China
Prior art keywords
control device
stability control
socket
open
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420434657.4U
Other languages
Chinese (zh)
Inventor
孙志媛
余玲芳
赵晓慧
姚占东
宁文辉
孙文胜
李明珀
王刚
刘默斯
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN WANSHENG TECHNOLOGY Co Ltd
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
WUHAN WANSHENG TECHNOLOGY Co Ltd
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN WANSHENG TECHNOLOGY Co Ltd, Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical WUHAN WANSHENG TECHNOLOGY Co Ltd
Priority to CN201420434657.4U priority Critical patent/CN204302403U/en
Application granted granted Critical
Publication of CN204302403U publication Critical patent/CN204302403U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

A kind of electrical network stability control device simulation and Test to Failure instrument, comprise 32 road of acs and export, each output has different gear, and electrodeless potentiometer regulates; 32 nodes export, action launching button.Good effect of the present utility model: realize test instrument multiple-channel output with this, and then coordinate stability control device action to export, realize the detection to safety and stability control device various functions.

Description

The simulation of electrical network stability control device and Test to Failure instrument
Technical field
The utility model relates to a kind of power system, particularly relates to a kind of regional stability control device to test technology and equipment.
Background technology
Regional stability control device is the three lines of defence to region bulk power grid safeguard protection, is the generating judging whole region, electricity consumption, and during the changes of operating modes such as electric network fault, protection power grid security is than indispensable defence line.Because electrical network is complicated, safety and stability control device function is changeable, and the circuit detected is numerous, and general checkout equipment is difficult to meet the demands on output loop and function test, brings a difficult problem to Equipment Inspection.
Utility model content
The purpose of this utility model is to provide one can provide guard signal, alternating voltage, current-mode analog quantity easily, can simulate various fault waveform, thus complete the functional test to stability control device easily.
A kind of electrical network stability control device simulation and Test to Failure instrument, comprising: 32 road of acs export, and each output has different gear, and electrodeless potentiometer regulates; 32 nodes export, action launching button.
Also comprise shell, be provided with power switch at the top of shell, power interface, socket 1/2/3/7YLH, socket 4/5/6/87YLH, socket DB37 open into, sync cap, open into public, KR1 and KR2; Socket 1/2/3/7YLH and socket 4/5/6/87YLH is Current Voltage output interface, drags four of 4 cables plugs to be connected with 1SAM or the 2SAM sampling plate of stability control device respectively by one 1; Socket DB37 opens into being open into output interface, drags 1 cable to open with 1Q33 or 2Q33 of stability control device be connected into plate by one 1; Intake input area is provided with in the upper end of the outer former of shell, analog input district is provided with immediately below intake input area, be provided with I4 adjuster, I5/I6 adjuster from top to bottom successively in the left side in analog input district, analog input district right side be provided with I1/I2 adjuster, I3 adjuster from top to bottom successively.Voltage anticlimax button and breakdown switch button is provided with immediately below I3 adjuster.
Good effect of the present utility model is: this device of test instrument is multiple-channel output, and function test is that multi-loop current voltage and node export interoperation output.Can realize the test of power system safety and stability control system, analog electrical Force system is by the action situation of stability control device during various different disturbance.Detect safety and stability control device various functions simultaneously.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
Fig. 2 is the connection layout of the utility model and stability control device.
Fig. 3 is this novel appearance layout.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, to be simulated by electrical network stability control device and Test to Failure instrument completes functional test to stability control device easily.Test instrument has 32 road of acs to export, and each output has different gear, and electrodeless potentiometer regulates.32 nodes export, action launching button.
The connection of stability control device and analog test instrument as shown in Figure 2.During connection, drag indicate 1SAM and 2SAM one the DB9 of four cables to hold and (can 1/2/3/7YLH be connected to by the 1YLH ~ 8YLH contact pin linked respectively shown in figure in two test instruments, also can be connected to 4/5/6/8YLH).Open on plate socket by 1Q33 and 2Q33 that cable one end plug is connected to stability control device Microcomputer box rear board that open indicating 1Q33 and 2Q33 again, the other end first inserts respectively and indicates on the plug of " KR ", then the DB37 linking test instrument opens on jack.Now, test instrument simulates the required alternating voltage current-mode analog quantity gathered of device respectively and opens into signal mode analog quantity.
Test instrument layout as shown in Figure 3, electrical network stability control device described in the utility model simulation and Test to Failure instrument, be provided with power switch, power interface, socket 1/2/3/7YLH, socket 4/5/6/87YLH, socket DB37 open into, sync cap, open into public, KR1 and KR2 at the top of shell.Intake input area is provided with in the upper end of the outer former of shell, analog input district is provided with immediately below intake input area, be provided with I4 adjuster, I5/I6 adjuster from top to bottom successively in the left side in analog input district, analog input district right side be provided with I1/I2 adjuster, I3 adjuster from top to bottom successively.Voltage anticlimax button and breakdown switch button is provided with immediately below I3 adjuster.
Wherein being described as follows of interface:
1) socket 1/2/3/7YLH and socket 4/5/6/87YLH is Current Voltage output interface, four of 4 cables plugs are dragged to be connected with 1SAM or the 2SAM sampling plate of stability control device respectively by one 1, for providing voltage x current analog quantity, test instrument can provide 64 tunnel analog quantitys altogether
2) socket DB37 opens into being open into output interface, and drag 1 cable to open with 1Q33 or 2Q33 of stability control device by one 1 and be connected into plate, for providing intake, this test instrument can provide 32 way switch amounts inputs altogether;
3) sync cap: when wanting to make many times elements with jumping test, but the element of simulation is not again on same test instrument, then this interface available is connected with this interface of another one test instrument, will produce the effect with jumping.
4) power interface: test instrument power input interface (AC220V).
5) power switch: test instrument power supply opens or closes button;
6) open into public: open into common port;
7) open into signal for KR1: the 1;
8) open into signal for KR2: the 2, pulse delay is longer than KR1 time delay;
The top panel components' placement of shell and function declaration as follows:
The top panel of test instrument shell is divided into Er great Qu (see accompanying drawing 3) by function, and the firstth district comprises 32 toggle switch, opens into signal when its effect is analog element fault; Secondth district is coordinated with adjuster by 20 toggle switch, waveform when its effect is analog element fault; When carrying out primary fault test, the firstth district and the secondth district should be with the use of.
32 toggle switch to open the numbering opened into plate in numbering in protection simulation numbering and the numbering of 20 toggle switch (of ac analog quantity) and stability control device terminal block and microcomputer completely the same.Therefore, after being connected by test instrument by accompanying drawing 2, utilize the analog functuion on panel just can carry out various test easily.
Good effect of the present utility model: ordinary test instrument only has 6 roads or 8 road of acs to export, and this test instrument has 32 road of acs to export.Can analog electrical Force system by different disturbance time stability control device action situation, and provide stability control device need gather alternating voltage current-mode analog quantity and open into signal mode analog quantity.Selected the fault can doing the fault-free such as power circuit, transformer, the various stability control device of single fault, phase-to phase fault etc. forever judges by dial-up, and coordinate Node Protection action.

Claims (2)

1. the simulation of electrical network stability control device and a Test to Failure instrument, is characterized in that, comprising: 32 road of acs export, and each output has different gear, and electrodeless potentiometer regulates; 32 nodes export, action launching button; Also comprise shell, be provided with power switch at the top of shell, power interface, socket 1/2/3/7YLH, socket 4/5/6/87YLH, socket DB37 open into, sync cap, open into public, KR1 and KR2; Socket 1/2/3/7YLH and socket 4/5/6/87YLH is Current Voltage output interface, drags four of 4 cables plugs to be connected with 1SAM or the 2SAM sampling plate of stability control device respectively by one 1; Socket DB37 opens into being open into output interface, drags 1 cable to open with 1Q33 or 2Q33 of stability control device be connected into plate by one 1; Intake input area is provided with in the upper end of the outer former of shell, analog input district is provided with immediately below intake input area, be provided with I4 adjuster, I5/I6 adjuster from top to bottom successively in the left side in analog input district, be provided with I1/I2 adjuster, I3 adjuster from top to bottom successively on the right side in analog input district; Voltage anticlimax button and breakdown switch button is provided with immediately below I3 adjuster.
2. a kind of electrical network stability control device simulation according to claim 1 and Test to Failure instrument, it is characterized in that, power interface is test instrument power input interface, AC220V; Open into public for open into common port; KR1 is the 1st and opens into signal; KR2 is the 2nd and opens into signal, and pulse delay is longer than KR1 time delay.
CN201420434657.4U 2014-08-04 2014-08-04 The simulation of electrical network stability control device and Test to Failure instrument Expired - Fee Related CN204302403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420434657.4U CN204302403U (en) 2014-08-04 2014-08-04 The simulation of electrical network stability control device and Test to Failure instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420434657.4U CN204302403U (en) 2014-08-04 2014-08-04 The simulation of electrical network stability control device and Test to Failure instrument

Publications (1)

Publication Number Publication Date
CN204302403U true CN204302403U (en) 2015-04-29

Family

ID=53107934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420434657.4U Expired - Fee Related CN204302403U (en) 2014-08-04 2014-08-04 The simulation of electrical network stability control device and Test to Failure instrument

Country Status (1)

Country Link
CN (1) CN204302403U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106681310A (en) * 2017-02-21 2017-05-17 武汉华飞智能电气科技有限公司 Function tester for conventional stability control device
CN106841922A (en) * 2017-02-21 2017-06-13 武汉华飞智能电气科技有限公司 Intelligent stable control device experiment instrument
CN106950939A (en) * 2017-03-07 2017-07-14 广西电网有限责任公司电力科学研究院 A kind of multi-functional detection terminal of stabilized control system
CN113156236A (en) * 2021-03-18 2021-07-23 广西电网有限责任公司 Method and system for judging line overload of stability control device based on temperature change

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106681310A (en) * 2017-02-21 2017-05-17 武汉华飞智能电气科技有限公司 Function tester for conventional stability control device
CN106841922A (en) * 2017-02-21 2017-06-13 武汉华飞智能电气科技有限公司 Intelligent stable control device experiment instrument
CN106681310B (en) * 2017-02-21 2019-02-19 武汉华飞智能电气科技有限公司 Conventional stability control device functional tester
CN106841922B (en) * 2017-02-21 2019-09-06 武汉华飞智能电气科技有限公司 Intelligent stable control device experiment instrument
CN106950939A (en) * 2017-03-07 2017-07-14 广西电网有限责任公司电力科学研究院 A kind of multi-functional detection terminal of stabilized control system
CN113156236A (en) * 2021-03-18 2021-07-23 广西电网有限责任公司 Method and system for judging line overload of stability control device based on temperature change

Similar Documents

Publication Publication Date Title
CN204302403U (en) The simulation of electrical network stability control device and Test to Failure instrument
CN202102624U (en) Integral experiment system for preventing electricity fraudulent use
CN105761569B (en) 10Kv distribution transformer analogue simulation systems
CN203178388U (en) Micro-grid test platform based on RTDS (Real Time Digital Simulator)
CN202405686U (en) Intelligent switching state display device
CN205562704U (en) Alternating -current charging stake functional test device
WO2012010216A3 (en) Configuring a field device in a system for distributing electrical energy
CN103064054A (en) Electric energy measure device simulation system and wiring matrix control method thereof
CN202282094U (en) Passive load circuit device for access demonstration in electric larceny prevention comprehensive experiment device
CN109283437A (en) PT broken string and singlephase earth fault simulator and method
CN108548984A (en) A kind of multi-function device and its assay method that line and switching value sequential are measured for intelligence
CN208077472U (en) A kind of load condition simulator
CN203405730U (en) An apparatus for testing the physical layer of a CAN bus
CN206992687U (en) A kind of electrical management device based on power line communication technology
CN202735843U (en) Portable tester for popular type transformer substation side security and stability control device
CN102981134A (en) Intelligent display device tester of switch cabinet
CN203455424U (en) Portable multifunctional shore power system tester
CN102419407A (en) Ground detection experiment system for mining equipment
CN202473044U (en) Cable fault simulation experimental device
CN202383900U (en) Distribution transformer fault simulation box
CN205910578U (en) Prefabricated cable intellectual detection system device
CN205809266U (en) A kind of power distribution functions of modules test device
CN206020546U (en) Distribution power automation terminal O&M test system
CN203588005U (en) Intelligent switch
CN205810162U (en) Electrician's skills practice training device based on gauge table, earth leakage protective and illuminator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20190804