CN106836662A - The concrete construction method of Curved Roof - Google Patents

The concrete construction method of Curved Roof Download PDF

Info

Publication number
CN106836662A
CN106836662A CN201611090429.XA CN201611090429A CN106836662A CN 106836662 A CN106836662 A CN 106836662A CN 201611090429 A CN201611090429 A CN 201611090429A CN 106836662 A CN106836662 A CN 106836662A
Authority
CN
China
Prior art keywords
steel form
roofing
concrete
steel
rail plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611090429.XA
Other languages
Chinese (zh)
Other versions
CN106836662B (en
Inventor
刘雪辉
郭华新
牛宏磊
张�浩
曹素芬
王永利
李廷秀
王宁
孙凯旋
李同玉
马燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Original Assignee
Hebei 20 Smelting Construction Co Ltd
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei 20 Smelting Construction Co Ltd, China MCC20 Group Corp Ltd filed Critical Hebei 20 Smelting Construction Co Ltd
Priority to CN201611090429.XA priority Critical patent/CN106836662B/en
Publication of CN106836662A publication Critical patent/CN106836662A/en
Application granted granted Critical
Publication of CN106836662B publication Critical patent/CN106836662B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D7/00Roof covering exclusively consisting of sealing masses applied in situ; Gravelling of flat roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings

Abstract

The invention provides a kind of concrete construction method of Curved Roof, comprise the following steps:A, installation rail plate;B, combine and steel form is installed;The radian of c, adjustment steel form;D, the installation form travel mechanism on steel form;E, on the steel form for assembling plate vibrator is installed;F, inspection pattern movement mechanism;Roofing concrete is carried out after the completion of g, pattern movement mechanism pours work;H, after the completion of the region roofing where steel form is poured, steel form is integrally hung to using tower crane for next casting area, repeat step f and g carry out concreting, until whole roofing pours completion;After the completion of roofing concrete is poured, after concrete reaches some strength, steel form is removed.The present invention solves the problems, such as difficult forming present in Curved Roof concreting, bent roofing concrete plate construction quality and curve surface accuracy are improved, design thickness, concrete density of Curved Roof concrete etc. has been effectively ensured and has been reached design requirement.

Description

The concrete construction method of Curved Roof
Technical field
The present invention relates to a kind of construction method of roofing, specifically a kind of concrete construction side of Curved Roof Method.
Background technology
In building engineering, in order that building it is real turn into contact natural landscape and cultural characteristics, traditional culture with One carrier of modern civilization, reaches the natural effect that mountain stone is unified, humanity is unified, and has emerged in large numbers substantial amounts of Curved Roof.Mesh Before, the concrete construction of Curved Roof is substantially:Support is set up;Formwork;Beam, slab muscle colligation;Lanyard bracing wire is controlled Pitched roof elevation;Casting concrete.But, in concrete construction, the radian for pouring thickness and roofing of its concrete More difficult control, causes the concrete slab construction of Curved Roof second-rate and bent surface accuracy is relatively low.
The content of the invention
It is an object of the invention to provide a kind of concrete construction method of Curved Roof, to solve existing shaped form The relatively low problem of the second-rate and bent surface accuracy of concrete slab construction present in the construction method of the concrete on roof.
The object of the present invention is achieved like this:A kind of concrete construction method of Curved Roof, comprises the following steps:
A, installation rail plate:Uniformly eject a plurality of parallel along roofing radian direction on the roofing plank sheathing for laying in advance Track centerline, multiple is evenly arranged with admittedly on every track centerline on roofing plank sheathing along the direction of track centerline Determine bearing, the adjusting screw rod with its plane perpendicular is installed on the hold-down support, the adjusting screw rod is connected through a screw thread Mode be fixedly connected with the top of the hold-down support, be fixedly installed at the top of the adjusting screw rod for accommodate slide The rail mounting groove of guide rail, places rail plate in rail mounting groove, and the upper surface of the rail plate is continuous to be set to Broached-tooth design, is installed when same rail plate is installed from eaves mouthful to the direction order of ridge, rail plate by pin with The side wall of rail mounting groove is fixedly connected, and the rail plate radian of identical elevation location is identical, by adjusting the adjusting screw rod The thickness for being screwed into depth and being treated to adjust casting concrete on the hold-down support;
B, combine and steel form is installed:Conventional modulus according to each building roof makes the different steel form of polylith width, so The area according to roofing to be poured is combined collocation afterwards, is entered by bolt between every piece of steel form and adjacent steel form , be placed on rail plate the good steel form of composite assembly so that steel form is relative with roofing plank sheathing using tower crane by row connection Set;When the steel form that combination is completed is placed, the side long of steel form is parallel with track centerline;
The radian of c, adjustment steel form:Intermediolateral column is fixedly mounted at every piece of back side of steel form, and uses scaffold tubes by every block of steel Intermediolateral column in template is linked to be overall structure, is connected with for adjusting between every piece of steel form and intermediolateral column mounted thereto The telescopic support adjusting rod of steel form radian, between support adjusting rod and steel form and support adjusting rod and intermediolateral column it Between connected by pin rotation, the support adjusting rod is symmetrically distributed in the both sides of the radial direction of intermediolateral column;Regulation support regulation The length of bar so that corresponding steel form rotates along the axis of itself, checked all the time when the radian of steel form is adjusted steel form with The distance between roofing plank sheathing, to adjust roofing concrete shaping radian and roofing concrete thickness to be poured at any time;
D, the installation form travel mechanism on steel form:Pattern movement mechanism includes driving shaft and driven shaft, in the driving shaft Be cased with the driven shaft with the same number of gear of the rail plate, the driving shaft and driven shaft are separately mounted to The top and bottom of the steel form after assembling, are provided with the driving electricity for driving the driving shaft to rotate on the steel form Machine, be fixed on gear where it by pin with after the engagement of corresponding rail plate with the gear on driven shaft by driving shaft On driving shaft or driven shaft;
