CN208777679U - A kind of novel building engineering means for fastening scaffolding - Google Patents

A kind of novel building engineering means for fastening scaffolding Download PDF

Info

Publication number
CN208777679U
CN208777679U CN201821272868.7U CN201821272868U CN208777679U CN 208777679 U CN208777679 U CN 208777679U CN 201821272868 U CN201821272868 U CN 201821272868U CN 208777679 U CN208777679 U CN 208777679U
Authority
CN
China
Prior art keywords
jacking block
connector
ring
terminal pad
adjusting ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821272868.7U
Other languages
Chinese (zh)
Inventor
王�琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821272868.7U priority Critical patent/CN208777679U/en
Application granted granted Critical
Publication of CN208777679U publication Critical patent/CN208777679U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a kind of novel building engineering means for fastening scaffolding, including mobile jib, first adjusts ring and connector, terminal pad is installed on the mobile jib, and terminal pad is connected with each other by fastening bolt and mobile jib, link slot is offered in the terminal pad, and mounting groove is provided on the outside of link slot, the connector is located at the inside of link slot, and connector is connected with each other by link slot and terminal pad, perforation is offered on the connector, and connector is connected with each other with the first jacking block and the second jacking block respectively by perforation, sleeve is installed on the outside of the connector, and connector is connected with each other by sleeve and strut.The novel building engineering means for fastening scaffolding, it is attached between mobile jib and strut by terminal pad and connector, and it is connected together between terminal pad and connector using perforation, the first jacking block and the second jacking block, it can be avoided the stability that connection using being bolted, is improved between mobile jib and strut.

