CN106862856B - It is a kind of that work steel-pipe welding equipment being built to connection function with fixation - Google Patents

It is a kind of that work steel-pipe welding equipment being built to connection function with fixation Download PDF

Info

Publication number
CN106862856B
CN106862856B CN201710286957.0A CN201710286957A CN106862856B CN 106862856 B CN106862856 B CN 106862856B CN 201710286957 A CN201710286957 A CN 201710286957A CN 106862856 B CN106862856 B CN 106862856B
Authority
CN
China
Prior art keywords
fixedly connected
plate
support base
support
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710286957.0A
Other languages
Chinese (zh)
Other versions
CN106862856A (en
Inventor
朱静洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Baoding Meicai New Material Technology Co.,Ltd.
Original Assignee
CHONGQING PUXIANG BAODING METAL PRODUCTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING PUXIANG BAODING METAL PRODUCTS Co Ltd filed Critical CHONGQING PUXIANG BAODING METAL PRODUCTS Co Ltd
Priority to CN201710286957.0A priority Critical patent/CN106862856B/en
Publication of CN106862856A publication Critical patent/CN106862856A/en
Application granted granted Critical
Publication of CN106862856B publication Critical patent/CN106862856B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0533Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor external pipe alignment clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Arc Welding In General (AREA)

Abstract

The present invention relates to construction engineering technical fields, and disclose it is a kind of with fixation work steel-pipe welding equipment is built to connection function, including support base, the side of the support base is fixedly connected with balanced support leg, the medium position of the support base offers cavity, the bottom of the cavity inside is fixedly connected with one end of electric pushrod, and the other end of the electric pushrod is fixedly connected with the bottom of lifting support plate.There is fixation to build work steel-pipe welding equipment to connection function for this, pass through the first concave block, the setting of connecting plate, fixing bearing, threaded rod, elevating screw thread set, fixed plate and the second concave block, steel pipe is fixed preferably when welding, solves existing steel-pipe welding equipment in this way, it is all to cause welding the case where deviation occur so as to avoid the shaking of staff's arm by the way that staff is fixed by way of hand-held the problem of when in use.

Description

It is a kind of that work steel-pipe welding equipment being built to connection function with fixation
Technical field
It is specially a kind of that work steel-pipe welding is built to connection function with fixation the present invention relates to construction engineering technical field Equipment.
Background technique
Architectural engineering, refer to by construction to all kinds of building constructions and its affiliated facility and route matched with its, pipeline, The installation activity of equipment is formed by engineering entity.Wherein " building construction ", which refers to, top cover, beam column, wall, basis and can Form inner space, meet people's production, live, the engineering that study, public activity need, architectural engineering be newly-built, reconstruction or Planning, prospecting, design and construction that enlarging building construction and auxiliary construction facility are carried out, every technical work such as completion With the installing engineering of the engineering entity of completion and matched with its route, pipeline, equipment.Also refer to various houses, building Build engineering, also known as building operation amount.The dynamic material of the necessary emerging work of this part investment, is just able to achieve by construction activities.
Architectural engineering needs to use welding equipment when construction and welds steel pipe, currently, existing in the market Steel-pipe welding equipment is all that docking is fixed by way of hand-held staff when in use, will lead in this way Staff is very inconvenient when welding, but also staff's arm shakes and causes to weld when will cause welding There is the case where deviation, to reduce the quality of steel-pipe welding, and existing steel-pipe welding equipment is when in use not It is moved easily, the convenience of steel-pipe welding equipment is caused to decrease in this way.
Summary of the invention
(One)The technical issues of solution
In view of the deficiencies of the prior art, the work of building of connection function is set with steel-pipe welding with fixation the present invention provides a kind of It is standby, have the advantages that automatic fixed and easy to remove, solving existing steel-pipe welding equipment when in use cannot be automatic Inconvenient problem when fixed steel pipe and movement.
(Two)Technical solution
To realize that above-mentioned automatic fixation and purpose easy to remove, the present invention provide the following technical solutions:One kind, which has, fixes Work steel-pipe welding equipment, including support base are built to connection function, the side of the support base is fixedly connected with balance branch Support leg, the medium position of the support base offer cavity, and the bottom of the cavity inside and one end of electric pushrod are fixed The other end of connection, the electric pushrod is fixedly connected with the bottom of lifting support plate, and the lifting support plate is located at electronic push away The bottom of bar side is fixedly connected with one end of support rod, the fixed company of the other end of the support rod and the top of shifting roller It connects, the bottom of the shifting roller is pierced by through-hole and extends to the outside of support base, and the through-hole is provided with support base Bottom, the bottom of the lifting support plate are fixedly connected with kelly, and the support base is located at the fixed company in bottom of through-hole side It is connected to card hole.
Fixing support rack is fixedly connected at the top of the support base, the side of the fixing support rack is fixedly connected with Fixed support plate, the front of the fixed support plate are fixedly connected with welding machine main tank, the bottom of the welding machine main tank and conductor wire One end be fixedly connected, the other end of the conductor wire is fixedly connected with one end of plumb joint, and the other end of the plumb joint is inserted Enter the inside of fixing chuck plate and with fixing chuck plate grafting, the fixing chuck plate is fixedly connected on the front of fixed support plate.
Sliding slot is offered at the top of the support base, the inside of the sliding slot and the surface activity of sliding block connect, described The top of sliding block is fixedly connected with the bottom of the first concave block, and the side of first concave block is fixedly connected with connecting plate, institute It states and is fixedly connected with fixing bearing at the top of connecting plate, the inner wall of the fixing bearing is fixedly connected with one end of threaded rod, institute The other end for stating threaded rod passes through the outside that elevating screw thread covers and extends to elevating screw thread set, and the elevating screw thread set is embedded in solid On fixed board, the fixed plate is fixedly connected on the side of the second concave block, and the top that the support base is located at sliding slot side is solid Surely it is connected with balance fixed plate, offers balance jack in the balance fixed plate.
Preferably, there are four the quantity of the shifting roller, and four shifting rollers are separately positioned on lifting support plate Surrounding.
Preferably, the position of the kelly and the position of card hole are corresponding.
Preferably, the surface of the welding machine main tank is fixedly connected by fixed link with the front of fixed support plate.
Preferably, the size of the sliding slot is adapted with the size of sliding block.
Preferably, the quantity of first concave block and the second concave block it is equal there are two, and two the first concave blocks and Two concave blocks are symmetrical arranged by symmetry axis of the central axes of support base.
(Three)Beneficial effect
Compared with prior art, work steel-pipe welding equipment is built to connection function with fixation the present invention provides a kind of, Has following beneficial effect:
1, there is fixation to build work steel-pipe welding equipment to connection function for this, pass through the first concave block, connecting plate, fixing axle Hold, the setting of threaded rod, elevating screw thread set, fixed plate and the second concave block, allow steel pipe welding when preferably into Row is fixed, and solves existing steel-pipe welding equipment in this way, is all in such a way that staff uses and holds when in use The problem of being fixed causes welding the case where deviation occur so as to avoid the shaking of staff's arm.