E, on the steel form for assembling plate vibrator is installed:According to the area choosing that different concrete slabs are thick and steel form is assembled Appropriate number of plate vibrator is taken, and plate vibrator is arranged in the steel form for assembling in the form of multiple lines and multiple rows The back side;
F, inspection pattern movement mechanism:After installing plate vibrator, motor is debugged, the steering of motor is adjusted to The state in the same direction with steel form direction of travel;Motor is existed to motor energization after the completion of turning to adjustment with debugging steel form Walking on rail plate, it is ensured that steady walking of the steel form on rail plate;
Roofing concrete is carried out after the completion of g, pattern movement mechanism pours work:When concreting is carried out to roofing under It is supreme to pour, plate vibrator is opened when pouring, when motor is opened after concreting to certain altitude, make assembling steel Template is moved up, and concreting speed is adjusted by controlling the translational speed of steel form;
H, after the completion of the region roofing where steel form is poured, steel form is integrally hung to using tower crane for next casting area, Repeat step f checks steel form travel mechanism, and repeat step g carries out concreting from the bottom to top to roofing, until whole Individual roofing pours completion;After the completion of roofing concrete is poured, after concrete reaches some strength, steel form is removed, by steel Template is transported to next construction area and reuses.
In step a, the hold-down support uses rubber hold-down support, and the hold-down support to be fixedly mounted on by steel nail On roofing plank sheathing.
In step c, the intermediolateral column is with the attachment structure of steel form:The back side of every piece of steel form is provided with fixing card Groove, fixed card slot is inserted and by pin by intermediolateral column the fixed installation again fixed card slot by intermediolateral column.
In step c, symmetrically adjusted to intermediolateral column direction simultaneously from both sides when steel form radian is adjusted.
Connected by chain between the motor and driving shaft.
In step f, when the walking to steel form is debugged, the gear on gear sideslip or driven shaft on driving shaft During sideslip, driving shaft and the perpendicularity and driven shaft of rail plate and the perpendicularity of rail plate are checked, by adjusting actively The measure of the position or local directed complete set rail plate position of axle or driven shaft ensures engaging for gear and rail plate.
Present invention installation form travel mechanism on steel form, and by the gear and rail plate on pattern movement mechanism Engagement realize movement of the steel form on rail plate, simplify the concrete working device of Curved Roof, make curve room The concreting process in face is easily controllable, improves the recycling rate of waterused of steel form, reduces the construction cost of concrete. The present invention fixedly mounts intermediolateral column at every piece of back side of steel form, and is linked to be the intermediolateral column on every piece of steel form using scaffold tubes Overall structure, is connected between every piece of steel form and intermediolateral column mounted thereto for adjusting the scalable of steel form radian Support adjusting rod, by support adjusting rod realize steel form radian adjust, improve the surface accuracy of Curved Roof.
The present invention solves the problems, such as difficult forming present in Curved Roof concreting, improves bent roofing coagulation Native plate construction quality and curve surface accuracy, have been effectively ensured design thickness, the concrete density of Curved Roof concrete Etc. reaching design requirement.The shelving roofing concrete that mobile steel form can adapt to different radians simultaneously is poured, with existing song The construction method of linear roofing is compared, economical, economies and it is advanced the advantages of.
Brief description of the drawings
Fig. 1 is the structural representation of the scaffold of Curved Roof of the invention.
Fig. 2 is the structural representation of steel form of the invention.
Fig. 3 is the attachment structure figure of rail plate of the invention and hold-down support.
Fig. 4 is the attachment structure top view of rail plate of the invention and hold-down support.
Fig. 5 is the structural representation of rail plate of the invention.
In figure:1st, roofing plank sheathing;2nd, hold-down support;3rd, adjusting screw rod;4th, rail plate;5th, steel form;6th, intermediolateral column; 7th, support adjusting rod;8th, scaffold tubes.
Specific embodiment
As shown in Fig. 1 ~ Fig. 5, a kind of concrete construction method of Curved Roof is comprised the following steps:
A, installation rail plate 4:Uniformly eject a plurality of parallel along roofing radian direction on the roofing plank sheathing 1 for laying in advance Track centerline, be evenly arranged with along the direction of track centerline on every track centerline on roofing plank sheathing 1 many Individual hold-down support 2, hold-down support 2 is using rubber hold-down support 2, and hold-down support 2 is fixedly mounted on roofing wooden model by steel nail On plate 1, the distance between hold-down support 2 on same track centerline and adjacent hold-down support 2 are arranged on for 1 meter.Solid Determine the adjusting screw rod 3 with its plane perpendicular is installed on bearing 2, the mode that adjusting screw rod 3 is connected through a screw thread and hold-down support 2 Top be fixedly connected, be fixedly installed the rail mounting groove for accommodating rail plate 4 at the top of adjusting screw rod 3, it is in-orbit Rail plate 4 is placed in road mounting groove, rail mounting groove is for the top of channel-section steel structure, i.e. rail mounting groove and along rail plate The two ends of heart line are disposed as opening.The upper surface of rail plate 4 to be set to continuous broached-tooth design, rail plate 4 in peace Installed from eaves mouthful to the direction order of ridge when filling same rail plate 4, rail plate 4 is by pin and rail mounting groove Side wall is fixedly connected, and the radian of rail plate 4 of identical elevation location is identical, by adjusting adjusting screw rod 3 on hold-down support 2 It is screwed into depth and is treated to adjust the thickness of casting concrete.It is fixed rail plate can be measured using axis intersection during construction Position.
B, combine and steel form 5 is installed:Conventional modulus according to each building roof makes the different punching block of polylith width Plate 5, is then combined collocation according to the area of roofing to be poured, by spiral shell between every piece of steel form 5 and adjacent steel form 5 Bolt is attached, and the good steel form 5 of composite assembly is placed on rail plate 4 using tower crane so that steel form 5 and roofing wood Template 1 is oppositely arranged;When the steel form 5 that combination is completed is placed, the side long of steel form 5 is parallel with track centerline.Making The size of steel form can be adjusted during steel form according to the gradient of Curved Roof, wherein steel form can be increased in heavy grade roofing Lateral length, conversely, the longitudinal length of steel form can be reduced, while adjusting the slump of concrete, has concrete good Mobility.
The radian of c, adjustment steel form 5:Intermediolateral column 6 is fixedly mounted at every piece of back side of steel form 5, and uses scaffold tubes 8 Intermediolateral column 6 on every piece of steel form 5 is linked to be overall structure, is connected between every piece of steel form 5 and intermediolateral column 6 mounted thereto Be connected to some telescopic support adjusting rods 7 for adjusting the radian of steel form 5, between support adjusting rod 7 and steel form 5 and Connected by pin rotation between support adjusting rod 7 and intermediolateral column 6, the pin between connection support adjusting rod 7 and steel form 5 The outer surface of the pin between nail and connection support adjusting rod 7 and intermediolateral column 6 is coated with lubricating oil.In the present embodiment, The front of steel form is concreting face, and the back side of steel form is the back side in the concreting face of steel form, in steel form The back side multiple ribs be arrangeding in parallel are installed, the side long of ribs is axially in parallel with steel form.Support adjusting rod 7 pairs Title is distributed in the both sides of the radial direction of intermediolateral column 6.In the present embodiment, intermediolateral column 6 is arranged on the back side axial direction of every piece of steel form 5 Respectively be connected with intermediolateral column 6 for the two ends and middle part along curve radian of steel form 5 by the middle part of side, support adjusting rod 7.Regulation The length of support adjusting rod 7 so that corresponding steel form 5 rotates along the axis of itself, when the radian of steel form 5 is adjusted all the time Check the distance between steel form 5 and roofing plank sheathing 1, with adjust roofing concrete shaping radian at any time and roofing wait to pour it is mixed Solidifying soil thickness, is symmetrically adjusted to the direction of intermediolateral column 6 simultaneously when 5 radian of steel form is adjusted from both sides.Wherein, intermediolateral column 6 and steel The attachment structure of template 5 is:The back side of every piece of steel form 5 is provided with fixed card slot, intermediolateral column 6 is inserted into fixed card slot and is led to Cross during intermediolateral column 6 fixedly mounts fixed card slot again by pin.Each support adjusting rod 7 includes first be connected with steel form 5 Bar and the second pole being connected with intermediolateral column, the first pole are provided with external screw thread with the mutually close two ends of the second pole, the The external screw thread of one pole is oppositely oriented with the external screw thread of the second pole.Adjusting set is connected between the first pole and the second pole Cylinder, the inner tube wall of regulating sleeve is provided with the internal thread being engaged with the first pole and the second pole, by rotating regulating sleeve The flexible of support adjusting rod 7 can be realized.
D, the installation form travel mechanism on steel form 5:Pattern movement mechanism includes driving shaft and driven shaft, in driving shaft Be cased with being respectively mounted steel after assembling with the same number of gear of rail plate 4, driving shaft and driven shaft on driven shaft The top and bottom of template 5, are provided with the motor for driving driving shaft to rotate, motor and master on steel form 5 Connected by chain between moving axis.In the present embodiment, the axle for supporting driving shaft to rotate is installed at the top of steel form Bearing, the bearing block for supporting driven shaft to rotate is provided with the bottom of steel form.By the gear on driving shaft and driven shaft On driving shaft or driven shaft where gear to be fixed on it by pin after being engaged with corresponding rail plate 4.
E, on the steel form 5 for assembling plate vibrator is installed:It is thick and the assembly of steel form 5 according to different concrete slabs Area chooses appropriate number of plate vibrator, and plate vibrator is arranged in the steel for assembling in the form of multiple lines and multiple rows The back side of template 5.The spacing between plate vibrator and adjacent plate vibrator is 1 meter in the horizontal, in the vertical flat board Spacing between vibrator and adjacent plate vibrator is 1 meter.
F, inspection pattern movement mechanism:After installing plate vibrator, motor is debugged, the steering of motor is adjusted It is whole to the state in the same direction with the direction of travel of steel form 5;Motor is powered to debugging steel after the completion of turning to adjustment to motor Walking of the template 5 on rail plate 4, it is ensured that steady walking of the steel form 5 on rail plate 4;The operation smooth-going of steel form 5 Afterwards, vibrator is opened, the steel form 5 that reruns is moved up and down, it is ensured that during steel form 5 shakes again, remain to even running. When walking to steel form 5 is debugged, during gear sideslip on the gear sideslip or driven shaft on driving shaft, driving shaft is checked With the perpendicularity of the perpendicularity and driven shaft of rail plate 4 and rail plate 4, by the position for adjusting driving shaft or driven shaft Or the measure of the position of local directed complete set rail plate 4 ensures engaging for gear and rail plate 4.
Roofing concrete is carried out after the completion of g, pattern movement mechanism pours work:When concreting is carried out to roofing Pour from the bottom to top, plate vibrator is opened when pouring, when motor is opened after concreting to certain altitude, make group Steel loading template 5 is moved up, and concreting speed is adjusted by controlling the translational speed of steel form 5.
H, after the completion of the region roofing where steel form 5 is poured, next pouring is hung to by steel form 5 is overall using tower crane Region, repeat step f checks the travel mechanism of steel form 5, and repeat step g carries out concreting from the bottom to top to roofing, Until whole roofing pours completion;After the completion of roofing concrete is poured, after concrete reaches some strength, steel form is removed 5, steel form 5 is transported to next construction area and is reused.
Next construction area carry out roofing concrete the installation that can successively carry out steel form when pouring by above-mentioned steps, The adjustment of steel form radian and pouring for roofing concrete.The present invention is applied to shaped form pitched roof, arc pitched roof and broken line The concrete of shape pitched roof is poured.
The present invention obtains good application effect in Ancient City of Ping Yao eco-tour cultural industry garden project.

Claims (6)

1. a kind of concrete construction method of Curved Roof, it is characterized in that, comprise the following steps:
A, installation rail plate:Uniformly eject a plurality of parallel along roofing radian direction on the roofing plank sheathing for laying in advance Track centerline, multiple is evenly arranged with admittedly on every track centerline on roofing plank sheathing along the direction of track centerline Determine bearing, the adjusting screw rod with its plane perpendicular is installed on the hold-down support, the adjusting screw rod is connected through a screw thread Mode be fixedly connected with the top of the hold-down support, be fixedly installed at the top of the adjusting screw rod for accommodate slide The rail mounting groove of guide rail, places rail plate in rail mounting groove, and the upper surface of the rail plate is continuous to be set to Broached-tooth design, is installed when same rail plate is installed from eaves mouthful to the direction order of ridge, rail plate by pin with The side wall of rail mounting groove is fixedly connected, and the rail plate radian of identical elevation location is identical, by adjusting the adjusting screw rod The thickness for being screwed into depth and being treated to adjust casting concrete on the hold-down support;
B, combine and steel form is installed:Conventional modulus according to each building roof makes the different steel form of polylith width, so The area according to roofing to be poured is combined collocation afterwards, is entered by bolt between every piece of steel form and adjacent steel form , be placed on rail plate the good steel form of composite assembly so that steel form is relative with roofing plank sheathing using tower crane by row connection Set;When the steel form that combination is completed is placed, the side long of steel form is parallel with track centerline;
The radian of c, adjustment steel form:Intermediolateral column is fixedly mounted at every piece of back side of steel form, and uses scaffold tubes by every block of steel Intermediolateral column in template is linked to be overall structure, is connected with for adjusting between every piece of steel form and intermediolateral column mounted thereto The telescopic support adjusting rod of steel form radian, between support adjusting rod and steel form and support adjusting rod and intermediolateral column it Between connected by pin rotation, the support adjusting rod is symmetrically distributed in the both sides of the radial direction of intermediolateral column;Regulation support regulation The length of bar so that corresponding steel form rotates along the axis of itself, checked all the time when the radian of steel form is adjusted steel form with The distance between roofing plank sheathing, to adjust roofing concrete shaping radian and roofing concrete thickness to be poured at any time;
D, the installation form travel mechanism on steel form:Pattern movement mechanism includes driving shaft and driven shaft, in the driving shaft Be cased with the driven shaft with the same number of gear of the rail plate, the driving shaft and driven shaft are separately mounted to The top and bottom of the steel form after assembling, are provided with the driving electricity for driving the driving shaft to rotate on the steel form Machine, be fixed on gear where it by pin with after the engagement of corresponding rail plate with the gear on driven shaft by driving shaft On driving shaft or driven shaft;
E, on the steel form for assembling plate vibrator is installed:According to the area choosing that different concrete slabs are thick and steel form is assembled Appropriate number of plate vibrator is taken, and plate vibrator is arranged in the steel form for assembling in the form of multiple lines and multiple rows The back side;
F, inspection pattern movement mechanism:After installing plate vibrator, motor is debugged, the steering of motor is adjusted to The state in the same direction with steel form direction of travel;Motor is existed to motor energization after the completion of turning to adjustment with debugging steel form Walking on rail plate, it is ensured that steady walking of the steel form on rail plate;
Roofing concrete is carried out after the completion of g, pattern movement mechanism pours work:When concreting is carried out to roofing under It is supreme to pour, plate vibrator is opened when pouring, when motor is opened after concreting to certain altitude, make assembling steel Template is moved up, and concreting speed is adjusted by controlling the translational speed of steel form;
H, after the completion of the region roofing where steel form is poured, steel form is integrally hung to using tower crane for next casting area, Repeat step f checks steel form travel mechanism, and repeat step g carries out concreting from the bottom to top to roofing, until whole Individual roofing pours completion;After the completion of roofing concrete is poured, after concrete reaches some strength, steel form is removed, by steel Template is transported to next construction area and reuses.
2. the concrete construction method of Curved Roof according to claim 1, it is characterized in that, in step a, the fixation Bearing uses rubber hold-down support, and the hold-down support to be fixedly mounted on roofing plank sheathing by steel nail.
3. the concrete construction method of Curved Roof according to claim 1, it is characterized in that, in step c, the centre Post is with the attachment structure of steel form:The back side of every piece of steel form is provided with fixed card slot, intermediolateral column is inserted into fixed card slot And by pin by intermediolateral column the fixed installation again fixed card slot.
4. the concrete construction method of Curved Roof according to claim 1, it is characterized in that, in step c, in regulation steel Symmetrically adjusted to intermediolateral column direction simultaneously from both sides during template radian.
5. the concrete construction method of Curved Roof according to claim 1, it is characterized in that, the motor and master Connected by chain between moving axis.
6. the concrete construction method of Curved Roof according to claim 1, it is characterized in that, in step f, to punching block When the walking of plate is debugged, during gear sideslip on the gear sideslip or driven shaft on driving shaft, check driving shaft and slide The perpendicularity and driven shaft of guide rail and the perpendicularity of rail plate, by the position or the part that adjust driving shaft or driven shaft The measure of adjustment rail plate position ensures engaging for gear and rail plate.
CN201611090429.XA 2016-12-01 2016-12-01 The concrete construction method of Curved Roof Active CN106836662B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611090429.XA CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611090429.XA CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Publications (2)

Publication Number Publication Date
CN106836662A true CN106836662A (en) 2017-06-13
CN106836662B CN106836662B (en) 2019-01-29

Family

ID=59146222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611090429.XA Active CN106836662B (en) 2016-12-01 2016-12-01 The concrete construction method of Curved Roof

Country Status (1)

Country Link
CN (1) CN106836662B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700829A (en) * 2017-09-26 2018-02-16 中建局集团建设发展有限公司 Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed
CN111878098A (en) * 2020-07-31 2020-11-03 中交隧道工程局有限公司 Concrete pouring device and method for shield starting base
CN113914626A (en) * 2021-09-29 2022-01-11 临沂市政集团有限公司 Municipal works are with cast-in-place concrete template vibrating device
CN114033107A (en) * 2021-12-15 2022-02-11 山西五建集团有限公司 Slope roof concrete pouring method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274073A (en) * 1999-03-26 2000-10-03 Kaneso Co Ltd Cutting die body holding device for drain
CN202347840U (en) * 2011-12-10 2012-07-25 齐冀鲁 Adjustable arc-shaped steel moulding plate
CN202401755U (en) * 2011-11-21 2012-08-29 中冶天工集团有限公司 Curvature-adjustable concrete construction steel mould
CN203145445U (en) * 2013-04-11 2013-08-21 大连大学 Shaping plate for civil construction
CN203160099U (en) * 2013-04-08 2013-08-28 中铁十局集团建筑工程有限公司 Dual-curve-surface concrete pavement steel mold plate
CN204983643U (en) * 2015-08-04 2016-01-20 天津市兴业龙祥建设工程有限公司 Ramp type concrete roof formwork system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000274073A (en) * 1999-03-26 2000-10-03 Kaneso Co Ltd Cutting die body holding device for drain
CN202401755U (en) * 2011-11-21 2012-08-29 中冶天工集团有限公司 Curvature-adjustable concrete construction steel mould
CN202347840U (en) * 2011-12-10 2012-07-25 齐冀鲁 Adjustable arc-shaped steel moulding plate
CN203160099U (en) * 2013-04-08 2013-08-28 中铁十局集团建筑工程有限公司 Dual-curve-surface concrete pavement steel mold plate
CN203145445U (en) * 2013-04-11 2013-08-21 大连大学 Shaping plate for civil construction
CN204983643U (en) * 2015-08-04 2016-01-20 天津市兴业龙祥建设工程有限公司 Ramp type concrete roof formwork system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700829A (en) * 2017-09-26 2018-02-16 中建局集团建设发展有限公司 Pulley suspension large form realizes the constructing device that the huge post of wide-angle inclined in two-way is tiltedly climbed
CN111878098A (en) * 2020-07-31 2020-11-03 中交隧道工程局有限公司 Concrete pouring device and method for shield starting base
CN113914626A (en) * 2021-09-29 2022-01-11 临沂市政集团有限公司 Municipal works are with cast-in-place concrete template vibrating device
CN113914626B (en) * 2021-09-29 2022-12-23 临沂市政集团有限公司 Municipal works are with cast-in-place concrete template vibrating device
CN114033107A (en) * 2021-12-15 2022-02-11 山西五建集团有限公司 Slope roof concrete pouring method
CN114033107B (en) * 2021-12-15 2023-04-18 山西五建集团有限公司 Slope roof concrete pouring method

Also Published As

Publication number Publication date
CN106836662B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN106836662A (en) The concrete construction method of Curved Roof
CN105715052A (en) 3D room printer and printing method for printing concrete at construction site and room
CN203247603U (en) High-position foundation bolt positioning device
CN109555027B (en) Segmental beam concrete pouring system and construction method thereof
CN204899204U (en) Mouthful structure concrete structure's of department a template system fetches earth among reverse construction method
CN102926538A (en) Reaction box and construction method of reaction wall
CN109837994A (en) A kind of Prefabricated reinforced concrete is whole to pour building structure and its construction method
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN108687950A (en) A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating
CN105507165A (en) Hanging basket for corrugated steel web plate construction and construction process
CN108590008B (en) Construction method of cast-in-place concrete for folding roof
CN110821024A (en) Steel structure roof supporting system and construction method thereof
CN110468702B (en) Center belt anti-collision guardrail sliding template and construction method thereof
CN112012373A (en) Light steel keel gypsum plasterboard partition wall and construction method
DE2422942A1 (en) Railway track construction with steel concrete base support - has anchors projecting from lower surface into foundation plate
CN201538969U (en) Precast concrete board forming die
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN102493349B (en) Method for prefabricating and erecting box girders by using bailey beam
CN204982673U (en) Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash
CN110409320A (en) A kind of the concrete cast-in-situ bracket and its construction method of adjustable slope
CN215907021U (en) Concrete prefabricated part for constructional engineering construction
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN102444406A (en) Needle beam type inverted arch lining sliding framework and construction method thereof
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN210684479U (en) Concrete cast-in-place support of adjustable slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant