CN207159938U - A kind of temporary support moulding bed for making Large Steel cylinder - Google Patents
A kind of temporary support moulding bed for making Large Steel cylinder Download PDFInfo
- Publication number
- CN207159938U CN207159938U CN201720781942.7U CN201720781942U CN207159938U CN 207159938 U CN207159938 U CN 207159938U CN 201720781942 U CN201720781942 U CN 201720781942U CN 207159938 U CN207159938 U CN 207159938U
- Authority
- CN
- China
- Prior art keywords
- moulding bed
- hanger
- cell board
- steel cylinder
- temporary support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 77
- 239000010959 steel Substances 0.000 title claims abstract description 77
- 238000000465 moulding Methods 0.000 title claims abstract description 33
- 238000003466 welding Methods 0.000 claims description 6
- 239000007787 solid Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 6
- 239000000463 material Substances 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 241000282326 Felis catus Species 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000035807 sensation Effects 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model is applied to construction engineering technical field, there is provided a kind of temporary support moulding bed for making Large Steel cylinder.The temporary support moulding bed includes bracket and some supporting adn fixing devices, some fixtures are installed on bracket, there is a guide groove between two relative fixtures, supporting adn fixing device includes first fixation kit on the inside of arc cell board, first fixation kit includes support bar and two hangers, one of hanger is arranged on the middle and upper part of arc cell board, and another hanger is installed on the ground, and the both ends of support bar are detachably connected on two hangers respectively.The utility model is supported using bracket to arc cell board, arc cell board bottom is precisely fixed by guide groove, and the middle and upper part of arc cell board is supported by the first fixation kit and fixed, it is effectively fixed and assembled so as to be carried out to arc unit piece, effectively reduce moulding bed materials'use amount, cost is saved, improves producing efficiency and precision.
Description
Technical field
The utility model belongs to construction engineering technical field, more particularly to a kind of temporary support tire for making Large Steel cylinder
Frame.
Background technology
In recent years, with the continuous breakthrough of domestic reclamation engineering technology, Large Steel cylinder because of it to Deep Thick Soft Ground
Base, the depth of water adverse circumstances that the wave is high have good adaptability, gradually start extensive use.Steel cylinder belongs to thin wall cylindrical housing
Structure, its height is high, and diameter is big.φ 30m are directly reached using the steel cylinder of maximum in current domestic reclamation, are highly reached
40m.And the shaping generally use vertical fragmentation method manufacture of steel cylinder, formed by six decile curved plate unit spliceds, arc-shaped steel
After the completion of Slab element manufactures in workshop, outfield need to be arrived and be always combined into steel cylinder.
As shown in figure 1, the existing way for making cylindrical steel tube is that the moulding bed is by six roots of sensation tubing string using moulding bed in regular hexagon
The 101 regular hexagon supports 102 formed with some steel pipes, which are set up, to be formed, if equably being installed along all circumferential directions in the bottom of moulding bed
Dry pad pier 103, every piece of curved plate 104 is lifted between two adjacent tubing strings 101 and is arranged on moulding bed, and by pad pier
103 are supported and are fixed with connector 105, and cat ladder 106 is set up on tubing string 101, above and below workmen, so as to by six
Block curved plate is mutually spliced into large-scale cylindrical steel tube.
The above-mentioned way for being used to make cylindrical steel tube has the following disadvantages:(1) moulding bed steel using amount is big, Production Time is long, cost
It is high;(2) installation of moulding bed is low with removing efficiency;(3) each pad pier supports the overall leveling of curved plate to be independently arranged structure
Spend low, influence the making precision of steel cylinder;(4) after the completion of cylindrical steel tube assembly, interior moulding bed remove lift by crane during easily and steel
Pipe collides, and influences body quality, and require high to the hoisting height of hoisting technology and lifting appliance.
Utility model content
The utility model embodiment technical problem to be solved is to provide a kind of interim branch for making Large Steel cylinder
Support frame, it is intended to which the cost height present in the production method of the Large Steel cylinder of prior art, producing efficiency are low and make precision
The problem of low.
The utility model embodiment, which is achieved in that, provides a kind of temporary support moulding bed for making Large Steel cylinder, greatly
Shaped steel cylinder is spliced by some arc cell boards;Temporary support moulding bed includes bracket and some supporting adn fixing devices, described
Some fixtures are installed on bracket, there is one to be used to plant leading for arc cell board between relative two fixtures
To groove, the supporting adn fixing device includes first fixation kit on the inside of the arc cell board, and described first is solid
Determining component includes support bar and two hangers, and one of them described hanger is arranged on the middle and upper part of arc cell board, another institute
State hanger installation on the ground, the both ends of the support bar are detachably connected on two described hangers respectively.
Further, the inclined-plane for being oriented to arc cell board is provided with the fixture.
Further, the both ends of the support bar are bolted to connection with the hanger.
Further, the bracket includes some support columns and some H profile steel parts, and the H profile steel part is welded on the branch
The upper end of dagger, described some H profile steel parts, which are welded to each other, forms a steel platform, and described some fixtures are welded on described
In steel platform.
Further, the steel platform is formed some for entering Large Steel for workmen with described some support columns
The passage of cylinder interior.
Further, first fixation kit also includes the first rod member and the second bar being welded on the support bar
Part, first rod member are connected by hanger with the middle and lower part of arc cell board, and second rod member passes through hanger and the support
Frame connects.
Further, first rod member is bolted to connection with the second rod member with the hanger.
Further, the supporting adn fixing device is also consolidated including two are located inside and outside arc cell board respectively second
Determine component, second fixation kit includes steel wire rope and two hangers, and one of them described hanger is arranged on arc cell board
Top, on the ground, the both ends of the steel wire rope are removably tightened in described two respectively for another described hanger installation
On individual hanger.
Further, the both ends of the steel wire rope are fixedly connected by steel wire buckle with the hanger.
Compared with prior art, beneficial effect is the utility model embodiment:The utility model is using bracket to arc
Cell board is supported, and the bottom of arc cell board is fixed by guide groove, ensures arc cell board accurate positioning;And
And the middle and upper part of arc cell board is carried out being detachably fixed support by the first fixation kit, so as to arc unit piece
Effectively fix, effectively reduce moulding bed materials'use amount, save cost, improve producing efficiency and make precision, and
Reduce in moulding bed unloading process to hanging device performance requirement.
Brief description of the drawings
Fig. 1 is the support jig schematic diagram for the making steel cylinder that prior art provides;
Fig. 2 is the temporary support moulding bed plan structure signal for the making Large Steel cylinder that the utility model embodiment provides
Figure;
Fig. 3 is that the B-B direction in 2 regards structural representation;
Fig. 4 is the C regions mplifying structure schematic diagram in Fig. 3.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation
Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining
The utility model, it is not used to limit the utility model.
As shown in Figures 2 to 4, a kind of temporary support tire for making Large Steel cylinder provided for the utility model embodiment
Frame.Wherein Large Steel cylinder is spliced by some arc cell board A, and temporary support moulding bed includes bracket 1 and some supports are solid
Determine device 2.Specifically, some fixtures 3 are installed on bracket 1, there is one to be used to plant between relative two fixtures 3
The guide groove 30 of arc cell board.The inclined-plane 31 for being oriented to arc cell board A is provided with fixture 3 so that
When being lifted to arc cell board A, it is easy to arc cell board A bottom to slide and is directed into guide groove 30, ensure arc list
First plate A's is accurately positioned.Bracket 1 includes some support columns 11 and some H profile steel parts 12, H profile steel part 12 are welded on support column 11
Upper end, some H profile steel parts 12 be welded to each other form a steel platform, the surface of steel platform need to ensure flatness requirement, be used for
Flat support is carried out to each arc cell board A.Some fixtures 3 are welded in steel platform, steel platform and some support columns 11
Some passages 13 for being used to enter Large Steel cylinder interior for workmen are formed, is advantageous to workmen and conveniently enters Large Steel
Welding procedure is carried out in cylinder.
In above-described embodiment, supporting adn fixing device 2 includes the first fixation kit and two on the inside of arc cell board A
The second fixation kit inside and outside arc cell board A respectively.Wherein, the first fixation kit includes support bar 51, two
Hanger 42 and the first rod member 52 and the second rod member 53 being welded on support bar 51.One of hanger 42 passes through welding manner
The inner side of arc cell board A middle and upper parts is fixedly mounted on, another hanger 42 is fixed by welding manner or screw threads for fastening mode
On the ground, the both ends of support bar 51 are detachably connected on two hangers 42 respectively, specially the two of support bar 51 for installation
End is fixedly connected with hanger 42 by bolt (not shown).First rod member 52 passes through in hanger 42 and arc cell board A
Lower inside is connected, and the second rod member 53 is connected by hanger 42 with bracket 1, specially the first rod member 52 and the second rod member 53 with
Hanger 42 is bolted to connection, convenient disassembly, is repeated and is utilized.
In above-described embodiment, the second fixation kit includes steel wire rope 41 and two hangers 42, and one of hanger 42 passes through
Welding manner is fixedly mounted on arc cell board A top, and another hanger 42 is consolidated by welding manner or screw threads for fastening mode
Dingan County fills on the ground, the both ends of steel wire rope 41 are removably tightened on two hangers 42 respectively, specially steel wire rope 41
Both ends are fixedly connected by steel wire buckle (not shown) with hanger 42, convenient disassembly, are repeated and are utilized.
The joining method that above-mentioned temporary support moulding bed makes Large Steel cylinder comprises the following steps:
A, the steel constructions such as bracket 1, fixture 3, steel wire rope 41, hanger 42 and support bar 51 are made in factory.
B, suitable area is chosen, line positioning, places bracket 1, and fixture 3 is welded on bracket 1, is welded on the ground
Fixed hanger 42 is connect, and ensures that hanger 42, bracket 1 are reliably connected with ground.
C, arc cell board A is made, chooses accurate location welding hanger 42.
D, before arc cell board A liftings, support bar 51, steel wire rope 41 and arc cell board A are utilized into spiral shell by hanger
Tether and connect.
E, arc cell board A is lifted, arc cell board A bottom is carried out by the fixture 3 on bracket 1 effectively solid
It is fixed, fixation is supported to arc cell board A by support bar 51, steel wire rope 41, ensures that arc cell board location A is accurate, and
Arc cell board A is carried out effectively fixed.
F, arc cell board A is lifted successively, is welded into Large Steel cylinder.
In summary, the temporary support moulding bed of the present utility model for making Large Steel cylinder, greatly reduces moulding bed material
Usage amount, reduce difficulty of construction, it is simple to operate, there is provided efficiency of construction, enhance to arc cell board A positioning it is accurate
Property, reduce in moulding bed unloading process to hanging device performance requirement, and repeatable utilization can be carried out to moulding bed, meet industry
Change form of construction work.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (9)
1. a kind of temporary support moulding bed for making Large Steel cylinder, Large Steel cylinder are spliced by some arc cell boards;Its
It is characterised by, the temporary support moulding bed includes bracket and some supporting adn fixing devices, and some fixations are provided with the bracket
Part, there is a guide groove for being used to plant arc cell board, the fixed dress of support between relative two fixtures
The first fixation kit including one on the inside of the arc cell board is put, first fixation kit includes support bar and two
Individual hanger, one of them described hanger are arranged on the middle and upper part of arc cell board, and another described hanger is installed on the ground, institute
The both ends for stating support bar are detachably connected on two described hangers respectively.
2. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 1, it is characterised in that set on the fixture
It is equipped with the inclined-plane for being oriented to arc cell board.
3. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 1, it is characterised in that the two of the support bar
End is bolted to connection with the hanger.
4. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 1, it is characterised in that if the bracket includes
Heavenly Stems and Earthly Branches dagger and some H profile steel parts, the H profile steel part are welded on the upper end of the support column, and described some H profile steel parts are mutual
A steel platform is formed by welding, described some fixtures are welded in the steel platform.
5. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 4, it is characterised in that the steel platform and institute
Some support columns stated form some passages for being used to enter Large Steel cylinder interior for workmen.
6. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 1, it is characterised in that the first fixation group
Part also includes the first rod member and the second rod member being welded on the support bar, and first rod member passes through hanger and arc unit
The middle and lower part connection of plate, second rod member are connected by hanger with the bracket.
7. as claimed in claim 6 make Large Steel cylinder temporary support moulding bed, it is characterised in that first rod member with
Second rod member is bolted to connection with the hanger.
8. the temporary support moulding bed of Large Steel cylinder is made as claimed in any of claims 1 to 7 in one of claims, it is characterised in that
The supporting adn fixing device also includes two the second fixation kits inside and outside arc cell board respectively, and described second is solid
Determining component includes steel wire rope and two hangers, and one of them described hanger is arranged on the top of arc cell board, described in another
Hanger is installed on the ground, and the both ends of the steel wire rope are removably tightened on two described hangers respectively.
9. the temporary support moulding bed of Large Steel cylinder is made as claimed in claim 8, it is characterised in that the two of the steel wire rope
End is fixedly connected by steel wire buckle with the hanger.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720781942.7U CN207159938U (en) | 2017-06-30 | 2017-06-30 | A kind of temporary support moulding bed for making Large Steel cylinder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720781942.7U CN207159938U (en) | 2017-06-30 | 2017-06-30 | A kind of temporary support moulding bed for making Large Steel cylinder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207159938U true CN207159938U (en) | 2018-03-30 |
Family
ID=61710683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720781942.7U Active CN207159938U (en) | 2017-06-30 | 2017-06-30 | A kind of temporary support moulding bed for making Large Steel cylinder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207159938U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338766A (en) * | 2017-06-30 | 2017-11-10 | 中建钢构有限公司 | Make the temporary support moulding bed and assembling method of Large Steel cylinder |
-
2017
- 2017-06-30 CN CN201720781942.7U patent/CN207159938U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107338766A (en) * | 2017-06-30 | 2017-11-10 | 中建钢构有限公司 | Make the temporary support moulding bed and assembling method of Large Steel cylinder |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203640309U (en) | Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame | |
CN207159938U (en) | A kind of temporary support moulding bed for making Large Steel cylinder | |
CN101890757B (en) | Assembled adjustable steel bar binding clamping fixture support | |
CN106812215B (en) | A kind of prefabricated PC steel core concrete column column connection type | |
CN101892679B (en) | Test device for simulating washing and bearing coupled characteristic of underwater pile foundation | |
CN106150105A (en) | A kind of stiffened column installation method | |
CN103341706B (en) | A kind of 300 feet of pile legs of self-elevating drilling platform structure jig frame specials | |
CN208899333U (en) | A kind of space curved surface suspension cable beam-ends cable guide pipe positioning device | |
CN216239786U (en) | Steel column grouting tool | |
CN103362315B (en) | Hanger for integral hoisting of pipeline and construction method thereof | |
CN205363119U (en) | A welding stent system that be used for waterproof wall body engineering to drawing screw rod | |
CN203111475U (en) | Anchor platform structure manufactured through integral manufacturing process of drilling-ship anchor platform | |
CN206495329U (en) | Adjustable high-precision foundation bolt reinforcing mold and reinforcing system | |
CN211173094U (en) | Novel high-low grade concrete interception tool | |
CN211110532U (en) | Wall-attached structure of super-long elevator with gradual change structure | |
CN107338766A (en) | Make the temporary support moulding bed and assembling method of Large Steel cylinder | |
CN204382575U (en) | A kind of plastic pipe double molds forming machine | |
CN111779010A (en) | Water collecting and draining device for deep foundation pit in building construction | |
CN203284886U (en) | Connection node structure of rectangular steel pipe column and I-shaped steel beam | |
CN203081019U (en) | Universal installation base of wire pole or lamp pole | |
CN107022956B (en) | A kind of bridge pier column steel form climbing system and its implementation method | |
CN207577883U (en) | A kind of stainless steel welded formula combined platform | |
CN206305640U (en) | A kind of aid for offshore platform outboard lamp support tube chamber welds with base | |
CN204899034U (en) | Prefabricated wall post | |
CN212222215U (en) | Carrying pole beam hanger supporting tool rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Science And Industry Co.,Ltd. Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701 Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address |