Description

A kind of novel building engineering means for fastening scaffolding
Technical field
The utility model relates to technical field of buildings, specially a kind of novel building engineering means for fastening scaffolding.
Background technique
Scaffold refers generally to the support frame class that construction site uses, commonly used in playing a supporting role in wall outer side, together When facilitate worker to carry out climbing work, be it is a kind of the frame body that forms is spliced by steel pipe, so it is generally necessary to using attachment device.
Existing attachment device mostly uses greatly lantern ring and bolt to be attached, and bolt is easy during Reusability Appearance loosens and the phenomenon that stripped thread, reduces the stability that scaffold is fixed, while lantern ring connection causes lantern ring to be easy Sliding is moved in the enterprising line position of steel pipe, is unfavorable for being stably connected with.In view of the above-mentioned problems, on the basis of original attachment device Carry out innovative design.
Summary of the invention
The purpose of this utility model is to provide a kind of novel building engineering means for fastening scaffolding, to solve above-mentioned background The existing attachment device proposed in technology mostly uses greatly lantern ring and bolt to be attached, and bolt is during Reusability It is easy to appear and loosens and the phenomenon that stripped thread, reduce the stability that scaffold is fixed, while lantern ring connection leads to lantern ring It is easy to move sliding in the enterprising line position of steel pipe, is unfavorable for the problem of being stably connected with.
To achieve the above object, the utility model provides the following technical solutions: a kind of novel building engineering scaffold connection Device, including mobile jib, first ring and connector are adjusted, terminal pad is installed on the mobile jib, and terminal pad passes through fastening bolt It is connected with each other with mobile jib, offers link slot in the terminal pad, and be provided with mounting groove on the outside of link slot, the mounting groove Inside be respectively arranged with the first jacking block and the second jacking block, and be provided with reset spring on the outside of the first jacking block and the second jacking block, And the first jacking block and the second jacking block pass through reset spring and mounting groove is connected with each other, and the first adjusting ring is located at mounting groove Top, and the first adjusting ring is located at the inside of terminal pad, and the second adjusting ring, and the second tune are provided with below the mounting groove Section ring is located at the inside of terminal pad, the first adjusting ring and second adjust ring pass through reset spring respectively with the first jacking block and Second jacking block is connected with each other, and driving lever is mounted on the first adjusting ring and the second adjusting ring, and first adjusts ring, the second tune It is mounted on permanent magnet on section ring, the first jacking block and the second jacking block, the driving lever is located at the inside of limiting slot, and driving lever passes through limit Position slot and terminal pad are connected with each other, and the connector is located at the inside of link slot, and connector passes through link slot and terminal pad phase It connects, perforation is offered on the connector, and connector is mutually interconnected with the first jacking block and the second jacking block respectively by perforation It connects, sleeve is installed, and connector is connected with each other by sleeve and strut on the outside of the connector.
Preferably, the link slot is in terminal pad spaced at equal angles around, and link slot is connected together with connector.
Preferably, the lower end of first jacking block is U shape structure, and the first jacking block is connected together with the second jacking block, And the first jacking block and the second jacking block pass through reset spring and mounting groove constitutes stretching structure.
Preferably, the first adjusting ring and the second adjusting ring structure are identical, equal in magnitude, and first adjusts ring and second The inside that ring is nested in terminal pad is adjusted, and the first driving lever adjusted on ring and the second adjusting ring constitutes cunning with limiting slot Dynamic structure.
Preferably, the permanent magnet is provided with eight groups, and the number of every group of permanent magnet is provided with 2, and the first top Permanent magnet on block and the first adjusting ring is opposite with the equal different pole of permanent magnet on the second jacking block and the second adjusting ring.
Preferably, the connector is connected together with the first jacking block and the second jacking block respectively by perforation, and on connector Sleeve be threadedly coupled with strut.
Compared with prior art, the utility model has the beneficial effects that the novel building engineering means for fastening scaffolding, mentions The stability connected between high scaffolding steel pipe.
1, it is attached between mobile jib and strut by terminal pad and connector, and uses and wear between terminal pad and connector Hole, the first jacking block and the second jacking block are connected together, and can be avoided between mobile jib and strut using being bolted, the company of improving The stability connect;
2, be connected together being conducive to first using perforation, the first jacking block and the second jacking block between terminal pad and connector Jacking block and the second jacking block realize locking to perforation under the drive of reset spring, avoid the occurrence of the feelings that connector is disconnected Condition;
3, the first jacking block and the second jacking block are separately controlled using the first adjusting ring and the second adjusting ring realization, are avoided out The case where existing first jacking block and the second jacking block are detached from out of perforation, increases the measure of security insurance, improves connector progress The stability of connection.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model terminal pad overlooking structure diagram;
Fig. 3 bows for the utility model terminal pad and cuts open structural schematic diagram;
Fig. 4 is the utility model connector overlooking structure diagram.
In figure: 1, mobile jib;2, terminal pad;3, fastening bolt;4, link slot;5, mounting groove;6, the first jacking block;7, the second top Block;8, reset spring;9, first ring is adjusted;10, second ring is adjusted;11, permanent magnet;12, driving lever;13, limiting slot;14, it connects Head;15, it perforates;16, sleeve;17, strut.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-4 is please referred to, the utility model provides a kind of technical solution: a kind of novel building engineering scaffold connection dress It sets, including mobile jib 1, first adjusts ring 9 and connector 14, is equipped with terminal pad 2 on mobile jib 1, and terminal pad 2 passes through fastening bolt 3 are connected with each other with mobile jib 1, offer link slot 4 in terminal pad 2, and the outside of link slot 4 is provided with mounting groove 5, link slot 4 In 2 spaced at equal angles around of terminal pad, and link slot 4 is connected together with connector 14, facilitates connector 14 by link slot 4 and connects The interconnection of disk 2 is connect, the inside of mounting groove 5 is respectively arranged with the first jacking block 6 and the second jacking block 7, and the first jacking block 6 and the second top The outside of block 7 is provided with reset spring 8, and the first jacking block 6 and the second jacking block 7 are mutual by reset spring 8 and mounting groove 5 The lower end of connection, the first jacking block 6 is U shape structure, and the first jacking block 6 is connected together with the second jacking block 7, and the first top Block 6 and the second jacking block 7 constitute stretching structure by reset spring 8 and mounting groove 5, are conducive to the first jacking block 6 and the second jacking block 7 Mounting groove 5 is stretched out under the promotion of reset spring 8 to be connected together;
First adjusting ring 9 is located at the top of mounting groove 5, and the first adjusting ring 9 is located at the inside of terminal pad 2, and first is adjusted Ring 9 is identical with the second adjusting 10 structure of ring, equal in magnitude, and the first adjusting ring 9 and the second adjusting ring 10 are nested in terminal pad 2 Inside, and first adjust ring 9 and second adjust ring 10 on driving lever 12 with limiting slot 13 constitute slide construction, be conducive to The first adjusting ring 9 and the second adjusting ring 10 is driven to be slided respectively in the inside of terminal pad 2 by driving lever 12, mounting groove 5 Lower section is provided with the second adjusting ring 10, and the second adjusting ring 10 is located at the inside of terminal pad 2, and first, which adjusts ring 9 and second, is adjusted Ring 10 is connected with each other with the first jacking block 6 and the second jacking block 7 by reset spring 8 respectively, and first adjusts ring 9 and the second adjusting Driving lever 12 is mounted on ring 10, and the first adjusting ring 9, second adjusts and pacifies on ring 10, the first jacking block 6 and the second jacking block 7 Equipped with permanent magnet 11, permanent magnet 11 is provided with eight groups, and the number of every group of permanent magnet 11 is provided with 2, and the first jacking block 6 The permanent magnet 11 adjusted on ring 9 with first is opposite with the equal different pole of permanent magnet 11 on the second jacking block 7 and the second adjusting ring 10, side It will pass through that the different pole between permanent magnet 11 is attracting to draw the first jacking block 6 and the second jacking block 7, driving lever 12 is located at limiting slot 13 inside, and driving lever 12 is connected with each other by limiting slot 13 and terminal pad 2;
Connector 14 is located at the inside of link slot 4, and connector 14 is connected with each other by link slot 4 and terminal pad 2, connection First 14 are connected together with the first jacking block 6 and the second jacking block 7 respectively by perforation 15, and the sleeve 16 on connector 14 and strut 17 It is threadedly coupled, strut 17 is facilitated to be installed by connector 14 and sleeve 16, perforation 15 is offered on connector 14, and connect First 14 are connected with each other with the first jacking block 6 and the second jacking block 7 respectively by perforation 15, and the outside of connector 14 is equipped with sleeve 16, And connector 14 is connected with each other by sleeve 16 and strut 17.
Working principle: according to Fig. 1-4, mobile jib 1 is inserted into terminal pad 2 first, then by the fastening in terminal pad 2 Bolt 3 is tightened, until fastening bolt 3 passes through the surface that terminal pad 2 withstands on mobile jib 1, connector 14 is then passed through sleeve 16 are screwed on strut 17, are then inserted into strut 17 in the link slot 4 in terminal pad 2 by connector 14, then manually respectively It stirs the first adjusting ring 9 and second and adjusts driving lever 12 on ring 10, until driving lever 12 slides into and indicates beside limiting slot 13 At " OFF ", so that driving lever 12 drives the first adjusting ring 9 and the second adjusting ring 10 to be slided in the inside of terminal pad 2 respectively, directly To first adjust ring 9 and second adjust ring 10 on permanent magnet 11 respectively with the permanent magnet 11 on the first jacking block 6 and the second jacking block 7 It is disconnected, the permanent magnet 11 on the first jacking block 6 and the second jacking block 7 loses absorption traction at this time, thus the first jacking block 6 and second Jacking block 7 stretches out mounting groove 5 under the promotion of reset spring 8, until on the first jacking block 6 and the second jacking block 7 insertion connector 14 It is connected together in perforation 15, just completes the installation to strut 17 in this way;
According to Fig. 1-4, when needing to be removed strut 17,9 He of the first adjusting ring is stirred respectively manually first Second adjusts the driving lever 12 on ring 10, until driving lever 12 slides at " ON " indicated beside limiting slot 13, driving lever 12 divides at this time Not Dai Dong first adjust ring 9 and second adjust ring 10 terminal pad 2 inside carry out opposite direction sliding, until first adjust ring 9 It is aligned respectively with the permanent magnet 11 on the first jacking block 6 and the second jacking block 7 with the permanent magnet 11 on the second adjusting ring 10, at this time Permanent magnet 11 on first jacking block 6 and the second jacking block 7 retrieves the permanent magnet 11 on the first adjusting ring 9 and the second adjusting ring 10 Absorption traction, thus the first jacking block 6 and the second jacking block 7 is driven under the action of magnetic absorption reset spring 8 retraction mounting groove 5 It is interior, and then strut 17 just can be passed through 16 He of sleeve at this time departing from connection by the first jacking block 6 and the second jacking block 7 and perforation 15 Connector 14 is extracted out out of link slot 4 in terminal pad 2, just completes the disassembly of strut 17 in this way, and first adjusts ring 9 and second The design for adjusting 10 isolated operation of ring can be avoided single first and adjust ring 9 or the second adjusting ring 10 in the case where accidentally touching Connector 14 is caused to be disconnected, only first, which adjusts ring 9 and second, adjusts ring 10 simultaneously by permanent magnet 11 to the first jacking block 6 Carrying out absorption traction with the second jacking block 7 can make connector 14 completely disengage connection, such a novel building engineering foot hand Holder connection device is convenient for people to use.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of novel building engineering means for fastening scaffolding, including mobile jib (1), the first adjusting ring (9) and connector (14), It is characterized in that: being equipped with terminal pad (2) on the mobile jib (1), and terminal pad (2) is mutual by fastening bolt (3) and mobile jib (1) It connects, is offered link slot (4) on the terminal pad (2), and be provided with mounting groove (5), the installation on the outside of link slot (4) It is respectively arranged with the first jacking block (6) and the second jacking block (7) on the inside of slot (5), and the first jacking block (6) and the second jacking block (7) is outer Side is provided with reset spring (8), and the first jacking block (6) and the second jacking block (7) pass through reset spring (8) and mounting groove (5) It is connected with each other, described first adjusts the top that ring (9) are located at mounting groove (5), and the first adjusting ring (9) is located at terminal pad (2) Inside, is provided with the second adjusting ring (10) below the mounting groove (5), and second adjusts ring (10) and be located at terminal pad (2) Inside, described first adjust ring (9) and second adjust ring (10) pass through reset spring (8) respectively with the first jacking block (6) and the Two jacking blocks (7) are connected with each other, and are mounted on driving lever (12) in the first adjusting ring (9) and the second adjusting ring (10), and first It is mounted on permanent magnet (11) on adjusting ring (9), the second adjusting ring (10), the first jacking block (6) and the second jacking block (7), described group Bar (12) is located at the inside of limiting slot (13), and driving lever (12) is connected with each other by limiting slot (13) and terminal pad (2), the company Connector (14) is located at the inside of link slot (4), and connector (14) is connected with each other by link slot (4) and terminal pad (2), described It is offered on connector (14) perforation (15), and connector (14) is pushed up with the first jacking block (6) and second respectively by perforation (15) Block (7) is connected with each other, and is equipped with sleeve (16) on the outside of the connector (14), and connector (14) passes through sleeve (16) and branch Bar (17) is connected with each other.
2. a kind of novel building engineering means for fastening scaffolding according to claim 1, it is characterised in that: the link slot (4) in terminal pad (2) spaced at equal angles around, and link slot (4) is connected together with connector (14).
3. a kind of novel building engineering means for fastening scaffolding according to claim 1, it is characterised in that: first top The lower end of block (6) is U shape structure, and the first jacking block (6) is connected together with the second jacking block (7), and the first jacking block (6) Stretching structure is constituted by reset spring (8) and mounting groove (5) with the second jacking block (7).
4. a kind of novel building engineering means for fastening scaffolding according to claim 1, it is characterised in that: described first adjusts Section ring (9) is identical with the second adjusting ring (10) structure, equal in magnitude, and the first adjusting ring (9) and the second adjusting ring (10) are embedding Cover the inside in terminal pad (2), and first adjusts driving lever (12) on ring (9) and the second adjusting ring (10) and limiting slot (13) slide construction is constituted.
5. a kind of novel building engineering means for fastening scaffolding according to claim 1, it is characterised in that: the permanent magnet (11) eight groups are provided with, and the number of every group of permanent magnet (11) is provided with 2, and the first jacking block (6) and first adjusts ring (9) permanent magnet (11) on is opposite with permanent magnet (11) the different pole on the second jacking block (7) and the second adjusting ring (10).
6. a kind of novel building engineering means for fastening scaffolding according to claim 1, it is characterised in that: the connector (14) it is connected together respectively with the first jacking block (6) and the second jacking block (7) by perforation (15), and the sleeve on connector (14) (16) it is threadedly coupled with strut (17).
CN201821272868.7U 2018-08-08 2018-08-08 A kind of novel building engineering means for fastening scaffolding Expired - Fee Related CN208777679U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821272868.7U CN208777679U (en) 2018-08-08 2018-08-08 A kind of novel building engineering means for fastening scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821272868.7U CN208777679U (en) 2018-08-08 2018-08-08 A kind of novel building engineering means for fastening scaffolding

Publications (1)

Publication Number Publication Date
CN208777679U true CN208777679U (en) 2019-04-23

Family

ID=66156157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821272868.7U Expired - Fee Related CN208777679U (en) 2018-08-08 2018-08-08 A kind of novel building engineering means for fastening scaffolding

Country Status (1)

Country Link
CN (1) CN208777679U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453906A (en) * 2019-07-12 2019-11-15 邱萍 A kind of means for fastening scaffolding for construction
CN110528868A (en) * 2019-08-28 2019-12-03 章庆宁 A kind of scaffold of architectural engineering
CN113898214A (en) * 2021-09-27 2022-01-07 刘凯 Building support frame device capable of realizing inclined reminding and convenient to install

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453906A (en) * 2019-07-12 2019-11-15 邱萍 A kind of means for fastening scaffolding for construction
CN110453906B (en) * 2019-07-12 2021-05-11 重庆工程职业技术学院 Scaffold connecting device for building construction
CN110528868A (en) * 2019-08-28 2019-12-03 章庆宁 A kind of scaffold of architectural engineering
CN113898214A (en) * 2021-09-27 2022-01-07 刘凯 Building support frame device capable of realizing inclined reminding and convenient to install

Similar Documents

Publication Publication Date Title
CN208777679U (en) A kind of novel building engineering means for fastening scaffolding
CN208899871U (en) The bracing device of template
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN209354754U (en) The mounting device of pipe trench is put under pipeline
CN100546899C (en) Tower lifting, the dual-purpose machine of cloth
CN206619855U (en) A kind of seat hangs dual-purpose cable laying pulley
CN104328851A (en) Curtain wall
CN202718383U (en) Building scaffold connecting device
CN204179605U (en) A kind of cable clip
CN213065826U (en) Elevator ceiling lamp with adjustable
CN208792730U (en) A kind of adjustable girder steel nacelle device
CN210461961U (en) Pipeline connection construction supporting device
CN208870243U (en) A kind of curtain wall installing structure
CN207334530U (en) The Landscape Lamp of convenient installation
CN208204393U (en) A kind of teaching assembled architecture supporting apparatus
CN107090980B (en) A kind of construction slurry hangs connection device
CN109779223A (en) A kind of assembled architecture external platform hanging
CN215358305U (en) Combine and adopt working face emulsion pump head to dismantle strutting arrangement
CN204026063U (en) A kind of hoisting structure of LED display
CN216603859U (en) Safety belt hanging device for disassembling and assembling oil drilling derrick
CN204266422U (en) A kind of novel curtain wall
CN205778630U (en) Quickly location kill manifold and the device of choke manifold
CN218510333U (en) Comprehensive support
CN207392437U (en) A kind of building builder's temporary shed stent
CN214500298U (en) Hanging bracket convenient to detach for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190423

Termination date: 20200808