2, there is fixation to build work steel-pipe welding equipment to connection function for this, pass through sliding slot, sliding block, balance fixed plate peace Weigh jack setting, allow steel pipe welding when preferably docked, make to be closed between steel pipe in this way it is more preferable, from And keep the quality of steel-pipe welding higher.
3, there is fixation to build work steel-pipe welding equipment to connection function for this, pass through electric pushrod, lifting support plate, support The setting of bar and shifting roller keeps steel-pipe welding equipment more convenient when mobile, solves existing steel-pipe welding in this way Equipment problem inconvenient when needing mobile, the case where avoiding using manual handling.
4, there is fixation to make plumb joint by the setting of fixing chuck plate to the work steel-pipe welding equipment of building of connection function for this It can preferably be placed when not in use, avoid welding equipment plumb joint when idle that from can not being consolidated Fixed problem.
5, there is fixation to build work steel-pipe welding equipment to connection function for this, and structure is simple, easy to operate, production cost It is low, convenient for marketing and use.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure of the present invention;
Fig. 2 is enlarged structure schematic diagram at the A of Fig. 1 of the present invention.
In figure:1 support base, 2 balanced support legs, 3 cavitys, 4 electric pushrods, 5 lifting support plates, 6 support rods, 7 movements Idler wheel, 8 through-holes, 9 fixing support racks, 10 fixed support plates, 11 welding machine main tanks, 12 conductor wires, 13 plumb joints, 14 fixing chuck plates, 15 sliding slots, 16 sliding blocks, 17 first concave blocks, 18 connecting plates, 19 fixing bearings, 20 threaded rods, 21 elevating screw thread sets, 22 are fixed Plate, 23 second concave blocks, 24 balance fixed plates, 25 balance jacks, 26 kellies, 27 card holes, 28 fixed links.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It is a kind of referring to FIG. 1-2, that work steel-pipe welding equipment, including support base are built to connection function with fixation(1), Support base(1)Side be fixedly connected with balanced support leg(2), support base(1)Medium position offer cavity(3), Cavity(3)Internal bottom and electric pushrod(4)One end be fixedly connected, electric pushrod(4)The other end and lifting support plate (5)Bottom be fixedly connected, go up and down support plate(5)Positioned at electric pushrod(4)The bottom of side and support rod(6)One end fix Connection, support rod(6)The other end and shifting roller(7)Top be fixedly connected, shifting roller(7)Quantity there are four, and Four shifting rollers(7)It is separately positioned on lifting support plate(5)Surrounding, shifting roller(7)Bottom be pierced by through-hole(8)And prolong Extend to support base(1)Outside, pass through electric pushrod(4), lifting support plate(5), support rod(6)And shifting roller(7)'s Setting keeps steel-pipe welding equipment more convenient when mobile, solves existing steel-pipe welding equipment in this way and needing to move When inconvenient problem, the case where avoiding using manual handling, through-hole(8)It is provided with support base(1)Bottom, rise Descending branch fagging(5)Bottom be fixedly connected with kelly(26), support base(1)Positioned at through-hole(8)The bottom of side is fixedly connected There is card hole(27), kelly(26)Position and card hole(27)Position it is corresponding.
Support base(1)Top be fixedly connected with fixing support rack(9), fixing support rack(9)Side be fixedly connected There is fixed support plate(10), fixed support plate(10)Front be fixedly connected with welding machine main tank(11), welding machine main tank(11)Table Face passes through fixed link(28)With fixed support plate(10)Front be fixedly connected, welding machine main tank(11)Bottom and conductor wire(12) One end be fixedly connected, conductor wire(12)The other end and plumb joint(13)One end be fixedly connected, plumb joint(13)It is another End insertion fixing chuck plate(14)Inside and and fixing chuck plate(14)Grafting, fixing chuck plate(14)It is fixedly connected on fixed support plate (10)Front, pass through fixing chuck plate(14)Setting, make plumb joint(13)It can preferably be put when not in use It sets, avoids welding equipment plumb joint when idle(13)The problem of can not being fixed.
Support base(1)Top offer sliding slot(15), sliding slot(15)Inside and sliding block(16)Surface activity connect It connects, sliding slot(15)Size and sliding block(16)Size be adapted, sliding block(16)Top and the first concave block(17)Bottom It is fixedly connected, the first concave block(17)Side be fixedly connected with connecting plate(18), connecting plate(18)Top be fixedly connected with Fixing bearing(19), fixing bearing(19)Inner wall and threaded rod(20)One end be fixedly connected, threaded rod(20)The other end Across elevating screw thread set(21)And extend to elevating screw thread set(21)Outside, elevating screw thread set(21)It is embedded in fixed plate(22) On, fixed plate(22)It is fixedly connected on the second concave block(23)Side, the first concave block(17)With the second concave block(23)'s There are two quantity is equal, and two the first concave blocks(17)With the second concave block(23)With support base(1)Central axes be pair Claim axial symmetry setting, passes through rotating threaded rod(20), make and threaded rod(20)The elevating screw thread set of threaded connection(21)It carries out down Drop, to make the second concave block(23)Decline and the first concave block(17)It is in contact and steel pipe is fixed, it is recessed by first Shape block(17), connecting plate(18), fixing bearing(19), threaded rod(20), elevating screw thread set(21), fixed plate(22)It is recessed with second Shape block(23)Setting, allow steel pipe welding when be preferably fixed, solve existing steel-pipe welding in this way Equipment is all by the way that staff is fixed by way of hand-held the problem of, so as to avoid work people when in use Member's arm shakes and welding is caused the case where deviation occur, support base(1)Positioned at sliding slot(15)It is fixedly connected at the top of side There is balance fixed plate(24), balance fixed plate(24)On offer balance jack(25), pass through sliding slot(15), sliding block(16), it is flat Weigh fixed plate(24)With balance jack(25)Setting, allow steel pipe welding when preferably docked, make in this way What is be closed between steel pipe is more preferable, to keep the quality of steel-pipe welding higher.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating current, and main controller can be meter Calculation machine etc. plays the conventionally known equipment of control.
In conclusion there is fixation to build work steel-pipe welding equipment to connection function for this, pass through the first concave block(17), even Fishplate bar(18), fixing bearing(19), threaded rod(20), elevating screw thread set(21), fixed plate(22)With the second concave block(23)'s Setting is fixed steel pipe preferably when welding, solves existing steel-pipe welding equipment in this way, using When be all by the way that staff is fixed by way of hand-held the problem of, so as to avoid the shaking of staff's arm Cause welding the case where deviation occur, passes through sliding slot(15), sliding block(16), balance fixed plate(24)With balance jack(25)Set Set, allow steel pipe welding when preferably docked, make to be closed between steel pipe in this way it is more preferable, to make steel pipe welding The quality connect is higher.
Pass through electric pushrod(4), lifting support plate(5), support rod(6)And shifting roller(7)Setting, make steel-pipe welding Equipment is more convenient when mobile, solves that existing steel-pipe welding equipment is inconvenient when needing mobile to ask in this way Topic, the case where avoiding using manual handling, passes through fixing chuck plate(14)Setting, make plumb joint(13)When not in use It can preferably be placed, avoid welding equipment plumb joint when idle(13)The problem of can not being fixed.
Structure is simple, easy to operate, and production cost is low, convenient for marketing and uses.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of build work steel-pipe welding equipment, including support base to connection function with fixation(1), it is characterised in that:Institute State support base(1)Side be fixedly connected with balanced support leg(2), the support base(1)Medium position open up it is free Chamber(3), the cavity(3)Internal bottom and electric pushrod(4)One end be fixedly connected, the electric pushrod(4)It is another End and lifting support plate(5)Bottom be fixedly connected, the lifting support plate(5)Positioned at electric pushrod(4)The bottom of side with Support rod(6)One end be fixedly connected, the support rod(6)The other end and shifting roller(7)Top be fixedly connected, it is described Shifting roller(7)Bottom be pierced by through-hole(8)And extend to support base(1)Outside, the through-hole(8)It is provided with support bottom Seat(1)Bottom, the lifting support plate(5)Bottom be fixedly connected with kelly(26), the support base(1)Positioned at through-hole (8)The bottom of side is fixedly connected with card hole(27);
The support base(1)Top be fixedly connected with fixing support rack(9), the fixing support rack(9)Side fix It is connected with fixed support plate(10), the fixed support plate(10)Front be fixedly connected with welding machine main tank(11), the welding machine Main tank(11)Bottom and conductor wire(12)One end be fixedly connected, the conductor wire(12)The other end and plumb joint(13)'s One end is fixedly connected, the plumb joint(13)The other end be inserted into fixing chuck plate(14)Inside and and fixing chuck plate(14)It inserts It connects, the fixing chuck plate(14)It is fixedly connected on fixed support plate(10)Front;
The support base(1)Top offer sliding slot(15), the sliding slot(15)Inside and sliding block(16)Surface it is living Dynamic connection, the sliding block(16)Top and the first concave block(17)Bottom be fixedly connected, first concave block(17)'s Side is fixedly connected with connecting plate(18), the connecting plate(18)Top be fixedly connected with fixing bearing(19), the fixation Bearing(19)Inner wall and threaded rod(20)One end be fixedly connected, the threaded rod(20)The other end pass through elevating screw thread set (21)And extend to elevating screw thread set(21)Outside, the elevating screw thread set(21)It is embedded in fixed plate(22)On, it is described solid Fixed board(22)It is fixedly connected on the second concave block(23)Side, the support base(1)Positioned at sliding slot(15)The top of side It is fixedly connected with balance fixed plate(24), the balance fixed plate(24)On offer balance jack(25).
2. it is according to claim 1 it is a kind of with fixation work steel-pipe welding equipment is built to connection function, it is characterised in that: The shifting roller(7)Quantity there are four, and four shifting rollers(7)It is separately positioned on lifting support plate(5)Surrounding.
3. it is according to claim 1 it is a kind of with fixation work steel-pipe welding equipment is built to connection function, it is characterised in that: The kelly(26)Position and card hole(27)Position it is corresponding.
4. it is according to claim 1 it is a kind of with fixation work steel-pipe welding equipment is built to connection function, it is characterised in that: The welding machine main tank(11)Surface pass through fixed link(28)With fixed support plate(10)Front be fixedly connected.
5. it is according to claim 1 it is a kind of with fixation work steel-pipe welding equipment is built to connection function, it is characterised in that: The sliding slot(15)Size and sliding block(16)Size be adapted.
6. it is according to claim 1 it is a kind of with fixation work steel-pipe welding equipment is built to connection function, it is characterised in that: First concave block(17)With the second concave block(23)Quantity it is equal there are two, and two the first concave blocks(17)It is recessed with second Shape block(23)With support base(1)Central axes for symmetry axis be symmetrical arranged.
CN201710286957.0A 2017-04-27 2017-04-27 It is a kind of that work steel-pipe welding equipment being built to connection function with fixation Active CN106862856B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710286957.0A CN106862856B (en) 2017-04-27 2017-04-27 It is a kind of that work steel-pipe welding equipment being built to connection function with fixation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710286957.0A CN106862856B (en) 2017-04-27 2017-04-27 It is a kind of that work steel-pipe welding equipment being built to connection function with fixation

Publications (2)

Publication Number Publication Date
CN106862856A CN106862856A (en) 2017-06-20
CN106862856B true CN106862856B (en) 2018-11-23

Family

ID=59161509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710286957.0A Active CN106862856B (en) 2017-04-27 2017-04-27 It is a kind of that work steel-pipe welding equipment being built to connection function with fixation

Country Status (1)

Country Link
CN (1) CN106862856B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107931938A (en) * 2017-11-14 2018-04-20 天津煜腾恒泰钢制品有限公司 A kind of welded steel fixed equipment of new rotatable commutation
CN107900583A (en) * 2017-11-21 2018-04-13 浙江经济职业技术学院 A kind of auto parts machinery production welding bench
CN110319047A (en) * 2019-06-21 2019-10-11 江苏精工泵业有限公司 A kind of novel submersible pump for fountain
CN111975261A (en) * 2020-08-28 2020-11-24 嘉兴学院 Automatic change welding equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201006564Y (en) * 2006-12-05 2008-01-16 浙江久立特材科技股份有限公司 Large diameter welding pipe longitudinal welding autotracking machine
CN105382447A (en) * 2015-12-01 2016-03-09 芜湖成德龙过滤设备有限公司 Automatic welding device
CN205147656U (en) * 2015-10-16 2016-04-13 天津金毅诺工贸有限公司 Vehicle vent -pipe installs support assembly welding jig

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1995013897A1 (en) * 1993-11-17 1995-05-26 Peter James Sims Pipe cutting apparatus
KR20080094128A (en) * 2007-04-19 2008-10-23 (주)진양비지엠텍 Apparatus for manufacturing grouting pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201006564Y (en) * 2006-12-05 2008-01-16 浙江久立特材科技股份有限公司 Large diameter welding pipe longitudinal welding autotracking machine
CN205147656U (en) * 2015-10-16 2016-04-13 天津金毅诺工贸有限公司 Vehicle vent -pipe installs support assembly welding jig
CN105382447A (en) * 2015-12-01 2016-03-09 芜湖成德龙过滤设备有限公司 Automatic welding device

Also Published As

Publication number Publication date
CN106862856A (en) 2017-06-20

Similar Documents

Publication Publication Date Title
CN106862856B (en) It is a kind of that work steel-pipe welding equipment being built to connection function with fixation
CN206971709U (en) Socket joint type disk button is rotatably connected disk and supporting construction
CN108188621A (en) It is a kind of that there is fixation to build work steel-pipe welding equipment to connection function
CN216382841U (en) Pipeline strutting arrangement for construction
CN208074270U (en) A kind of fixing device of petroleum pipeline
CN207004090U (en) A kind of construction inclined-plane supporting construction
CN103322877B (en) For checking the device of galvanizing unit zinc pot roll body state
CN206235295U (en) Ball's dead center coordinate measuring set
CN214952597U (en) Pressure-bearing detection device for production of gypsum plaster boards
CN209613700U (en) A kind of target dust-extraction unit
CN208303907U (en) A kind of reinforcing mechanisms of vertical machining centre main shaft seat
CN210441851U (en) Auxiliary device for detecting roughness of inner part of large-size stepped hole
CN201671890U (en) Three-way support mechanism of bearing box
CN207159938U (en) A kind of temporary support moulding bed for making Large Steel cylinder
CN105092020B (en) Acoustic power level test fixture
CN207647134U (en) A kind of easy-to-dismount scaffold for building
CN106290136A (en) Titanium alloy disk-like accessory anodization corrosion check fixture, device and method
CN207813124U (en) A kind of improvement of stage lifting device lifting support
CN206779783U (en) Vertical rod clamping device
CN209892984U (en) Electromechanical mounting device convenient to place instrument
CN217841031U (en) Constructional engineering steel construction strutting arrangement
CN201320668Y (en) Welding table
CN207413482U (en) A kind of hospital care rack for test tube convenient for assembling
CN208184219U (en) A kind of concrete beam mould board support
CN202820243U (en) Commodity shelf main body frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180928

Address after: 312400 No. 102, Cha Fang Chuang village, Sanjiang street, Shengzhou, Shaoxing, Zhejiang

Applicant after: Wang Jinxia

Address before: 314513 Dong Jia Bang 86, Jin Jia Cun, zhouquan Town, Tongxiang City, Jiaxing, Zhejiang

Applicant before: Zhu Jingjie

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181029

Address after: 402260 No. 2, fufu Road, Shuang Fu New District, Jiangjin District, Chongqing

Applicant after: Chongqing Puxiang Baoding Metal Products Co., Ltd.

Address before: 312400 No. 102, Cha Fang Chuang village, Sanjiang street, Shengzhou, Shaoxing, Zhejiang

Applicant before: Wang Jinxia

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 402260 No. 2, fufu Road, Shuang Fu New District, Jiangjin District, Chongqing

Patentee after: Chongqing Baoding Meicai New Material Technology Co.,Ltd.

Address before: 402260 No. 2, fufu Road, Shuang Fu New District, Jiangjin District, Chongqing

Patentee before: CHONGQING PUXIANG BAODING METAL PRODUCT CO.,LTD.

CP01 Change in the name or title of a patent holder