CN205530816U - Modular separate sand wall - Google Patents
Modular separate sand wall Download PDFInfo
- Publication number
- CN205530816U CN205530816U CN201620304050.3U CN201620304050U CN205530816U CN 205530816 U CN205530816 U CN 205530816U CN 201620304050 U CN201620304050 U CN 201620304050U CN 205530816 U CN205530816 U CN 205530816U
- Authority
- CN
- China
- Prior art keywords
- template
- base
- steelframe
- headwall
- center rest
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a modular separate sand wall, including base (1), stabilizing support (6), template (3), base (1) is gone up to fix and is equipped with stabilizing support (6), and a plurality of templates (3), its characterized in that are installed to stabilizing support (6) both ends: base (1) head is fixed with headwall (2), and stabilizing support (6) comprise steelframe (5) on both sides and a plurality of tension boards (7) between steelframe (5), are equipped with between adjacent steelframe (5) detachable continuous template (3), all are equipped with between base (1) and headwall (2), base (1) and stabilizing support (6), headwall (2) and stabilizing support (6) built -in fitting (9). The utility model discloses cyclicity height, economic environmental protection, convenient to use, installation are swift, suitable grit the using widely of the modular separate sand wall preparation of stacking in grades of gathering materials.
Description
Technical field
This utility model belongs to civil engineering construction technical field, relates in particular to a kind of combination type for Aggregate separate storage to quality every Sha Qiang.
Background technology
Highway, the construction of railway at present, more and more higher to the sandstone material prescription for major project, exploit, process, stacking etc. requires the strictest, in order to ensure stablizing of Mixture Ratio, indices reaches design and code requirement, and Aggregate must use and carry out the stacking of classification point storehouse every Sha Qiang.In construction, it is all to use mortar flag stone or pour sheet stone concrete every sand wall.Along with the environmental conservation to construction area of present Huan Shuibao department of country and the great attention of soil erosion, the profit margin of construction enterprises is more and more less, the most strictly controls cost control.
Existing have two kinds every sand wall construction method: one be mortar flag stone every Sha Qiang, will the transport of materials such as slabstone, sand, cement to gathering materials stacking planning region, by certain proportioning mixing mortar, manually build by laying bricks or stones every Sha Qiang;Another kind be sheet stone concrete every Sha Qiang, i.e. use scaffold formwork, pour sheet stone concrete every Sha Qiang.It is primarily present following deficiency:
One, mortar flag stone is every Sha Qiang
1, slabstone and mortar are all by manually carrying, and also need erection construction platform after building certain altitude by laying bricks or stones, need substantial amounts of artificial and part auxiliary equipment, cause labour cost to increase, and construction highly exists potential safety hazard to one;2, slabstone grouts work progress is manual work entirely, and construction speed is slow, after Sha Qiang has built by laying bricks or stones, will wait until that the mortar of whole wall body reaches some strength and just can carry out stacking of gathering materials, affect the duration;3, building certain position casting concrete booth basis, top by laying bricks or stones every Sha Qiang, and bury steel structural embedded parts underground, volume of concrete is little, and support template difficulty in high-altitude exists potential safety hazard during the casting concrete of high-altitude;4, grouting as slabstone every Sha Qiangqiang, loader, when shovel material, easily by shovel pine bottom wall body, causes collapsing every Sha Qiang, when loader is worked at night, the phenomenon that will knock down every Sha Qiang termination often occurs;5, after engineering project completion, need to remove and carry out revegetation every Sha Qiang, its dismounting amount is big, big for environment pollution, if not removing, will be again building waste.
Two, sheet stone concrete is every Sha Qiang
When 1, pouring, artificial scaffold carries out formwork, concrete is transported to scene and is poured by concrete delivery truck, casting process manually adds sheet in concrete, using vibrating head vibration compacting, steel construction booth basis built-in fitting is buried at top underground, needs substantial amounts of artificial, template, scaffold and concrete, also need corresponding auxiliary equipment to coordinate, add construction cost;2, after having poured, the concrete health preserving that needs to sprinkle water reaches form removal after some strength, then the time needed for propping up the template of another construction section, this process is long, and progress is relatively slow, have impact on construction speed;3, use sheet stone concrete every Sha Qiang, although to solve bottom wall body by shovel pine, cause collapsing every Sha Qiang, when loader is worked at night, the phenomenon that will knock down every Sha Qiang termination occurs, but cost is high, uneconomical;4, after engineering project completion, place carries out dismounting during revegetation, every Sha Qiang, needs demolition blasting, and dismounting amount is big, removes cost high, big for environment pollution, if not removing, will be again building waste.
Either mortar flag stone is every sand wall or sheet stone concrete every Sha Qiang, and each building site must re-start constructs every sand wall, is waste for construction enterprises, and cost is the highest, causes permanent construction refuse pollution for natural environment.
Summary of the invention
The purpose of this utility model is to overcome disadvantages mentioned above and a kind of cyclicity of providing combination type high, economic and environment-friendly, easy to use, quick for installation is every Sha Qiang.
Utility model this utility model purpose and solve its technical problem underlying and realize by the following technical solutions:
A kind of combination type of the present utility model is every Sha Qiang, including base, center rest, template, fix equipped with center rest on base, center rest two ends are provided with some templates, wherein: base head is fixed with headwall, center rest is made up of the some tension boards between steelframe and the steelframe on both sides, equipped with detachable connected template between adjacent steelframe.
Combinations thereof formula is every Sha Qiang, wherein: be respectively arranged with built-in fitting between base and headwall, base and center rest, headwall and center rest.
Combinations thereof formula is every Sha Qiang, wherein: equipped with two-layer template between adjacent steelframe, and two-layer template is connected by hangers.
Combinations thereof formula is every Sha Qiang, wherein: steelframe is welded back-to-back by channel-section steel, and both sides form I-shaped socket, and template is loaded in socket.
Combinations thereof formula is every Sha Qiang, wherein: template is welded by the steel plate of both sides and middle floor, and floor is combined into " well " font.
This utility model compared with the existing technology has clear advantage and beneficial effect.From above technical scheme, combination type of the present utility model is in sand wall, and 1, concrete bed and headwall concreting, intensity is high, and loader is difficult to slide tackle wall body when shovel material, and when carrying on construction work at night, loader is difficult to knock down every Sha Qiang termination;2, bury built-in fitting underground in base and headwall, center rest is welded on built-in fitting, make center rest and base and one entirety of partition wall end head forming, strengthen the stability of whole wall body;3, two hangers on template top, the hangers in template is crossed with steel wire rope, template being sling during lifting in two center rests of insertion, its construction and installation are simple, convenient, fast, save substantial amounts of manpower and materials, accelerate construction speed, when installing second layer template, hangers just blocks bottom template, template is fixed, two pieces of template even one, enhance stablizing of template;4, backfilling fine sand between two pieces of templates, make cavity wall figure become solid every Sha Qiang, enhance the stress of wall body, and fine sand can be gathered materials on the spot, easy construction, completion is also with after removing, and has saved cost;5, combination type is every Sha Qiang, removes and be shipped to new building site and install and be continuing with after engineering project completion, and dismounting simplicity is reusable, accelerating construction progress, drops end construction cost, has saved the duration, improve productivity effect;Environmental pollution is little, reduces the building waste permanent pollution to environment.In a word, this utility model cyclicity is high, economic and environment-friendly, easy to use, quick for installation, is suitable for the combination type of Aggregate separate storage to quality every promoting the use of that sand wall makes.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the connection diagram of base and headwall;
Fig. 3 is the front view of interior Fig. 3;
Fig. 4 is the structural representation of center rest;
Fig. 5 is the structural representation of template;
Fig. 6 is use state diagram of the present utility model;
Fig. 7 is the top view of Fig. 6.
Figure identifies:
1, base;2, headwall;3, template;4, hangers;5, steelframe;6, center rest;7, tension board;8, socket;9, built-in fitting;10, floor;11, steel plate;12, fine sand.
Detailed description of the invention
Below in conjunction with accompanying drawing and preferred embodiment, a kind of combination type that the utility model proposes foundation is every sand wall detailed description of the invention, structure, feature and effect thereof, after describing in detail such as.
See Fig. 1 to Fig. 5, combination type of the present utility model is every Sha Qiang, including base 1, center rest 6, template 3, fix equipped with center rest 6 on base 1, center rest 6 two ends are provided with some templates 3, it is characterized in that: base 1 head is fixed with headwall 2, center rest 6 is made up of the some tension boards 7 between steelframe 5 and the steelframe 5 on both sides, equipped with detachable connected template 3 between adjacent steelframe 5.It is respectively arranged with built-in fitting 9 between base 1 and headwall 2, base 1 and center rest 6, headwall 2 and center rest 6.Equipped with two-layer template 3 between adjacent steelframe 5, two-layer template 3 is connected by hangers 4.Steelframe 5 is welded back-to-back by channel-section steel, and both sides form I-shaped socket 8, and template 3 is loaded in socket 8.Template 3 is welded by steel plate 11 and the middle floor 10 of both sides, and floor 10 is combined into " well " font.
Combination type of the present utility model, every the installation method of sand wall, sees Fig. 6 to Fig. 7, comprises step as follows:
(1), before installing, first casting concrete base 1 and headwall 2 in stockpiling area place, bury built-in fitting 9 underground in base 1 and headwall 2 when pouring, ready-made for system center rest 6 and template 3 transported to scene;
(2) when installing, bury center rest 6 correspondence underground built-in fitting 9, length according to template 3 has proofreaded the distance between two center rests 6, and one_to_one corresponding carries out welding and consolidates, then with the hangers 4 in steel wire penetrating template 3, with crane or loader, template 3 is sling, the I-shaped socket 8 on the alignment center rest 6 of template 3 two ends, template 3 is inserted two center rests 6, after ground floor template 3 installation, backfill fine sand 12 in the middle of two pieces of templates 3, formed every Sha Qiang, with the mounting means of ground floor template 3, second layer template 3 is installed again, hangers 4 in ground floor template 3 blocks the bottom of second layer template 3, fixing second layer template 3, two pieces of templates 3 of levels are allowed to couple together, become an entirety, depending on sand wall height needs according to practice of construction;
(3) after installing, in field, casting concrete hardens, and can carry out stacking Aggregate, after completion, extracts template 3 successively out from top, removes center rest 6, and entrucking is transported to new building site installation and is continuing with.
This utility model cyclicity is high, economic and environment-friendly, easy to use, quick for installation, is suitable for the combination type of Aggregate separate storage to quality every promoting the use of that sand wall makes.
The above, it it is only preferred embodiment of the present utility model, not this utility model is made any pro forma restriction, any without departing from technical solutions of the utility model content, any simple modification, equivalent variations and the modification made above example according to technical spirit of the present utility model, all still falls within the range of technical solutions of the utility model.
Claims (5)
1. a combination type is every Sha Qiang, including base (1), center rest (6), template (3), base (1) is upper fixing equipped with center rest (6), center rest (6) two ends are provided with some templates (3), it is characterized in that: base (1) head is fixed with headwall (2), center rest (6) is made up of the some tension boards (7) between steelframe (5) and the steelframe (5) on both sides, equipped with detachable connected template (3) between adjacent steelframe (5).
2. combination type as claimed in claim 1 is every Sha Qiang, it is characterised in that: it is respectively arranged with built-in fitting (9) between base (1) and headwall (2), base (1) and center rest (6), headwall (2) and center rest (6).
3. combination type as claimed in claim 1 is every Sha Qiang, it is characterised in that: equipped with two-layer template (3) between adjacent steelframe (5), two-layer template (3) is connected by hangers (4).
4. combination type as claimed in claim 1 is every Sha Qiang, it is characterised in that: steelframe (5) is welded back-to-back by channel-section steel, and both sides form I-shaped socket (8), and template (3) is loaded in socket (8).
5. combination type as claimed in claim 1 is every Sha Qiang, it is characterised in that: template (3) is welded by steel plate (11) and the middle floor (10) of both sides, and floor (10) is combined into " well " font.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620304050.3U CN205530816U (en) | 2016-04-13 | 2016-04-13 | Modular separate sand wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620304050.3U CN205530816U (en) | 2016-04-13 | 2016-04-13 | Modular separate sand wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205530816U true CN205530816U (en) | 2016-08-31 |
Family
ID=56791386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620304050.3U Active CN205530816U (en) | 2016-04-13 | 2016-04-13 | Modular separate sand wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205530816U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756234A (en) * | 2016-04-13 | 2016-07-13 | 贵州路桥集团有限公司 | Combined type sand isolating wall and mounting method thereof |
-
2016
- 2016-04-13 CN CN201620304050.3U patent/CN205530816U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105756234A (en) * | 2016-04-13 | 2016-07-13 | 贵州路桥集团有限公司 | Combined type sand isolating wall and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103570317B (en) | A kind of clear-water concrete using construction refuse regenerated aggregate to produce | |
CN106703834A (en) | Secondary lining integral formworking construction method for tunnel with super-large cross section | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN205576955U (en) | Raft foundation's reinforced structure is displaced into to strip footing | |
CN103469806A (en) | Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die | |
CN106013781A (en) | Slab supporting construction method and construction device by reversely suspending template | |
CN102877486A (en) | Integral cast-in-situ construction method for cable ducts | |
CN104532754B (en) | A kind of prestressed concrete box girder end-blocking template construction method | |
CN201943086U (en) | Underground building wall body | |
CN109648696A (en) | Side slope precast lattice beam of reinforcing bar connection and preparation method thereof and construction method | |
CN111997066A (en) | Manufacturing and construction method of assembled prestressed anchor cable frame beam for slope reinforcement | |
CN104328790B (en) | Cast-in-situ sprayed concrete hidden bearing platform and hidden ground beam molding bed | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN108330902A (en) | The cast-in-place bottom end rail construction method of long piled wharf | |
CN104929047A (en) | V-shaped pier outer support construction method | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
CN103215950A (en) | Pile foundation extension construction method in backfilling area | |
CN205530816U (en) | Modular separate sand wall | |
JP2014125830A (en) | Split type precast concrete foundation and assembly method therefor | |
CN110453592B (en) | Bearing platform construction process method in prefabricated stand column range | |
CN205444236U (en) | Retaining wall structure that broken concrete of junked tire - constitutes | |
CN111648256A (en) | Pier body reinforcing construction method | |
CN107142902A (en) | High head and large flow tunneling boring damming method | |
CN109024670B (en) | Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method | |
CN201605588U (en) | Structure for reinforcing and fixing slope surface of prestress anchoring frame beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |