CN106845794A - A kind of online check method of electric network model that system is dispatched for intelligent grid - Google Patents
A kind of online check method of electric network model that system is dispatched for intelligent grid Download PDFInfo
- Publication number
- CN106845794A CN106845794A CN201611231118.0A CN201611231118A CN106845794A CN 106845794 A CN106845794 A CN 106845794A CN 201611231118 A CN201611231118 A CN 201611231118A CN 106845794 A CN106845794 A CN 106845794A
- Authority
- CN
- China
- Prior art keywords
- model
- check
- electric network
- rule
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 48
- 230000008569 process Effects 0.000 claims abstract description 21
- 238000012423 maintenance Methods 0.000 claims abstract description 14
- 238000004458 analytical method Methods 0.000 claims abstract description 12
- 238000007619 statistical method Methods 0.000 claims abstract description 6
- 238000003860 storage Methods 0.000 claims description 4
- 230000014759 maintenance of location Effects 0.000 claims description 3
- 241000208340 Araliaceae Species 0.000 claims 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 claims 1
- 235000003140 Panax quinquefolius Nutrition 0.000 claims 1
- 235000008434 ginseng Nutrition 0.000 claims 1
- 230000006870 function Effects 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 241000406668 Loxodonta cyclotis Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of online check method of electric network model that system is dispatched for intelligent grid, comprise the following steps, step(A), set up Model Checking rule base and configuration operating process;Step(B), the structure of the electric network model check object based on CIM;Step(C), on-time model maintenance check statistical analysis.The online check method of electric network model that system is dispatched for intelligent grid of the invention, the correctness of electric network model can efficiently be checked, on-time model is checked and provides function of statistic analysis, the performance assessment criteria of model maintenance can be given by attendant, error-prone place, has a good application prospect during analysis modeling.
Description
Technical field
The present invention relates to power network dispatching system technical field, and in particular to a kind of power network that system is dispatched for intelligent grid
The online check method of model.
Background technology
Electric network model is a kind of digitized description of objective electric power grid structure, is the basis of power system software analysis.
Intelligent scheduling requirement is complete, consistent, accurate, timely, reliable grid model data is supported.Thus it is guaranteed that electric network model is complete
Whole property and correctness are the core links during automatic System Construction.
With the construction of network system, the increasingly complicated application related to intelligent grid scheduling system of power network characteristic is more next
More, the pressure of the electric network model maintenance for thus being brought to control centre is also increasing, if electric network model safeguards improper, having can
Significant impact can be caused to the safe operation of power network.Therefore, in the urgent need to research intelligent grid scheduling system in-stockroom operation standard
Change online Verification Technology, realize standardizing intelligent grid Dispatching Control System I areas the online management and control of O&M.
The content of the invention
The purpose of the present invention is to overcome existing control centre to bring the pressure that electric network model is safeguarded also increasing, if electric
It is improper that pessimistic concurrency control is safeguarded, it is possible to which the safe operation to power network causes the problem of significant impact.It is of the invention for intelligent grid
The online check method of electric network model of scheduling system, can efficiently check the correctness of electric network model, and on-time model is checked and provided
Function of statistic analysis, can be provided the performance assessment criteria of model maintenance by attendant, error-prone place during analysis modeling,
Have a good application prospect.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of online check method of electric network model that system is dispatched for intelligent grid, it is characterised in that:Comprise the following steps,
Step(A), set up Model Checking rule base and configuration operating process;
Step(B), the structure of the electric network model check object based on CIM;
Step(C), on-time model maintenance check statistical analysis.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:Step(A),
Model Checking rule base and configuration operating process are set up, are comprised the following steps,
(A1)Model Checking rule base is set up, including model real-time check rule and model check rule afterwards;
(A2)Set up the process mode of on-time model check;
(A3)Operating personnel's list of operating maintenance is set up, and is bound with process mode.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:The model
Real-time check rule, including model parameter missing is checked rule, model parameter mistake check rule, model parameter and deviates normal value
Check rule.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:The model
Afterwards check rule, including model topologically correct property check rule, model relating attribute correctness check rule, based on electricity
The correctness of Force system rule checks rule.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:(A2)Set up
The process mode that on-time model is checked, including procedure below,
(1)Process mode is checked in thing, Selection Model real-time check rule is checked in this mode;
(2)Process mode is checked afterwards, and Selection Model is checked rule and checked afterwards in this mode.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:Step(B),
Electric network model based on CIM checks the structure of object, is to be mapped as CIM power network moulds in computer by the way that model in data recorded
Realized in type object, including CIM Object Creations class, CIM object properties class, CIM object class.
It is previously described for the online check method of electric network model that intelligent grid dispatches system, it is characterised in that:Step(C),
On-time model is safeguarded and checks statistical analysis, and on-time model provides the personnel of being based on, time, the modeling statistics analysis of three dimensions of model
Function, on-time model is checked by human users' information during check, checks information time, and checks object, according to people
Member, time, in three dimension storages of model scope to database, for subsequent query analysis.
The beneficial effects of the invention are as follows:The electric network model side of check online for intelligent grid scheduling system of the invention
Method, can efficiently check the correctness of electric network model, and on-time model is checked and provides function of statistic analysis, can be given by attendant
Go out the performance assessment criteria of model maintenance, error-prone place, has a good application prospect during analysis modeling.
Brief description of the drawings
Fig. 1 is the flow chart of the online check method of electric network model for intelligent grid scheduling system of the invention.
Specific embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in figure 1, the online check method of electric network model that system is dispatched for intelligent grid of the invention, including it is following
Step,
Step(A), Model Checking rule base and configuration operating process are set up, comprise the following steps,
(A1)Model Checking rule base is set up, including model real-time check rule and model check rule, the model reality afterwards
Shi Jiaohe rules, including model parameter missing is checked rule, model parameter mistake check rule, model parameter and deviates normal value school
Core rule;The model checks rule afterwards, including the topologically correct property of model checks rule, the relating attribute correctness of model
Check rule, the correctness based on electric power system planning and check rule;
(A2)The process mode of on-time model check, including procedure below are set up,
(1)Process mode is checked in thing, Selection Model real-time check rule is checked in this mode;
(2)Process mode is checked afterwards, and Selection Model is checked rule and checked afterwards in this mode;
(A3)Operating personnel's list of operating maintenance is set up, and is bound with process mode;
Step(B), the electric network model based on CIM checks the structure of object, is to be mapped as calculating by by model record in data
Realized in CIM electric network models object in machine, including CIM Object Creations class, CIM object properties class, CIM object class, specific table
It is now as follows:
CIM Object Creation classes, such mainly includes CimSchema and CimObjFactory classes.Wherein CimSchema classes master
Be used to reading CIM/RDFS fileinfos, CimObjFactory classes are used to applying calculator memory, establishment specify based on
The electric network model object of CIM/RDFS;CIM object properties classes, such mainly includes CimType classes, CimAttr classes,
CimProperty classes, wherein CimType classes define the CIM class names of electric network model object and the parent and subclass of the CIM classes
Information, CimAttr classes define the CIM attribute informations of electric network model object, and CIM attribute informations dtd--data type definition, such as
INT types, STRING types, many-one association, one-to-many association etc., CimProperty classes are used to define and obtain electric network model pair
The property value of elephant;CIM object class, main class is CimObject classes, and such is the CIM electricity constituted based on the above two class
Implementing for pessimistic concurrency control object, all attribute informations based on CIM of the electric network model object can be obtained by such;
Step(C), on-time model safeguard check statistical analysis, on-time model provide be based on personnel, the time, three dimensions of model
Modeling statistics analytic function, on-time model is checked by human users' information during check, checks information time, and check
Object, according to personnel, time, in three dimension storages of model scope to database, for subsequent query analysis.
In sum, the online check method of electric network model that system is dispatched for intelligent grid of the invention, by setting up
Model Checking rule base and configuration operating process, automation operation maintenance personnel are entered according to the check rule and flow that pre-define
Row model maintenance works, according to the stage of model maintenance in the pattern of Model Checking, it is online check flow be divided into thing check and
Check afterwards, it is that, to submitting the real-time check for recording to, it is to selected model scope after model is put in storage to check afterwards to be checked in thing
Overall check, it is considered to the complexity of electric network model, in order to improve the efficiency checked afterwards, it is proposed that based on CIM electric network models
The construction method of object is checked, CIM electric network model objects in computer is mapped as by the way that model in data is recorded, so that efficiently
The correctness of electric network model is checked, on-time model is checked and provides function of statistic analysis, can provide model maintenance by attendant
Performance assessment criteria, error-prone place during analysis modeling.
General principle of the invention, principal character and advantage has been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, simply original of the invention is illustrated described in above-described embodiment and specification
Reason, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes and improvements
All fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appending claims and its equivalent circle.
It is fixed.
Claims (7)
1. it is a kind of for intelligent grid dispatch system the online check method of electric network model, it is characterised in that:Comprise the following steps,
Step(A), set up Model Checking rule base and configuration operating process;
Step(B), the structure of the electric network model check object based on CIM;
Step(C), on-time model maintenance check statistical analysis.
2. the online check method of electric network model that system is dispatched for intelligent grid according to claim 1, its feature exists
In:Step(A), Model Checking rule base and configuration operating process are set up, comprise the following steps,
(A1)Model Checking rule base is set up, including model real-time check rule and model check rule afterwards;
(A2)Set up the process mode of on-time model check;
(A3)Operating personnel's list of operating maintenance is set up, and is bound with process mode.
3. the online check method of electric network model that system is dispatched for intelligent grid according to claim 2, its feature exists
In:The model real-time check rule, including model parameter missing is checked rule, model parameter mistake and checks rule, model ginseng
Number deviates normal value and checks rule.
4. the online check method of electric network model that system is dispatched for intelligent grid according to claim 2, its feature exists
In:The model checks rule afterwards, including the topologically correct property of model checks rule, the check of the relating attribute correctness of model
Rule, the correctness based on electric power system planning check rule.
5. the online check method of electric network model that system is dispatched for intelligent grid according to claim 2, its feature exists
In:(A2)The process mode of on-time model check, including procedure below are set up,
(1)Process mode is checked in thing, Selection Model real-time check rule is checked in this mode;
(2)Process mode is checked afterwards, and Selection Model is checked rule and checked afterwards in this mode.
6. the online check method of electric network model that system is dispatched for intelligent grid according to claim 1, its feature exists
In:Step(B), the electric network model based on CIM checks the structure of object, is to be mapped as computer by by model record in data
Realized in middle CIM electric network models object, including CIM Object Creations class, CIM object properties class, CIM object class.
7. the online check method of electric network model that system is dispatched for intelligent grid according to claim 1, its feature exists
In:Step(C), on-time model safeguard check statistical analysis, on-time model provide be based on personnel, the time, three dimensions of model
Modeling statistics analytic function, on-time model is checked by human users' information during check, checks information time, and check
Object, according to personnel, time, in three dimension storages of model scope to database, for subsequent query analysis.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611231118.0A CN106845794A (en) | 2016-12-28 | 2016-12-28 | A kind of online check method of electric network model that system is dispatched for intelligent grid |
PCT/CN2017/099743 WO2018120893A1 (en) | 2016-12-28 | 2017-08-30 | Power grid model on-line calibration method, device, and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611231118.0A CN106845794A (en) | 2016-12-28 | 2016-12-28 | A kind of online check method of electric network model that system is dispatched for intelligent grid |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106845794A true CN106845794A (en) | 2017-06-13 |
Family
ID=59113459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611231118.0A Pending CN106845794A (en) | 2016-12-28 | 2016-12-28 | A kind of online check method of electric network model that system is dispatched for intelligent grid |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106845794A (en) |
WO (1) | WO2018120893A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018120893A1 (en) * | 2016-12-28 | 2018-07-05 | 国电南瑞科技股份有限公司 | Power grid model on-line calibration method, device, and storage medium |
CN110033179A (en) * | 2019-03-29 | 2019-07-19 | 国网山东省电力公司青岛供电公司 | Model in-stockroom operation verifies in real time online and the implementation method of history verification |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109710669B (en) * | 2018-12-05 | 2022-07-29 | 国网山东省电力公司青岛供电公司 | Method for improving accuracy of full power grid model data based on check rule base |
US20200327435A1 (en) | 2019-04-12 | 2020-10-15 | General Electric Company | Systems and methods for sequential power system model parameter estimation |
US11636557B2 (en) | 2019-05-29 | 2023-04-25 | General Electric Company | Systems and methods for enhanced power system model validation |
CN110727427A (en) * | 2019-10-14 | 2020-01-24 | 国网江苏省电力有限公司镇江供电分公司 | Intelligent safety checking method for dispatching automation master station model |
CN111160795B (en) * | 2019-12-31 | 2023-10-20 | 国网安徽省电力有限公司芜湖供电公司 | Management system and method for distribution network pattern abnormal operation and power failure lean assessment |
CN112419094B (en) * | 2020-08-12 | 2024-03-29 | 国网江西省电力有限公司信息通信分公司 | Power distribution Internet of things data product construction method and device and readable storage medium |
CN112597645A (en) * | 2020-12-17 | 2021-04-02 | 武汉大学 | Power distribution network model checking method based on cloud platform |
CN114614567A (en) * | 2022-03-24 | 2022-06-10 | 广州能信数字科技有限公司 | Operation method applied to power grid dispatching safety check |
CN115545197B (en) * | 2022-11-24 | 2023-04-28 | 中国电力科学研究院有限公司 | Power grid regulation and control decision knowledge model construction method and device |
CN116955894B (en) * | 2023-09-20 | 2024-01-09 | 肇庆星诺奇传动科技有限公司 | Online self-adaptive thread length information calibration method and system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182911A (en) * | 2014-08-25 | 2014-12-03 | 国家电网公司 | Calibration method for realizing CIM (Common Information Model) consistency of power distribution network system |
CN104600840A (en) * | 2014-12-30 | 2015-05-06 | 国家电网公司 | Intelligent dispatching and mis-operation preventing management system and method |
CN106021344A (en) * | 2016-05-09 | 2016-10-12 | 国电南瑞科技股份有限公司 | A multi-adaptive CIME power grid model sharing method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104318391A (en) * | 2014-10-24 | 2015-01-28 | 中国南方电网有限责任公司 | Method for implementing plan security check on basis of power grid operation service bus |
CN104361095B (en) * | 2014-11-20 | 2017-11-10 | 国电南瑞科技股份有限公司 | A kind of power distribution network artwork data management method based on dual system |
CN106845794A (en) * | 2016-12-28 | 2017-06-13 | 国电南瑞科技股份有限公司 | A kind of online check method of electric network model that system is dispatched for intelligent grid |
-
2016
- 2016-12-28 CN CN201611231118.0A patent/CN106845794A/en active Pending
-
2017
- 2017-08-30 WO PCT/CN2017/099743 patent/WO2018120893A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104182911A (en) * | 2014-08-25 | 2014-12-03 | 国家电网公司 | Calibration method for realizing CIM (Common Information Model) consistency of power distribution network system |
CN104600840A (en) * | 2014-12-30 | 2015-05-06 | 国家电网公司 | Intelligent dispatching and mis-operation preventing management system and method |
CN106021344A (en) * | 2016-05-09 | 2016-10-12 | 国电南瑞科技股份有限公司 | A multi-adaptive CIME power grid model sharing method |
Non-Patent Citations (2)
Title |
---|
赵家庆 等: "电网调度自动化主备系统间模型正确性校验技术方案", 《电力系统保护与控制》 * |
韩冰 等: "配电网主站网络模型校核方法设计与实现", 《电力系统自动化》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018120893A1 (en) * | 2016-12-28 | 2018-07-05 | 国电南瑞科技股份有限公司 | Power grid model on-line calibration method, device, and storage medium |
CN110033179A (en) * | 2019-03-29 | 2019-07-19 | 国网山东省电力公司青岛供电公司 | Model in-stockroom operation verifies in real time online and the implementation method of history verification |
Also Published As
Publication number | Publication date |
---|---|
WO2018120893A1 (en) | 2018-07-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106845794A (en) | A kind of online check method of electric network model that system is dispatched for intelligent grid | |
CN101930481B (en) | Method used for generating CIM model describing power grid change in designated time slot and system thereof | |
CN109146089A (en) | A kind of life period of an equipment management method based on BIM | |
CN108736465A (en) | A kind of future-state electric network model construction method and device | |
CN105373472B (en) | A kind of method of testing and test system of the statistical accuracy based on database | |
CN106528828A (en) | Multi-dimensional checking rule-based data quality detection method | |
CN102208057A (en) | Method, platform and system for processing audit information | |
CN102938096B (en) | A kind of implementation method of the power plant registration information declaration system of dynamic configuration | |
CN104200324A (en) | Business knowledge management based configuration management method | |
CN110490761A (en) | A kind of power grid distribution net equipment account data model modelling approach | |
CN110322226A (en) | A kind of project supervision method and system | |
EP2637130A1 (en) | Collaborative system and method to mine inventions | |
CN116259209A (en) | Intelligent factory production and training system based on digital twinning | |
CN103345485B (en) | A kind of mainframe platform dynamic statement automatic generation method and system | |
CN113344393B (en) | Resource construction method based on V model product development process | |
CN115471215A (en) | Business process processing method and device | |
CN201607765U (en) | Management system for traveling abroad on business | |
CN113807573A (en) | Construction prediction analysis method and system based on data management and three-dimensional search | |
KR20220159802A (en) | A method of construction information management system with using big data processing | |
CN109064362B (en) | AI technology-based power grid material management and training system | |
CN103136031A (en) | Large-scale scene skill training simulation software of business model navigation | |
CN105139114A (en) | Automatic compiling method for annual operation mode of power grid in district or county | |
CN110188898A (en) | A kind of power distribution network Dispatching intelligent tickets system and method based on line chart | |
CN109766727A (en) | Intelligent block network establishing method and system | |
CN109767051B (en) | Transformer power failure planning method based on big data analysis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |