should half at
Product transfer car(buggy) is used for the rapid transport of kerbstone semi-finished product, and key position is flat gear shaping 21, and light shake table is mating makes
With.
Semi-finished product transhipment provided in this embodiment applied in above-mentioned town road kerbstone prefabricated construction method
Vehicle, convenient for the rapid transport of kerbstone semi-finished product, to greatly improve working efficiency;Transfer car(buggy), damage are used in handling process
Rate is low.
Further, as shown in Figure 10, the present embodiment also provides a kind of applied to the above-mentioned prefabricated peace of town road kerbstone
The finished product transfer car(buggy) in construction method is filled, which includes for the concrete of maintenance demoulding to be levered up and placed
Sled shovel 31, with sled shovel 31 be connected the second handle 32 for facilitating support and be arranged in sled shovel 31 bottom be used for rest
The concrete block-by-block of shield demoulding is transported to the second wheel 33 of kerbstone installation region.Wherein, sled shovel 31 and second handle 32 by
Angle steel, round steel and band steel are made, and the second wheel 33 is made by bearing and small-sized rubber tire tire.Finished product transhipment is automobile-used
It is closely transported in 50 meters in kerbstone finished product, key position is sled shovel 31.
Semi-finished product transhipment provided in this embodiment applied in above-mentioned town road kerbstone prefabricated construction method
Vehicle, convenient for the rapid transport of kerbstone finished product, to greatly improve working efficiency;Transfer car(buggy), spoilage are used in handling process
It is low.
Town road kerbstone prefabricated construction method provided in this embodiment, quality control process is visual, and control is difficult
Degree reduces;It is live prefabricated nearby, it greatly reduces transportation cost and destroys loss;Overcome sub-surface out-of-flatness and light grade edge
The uniform problem of stone thickness control realizes the rapidly and efficiently prefabricated of scene;Shake table, semi-finished product transfer vehicle and finished product transfer car(buggy)
Apply and largely save manpower in multiple links, improve effect.It is especially inconvenient to comparatively remote and road transport
In the case of it is more effective.
Town road kerbstone prefabricated construction method provided in this embodiment, by one 5.8 kilometers of municipal administration
The nearly 9 myriametre kerbstone construction of road is attempted to improve again and continues to use, and cost of labor, duration guarantee, the proportion of goods damageds etc. are received
To good result.
These are only the preferred embodiment of the present invention, is not intended to restrict the invention, for those skilled in the art
For member, the invention may be variously modified and varied.All within the spirits and principles of the present invention, it is made it is any modification,
Equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of town road kerbstone prefabricated construction method, which is characterized in that comprising steps of
The predetermined manufactured operation region in municipal road construction scene, operating area includes the kerbstone installing zone for installing kerbstone
Domain, the road travel zone for vehicle pass-through and setting are used between kerbstone installation region and road travel zone
Put the semi-finished product placement region of kerbstone semi-finished product;
Kerb mould is placed on to the shake table for being used for vibrated concrete;
The concreting stirred evenly is entered in the Kerb mould and by the shake table to the Kerb mould
Interior concrete vibrates;
The Kerb mould for pouring concrete is delivered together with the shake table to institute using semi-finished product transfer vehicle
It states and is put in semi-finished product placement region;
, the concrete grounding slump levelling to the Kerb mould inner concrete receipts face after semi-finished product transfer vehicle delivery using trowel
Control is between 140~170mm, to ensure that mold inner concrete will not be because of slope surface too spill losses greatly, to mix in mold
Close to when initial set, mobility becomes smaller solidifying soil, carries out secondary receipts face to mold inner concrete using its plasticity, thickness is adjusted
Uniformly;
To be poured into Kerb mould receive face it is levelling after concrete carry out maintenance demoulding;
The concrete block-by-block after conserving demoulding is transported to kerbstone installation region using finished product transfer car(buggy) and carries out assembly.
2. town road kerbstone prefabricated construction method according to claim 1, which is characterized in that
The side of the kerbstone installation region is arranged in the semi-finished product placement region.
3. town road kerbstone prefabricated construction method according to claim 1, which is characterized in that
Template is also equipped in the semi-finished product placement region, the kerbstone semi-finished product, the Kerb mould are together with described
Shake table is placed in the template.
4. town road kerbstone prefabricated construction method according to claim 3, which is characterized in that
The template is longitudinally continuous laying along the semi-finished product placement region.
5. town road kerbstone prefabricated construction method according to claim 1, which is characterized in that
The shake table is arranged on semi-finished product placement region periphery.
6. town road kerbstone prefabricated construction method as described in claim 1, which is characterized in that the shake table packet
Include pedestal (11) for fixing the Kerb mould, setting the pedestal (11) bottom multiple springs (12) and
Be arranged on the pedestal (11) makes the spring (12) that elastic deformation occurs to the kerbstone mould for generating exciting force
The vibrator (13) that concrete in tool vibrates.
7. town road kerbstone prefabricated construction method as described in claim 1, which is characterized in that the semi-finished product turn
Transporting vehicle includes for levering up and placing the flat gear shaping (21) of the shake table, be connected with the flat gear shaping (21) for institute
State the first in command (22) and be arranged in the flat gear shaping (21) and the first in command that flat gear shaping (21) exerts a force
(22) junction is used to exert a force fulcrum and will pour coagulation to stating flat gear shaping (21) and the first in command (22) and rise
The Kerb mould of soil is delivered together with the shake table to first put in the semi-finished product placement region
Wheel (23).
8. town road kerbstone prefabricated construction method as described in claim 1, which is characterized in that the finished product transhipment
Vehicle includes that the sled for the concrete of maintenance demoulding to be levered up and placed shovels (31), is connected with sled shovel (31) for side
Just the second handle (32) and setting helped are transported in the concrete block-by-block that the bottom of the sled shovel (31) is used to conserve demoulding
It send to the second wheel (33) of kerbstone installation region.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710000714.6A CN106868993B (en) | 2017-01-03 | 2017-01-03 | Town road kerbstone prefabricated construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710000714.6A CN106868993B (en) | 2017-01-03 | 2017-01-03 | Town road kerbstone prefabricated construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106868993A CN106868993A (en) | 2017-06-20 |
CN106868993B true CN106868993B (en) | 2019-04-23 |
Family
ID=59164389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710000714.6A Active CN106868993B (en) | 2017-01-03 | 2017-01-03 | Town road kerbstone prefabricated construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106868993B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108995023A (en) * | 2018-07-02 | 2018-12-14 | 济南城建集团有限公司 | Kerb of concrete makes construction method |
CN110722679B (en) * | 2019-10-18 | 2021-09-07 | 广东草根民墅房屋制造有限公司 | Method for producing prefabricated member by movable group vertical mould |
CN111037707A (en) * | 2020-01-08 | 2020-04-21 | 杜艳阳 | Municipal road curb prefabrication installation construction method |
CN111633807A (en) * | 2020-05-15 | 2020-09-08 | 中铁五局集团有限公司 | On-site prefabricating and mounting method for groove cover plate in tunnel |
CN114875752A (en) * | 2022-06-09 | 2022-08-09 | 浙江嘉湖生态建设有限公司 | Municipal road curb prefabrication installation construction method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101045314A (en) * | 2006-03-31 | 2007-10-03 | 秦永斌 | Method for producing one-side mould of semi-'u' shaped construction element made of concrete for anti-seepage of channel |
CN101260726A (en) * | 2008-04-18 | 2008-09-10 | 许小林 | Prestressed concrete wide goose plate construction method |
CN204109115U (en) * | 2014-09-01 | 2015-01-21 | 中国铁建大桥工程局集团有限公司 | A kind of vehicular tamping equipment of prefabricated small-size concrete component |
CN104532718A (en) * | 2014-12-15 | 2015-04-22 | 沈阳市政集团有限公司 | L-shaped concrete kerb and preparation method thereof |
-
2017
- 2017-01-03 CN CN201710000714.6A patent/CN106868993B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106868993A (en) | 2017-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106868993B (en) | Town road kerbstone prefabricated construction method | |
CN103866670B (en) | Fabricated vehicle bearing pavement and construction method thereof | |
US6709192B2 (en) | Method of forming, installing and a system for attaching a pre-fabricated pavement slab to a subbase and the pre-fabricated pavement slab so formed | |
CN107542017A (en) | A kind of assembled road construction method | |
CN108868063A (en) | A kind of method for constructing terrace | |
CN102505709A (en) | Concrete-formwork-precast foundation construction method | |
US7004674B2 (en) | Pre-fabricated warped pavement slab, forming and pavement systems, and methods for installing and making same | |
CN106930327B (en) | Well lid construction installation method | |
CN107151958B (en) | Permanent rural highway cement road surface of easy maintenance | |
CN110306382A (en) | A kind of slding form operation method of underground railway track substrate large fluidity spread concrete | |
CN204125807U (en) | Periphery has the reinforced concrete prefabricated board of connector | |
KR101705310B1 (en) | Precast concrete panels and precast concrete panels with cast-in-place concrete composite road paving method | |
KR101705313B1 (en) | Precast concrete panels and paving method using an embedded nut and asymmetric pocket | |
CN113832807A (en) | Cement stabilized macadam processing method | |
KR101940527B1 (en) | Method for Constructing Boundary Stone | |
CN207419538U (en) | A kind of height-adjustable inspection shaft covering system | |
US20050178294A1 (en) | System for recycling wet concretre into precast structures and structures formed thereby | |
CN205530816U (en) | Modular separate sand wall | |
JPH0646008U (en) | Permeable cement curb | |
AU2014101042A4 (en) | Method of roadway construction | |
CN217810304U (en) | Multifunctional road construction prefabricated slab | |
CN219045072U (en) | Concrete pouring road | |
CN211446437U (en) | Hot recycled asphalt road structure of plantmix | |
US20230002979A1 (en) | Paving device | |
KR101705312B1 (en) | Precast concrete panels and paving method using an embedded nut and asymmetric pocket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |