Glass wool cloth mounting method mending concrete sluice plate crack Download PDFInfo
- Publication number
- CN106854868A CN106854868A CN201510946111.6A CN201510946111A CN106854868A CN 106854868 A CN106854868 A CN 106854868A CN 201510946111 A CN201510946111 A CN 201510946111A CN 106854868 A CN106854868 A CN 106854868A
- Authority
- CN
- China
- Prior art keywords
- glass wool
- wool cloth
- crack
- sluice
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/20—Movable barrages; Lock or dry-dock gates
- E02B7/54—Sealings for gates
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Sewage (AREA)
Abstract
The application is claimed a kind of glass wool cloth mounting method mending concrete sluice plate crack.When crack occurs in sluice plate, the lighter will cause the infiltration of sluice, leak, and infiltration, water leakage increase when serious, when there is piping, will jeopardize the safety of sluice.Therefore, it is to ensure the normal operation of sluice and safely, it is necessary to a kind of preferable crack repairing method of relatively simple and effect.Before repairing mixed mud sluice plate crack with glass wool cloth mounting method, by the concrete dabbing of soleplate crack both sides, width is 300mm or so, and depth is 10~20mm, exposes the new face of concrete, and is rinsed well, then is dried with infrared lamp.Then the epoxy cement slurry that will be modulated fills crack, with the floating dabbing position of trowel.Uniform one layer of epoxy base fluid of brush on sticking veneer is pasted before glass wool cloth, is sticked cutting out in advance and having rolled up the glass wool cloth on paper web, then floating with brush.Then the brush epoxy base fluid on glass wool cloth, pastes the second layer and third layer in the same way.The glass wool cloth on upper strata should be than next slice width 20mm.
Description
1. art
The present invention relates to a kind of concrete sluice floor crack repairing method, the lighter will cause infiltration, leak when especially crack occurs in concrete water gate floor, normal operation and the safety of sluice will be had influence on when serious, mending concrete sluice plate crack is extremely important to the normal operation and safety for ensureing sluice.
2. background technology
Sluice is widely used in field irrigation, discharge conduit, urban drainage pipe duct, the control of river water level and flow;The diversion of irrigation canal and urban water supply engineering water source;Flood control works;Many aspects such as the gear tide of coastal river course and channel.If crack occurs in concrete water gate floor, the lighter will cause the infiltration of sluice, drainage, particularly when sluice water levels of upstream and downstream difference is larger, will roll up infiltration, leak, will have influence on the normal of sluice and uses;Infiltration, leak are also possible to be pulled away the mud particles of sluice plate bottom, form piping, injure the safety of sluice.Therefore, it is the normal operation of guarantee sluice and safety, it is necessary to be repaired to concrete water pocket floor plank split when crack occurs in concrete water gate floor.Glass wool cloth mounting method mending concrete sluice plate crack is a kind of preferable method of relatively simple and effect.
3. the content of the invention
When crack occurs in concrete water gate floor, the lighter will cause the infiltration of sluice, leak, and infiltration, water leakage increase when serious, when there is piping, will jeopardize the safety of sluice.Therefore, when crack occurs in concrete water gate floor, to ensure the normal operation of sluice with safety, it is necessary to a kind of preferable crack repairing method of relatively simple and effect.
Before glass wool cloth mounting method mending concrete sluice plate crack, by the concrete dabbing of soleplate crack (3) both sides, expose the new face of concrete, then epoxy cement slurry is filled into crack (3), paste the preceding one layer of epoxy base fluid (2) of uniform brush on sticking veneer of glass wool cloth (1), the glass wool cloth (1) cut out in advance is sticked, it is floating with brush, glass wool cloth is combined closely with concrete surface.Then the brush epoxy base fluid (2) on glass wool cloth (1), pastes the second layer and third layer in the same way.Refer to Figure of description.
The beneficial effects of the invention are as follows with relatively simple method mending concrete sluice plate crack, the crack infiltration of elimination concrete water gate floor, drainage.
4. illustrate
Fig. 1 glass wool cloths paste figure, below in conjunction with the accompanying drawings 1 and embodiment the present invention is further described.1. glass wool cloth in Fig. 1,2. epoxy base fluid, 3. concrete water pocket floor plank split.
5. specific embodiment
Before repairing mixed mud sluice plate crack with glass wool cloth mounting method, by the concrete dabbing of soleplate crack (3) both sides, width is 300mm or so, and depth is 10~20mm, exposes the new face of concrete, and is rinsed well, then is dried with infrared lamp.Then epoxy cement slurry (formula is shown in Table 1) that will be modulated fills crack (3), with the floating dabbing position of trowel.Paste the preceding one layer of epoxy base fluid (2) (formula is shown in Table 1) of uniform brush on sticking veneer of glass wool cloth (1), sticked cutting out in advance and having rolled up the glass wool cloth on paper web (1), it is floating with brush again, glass wool cloth is combined closely with concrete surface.Then the brush epoxy base fluid (2) on glass wool cloth (1), pastes the second layer and third layer in the same way.The glass wool cloth on upper strata should be than next slice width 20mm.
The epoxy adhesive material formula table of table 1 (weight ratio)
Claims (1)
1. a kind of glass wool cloth mounting method mending concrete sluice plate crack, the concrete dabbing of soleplate crack (3) both sides is revealed
Go out the new face of concrete, epoxy cement slurry is then filled into crack (3), paste one layer of ring of brush uniform on sticking veneer before glass wool cloth (1)
Epoxide liquid (2), sticks the glass wool cloth (1) cut out in advance, then the brush epoxy base fluid (2) on glass wool cloth (1), by same
Method pastes the second layer and third layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510946111.6A CN106854868A (en) | 2015-12-09 | 2015-12-09 | Glass wool cloth mounting method mending concrete sluice plate crack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510946111.6A CN106854868A (en) | 2015-12-09 | 2015-12-09 | Glass wool cloth mounting method mending concrete sluice plate crack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106854868A true CN106854868A (en) | 2017-06-16 |
Family
ID=59125691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510946111.6A Pending CN106854868A (en) | 2015-12-09 | 2015-12-09 | Glass wool cloth mounting method mending concrete sluice plate crack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106854868A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107807080A (en) * | 2017-10-12 | 2018-03-16 | 乔欢欢 | A kind of building wall seam repairs the impermeable detection means of pitch and its detection method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1626735A (en) * | 2003-12-09 | 2005-06-15 | 长春市长生工程加固有限公司 | Waterproof sealing equipment for deformation slots on upper faceplate of dam prepared from rock dump and concrete |
JP2009174255A (en) * | 2008-01-28 | 2009-08-06 | Aica Kogyo Co Ltd | Irrigation channel repairing method and modification method |
CN101701455A (en) * | 2009-11-05 | 2010-05-05 | 河南省水利科学研究院 | Seepage-proofing processing method of channel concrete panel crack |
CN202945622U (en) * | 2012-11-26 | 2013-05-22 | 浙江信博城市建设有限公司 | Composite repaired structure of reinforced concrete base plate cracks in basement |
CN203229927U (en) * | 2013-03-21 | 2013-10-09 | 河海大学 | Treatment structure for dam body upstream face superficial layer temperature crack |
CN103981839A (en) * | 2014-06-05 | 2014-08-13 | 凌贤长 | Fixing method for repairing old concrete gravity dam with cracks through FRP |
-
2015
- 2015-12-09 CN CN201510946111.6A patent/CN106854868A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1626735A (en) * | 2003-12-09 | 2005-06-15 | 长春市长生工程加固有限公司 | Waterproof sealing equipment for deformation slots on upper faceplate of dam prepared from rock dump and concrete |
JP2009174255A (en) * | 2008-01-28 | 2009-08-06 | Aica Kogyo Co Ltd | Irrigation channel repairing method and modification method |
CN101701455A (en) * | 2009-11-05 | 2010-05-05 | 河南省水利科学研究院 | Seepage-proofing processing method of channel concrete panel crack |
CN202945622U (en) * | 2012-11-26 | 2013-05-22 | 浙江信博城市建设有限公司 | Composite repaired structure of reinforced concrete base plate cracks in basement |
CN203229927U (en) * | 2013-03-21 | 2013-10-09 | 河海大学 | Treatment structure for dam body upstream face superficial layer temperature crack |
CN103981839A (en) * | 2014-06-05 | 2014-08-13 | 凌贤长 | Fixing method for repairing old concrete gravity dam with cracks through FRP |
Non-Patent Citations (1)
Title |
---|
汤理真: "《泵站工程经营管理》", 31 January 2014, 安徽科学技术出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107807080A (en) * | 2017-10-12 | 2018-03-16 | 乔欢欢 | A kind of building wall seam repairs the impermeable detection means of pitch and its detection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103343543B (en) | Foundation pit dewatering well pressure-reduction-type plugging method | |
CN101701455B (en) | Seepage-proofing processing method of channel concrete panel crack | |
CN103967507B (en) | A kind of curtain-grouting technique being suitable for rich water mine down-hole exploitation water blockoff | |
CN203924083U (en) | Cushion cap excavation of foundation pit well-points dewatering device | |
CN104060619B (en) | Construction method and structure of hydraulic core-wall rockfill dam without cofferdams | |
CN107012832A (en) | Plugging structure and method under a kind of CFRD percolating water | |
CN203939060U (en) | Slight seepage block structure of underground continuous wall | |
CN106854868A (en) | Glass wool cloth mounting method mending concrete sluice plate crack | |
CN103967506B (en) | A kind of ore body roof Karst Fissures is grown and the curtain-grouting method in strong Fu Shui mineral deposit | |
CN109138116A (en) | Concrete expires packet drainage pipeline tubine construction method | |
CN106498905B (en) | A kind of concrete gravity dam transverse joint water seepage treatment structure and processing method | |
CN104399740A (en) | Horizontal water stopping layer structure and method thereof for contaminated soil remediation | |
CN112523170A (en) | Seepage-proofing treatment method for deep-buried karst seepage channel of reservoir | |
CN102943568B (en) | Chemical remediation method of micro-damage moistureproof layer | |
CN206693158U (en) | Plugging structure under a kind of CFRD percolating water | |
CN108252269B (en) | Impervious watertight structure in hydraulic engineering | |
CN106120829A (en) | A kind of deep hole grout curtain overfall thickens construction method | |
CN207597377U (en) | Water conservancy and hydropower lining for building discharge structure | |
CN104412749A (en) | Process for improving heavily salinized soil in saline-alkali wasteland by using capillary pervious drain belt | |
CN205531429U (en) | Quick hole sealing device of biliquid slip casting bag pocket type | |
CN204266231U (en) | Pipe trench connecting sewing syndeton | |
CN205605158U (en) | Miniature coating leaking stoppage ball of oil well | |
CN206273898U (en) | A kind of dirty groove of U-shaped section of Fast Installation | |
CN108316362B (en) | A kind of water seepage prevention method for refuse landfill | |
CN108374468B (en) | Method for blocking damage of old flood drainage system of tailing pond |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170616 |