CN106836813B - A kind of construction hangs connection device with mud - Google Patents

A kind of construction hangs connection device with mud Download PDF

Info

Publication number
CN106836813B
CN106836813B CN201611250084.XA CN201611250084A CN106836813B CN 106836813 B CN106836813 B CN 106836813B CN 201611250084 A CN201611250084 A CN 201611250084A CN 106836813 B CN106836813 B CN 106836813B
Authority
CN
China
Prior art keywords
sleeve pipe
described sleeve
rope
outside
extension bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611250084.XA
Other languages
Chinese (zh)
Other versions
CN106836813A (en
Inventor
施洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yidu Xingyi Construction Engineering Co., Ltd.
Original Assignee
Yidu Xingyi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yidu Xingyi Construction Engineering Co Ltd filed Critical Yidu Xingyi Construction Engineering Co Ltd
Priority to CN201611250084.XA priority Critical patent/CN106836813B/en
Publication of CN106836813A publication Critical patent/CN106836813A/en
Application granted granted Critical
Publication of CN106836813B publication Critical patent/CN106836813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a kind of construction to hang connection device with mud, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, pillar is combined in the interconnecting piece, pedestal is provided with below the pillar, there are two slippage slots for well-balanced setting on the outside of described sleeve pipe, sliding, which is provided with, in described sleeve pipe hangs extension bar, there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, intert the slippage slot and extend into the outside of described sleeve pipe in the scimitar portion, the outside of described sleeve pipe and a tensioning member is connected between two scimitar portions, the present apparatus to hang extension bar sliding up and down by tensing payout, the decline of mud tank can be realized, it is simple to operate, the adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve synchronizes fixation, the structure of the present apparatus is relatively simple, cost is more low It is honest and clean, it is suitble to promote the use of.

Description

A kind of construction hangs connection device with mud
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction hangs connection device with mud.
Background technique
Mud is commonly used in construction, and mud is elongated on the relatively complete large-scale building site of some auxiliary facilities is It is transported on floor by Cargo Lift, however is all often logical on the relatively incomplete building site of some small-sized building sites or auxiliary facility Manpower self carrying is crossed, process not only takes time and effort, but also working efficiency and its low, and also have much makes in the prior art Mud is conveyed with pulley instrument, but it is not able to satisfy construction personnel and synchronizes fixation for mud tank in external wall construction Demand, and install it is excessively cumbersome, safety guarantee is not high, and use cost is excessively high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction to hang connection device with mud.
To solve the above problems, the present invention adopts the following technical scheme:
A kind of construction hangs connection device, including casing with mud, is provided with interconnecting piece at the bottom end die of described sleeve pipe, It is combined with pillar in the interconnecting piece, is provided with pedestal below the pillar, it is well-balanced on the outside of described sleeve pipe to be provided with Two slippage slots, sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two scimitars for well-balanced setting on the outside for hanging extension bar Portion, the scimitar portion intert the slippage slot and extend into the outside of described sleeve pipe, the outside of described sleeve pipe and in two scimitars A tensioning member is connected between portion, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, It is provided with pulley in the mounting groove, is combined with axle portion between the pulley and the inner sidewall of the mounting groove, on the pulley Equipped with annular groove, the rope leaves the excessively described annular groove of a side hanging of the tensioning member, is provided on the pillar close to bottom end Through slot, the rope intert the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, and the rope is interspersed described Clamping portion is provided on that side of through slot, the clamping portion is elastic card socket part, is provided with described in being used as in the clamping portion The interspersed inserting hole of rope, the clamping portion are movably set on the rope, when the through slot is inserted into the clamping portion When, so that the clamping portion is squeezed and deformed, the rope is fixedly clamped by the extrusion deformation of the clamping portion.
Preferably, No.1 bolt is combined between the interconnecting piece and the pillar, between the pedestal and the pillar No. two bolts are combined with, the left and right ends of the pedestal are movable to be equipped with clump weight, the inside of the axle portion and the mounting groove Wall is fixedly connected, and the pulley is movably disposed in the midpoint of the axle portion.
Preferably, described hang slides cooperation between extension bar and described sleeve pipe, is provided in described sleeve pipe and connects as described hang The slid chamber that bar slides up and down, the clamping portion have shrinkage.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope, The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate, The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more Simply, cost is more cheap, is suitble to promote the use of.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the overall structure diagram that connection device is hung in construction of the present invention with mud;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of clamping portion and rope in the present invention.
Fig. 4 is the enlarged diagram of interconnecting piece.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
A kind of construction shown in -4 hangs connection device, including casing 1, the bottom end pipe of described sleeve pipe 1 with mud refering to fig. 1 It is provided with interconnecting piece 2 at the heart, pillar 3 is combined in the interconnecting piece 2, the lower section of the pillar 3 is provided with pedestal 4, described There are two slippage slots 101 for well-balanced setting on the outside of casing 1, and sliding, which is provided with, in described sleeve pipe 1 hangs extension bar 5, and described hang connects There are two scimitar portions 501 for the well-balanced setting in the outside of bar 5, and the scimitar portion 501 interts the slippage slot 101 and extends into the set The outside of pipe 1, the outside of described sleeve pipe 1 and is connected with a tensioning member 502, the tensioning member 502 between two scimitar portions 501 Head be connected with rope 6, the head of described sleeve pipe 1 is provided with mounting groove 102, is provided with pulley in the mounting groove 102 7, axle portion 103 is combined between the pulley 7 and the inner sidewall of the mounting groove 102, the pulley 7 is equipped with annular groove 701, institute It states the excessively described annular groove 701 of a side hanging that rope 6 leaves the tensioning member 502, bottom end is provided with through slot on the pillar 3 311, the rope 6 interts the through slot 311, the rope after leaving the excessively described annular groove 701 of a side hanging of the tensioning member 502 6 intert and are provided with clamping portion 8 on that side of the through slot 311, and the clamping portion 8 is elastic card socket part, in the clamping portion 8 It is provided with and is used as the inserting hole that the rope 6 interts, the clamping portion 8 is movably set on the rope 6, when the card When socket part 8 is inserted into the through slot 311, so that the clamping portion 8 is squeezed and deformed, the rope 6 is become by the extruding of the clamping portion 8 Shape and be fixedly clamped, the setting of the inserting hole increases the clamping force between the rope 6 and the clamping portion 8, to make Obtain the clamping rope 6 that the clamping portion 8 can be more preferably more steady.
A preferred embodiment in the present invention is combined with No.1 bolt 201 between the interconnecting piece 2 and the pillar 3, No. two bolts 401 are combined between the pedestal 4 and the pillar 3, the left and right ends of the pedestal 4 are movable to be equipped with clump weight 402, it is by No.1 bolt 201 that the interconnecting piece 2 is fixed with the pillar 3, by No. two bolts 401 by the pedestal 4 with The pillar 3 is fixed, can be matched according to practical operation situation by the clump weight 402 of the activity setting on pedestal 4 Weight, to keep the pedestal more firm, the axle portion 103 is fixedly connected with the inner sidewall of the mounting groove 102, the pulley 7 are movably disposed in the midpoint of the axle portion 103, to facilitate the rope 6 that the tensioning member 502 is pulled to go up and down.
A preferred embodiment in the present invention, described hang slide cooperation, described sleeve pipe 1 between extension bar 5 and described sleeve pipe 1 Inside be provided with and be used as the slid chamber 503 hanging about 5 extension bar and sliding, in order to it is described hang extension bar 5 in described sleeve pipe 1 on To drive two scimitar portions 501 to move up and down, the clamping portion 8 has shrinkage for lower sliding, can preferably be squeezed change Shape is also convenient for being replaced so that the rope 6 is fixed after the damage of the clamping portion 8.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope, The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate, The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more Simply, cost is more cheap, is suitble to promote the use of.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (2)

1. a kind of construction hangs connection device with mud, it is characterised in that: including casing, be arranged at the bottom end die of described sleeve pipe There is interconnecting piece, pillar is combined in the interconnecting piece, is provided with pedestal below the pillar, it is even on the outside of described sleeve pipe Claiming setting, there are two slippage slots, and sliding, which is provided with, in described sleeve pipe hangs extension bar, well-balanced on the outside for hanging extension bar to be provided with Two scimitar portions, the scimitar portion intert the slippage slot and extend into the outside of described sleeve pipe, the outside of described sleeve pipe and A tensioning member is connected between two scimitar portions, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with Mounting groove is provided with pulley in the mounting groove, and axle portion, institute are combined between the pulley and the inner sidewall of the mounting groove Pulley is stated equipped with annular groove, the rope leaves the excessively described annular groove of a side hanging of the tensioning member, close to bottom end on the pillar Place is provided with through slot, and the rope interts the through slot, the rope after leaving the excessively described annular groove of a side hanging of the tensioning member Intert and be provided with clamping portion on that side of the through slot, is provided in the clamping portion and interts as what the rope interted Hole;Described hang slides cooperation between extension bar and described sleeve pipe, be provided with described in being used as in described sleeve pipe and hang what extension bar slid up and down Slid chamber, the clamping portion have shrinkage.
2. construction according to claim 1 hangs connection device with mud, it is characterised in that: the interconnecting piece and the branch It is combined with No.1 bolt between column, No. two bolts, the left and right ends of the pedestal are combined between the pedestal and the pillar Movable to be equipped with clump weight, the axle portion is fixedly connected with the inner sidewall of the mounting groove, and the pulley is movably disposed in The midpoint of the axle portion.
CN201611250084.XA 2016-12-29 2016-12-29 A kind of construction hangs connection device with mud Active CN106836813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611250084.XA CN106836813B (en) 2016-12-29 2016-12-29 A kind of construction hangs connection device with mud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611250084.XA CN106836813B (en) 2016-12-29 2016-12-29 A kind of construction hangs connection device with mud

Publications (2)

Publication Number Publication Date
CN106836813A CN106836813A (en) 2017-06-13
CN106836813B true CN106836813B (en) 2019-04-23

Family

ID=59114662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611250084.XA Active CN106836813B (en) 2016-12-29 2016-12-29 A kind of construction hangs connection device with mud

Country Status (1)

Country Link
CN (1) CN106836813B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Also Published As

Publication number Publication date
CN106836813A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN107090980B (en) A kind of construction slurry hangs connection device
CN209047559U (en) A kind of new teaching dais with expansion function
CN106836813B (en) A kind of construction hangs connection device with mud
CN208777679U (en) A kind of novel building engineering means for fastening scaffolding
CN107090979B (en) A kind of durable building construction slurry hangs connection device
CN107090978B (en) A kind of construction hangs connection device with displaceable mud
CN107089583B (en) A kind of construction slurry hangs connection device
CN106185022A (en) A kind of tube support arrangement
CN205322043U (en) Lift retractable curtain
CN203756633U (en) Supporting cylinder and wall plastering machine
CN207726600U (en) A kind of tubular body promotion claw
CN103758817A (en) Supporting cylinder and spackling machine
CN201358764Y (en) Balance weight structure of vertical oil extractor
CN106049971B (en) The installation method of the towering contactless suspender of noble metal tower mast
CN104456025A (en) Sling wall-hanging support
CN106930708B (en) Polished rod is taken out and is hung device
CN208668098U (en) A kind of telescopic clothes hanger
CN209195003U (en) Telescopic hanging landing beam
CN207890894U (en) A kind of box-type member lifting appliance
CN204454193U (en) A kind of lift car glass side plate structure easy to assemble
CN106049970B (en) The installation method of the towering contactless sling system of noble metal tower mast
CN210461961U (en) Pipeline connection construction supporting device
CN107087946B (en) A kind of new-type bracketplant bar
CN104210941B (en) Novel dragon gantry crane
CN107087949B (en) A kind of removable bracketplant bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190327

Address after: 443300 Yaojiadian Village, Yaojiadian Town, Yicheng City, Hubei Province (No. 6 Wangcheng Road)

Applicant after: Yidu Xingyi Construction Engineering Co., Ltd.

Address before: 510000 B5 building, No. 6, No. 6, Ying Long Road, Tianhe District, Guangzhou, Guangdong (Part 6, floor)

Applicant before: Guangzhou top security technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant