CN107089583B - A kind of construction slurry hangs connection device - Google Patents
A kind of construction slurry hangs connection device Download PDFInfo
- Publication number
- CN107089583B CN107089583B CN201611250083.5A CN201611250083A CN107089583B CN 107089583 B CN107089583 B CN 107089583B CN 201611250083 A CN201611250083 A CN 201611250083A CN 107089583 B CN107089583 B CN 107089583B
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- described sleeve
- rope
- pillar
- extension bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Treatment Of Sludge (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The invention discloses a kind of construction slurries to hang connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, pillar is combined in the interconnecting piece, pedestal is provided with below the pillar, there are two slippage slots for well-balanced setting on the outside of described sleeve pipe, it is provided in the interior sliding of described sleeve pipe and hangs extension bar, there are two scimitar portions for well-balanced setting on the outside for hanging extension bar, intert the slippage slot and extend into the outside of described sleeve pipe in the scimitar portion, the outside of described sleeve pipe and a tensioning member is connected between two scimitar portions, the present apparatus to hang extension bar sliding up and down by tensing payout, the decline of mud tank can be realized, it is simple to operate, the adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve synchronizes fixation, the structure of the present apparatus is relatively simple, cost is more cheap, It is suitble to promote the use of.
Description
Technical field
The present invention relates to the realm of building construction, in particular to a kind of construction slurry hangs connection device.
Background technique
Mud is commonly used in construction, and mud is elongated on the relatively complete large-scale building site of some auxiliary facilities is
It is transported on floor by Cargo Lift, however is all often logical on the relatively incomplete building site of some small-sized building sites or auxiliary facility
Manpower self carrying is crossed, process not only takes time and effort, but also working efficiency and its low, and also have much makes in the prior art
Mud is conveyed with pulley instrument, but it is not able to satisfy construction personnel and synchronizes fixation for mud tank in external wall construction
Demand, and install it is excessively cumbersome, safety guarantee is not high, and use cost is excessively high.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction slurries to hang connection device.
To solve the above problems, the present invention adopts the following technical scheme:
A kind of construction slurry hangs connection device, including casing, interconnecting piece is provided at the bottom end die of described sleeve pipe, described
It is combined with pillar in interconnecting piece, pedestal is provided with below the pillar, there are two sliding for well-balanced setting on the outside of described sleeve pipe
Slot is moved, is provided in the interior sliding of described sleeve pipe and hangs extension bar, there are two scimitar portion, institutes for well-balanced setting on the outside for hanging extension bar
State the outside that scimitar portion interts the slippage slot and extends into described sleeve pipe, the outside of described sleeve pipe and between two scimitar portions
It is connected with a tensioning member, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, in the peace
It puts and is provided with pulley in slot, axle portion is combined between the pulley and the inner sidewall of the mounting groove, the pulley has
Annular groove, the rope leave the excessively described annular groove of a side hanging of the tensioning member, and the head of described sleeve pipe is additionally provided with door, described
Door is fixedly connected with the head of described sleeve pipe, and the area of the door is greater than the area of described sleeve pipe, and the door is located at institute
State prevents dust from entering in the mounting groove and stacks on mounting groove to block the mounting groove, to guarantee the cunning
The operating of wheel is provided with through slot close to bottom end on the pillar, and the side hanging that the rope leaves the tensioning member is excessively described
Intert the through slot after annular groove, the rope, which interts, is provided with clamping portion on that side of the through slot, and the clamping portion is bullet
Property clamping portion, the inserting hole interted as the rope is provided in the clamping portion, the clamping portion is movably set in
On the rope, when the through slot is inserted into the clamping portion, so that the clamping portion is squeezed and deformed, the rope is by the card
The extrusion deformation of socket part and be fixedly clamped.
Preferably, No.1 bolt is combined between the interconnecting piece and the pillar, between the pedestal and the pillar
No. two bolts are combined with, the left and right ends of the pedestal are movable to be equipped with clump weight, the inside of the axle portion and the mounting groove
Wall is fixedly connected, and the pulley is movably disposed in the midpoint of the axle portion.
Preferably, described hang slides cooperation between extension bar and described sleeve pipe, is provided in described sleeve pipe and is used as described hang
The slid chamber that extension bar slides up and down, the clamping portion have shrinkage.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope,
The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make
It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality
The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping
Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time
Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion
Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate,
The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more
Simply, cost is more cheap, is suitble to promote the use of.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the overall structure diagram that construction slurry of the present invention hangs connection device;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the structural schematic diagram of clamping portion and rope in the present invention.
Fig. 4 is the enlarged diagram of interconnecting piece.
Specific embodiment
The preferred embodiment of the present invention is described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
A kind of construction slurry shown in -4 hangs connection device, including casing 1 refering to fig. 1, sets at the bottom end die of described sleeve pipe 1
It is equipped with interconnecting piece 2, pillar 3 is combined in the interconnecting piece 2, the lower section of the pillar 3 is provided with pedestal 4, described sleeve pipe 1
On outside well-balanced setting is provided in the interior sliding of described sleeve pipe 1 and hangs extension bar 5 there are two slippage slot 101, the extension bar 5 that hangs
There are two scimitar portions 501 for the well-balanced setting in outside, and the scimitar portion 501 interts the slippage slot 101 and extends into described sleeve pipe 1
Outside, the outside of described sleeve pipe 1 and is connected with a tensioning member 502, the head of the tensioning member 502 between two scimitar portions 501
Portion is connected with rope 6, and the head of described sleeve pipe 1 is provided with mounting groove 102, and pulley 7, institute are provided in the mounting groove 102
It states and is combined with axle portion 103 between pulley 7 and the inner sidewall of the mounting groove 102, the pulley 7 has annular groove 701, described
Rope 6 leaves the excessively described annular groove 701 of a side hanging of the tensioning member 502, and the head of described sleeve pipe 1 is additionally provided with door 110, institute
It states door 110 to be fixedly connected with the head of described sleeve pipe 1, the area of the door 110 is greater than the area of described sleeve pipe 1, described
Door 110 is located on the mounting groove 102 prevents dust from entering the mounting groove to block the mounting groove 102
It is stacked in 102, to guarantee the operating of the pulley 7, bottom end is provided with through slot 311, the rope on the pillar 3
6 leave and intert the through slot 311 after the excessively described annular groove 701 of a side hanging of the tensioning member 502, and the rope 6 interts described logical
Clamping portion 8 is provided on that side of slot 311, the clamping portion 8 is elastic card socket part, is provided with and is used as in the clamping portion 8
The interspersed inserting hole of the rope 6, the clamping portion 8 are movably set on the rope 6, when the clamping portion 8 is inserted into
When the through slot 311, so that the clamping portion 8 is squeezed and deformed, the rope 6 is clamped by the extrusion deformation of the clamping portion 8
Fixed, the setting of the inserting hole increases the clamping force between the rope 6 and the clamping portion 8, so that the card
Socket part 8 can be more preferably more steady the clamping rope 6.
A preferred embodiment in the present invention is combined with No.1 bolt 201 between the interconnecting piece 2 and the pillar 3,
No. two bolts 401 are combined between the pedestal 4 and the pillar 3, the left and right ends of the pedestal 4 are movable to be equipped with clump weight
402, it is by No.1 bolt 201 that the interconnecting piece 2 is fixed with the pillar 3, by No. two bolts 401 by the pedestal 4 with
The pillar 3 is fixed, can be matched according to practical operation situation by the clump weight 901 of the activity setting on pedestal 4
Weight, to keep the pedestal more firm, the axle portion 103 is fixedly connected with the inner sidewall of the mounting groove 102, the pulley
7 are movably disposed in the midpoint of the axle portion 103, to facilitate the rope 6 that the tensioning member 502 is pulled to go up and down.
A preferred embodiment in the present invention, described hang slide cooperation, described sleeve pipe 1 between extension bar 5 and described sleeve pipe 1
In be provided with and be used as the slid chamber 503 hanging about 5 extension bar and sliding, in order to which the extension bar 5 that hangs is in described sleeve pipe 1
To drive two scimitar portions 501 to move up and down, the clamping portion 8 has shrinkage for sliding up and down, can preferably be squeezed
Deformation is also convenient for being replaced so that the rope 6 is fixed after the damage of the clamping portion 8.
The beneficial effects of the present invention are: realize the suspension of mud tank by two scimitar portions, then by the pulling of rope,
The upper and lower position in two scimitar portions is changed, extension bar sliding up and down in slid chamber is hung, when needing to rise, rope is pulled to make
It hangs extension bar to slide upwards, then drives and rise, to complete the conveying for mud;It is such as needed in external wall construction to mud tank reality
The position for synchronizing fixed clamping portion mobile after the completion of height adjustment on rope is applied, through slot is inserted into clamping portion, so that clamping
Portion occurs to be squeezed and deformed and clamp rope, so that rope not stretchy, two scimitar portions are fixed on the height of needs at this time
Degree, while mud tank is also suspended in the height of needs, when needing to decline, it is only necessary to extract clamping portion, then move clamping portion
Position on rope is made to hang extension bar downslide by payout, the decline of mud tank can be realized, simple to operate,
The adjustable height of mud tank can be adjusted according to different construction requirements and is able to achieve and synchronizes fixation, and the structure of the present apparatus is more
Simply, cost is more cheap, is suitble to promote the use of.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent defines.
Claims (2)
1. a kind of construction slurry hangs connection device, it is characterised in that: including casing, be provided with connection at the bottom end die of described sleeve pipe
Portion is combined with pillar in the interconnecting piece, and pedestal, well-balanced setting on the outside of described sleeve pipe are provided with below the pillar
There are two slippage slots, and sliding, which is provided with, in described sleeve pipe hangs extension bar, and there are two hooks for well-balanced setting on the outside for hanging extension bar
Sickle portion, the scimitar portion intert the slippage slot and extend into the outside of described sleeve pipe, the outside of described sleeve pipe and in two hooks
A tensioning member is connected between sickle portion, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove,
It is provided with pulley in the mounting groove, axle portion, the pulley are combined between the pulley and the inner sidewall of the mounting groove
It is equipped with annular groove, the rope leaves the excessively described annular groove of a side hanging of the tensioning member, and the head of described sleeve pipe is additionally provided with gear
Lid, the door is fixedly connected with the head of described sleeve pipe, and the door is located on the mounting groove, on the pillar close to
Bottom end is provided with through slot, and the rope interts the through slot after leaving the excessively described annular groove of a side hanging of the tensioning member, described
Rope, which interts, is provided with clamping portion on that side of the through slot, is provided in the clamping portion and wears as what the rope interted
Jack;
Wherein, described hang slides cooperation between extension bar and described sleeve pipe, is provided with described in being used as in described sleeve pipe and hangs extension bar or more
The slid chamber of sliding, the clamping portion have shrinkage.
2. construction slurry according to claim 1 hangs connection device, it is characterised in that: between the interconnecting piece and the pillar
It is combined with No.1 bolt, No. two bolts are combined between the pedestal and the pillar, the left and right ends of the pedestal are movable
Equipped with clump weight, the axle portion is fixedly connected with the inner sidewall of the mounting groove, and the pulley is movably disposed in the axis
The midpoint in portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611250083.5A CN107089583B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611250083.5A CN107089583B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107089583A CN107089583A (en) | 2017-08-25 |
CN107089583B true CN107089583B (en) | 2018-12-18 |
Family
ID=59646429
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611250083.5A Active CN107089583B (en) | 2016-12-29 | 2016-12-29 | A kind of construction slurry hangs connection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107089583B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000064613A (en) * | 1998-08-25 | 2000-02-29 | Asuku Techno Koji Kk | Spray-coating refractory cement feeder |
CN201062777Y (en) * | 2007-07-17 | 2008-05-21 | 中国二十冶建设有限公司 | Height-adjustable lighting lamp stand for building site |
CN101866595A (en) * | 2010-02-05 | 2010-10-20 | 成都市宇中梅科技有限责任公司 | Liftable slogan bracket |
CN203911197U (en) * | 2014-06-19 | 2014-10-29 | 国网四川省电力公司成都市新都供电分公司 | Labor-saving adjustable ground lead hook mounting mechanism |
CN105257018B (en) * | 2015-10-19 | 2018-10-30 | 黄翠琳 | Construction site supporting rack that is a kind of easy to remove and placing |
CN105251076A (en) * | 2015-11-17 | 2016-01-20 | 任巧凤 | Infusion hanging device for hospital |
-
2016
- 2016-12-29 CN CN201611250083.5A patent/CN107089583B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107089583A (en) | 2017-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103449314A (en) | Telescopic high-rise hoisting machine | |
CN107090980B (en) | A kind of construction slurry hangs connection device | |
CN107089583B (en) | A kind of construction slurry hangs connection device | |
CN108584675B (en) | A kind of anti-bending safty hoisting equipment of spiral moving axis | |
CN207175205U (en) | A kind of adjustable unit plate suspension clipping device | |
CN106836813B (en) | A kind of construction hangs connection device with mud | |
CN107090979B (en) | A kind of durable building construction slurry hangs connection device | |
CN107090978B (en) | A kind of construction hangs connection device with displaceable mud | |
CN105731237B (en) | Computer room Multifunctional static electricity floor sucker | |
CN209724201U (en) | A kind of brick-clamping device convenient to overhaul | |
CN109386666A (en) | A kind of adjustable spring support hanging frame | |
CN207893365U (en) | A kind of display lifting support | |
CN203756633U (en) | Supporting cylinder and wall plastering machine | |
CN203428792U (en) | Retractable type high rise hoisting machine | |
CN106952574B (en) | A kind of advertisement board structure | |
CN104456025A (en) | Sling wall-hanging support | |
CN103758817A (en) | Supporting cylinder and spackling machine | |
CN209522499U (en) | A kind of novel construction and installation hanging apparatus | |
CN207034413U (en) | A kind of adjustable spring support hanging frame | |
CN106049970B (en) | The installation method of the towering contactless sling system of noble metal tower mast | |
CN107087947B (en) | A kind of bracketplant bar | |
CN208232300U (en) | Stretching device for elastic rubber | |
CN207330289U (en) | A kind of packaged type coal mine hydraulic supporting maintenance platform | |
CN107087949B (en) | A kind of removable bracketplant bar | |
CN210461961U (en) | Pipeline connection construction supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181105 Address after: 450000 Henan Zhengzhou Jinshui District Garden Road West, agricultural road south 6 Building 1 unit 22 level 2207 Applicant after: The Second Construction Company Of China Construction Second Engineering Bureau Address before: 510000 B5 building, No. 6, No. 6, Ying Long Road, Tianhe District, Guangzhou, Guangdong (Part 6, floor) Applicant before: Guangzhou top security technology Co., Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |