CN106841922A - Intelligent stable control device experiment instrument - Google Patents

Intelligent stable control device experiment instrument Download PDF

Info

Publication number
CN106841922A
CN106841922A CN201710092446.5A CN201710092446A CN106841922A CN 106841922 A CN106841922 A CN 106841922A CN 201710092446 A CN201710092446 A CN 201710092446A CN 106841922 A CN106841922 A CN 106841922A
Authority
CN
China
Prior art keywords
experiment instrument
hole
groove
control device
standing groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710092446.5A
Other languages
Chinese (zh)
Other versions
CN106841922B (en
Inventor
姚占东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Original Assignee
Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Fly Fly Intelligent Electric Technology Co Ltd filed Critical Wuhan Fly Fly Intelligent Electric Technology Co Ltd
Priority to CN201710092446.5A priority Critical patent/CN106841922B/en
Publication of CN106841922A publication Critical patent/CN106841922A/en
Application granted granted Critical
Publication of CN106841922B publication Critical patent/CN106841922B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/086Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25338Microprocessor
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2604Test of external equipment

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a kind of intelligent stable control device experiment instrument, including experiment instrument body, standing groove is offered on front side of the experiment instrument body, and standing groove is located remote from the middle position of the side inwall of channel opening and offers through hole, through hole is connected with the inside of experiment instrument body, the periphery of the through hole is provided with the screwed hole for being opened in the side inwall that standing groove is located remote from channel opening, and offer fixing groove on the both sides inwall of standing groove, the fixing groove is away from one end that spring is connected with the side inwall of fixed channel opening, and the other end of spring is connected with the fixture block being slidably mounted in fixing groove.The present invention can be easily installed and dismantle control panel, cause to change and easy to maintenance, and can coordinate without higher level Wen Kong main websites when testing steady control substation, possess various back-stage management functions;The normal operation of Wen Kong main websites is not influenceed, and test operation is convenient, and efficiency high, simple structure is easy to use.

Description

Intelligent stable control device experiment instrument
Technical field
The present invention relates to technical field of power systems, more particularly to a kind of intelligent stable control device experiment instrument.
Background technology
Second and third road defence line that electric power system stability control device is defendd as bulk power grid, is ensureing the safety fortune of power system Row aspect has great importance;Whether stability control device will normally influence whether the safety and reliability of whole operation of power networks.
Current stabilized control system experiment instrument can't simulate the digital command of Wen Kong main websites, be tested to steady control substation When need higher level Wen Kong main websites to coordinate, the normal operation of influence Wen Kong main websites, test operation trouble, efficiency is low, existing experiment instrument Export the way of analog quantity not enough, general most 12 tunnels, output node is few, not square with the functional experiment to stabilized control system Just, not comprehensive the problems such as, and can not control panel easy for removal and installation, cause to repair and change inconvenience.
Therefore, it is used to solve the above problems we have proposed a kind of intelligent stable control device experiment instrument.
The content of the invention
Based on the technical problem that background technology is present, the present invention proposes intelligent stable control device experiment instrument.
A kind of intelligent stable control device experiment instrument proposed by the present invention, including experiment instrument body, the experiment instrument body Front side offer standing groove, and standing groove is located remote from the middle position of the side inwall of channel opening and offers through hole, through hole Inside with experiment instrument body connects, and the periphery of the through hole is provided with and is opened in the side inwall that standing groove is located remote from channel opening Screwed hole, and fixing groove is offered on the both sides inwall of standing groove, the fixing groove is away from the side of fixed channel opening One end of spring is connected with wall, and the other end of spring is connected with the fixture block being slidably mounted in fixing groove, the standing groove Control panel is inside placed with, and the periphery of control panel offers peace in the fastener hole being adapted with screwed hole, the fastener hole Equipped with fastener, the fastener includes pressing on fixed block of the control panel away from the side of through hole, and fixed block near logical The side in hole is welded with screw rod, and through fastener hole, simultaneously screw thread is installed in screwed hole the screw rod, and the periphery of fixed block is welded The both sides for having multiple projections, the control panel offer draw-in groove, and fixture block is snapped in draw-in groove;Set in the experiment instrument body Have control signal processor microcomputer, D/A conversion and low-pass filtering module, power amplifier, GPS module, communication module, open into, Output module, integration test software adjacent modules and interface module, the control signal processor microcomputer, D/A conversions and low pass Filtration module, power amplifier and interface module are sequentially connected, and control signal processor microcomputer respectively with GPS module, communicate Module, open into, output module and integration test software adjacent modules are bi-directionally connected, it is described open into, output module and interface module Connection.
Preferably, it is described open into, output module and include opening into unit and outputing unit, and open into unit and to output unit equal It is connected with control signal processor microcomputer and interface module respectively.
Preferably, the cross section of the fixture block is for trapezoidal, and fixture block near one end of spring path length more than fixture block away from The path length of one end of spring.
Preferably, the screwed hole and fastener hole are multiple, and uniform annular is opened in standing groove and is located remote from respectively With the periphery of control panel on the side inwall of channel opening.
Preferably, the uniform annular of multiple projections is welded in the periphery of fixed block.
Preferably, the projection is provided with antiskid thread away from the side of fixed block.
In the present invention, the intelligent stable control device experiment instrument can simultaneously export 64 tunnel analog quantitys and 32 roads are outputed Amount, and various simulations and digital command that 8 steady control substations provide to stability control device can be simulated;Dress can be surely controlled for electric power Putting carries out single experiment and tests in groups;And the power system fault-free trip that can cooperate, individual event transient fault, individual event are forever The various experiments such as long failure, phase-to phase fault, earth fault and overload;Various outputs can be controlled with local and remote software synthesis Experiment;Coordinate without higher level Wen Kong main websites when testing steady control substation, possess various back-stage management functions;Do not influence steady The normal operation of main website is controlled, test operation is convenient, efficiency high, can be easy to place control panel by standing groove, by fixation Groove, spring, fixture block and draw-in groove can be easily installed control panel, and can strengthen the steadiness that control panel is installed, by spiral shell Pit, fastener hole and fastener can be easy to fixedly mount control panel, can be easy to turn fastener manually by projection, this Invention can be easily installed and dismantle control panel, cause to change and easy to maintenance, and can be tested to steady control substation Shi Wuxu higher level Wen Kong main websites coordinate, and possess various back-stage management functions;The normal operation of Wen Kong main websites, test operation are not influenceed Convenient, efficiency high, simple structure is easy to use.
Brief description of the drawings
Fig. 1 is the structural representation of intelligent stable control device experiment instrument proposed by the present invention;
Fig. 2 is the part-structure schematic diagram of intelligent stable control device experiment instrument proposed by the present invention;
Fig. 3 is the structural representation of the fastener of intelligent stable control device experiment instrument proposed by the present invention;
Fig. 4 is the operation principle schematic diagram of intelligent stable control device experiment instrument proposed by the present invention.
In figure:1 experiment instrument body, 2 standing grooves, 3 through holes, 4 screwed holes, 5 fixture blocks, 6 control panels, 7 fasteners, 71 are fixed Block, 72 projections, 73 screw rods.
Specific embodiment
The present invention is made with reference to specific embodiment further explain.
Embodiment
Reference picture 1-4, the present embodiment proposes a kind of intelligent stable control device experiment instrument, including experiment instrument body 1, real The front side for testing instrument body 1 offers standing groove 2, and standing groove 2 is located remote from the middle position of the side inwall of the opening of groove 2 and opens up There is through hole 3, through hole 3 is connected with the inside of experiment instrument body 1, the periphery of through hole 3 is provided with and is opened in standing groove 2 and is located remote from groove 2 The screwed hole 4 of the side inwall of opening, and fixing groove is offered on the both sides inwall of standing groove 2, fixing groove is away from fixing groove One end of spring is connected with the side inwall of opening, and the other end of spring is connected with the fixture block being slidably mounted in fixing groove 5, control panel 6 is placed with standing groove 2, and the periphery of control panel 6 offers the fastener hole being adapted with screwed hole 4, tightly Fastener 7 is installed, fastener 7 includes pressing on fixed block 71 of the control panel 6 away from the side of through hole 3, and solid in solid hole Determine block 71 and be welded with screw rod 73 near the side of through hole 3, simultaneously screw thread is installed in screwed hole 4 screw rod 73 through fastener hole, and solid The periphery for determining block 71 is welded with multiple projections 72, and the both sides of control panel 6 offer draw-in groove, and fixture block 5 is snapped in draw-in groove;It is real Test in instrument body 1 and be provided with control signal processor microcomputer, D/A conversions and low-pass filtering module, power amplifier, GPS module, logical Letter module, open into, output module, integration test software adjacent modules and interface module, control signal processor microcomputer, D/A turn Change and be sequentially connected with low-pass filtering module, power amplifier and interface module, and control signal processor microcomputer respectively with GPS moulds Block, communication module, open into, output module and integration test software adjacent modules are bi-directionally connected, open into, output module and interface mould Block is connected, and intelligent stable control device experiment instrument can simultaneously export 64 tunnel analog quantitys and the 32 road amounts of outputing, and can simulate 8 Various simulations and digital command that steady control substation provides to stability control device;Can for electric power stability control device carry out single experiment and Test in groups;And the power system fault-free trip that can cooperate, individual event transient fault, individual event permanent fault, phase-to phase fault, The various experiments such as earth fault and overload;Can be with the various output experiments of local and remote software synthesis control;To steady control Coordinate without higher level Wen Kong main websites when station is tested, possess various back-stage management functions;The normal fortune of Wen Kong main websites is not influenceed OK, test operation is convenient, efficiency high, can be easy to place control panel 6 by standing groove 2, by fixing groove, spring, fixture block 5 Control panel 6 can be easily installed with draw-in groove, and the steadiness that control panel 6 is installed can be strengthened, by screwed hole 4, fastening Hole and fastener 7 can be easy to fixedly mount control panel 6, can be easy to turn fastener 7 manually by projection 72, the present invention Can be easily installed and dismantle control panel 6, cause to change and easy to maintenance, and can when testing steady control substation without Need higher level Wen Kong main websites to coordinate, possess various back-stage management functions;The normal operation of Wen Kong main websites, test operation side are not influenceed Just, efficiency high, simple structure is easy to use.
In the present embodiment, open into, output module and include opening into unit and outputing unit, and open into unit and to output unit equal It is connected with control signal processor microcomputer and interface module respectively, the cross section of fixture block 5 is trapezoidal, and fixture block 5 is near spring The path length of one end is more than path length of the fixture block 5 away from one end of spring, and screwed hole 4 and fastener hole are multiple, and uniform ring respectively Shape be opened in standing groove 2 be located remote from groove 2 opening side inwall on and control panel 6 periphery, the uniform ring of multiple projections 72 Shape is welded in the periphery of fixed block 71, and projection 72 is provided with antiskid thread, intelligent stable control device away from the side of fixed block 71 Experiment instrument can simultaneously export 64 tunnel analog quantitys and the 32 road amounts of outputing, and can simulate 8 steady control substations to stability control device offer Various simulations and digital command;For electric power stability control device can carry out single experiment and test in groups;And can be closed Make power system fault-free trip, individual event transient fault, individual event permanent fault, phase-to phase fault, earth fault and overload etc. each Plant experiment;Can be with the various output experiments of local and remote software synthesis control;When testing steady control substation without higher level Wen Kong main websites coordinate, and possess various back-stage management functions;The normal operation of Wen Kong main websites is not influenceed, and test operation is convenient, efficiency Height, can be easy to place control panel 6 by standing groove 2, and control can be easily installed by fixing groove, spring, fixture block 5 and draw-in groove Panel processed 6, and the steadiness of the installation of control panel 6 can be strengthened, can be easy to by screwed hole 4, fastener hole and fastener 7 solid Dingan County fills control panel 6, can be easy to turn fastener 7 manually by projection 72, and the present invention can be easily installed and dismantle control Panel processed 6, causes to change and easy to maintenance, and can coordinate without higher level Wen Kong main websites when testing steady control substation, Possess various back-stage management functions;The normal operation of Wen Kong main websites is not influenceed, and test operation is convenient, and efficiency high, simple structure makes With conveniently.
In the present embodiment, control panel 6 is put into standing groove 2, while being put into, control panel 6 extrudes fixture block 5 Enter in fixing groove, when the position of draw-in groove and fixture block 5 matches, under the action of the spring, fixture block 5 is snapped in draw-in groove, and it is right to complete The fixation of control panel 6, now, fastener hole is matched with screwed hole 4, and then fastener 7 is put into fastener hole, turns fastener 7 so that the screw thread of screw rod 73 is installed in screwed hole 4, meanwhile, fixed block 71 is pressed on control panel 6, completes control panel 6 Fixed installation.
In the present embodiment, control signal processor microcomputer:Experiment instrument is using high speed, good digital control process device conduct Control microcomputer, using integrative-structure, each several part is tightly combined, and data transmission distance is short, compact conformation;Cpu motherboard is used as experiment The core component of instrument carries out the functions such as the processing data of experiment instrument.
D/A is changed and low-pass filtering module:Using high-order D/A converter at a high speed, the digital quantity that will be obtained is converted into simulation Amount, and by power amplifier transfer to stability control device.
Power amplifier:Using high-power high-fidelity modular power device as power output stage, with reference to radiator structure, With sufficiently large power redundancy and thermal capacity;It is supplied to the necessary voltage x current of stability control device to believe by the output of conversion signal Number.
Open into, output module:Experiment instrument set open into, output module, there are 32 tunnels to open the roads of Ru He 32 and output;By opening into unit The action return signal of stability control device is received, the on-off model that unit provides relay protection to stability control device is outputed;By opening Entering unit makes stability control device form closed loop feedback with digital experiment instrument, and makes the experiment instrument for realizing main website current to related substation Feedback.
GPS module:Experiment instrument inside installing GPS module, the precise time accuracy guarantee by GPS module is ensureing steady control The synchronism of test.
Communication module:Testing experiment instrument carries out data biography by the test instrument of long-range data communication network and steady control substation It is defeated, remote data transmission is carried out using GPRS+VPN.
Integration test software adjacent modules:Integration test software is connected by Ethernet with digital experiment instrument, obtains steady Control device information simultaneously can send instruction to the multi-functional detection terminal of stabilized control system, complete to monitor stability control device, to judge steady control The correctness of device action.
Interface module:The electrical quantity exported in digital experiment instrument is exported by optical isolation, it is ensured that dress The security and stability put;The interface for externally swapping signal mainly has:The input of 32 tunnels, the output of 32 tunnels, 8 2M mouthfuls and two strings Mouthful.
In the present embodiment, by the multi-functional detection terminal of stabilized control system provide the protection signal of power system, alternating voltage, Current-mode analog quantity, simulates various fault waveforms, the various digital commands of simulation Wen Kong main websites;By digital power stabilized control system reality Instrument software is tested to realize uploading the definite value list file of stability control device to be measured, definite value list file is passed down, definite value list file is read, is read just Take various definite value table template files in formula computer, upload stability control device to be measured tactful list file, pass down tactful list file, Tactful list file is read, other template files of portable computer is read, is uploaded the newest action report of stability control device to be measured With upload required movement report and other specified files and check the function of digital fault recorder data.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, technology according to the present invention scheme and its Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.

Claims (6)

1. intelligent stable control device experiment instrument, including experiment instrument body (1), it is characterised in that the experiment instrument body (1) Front side offers standing groove (2), and standing groove (2) be located remote from the side inwall of groove (2) opening middle position offer it is logical Hole (3), through hole (3) is connected with the inside of experiment instrument body (1), and the periphery of the through hole (3) is provided with and is opened in standing groove (2) far From the screwed hole (4) of the side inwall of standing groove (2) opening, and fixing groove is offered on the both sides inwall of standing groove (2), institute Fixing groove is stated away from one end that spring is connected with the side inwall of fixed channel opening, and the other end of spring is connected with slip peace Loaded on the fixture block (5) in fixing groove, control panel (6) is placed with the standing groove (2), and the periphery of control panel (6) is opened The fastener hole being adapted with screwed hole (4) is provided with, fastener (7) is installed in the fastener hole, the fastener (7) is including supporting Fixed block (71) of the control panel (6) away from the side of through hole (3) is pressed on, and fixed block (71) is welded near the side of through hole (3) Be connected to screw rod (73), the screw rod (73) is installed in screwed hole (4) through fastener hole and screw thread, and fixed block (71) periphery Multiple projections (72) are welded with, the both sides of the control panel (6) offer draw-in groove, and fixture block (5) is snapped in draw-in groove;It is described Control signal processor microcomputer, D/A conversions and low-pass filtering module, power amplifier, GPS moulds are provided with experiment instrument body (1) Block, communication module, open into, output module, integration test software adjacent modules and interface module, the control signal processor is micro- Machine, D/A conversions and low-pass filtering module, power amplifier and interface module are sequentially connected, and control signal processor microcomputer point Not with GPS module, communication module, open into, output module and integration test software adjacent modules are bi-directionally connected, it is described open into, open Go out module and interface module connection.
2. intelligent stable control device experiment instrument according to claim 1, it is characterised in that it is described open into, output module Including opening into unit and outputing unit, and open into unit and output unit respectively with control signal processor microcomputer and interface mould Block is connected.
3. intelligent stable control device experiment instrument according to claim 1, it is characterised in that the fixture block (5) it is transversal Face is trapezoidal, and path length of the fixture block (5) near one end of spring is more than path length of the fixture block (5) away from one end of spring.
4. intelligent stable control device experiment instrument according to claim 1, it is characterised in that the screwed hole (4) and tight Solid hole is multiple, and uniform annular is opened in standing groove (2) and is located remote from the side inwall of groove (2) opening and controls respectively The periphery of panel (6).
5. intelligent stable control device experiment instrument according to claim 1, it is characterised in that multiple projection (72) uniform rings Shape is welded in the periphery of fixed block (71).
6. intelligent stable control device experiment instrument according to claim 1, it is characterised in that the projection (72) is away from solid The side for determining block (71) is provided with antiskid thread.
CN201710092446.5A 2017-02-21 2017-02-21 Intelligent stable control device experiment instrument Expired - Fee Related CN106841922B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710092446.5A CN106841922B (en) 2017-02-21 2017-02-21 Intelligent stable control device experiment instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710092446.5A CN106841922B (en) 2017-02-21 2017-02-21 Intelligent stable control device experiment instrument

Publications (2)

Publication Number Publication Date
CN106841922A true CN106841922A (en) 2017-06-13
CN106841922B CN106841922B (en) 2019-09-06

Family

ID=59133816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710092446.5A Expired - Fee Related CN106841922B (en) 2017-02-21 2017-02-21 Intelligent stable control device experiment instrument

Country Status (1)

Country Link
CN (1) CN106841922B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109725114A (en) * 2019-02-20 2019-05-07 湖南创阳环保科技有限公司 A kind of air-quality monitoring system
CN111600773A (en) * 2020-05-11 2020-08-28 杭州意能电力技术有限公司 HDLC protocol simulation-based integrated test device and method for stability system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101068081A (en) * 2007-05-09 2007-11-07 南京南瑞继保电气有限公司 Electricity net safety stable controlling system testing method
CN202102312U (en) * 2011-06-08 2012-01-04 国电南京自动化股份有限公司 Portable light current AC signal testing arrangement
CN202196132U (en) * 2011-09-05 2012-04-18 福建省电力有限公司电力科学研究院 Dynamic simulation test system of power grid region stable control system
CN103941721A (en) * 2014-03-24 2014-07-23 广东电网公司东莞供电局 Numerical control testing device for electrical power system field intelligent stability control device
CN104267284A (en) * 2014-09-29 2015-01-07 华中电网有限公司 One-click cooperative testing and detecting method and device for stability control system
CN204302403U (en) * 2014-08-04 2015-04-29 广西电网公司电力科学研究院 The simulation of electrical network stability control device and Test to Failure instrument
CN105204485A (en) * 2014-05-28 2015-12-30 广西电网公司电力科学研究院 Digital electric power stability control system tester
CN206460327U (en) * 2017-02-21 2017-09-01 武汉华飞智能电气科技有限公司 The steady control tester of HF WDIT numerals

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101068081A (en) * 2007-05-09 2007-11-07 南京南瑞继保电气有限公司 Electricity net safety stable controlling system testing method
CN202102312U (en) * 2011-06-08 2012-01-04 国电南京自动化股份有限公司 Portable light current AC signal testing arrangement
CN202196132U (en) * 2011-09-05 2012-04-18 福建省电力有限公司电力科学研究院 Dynamic simulation test system of power grid region stable control system
CN103941721A (en) * 2014-03-24 2014-07-23 广东电网公司东莞供电局 Numerical control testing device for electrical power system field intelligent stability control device
CN105204485A (en) * 2014-05-28 2015-12-30 广西电网公司电力科学研究院 Digital electric power stability control system tester
CN204302403U (en) * 2014-08-04 2015-04-29 广西电网公司电力科学研究院 The simulation of electrical network stability control device and Test to Failure instrument
CN104267284A (en) * 2014-09-29 2015-01-07 华中电网有限公司 One-click cooperative testing and detecting method and device for stability control system
CN206460327U (en) * 2017-02-21 2017-09-01 武汉华飞智能电气科技有限公司 The steady control tester of HF WDIT numerals

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109725114A (en) * 2019-02-20 2019-05-07 湖南创阳环保科技有限公司 A kind of air-quality monitoring system
CN111600773A (en) * 2020-05-11 2020-08-28 杭州意能电力技术有限公司 HDLC protocol simulation-based integrated test device and method for stability system

Also Published As

Publication number Publication date
CN106841922B (en) 2019-09-06

Similar Documents

Publication Publication Date Title
CN100547875C (en) Electricity net safety stable controlling system testing method
CN102510131B (en) Method and device for testing overall performance of intelligent transformer substation
CN105429291B (en) The correlating method of intelligent substation primary connection figure and electrical secondary system logic connectivity diagram
CN104122474B (en) A kind of intelligent distribution type feeder automation logic testing system
CN103680238B (en) A kind of intelligent substation Hybrid Simulation Training System for Industry
CN102937685B (en) The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology
CN103869190A (en) Real time simulation system-based power distribution terminal automatic closed-loop test platform
CN104076693A (en) Flexible direct current transmission real-time simulation system and simulation method thereof
CN103176084A (en) Intelligent substation simulation system in panoramic replace mode and integration testing method for intelligent substation simulation system
CN108241771A (en) Secondary device modeling method based on electromagnetic transient simulation platform
CN104007978A (en) Intelligent substation secondary equipment logic emulation system
CN109582004A (en) Intelligent measurement platform
CN103281226B (en) A kind of MVB device address configuration system and method based on TCN
CN201839095U (en) Intelligent transformer substation testing and simulation system
CN107255940A (en) Remote real-time simulation system of safety and stability control device
CN208432876U (en) Real-time simulation system of direct-current power distribution network
CN105449847A (en) Digital transformer substation testing system
CN105914884A (en) One-to-many intelligent substation process layer virtual secondary equipment and implementation method
CN108169586A (en) One kind is used for avionics system integration test method
CN105204485A (en) Digital electric power stability control system tester
CN201611448U (en) Closed loop test platform of control protection device in electrical power system
CN106841922A (en) Intelligent stable control device experiment instrument
CN104076197A (en) Unbalanced current testing device and method for capacitor bank
CN206460327U (en) The steady control tester of HF WDIT numerals
CN102998571B (en) A kind of RTDS test method of fault current limiter device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190906