CN108687950A - A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating - Google Patents
A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating Download PDFInfo
- Publication number
- CN108687950A CN108687950A CN201810303859.8A CN201810303859A CN108687950A CN 108687950 A CN108687950 A CN 108687950A CN 201810303859 A CN201810303859 A CN 201810303859A CN 108687950 A CN108687950 A CN 108687950A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- hydraulic cylinder
- template
- prefabricated
- side form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 15
- 238000009415 formwork Methods 0.000 claims abstract description 51
- 238000010276 construction Methods 0.000 claims abstract description 21
- 238000013519 translation Methods 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 7
- 239000010720 hydraulic oil Substances 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims description 5
- 239000004746 geotextile Substances 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 claims description 2
- 238000005086 pumping Methods 0.000 claims description 2
- 238000005266 casting Methods 0.000 claims 4
- 230000003014 reinforcing effect Effects 0.000 claims 2
- 230000015271 coagulation Effects 0.000 claims 1
- 238000005345 coagulation Methods 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 230000007613 environmental effect Effects 0.000 abstract description 3
- 238000003908 quality control method Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 238000009417 prefabrication Methods 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000011031 large-scale manufacturing process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 230000003020 moisturizing effect Effects 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0029—Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
- B28B7/0055—Mould pallets; Mould panels
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种综合管廊预制台车,其包括门式桁架、顶模组件、侧模组件以及行走组件;顶模组件包括:顶模模板以及顶升液压缸,所述顶升液压缸用于控制所述门式桁架上下移动;所述顶模模板连接所述门式桁架,且可随所述门式桁架一起上下移动;所述侧模组件包括:侧模模板以及侧向转动液压缸,且所述侧向转动液压缸用于控制所述侧模模板横断面上转动;所述行走组件包括:行走轮以及行走轨道,且所述行走轮设置在所述门式桁架底部,用于带动所述综合管廊预制台车整体沿所述行走轨道移动。本发明具有施工效率高、质量控制好,适用于机械化大批量生产、节约工期和绿色环保等优点。
The invention discloses a prefabricated trolley for a comprehensive pipe gallery, which includes a portal truss, a top formwork assembly, a side formwork assembly and a walking assembly; the top formwork assembly includes: a top formwork template and a jacking hydraulic cylinder, the top formwork The lifting hydraulic cylinder is used to control the portal truss to move up and down; the top formwork is connected to the portal truss and can move up and down together with the portal truss; the side form assembly includes: side formwork and Lateral rotation hydraulic cylinder, and the lateral rotation hydraulic cylinder is used to control the rotation on the cross section of the side formwork template; the walking assembly includes: walking wheels and walking tracks, and the walking wheels are arranged on the door The bottom of the truss is used to drive the prefabricated trolley of the comprehensive pipe gallery to move along the walking track as a whole. The invention has the advantages of high construction efficiency, good quality control, suitability for mechanized mass production, saving construction period, environmental protection and the like.
Description
技术领域technical field
本发明涉及岩土工程领域,尤其涉及一种综合管廊预制台车及管廊预制方法。The invention relates to the field of geotechnical engineering, in particular to a comprehensive pipe gallery prefabrication trolley and a pipe gallery prefabrication method.
背景技术Background technique
城市地下管线是指城市范围内供水、排水、燃气、热力、电力、通信、广播电视、工业等管线及其附属设施,是保障城市运行的重要基础设施和“生命线”。近年来,随着城市快速发展,地下管线建设规模不足、管理水平不高等问题凸现,一些城市相继发生大雨内涝、管线泄漏爆炸、路面塌陷等事件,严重影响了人民群众生命财产安全和城市运行秩序。Urban underground pipelines refer to pipelines and ancillary facilities for water supply, drainage, gas, heat, electricity, communications, radio and television, industry, etc. within the city, and are important infrastructure and "lifelines" to ensure urban operation. In recent years, with the rapid development of cities, problems such as insufficient scale of underground pipeline construction and low management level have emerged. In some cities, incidents such as heavy rain and waterlogging, pipeline leakage and explosion, and road subsidence have occurred one after another, which have seriously affected the safety of people's lives and property and the order of urban operation. .
传统的城市地下管线各自为政地敷设在道路的浅层空间内,因管线增容扩容不但造成了“拉链路”现象,而且导致管线事故频发,极大地影响了城市的安全运行。目前,我国城镇化进程十分迅速。为提升管线建设水平,保障市政管线的安全运行,有必要采用新的管线敷设方式-综合管廊。综合管廊工程是指在城市道路下面建造一个市政共用隧道,将电力、通信、供水、燃气等多种市政管线集中在一体,实行“统一规划、统一建设、统一管理”,以做到地下空间的综合利用和资源的共享。Traditional urban underground pipelines are laid separately in the shallow space of the road. The expansion of pipelines not only causes the phenomenon of "pull links", but also leads to frequent pipeline accidents, which greatly affects the safe operation of the city. At present, my country's urbanization process is very rapid. In order to improve the level of pipeline construction and ensure the safe operation of municipal pipelines, it is necessary to adopt a new pipeline laying method - comprehensive pipeline gallery. The comprehensive pipe corridor project refers to the construction of a municipal shared tunnel under the urban road, which integrates various municipal pipelines such as electricity, communication, water supply, and gas, and implements "unified planning, unified construction, and unified management" to achieve underground space. Comprehensive utilization and resource sharing.
城市地下综合管廊的施工方法主要分为明挖施工和暗挖施工,但普遍存在现浇施工速度慢、工艺复杂、质量不易保证等缺点,不利于进行规模化大批量生产。The construction methods of urban underground comprehensive pipe corridors are mainly divided into open-cut construction and underground excavation construction, but there are generally disadvantages such as slow construction speed, complicated process, and difficult quality assurance of cast-in-place construction, which is not conducive to large-scale mass production.
发明内容Contents of the invention
本发明针对现有技术的上述缺陷,提供一种综合管廊预制台车及管廊预制方法,其具有施工效率高、质量控制好,适用于机械化大批量生产、节约工期和绿色环保等优点。In view of the above-mentioned defects of the prior art, the present invention provides a comprehensive pipe gallery prefabrication trolley and a pipe gallery prefabrication method, which have the advantages of high construction efficiency, good quality control, suitable for mechanized mass production, saving construction period, and environmental protection.
本发明解决其技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve its technical problems is:
一方面,提供一种综合管廊预制台车,其包括门式桁架、顶模组件、侧模组件以及行走组件;On the one hand, a prefabricated trolley for a comprehensive pipe gallery is provided, which includes a portal truss, a top form assembly, a side form assembly, and a walking assembly;
所述顶模组件包括:顶模模板以及顶升液压缸,且所述顶升液压缸一端连接固定位,另一端连接所述门式桁架,用于控制所述门式桁架上下移动;所述顶模模板连接所述门式桁架,且可随所述门式桁架一起上下移动;The top mold assembly includes: a top mold template and a jacking hydraulic cylinder, and one end of the jacking hydraulic cylinder is connected to a fixed position, and the other end is connected to the portal truss for controlling the vertical movement of the portal truss; The top mold template is connected to the portal truss, and can move up and down together with the portal truss;
所述侧模组件包括:侧模模板以及侧向转动液压缸,且所述侧向转动液压缸的一端连接所述侧模模板,另一端连接所述门式桁架,用于控制所述侧模模板横断面上转动;The side form assembly includes: a side form template and a laterally rotating hydraulic cylinder, and one end of the laterally rotating hydraulic cylinder is connected to the side form formwork, and the other end is connected to the portal truss for controlling the side Rotation on the cross-section of the formwork;
所述行走组件包括:行走轮以及行走轨道,且所述行走轮设置在所述门式桁架底部,用于带动所述综合管廊预制台车整体沿所述行走轨道移动。The traveling assembly includes: traveling wheels and a traveling track, and the traveling wheels are arranged at the bottom of the portal truss, and are used to drive the integrated pipe gallery prefabricated trolley to move along the traveling track as a whole.
优选的,所述门式桁架包括:上横梁、下横梁、上纵梁、下纵梁、立柱以及横梁支撑柱;所述上纵梁垂直连接所述上横梁,所述下纵梁垂直连接所述下横梁;所述上横梁、下横梁相互平行,且两者之间通过所述横梁支撑柱连接;所述上纵梁、下纵梁相互平行,且所述上横梁与下横梁之间通过所述立柱连接。Preferably, the portal truss includes: an upper beam, a lower beam, an upper stringer, a lower stringer, a column and a beam support column; the upper stringer is vertically connected to the upper beam, and the lower stringer is vertically connected to the The lower beam; the upper beam and the lower beam are parallel to each other, and the two are connected by the beam support column; the upper longitudinal beam and the lower longitudinal beam are parallel to each other, and the upper beam and the lower beam are connected by The uprights are connected.
优选的,所述顶升液压缸包括:牛腿,其安装在所述横梁支撑柱的前端面上;缸体,其连接所述牛腿下端面;上下导轨套,用于供所述缸体沿其上下移动;以及液压油泵站,其用于为所述缸体提供液压油。Preferably, the jacking hydraulic cylinder includes: a corbel, which is installed on the front end surface of the beam support column; a cylinder, which is connected to the lower end surface of the corbel; upper and lower guide rail sleeves, used for the cylinder moving up and down therealong; and a hydraulic oil pumping station for supplying hydraulic oil to the cylinder.
优选的,所述综合管廊预制台车还包括:Preferably, the prefabricated trolley of the comprehensive pipe gallery also includes:
侧向螺旋丝杠,其一端连接所述门式桁架侧部,另一端连接所述侧模模板;所述侧模模板转动至预定位置后,通过旋紧所述侧向螺旋丝杠实现对所述侧模模板的固定;One end of the lateral screw screw is connected to the side of the portal truss, and the other end is connected to the side formwork template; after the side form template is rotated to a predetermined position, the lateral screw screw is tightened to realize The fixation of the side formwork;
垂直螺旋丝杠,其一端连接所述门式桁架底部,另一端连接固定位;所述侧模模板、顶模模板移动至预定位置后,通过旋紧所述垂直螺旋丝杠实现对所述综合管廊预制台车整体的固定。One end of the vertical screw is connected to the bottom of the portal truss, and the other end is connected to the fixed position; after the side formwork and the top formwork are moved to the predetermined position, the integrated screw is realized by tightening the vertical screw. The overall fixation of the prefabricated trolley in the pipe gallery.
优选的,所述顶模组件还包括:顶平移液压缸,且所述顶升液压缸一端连接所述顶模模板,另一端连接所述门式桁架,用于控制所述顶模模板水平移动。Preferably, the top mold assembly further includes: a jack translation hydraulic cylinder, and one end of the jacking hydraulic cylinder is connected to the top mold template, and the other end is connected to the portal truss for controlling the level of the top mold template. move.
优选的,每一所述顶升液压缸、每一所述侧向转动液压缸以及每一所述平移液压缸均可被单独控制。Preferably, each of the jacking hydraulic cylinders, each of the lateral rotation hydraulic cylinders and each of the translation hydraulic cylinders can be individually controlled.
另一方面,还提供一种综合管廊预制方法,其包括如下步骤:On the other hand, a method for prefabricating a comprehensive pipe gallery is also provided, which includes the following steps:
S1、施工完成混凝土底板、顶模模板的钢筋绑扎以及侧模模板的钢筋绑扎;S1. The concrete base plate, the reinforcement binding of the top formwork and the reinforcement binding of the side formwork are completed;
S2、安装形成如权利要求6所述的综合管廊预制台车,且将其牵引至浇筑位置;S2, install and form the comprehensive pipe gallery prefabricated trolley as claimed in claim 6, and pull it to the pouring position;
S3、启动所述侧向转动液压缸,以带动所述侧模模板在横断面上旋转至与地面垂直位置;启动所述平移液压缸,带动所述顶模模板整体移动至中心位置;启动所述顶升液压缸,将所述顶模模板调整到浇筑位置;S3. Start the lateral rotation hydraulic cylinder to drive the side formwork to rotate on the cross section to a position perpendicular to the ground; start the translational hydraulic cylinder to drive the top formwork to move to the center position as a whole; start the The jacking hydraulic cylinder is used to adjust the top formwork to the pouring position;
S4、旋紧侧向螺旋丝杠以及垂直螺旋丝杠;S4, tighten the lateral screw screw and the vertical screw screw;
S5、进行混凝土浇筑作业,待完成混凝土浇筑后进行模板拆除,获得若干预制管廊节段,且对混凝土终凝后的预制管廊节段进行及时养护。S5. Concrete pouring operation is performed. After the concrete pouring is completed, the formwork is removed to obtain a number of prefabricated pipe gallery segments, and the prefabricated pipe gallery sections after the final setting of the concrete are maintained in time.
优选的,所述混凝土浇筑作业包括如下步骤:Preferably, the concrete pouring operation comprises the steps of:
S51、对绑扎钢筋骨架、侧模模板、顶模模板、止水带以及预埋件进行安装完毕后的验收;S51. Check and accept the binding steel skeleton, side formwork, top formwork, waterstop and embedded parts after installation;
S52、验收合格后,将混凝土采用罐车运送至浇筑现场,且泵送至浇筑位置,其中,混凝土下料自由高度小于2m,防止骨料分离,采用插入式振捣棒振捣,振捣时,要快插慢拔,插棒间距40cm左右,以防止漏振,每一插点要掌握好振捣时间,以混凝土表面呈水平,不大量返气泡,不再显著下沉,表面浮出灰浆为准,且振捣不得欠振、漏振及振捣过度,禁止用振捣器平仓,上层混凝土振捣要在下层混凝土初凝之前进行,并要求振捣棒插入下层混凝土5cm,以保证上下层混凝土结合紧密;止水带处要由内向外浇注和平振捣;S52. After passing the acceptance check, the concrete is transported to the pouring site by tank truck and pumped to the pouring location. Among them, the free height of concrete blanking is less than 2m to prevent the separation of aggregates. Vibrate with plug-in vibrating rods. When vibrating, Quickly insert and slowly pull out, and the distance between the inserting rods is about 40cm to prevent leakage of vibration. The vibration time of each inserting point must be mastered, so that the concrete surface is horizontal, there is no large amount of air bubbles, no significant sinking, and the surface floats out of the mortar. Accurate, and the vibration must not be under-vibrated, missed or excessively vibrated. It is forbidden to use a vibrator to close the warehouse. The upper layer of concrete should be vibrated before the lower layer of concrete is initially set, and the vibrating rod should be inserted into the lower layer of concrete 5cm to ensure that the upper and lower layers The first layer of concrete is closely combined; the waterstop should be poured and vibrated from the inside to the outside;
S53、顶板模板混凝土浇筑后,在终凝前完成压实、收浆、抹光等工作,终凝后拆除端头板,凿毛外露面。S53. After the top plate formwork concrete is poured, compaction, slurry collection, troweling and other work are completed before the final setting. After the final setting, the end plate is removed, and the exposed surface is chiseled.
优选的,所述模板拆除包括如下步骤:Preferably, said formwork removal comprises the steps of:
S54、旋松侧向螺旋丝杠;通过侧向转动液压缸带动侧模模板反向转动;旋松垂直螺旋丝杠;且所述顶升油缸落下,使得所述综合管廊预制台车整体下落200mm;驱动所述综合管廊预制台车整体移动,待确定所述顶模模板、侧模模板均已脱离混凝土墙体后,启动所述行走组件,以将其综合管廊预制台车整体牵引至下一综合管廊节段的浇筑位置,由此获得若干预制管廊节段。S54. Unscrew the lateral screw screw; drive the side form template to rotate reversely through the lateral rotation hydraulic cylinder; unscrew the vertical screw screw; and the jacking cylinder falls, so that the integrated pipe gallery prefabricated trolley falls as a whole 200mm; drive the integrated pipe gallery prefabricated trolley to move as a whole. After confirming that the top formwork and side formwork have been separated from the concrete wall, start the walking assembly to pull the integrated pipe gallery prefabricated trolley as a whole to the pouring position of the next comprehensive pipe gallery segment, thus obtaining several prefabricated pipe gallery segments.
优选的,所述养护包括如下步骤:S55、对混凝土终凝后的预制管廊节段进行养生土工布保湿养护,养护时间为14天。Preferably, the curing includes the following steps: S55. Carry out moisturizing and curing of the health-care geotextiles on the prefabricated pipe gallery segment after the final setting of the concrete, and the curing time is 14 days.
本发明技术方案的有益效果在于:The beneficial effects of the technical solution of the present invention are:
本发明具有施工效率高、质量控制好,适用于机械化大批量生产、节约工期和绿色环保等优点。The invention has the advantages of high construction efficiency, good quality control, suitability for mechanized mass production, saving construction period, environmental protection and the like.
附图说明Description of drawings
下面将结合附图及实施例对本发明作进一步说明,附图中:The present invention will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:
图1为本发明实施例一中综合管廊预制台车的横断面图;Fig. 1 is a cross-sectional view of a prefabricated trolley for a comprehensive utility gallery in Embodiment 1 of the present invention;
图2为本发明实施例一中综合管廊预制台车的纵断面图。Fig. 2 is a longitudinal sectional view of the prefabricated trolley of the comprehensive utility gallery in the first embodiment of the present invention.
具体实施方式Detailed ways
为了使本发明的目的、技术方案以及优点更加清楚明白,以下结合附图和实施例,对本发明进行进一步详细说明。应当理解的是,此处所描述的具体实施例仅用于解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
实施例一:Embodiment one:
如图1-2所示,本发明的综合管廊预制台车包括门式桁架1、顶模组件、侧模组件以及行走组件;As shown in Figure 1-2, the prefabricated trolley of the comprehensive pipe gallery of the present invention includes a portal truss 1, a top mold assembly, a side mold assembly and a walking assembly;
所述顶模组件包括:顶模模板2、顶升液压缸3以及平移液压缸7;所述顶升液压缸3一端活动连接固定位,如地面等,另一端活动连接所述门式桁架1,用于控制所述门式桁架1上下移动;所述顶模模板2活动连接所述门式桁架1,且可随所述门式桁架1一起上下移动;所述平移液压缸7一端活动连接所述顶模模板2,另一端活动连接所述门式桁架1,用于控制所述顶模模板2水平移动;The top mold assembly includes: a top mold template 2, a jacking hydraulic cylinder 3 and a translation hydraulic cylinder 7; one end of the jacking hydraulic cylinder 3 is movably connected to a fixed position, such as the ground, and the other end is movably connected to the portal truss 1. It is used to control the up and down movement of the portal truss 1; the top formwork 2 is movably connected to the portal truss 1 and can move up and down together with the portal truss 1; one end of the translation hydraulic cylinder 7 is movable Connect the top mold template 2, and the other end is movably connected to the portal truss 1 for controlling the horizontal movement of the top mold template 2;
所述侧模组件包括:侧模模板4以及侧向转动液压缸5,且所述侧向转动液压缸5的一端活动连接所述侧模模板4,另一端活动连接所述门式桁架1,用于控制所述侧模模板4在横断面上转动;The side form assembly includes: a side form template 4 and a laterally rotating hydraulic cylinder 5, and one end of the laterally rotating hydraulic cylinder 5 is movably connected to the side form template 4, and the other end is movably connected to the portal truss 1 , for controlling the rotation of the side form template 4 on the cross-section;
所述行走组件包括:电机9、行走轮6以及行走轨道(未示出),且所述行走轮6设置在所述门式桁架1底部,用于在所述电机9的驱动下带动所述综合管廊预制台车整体沿所述行走轨道移动。The traveling assembly includes: a motor 9, a traveling wheel 6 and a traveling track (not shown), and the traveling wheel 6 is arranged at the bottom of the portal truss 1 for driving the motor 9 to drive the The integrated pipe gallery prefabricated trolley moves along the walking track as a whole.
本实施例中,采用门式桁架1替代常规模板系统内的钢管支撑架作为主要的竖向力承受系统,可实现快速安装和脱模施工钢桁架;所述行走轮6有8个,对称布置在单节台车底部,且行走轮6为直径270mm的槽形轮,行走轨道为38kg/m的轻轨;所述顶模模板2与侧模模板4均采用定型钢模板,厚度为8mm。In this embodiment, the portal truss 1 is used to replace the steel pipe support frame in the conventional formwork system as the main vertical force bearing system, which can realize rapid installation and demoulding of the construction steel truss; there are 8 walking wheels 6, symmetrically arranged At the bottom of the single trolley, the traveling wheel 6 is a grooved wheel with a diameter of 270mm, and the traveling track is a 38kg/m light rail; the top formwork 2 and the side formwork 4 all adopt shaped steel formworks with a thickness of 8mm.
进一步的,所述门式桁架1包括:上横梁11、下横梁12、上纵梁13、下纵梁14、立柱15以及横梁支撑柱16;所述上纵梁13垂直连接所述上横梁11,所述下纵梁14垂直连接所述下横梁12;所述上横梁11、下横梁12相互平行,且两者之间通过所述横梁支撑柱16连接;所述上纵梁13、下纵梁14相互平行,且所述上横梁13与下横梁14之间通过所述立柱15连接;且所述立柱15的侧部安装有与所述侧向转动液压缸5另一端连接的侧部连接板17。Further, the portal truss 1 includes: an upper beam 11, a lower beam 12, an upper longitudinal beam 13, a lower longitudinal beam 14, a column 15 and a beam supporting column 16; the upper beam 13 is vertically connected to the upper beam 11 , the lower longitudinal beam 14 is vertically connected to the lower beam 12; the upper beam 11 and the lower beam 12 are parallel to each other, and the two are connected through the beam support column 16; the upper longitudinal beam 13, the lower longitudinal beam The beams 14 are parallel to each other, and the upper beam 13 and the lower beam 14 are connected by the column 15; plate 17.
所述顶升液压缸3设有12个,其包括:牛腿31,其安装在所述横梁支撑柱16的前端面上;缸体32,其连接所述牛腿31下端面;上下导轨套33,用于供所述缸体32沿其上下移动;液压油泵站34,其用于为所述缸体32提供液压油;所述侧向转动液压缸5设有12个;且所述顶升液压缸3、侧向转动液压缸5以及平移液压缸7中的一项或几项为HSJK200/110-300,最大行程300mm,实际利用约200mm,且为便于控制,所述综合管廊预制台车还包括控制器,如SXLD-08-340-B,每一所述顶升液压缸、每一所述侧向转动液压缸以及每一所述平移液压缸均与所述控制器连接,且可被单独控制,由此通过所述控制器各类液压缸进行统一操作控制,采用一缸一控,简化操作。The jacking hydraulic cylinder 3 is provided with 12, which includes: a corbel 31, which is installed on the front end surface of the beam support column 16; a cylinder body 32, which is connected to the lower end surface of the corbel 31; 33, for the cylinder 32 to move up and down; hydraulic oil pump station 34, for providing hydraulic oil for the cylinder 32; the lateral rotation hydraulic cylinder 5 is provided with 12; and the top One or more of the lifting hydraulic cylinder 3, the lateral rotation hydraulic cylinder 5 and the translation hydraulic cylinder 7 are HSJK200/110-300, the maximum stroke is 300mm, the actual utilization is about 200mm, and for the convenience of control, the comprehensive pipe gallery is prefabricated The trolley also includes a controller, such as SXLD-08-340-B, each of the jacking hydraulic cylinders, each of the lateral rotation hydraulic cylinders and each of the translation hydraulic cylinders is connected to the controller, And it can be controlled separately, so all kinds of hydraulic cylinders can be controlled uniformly through the controller, and one cylinder can be controlled by one cylinder, which simplifies operation.
此外,为防止管廊预制过程中,所述台车位置移动,影响管廊阶段质量,所述综合管廊预制台车还包括:In addition, in order to prevent the position of the trolley from moving during the prefabrication process of the pipe gallery and affect the quality of the pipe gallery stage, the prefabricated trolley of the integrated pipe gallery also includes:
侧向螺旋丝杠7,其一端活动连接所述门式桁架1侧部(如所述上横梁11侧部),另一端通过12×200×200mm耳板活动连接所述侧模模板4的内表面;所述侧模模板4转动至预定位置后,通过旋紧所述侧向螺旋丝杠7实现对所述侧模模板4的固定;A lateral screw screw 7, one end of which is movably connected to the side of the portal truss 1 (such as the side of the upper beam 11), and the other end is movably connected to the inner side of the side formwork 4 through a 12×200×200mm ear plate. surface; after the side mold template 4 is rotated to a predetermined position, the side mold template 4 is fixed by tightening the lateral screw screw 7;
垂直螺旋丝杠8,其一端活动连接所述门式桁架1底部(如所述下纵梁14底部),另一端活动连接固定位,如地面;所述侧模模板4及顶模模板2移动至预定位置后,通过旋紧所述垂直螺旋丝杠8实现对所述综合管廊预制台车整体的固定;本实施例中,所述垂直螺旋丝杠8纵向间距为2500mm,且所述侧向螺旋丝杠7及垂直螺旋丝杠8均包括:φ75×275mm丝杠螺杆以及φ89×5.5×430mm无缝钢管。Vertical screw 8, one end of which is movably connected to the bottom of the portal truss 1 (such as the bottom of the lower stringer 14), and the other end is movably connected to a fixed position, such as the ground; the side formwork 4 and the top formwork 2 move After arriving at the predetermined position, the overall fixing of the prefabricated trolley of the comprehensive pipe gallery is realized by tightening the vertical screw screw 8; in this embodiment, the vertical spacing of the vertical screw screw 8 is 2500mm, and the side Both the directional screw screw 7 and the vertical screw screw 8 include: φ75×275mm lead screw and φ89×5.5×430mm seamless steel pipe.
本实施例中,门式桁架1的整体性较好,但各部件具有可拆性,便于拆卸安装,且门式桁架1下部装设行走装置,由此在实际施工时可利用其下部行走装置整体移动;此外,门式桁架1作为支撑系统后,后期不需要大量的人工和机动设备来搬运钢架管和模板,由此可大量减少人工费用。In this embodiment, the integrity of the portal truss 1 is better, but each component is detachable, which is convenient for disassembly and installation, and the lower part of the portal truss 1 is equipped with a traveling device, so that the lower part of the traveling device can be used in actual construction Overall movement; In addition, after the portal truss 1 is used as a support system, a large amount of labor and motorized equipment are not required to carry the steel frame tubes and formwork in the later stage, which can greatly reduce labor costs.
实施例二:Embodiment two:
本实施例提供了一种综合管廊预制方法,其包括如下步骤:This embodiment provides a prefabrication method for a comprehensive pipe gallery, which includes the following steps:
S1、施工完成混凝土底板、顶模模板的钢筋绑扎以及侧模模板的钢筋绑扎;S1. The concrete base plate, the reinforcement binding of the top formwork and the reinforcement binding of the side formwork are completed;
S2、安装形成实施例一所述的综合管廊预制台车,且在对其进行调试后将其牵引至浇筑位置;具体的,所述步骤S2包括:S21、在混凝土底板表面测量放出轨道安装线,且沿所述轨道安装线、按照间距500mm放置若干枕木,再在所述枕木上放置行走轨道;S22、采用人工配合25T汽车式起重机现场安装门式桁架、侧模组件和顶模组件,并装置垂直螺旋丝杆、侧向螺旋丝杠,以形成所述综合管廊预制台车;对所述综合管廊预制台车进行使用前的调试;以及S23、待混凝土底板达到强度要求后,用卷扬机牵引所述综合管廊预制台车,使其沿所述行走轨道移动至浇筑位置,且用夹轨器固定所述综合管廊预制台车及行走;S2. Install and form the prefabricated trolley of the comprehensive pipe gallery described in Embodiment 1, and pull it to the pouring position after debugging; specifically, the step S2 includes: S21. Measure and install the release track on the surface of the concrete floor line, and along the track installation line, place a number of sleepers at a distance of 500mm, and then place a walking track on the sleepers; S22, manually cooperate with a 25T truck crane to install the portal truss, side formwork components and top formwork on site parts, and install a vertical screw screw and a lateral screw screw to form the prefabricated trolley of the comprehensive pipe gallery; debug the prefabricated trolley of the comprehensive pipe gallery before use; and S23, wait for the concrete floor to meet the strength requirements Finally, use the hoist to pull the prefabricated trolley of the comprehensive pipe gallery, move it to the pouring position along the walking track, and fix the prefabricated trolley and walking of the comprehensive pipe gallery with rail clamps;
S3、启动所述侧向转动液压缸,以带动所述侧模模板在横断面上旋转至与地面垂直位置;启动所述平移液压缸,带动所述顶模模板移动至中心位置;启动所述顶升液压缸,带动所述门式桁架上下移动,以将所述顶模模板调整到浇筑位置;S3. Start the lateral rotation hydraulic cylinder to drive the side formwork to rotate on the cross-section to a position perpendicular to the ground; start the translational hydraulic cylinder to drive the top formwork to move to the center position; start the Lift the hydraulic cylinder to drive the portal truss to move up and down to adjust the top formwork to the pouring position;
S4、旋紧侧向螺旋丝杠以及垂直螺旋丝杠,验收合格后进入下道工序;S4. Tighten the lateral screw screw and the vertical screw screw, and enter the next process after acceptance;
S5、进行混凝土浇筑作业,待完成混凝土浇筑后进行模板拆除,获得若干预制管廊节段,且对混凝土终凝后的预制管廊节段进行及时养护;S5. Carry out concrete pouring operations, remove the formwork after the concrete pouring is completed, obtain a number of prefabricated pipe gallery segments, and perform timely maintenance on the prefabricated pipe gallery sections after the final setting of the concrete;
具体的,所述步骤S5包括:Specifically, the step S5 includes:
S51、对绑扎钢筋骨架、侧模模板、顶模模板、止水带以及预埋件进行安装完毕后的验收;S51. Check and accept the binding steel skeleton, side formwork, top formwork, waterstop and embedded parts after installation;
S52、验收合格后,将混凝土采用罐车运送至浇筑现场,且泵送至浇筑位置,其中,混凝土下料自由高度小于2m,防止骨料分离,采用插入式振捣棒振捣,振捣时,要快插慢拔,插棒间距40cm左右,以防止漏振,每一插点要掌握好振捣时间,以混凝土表面呈水平,不大量返气泡,不再显著下沉,表面浮出灰浆为准,且振捣不得欠振、漏振及振捣过度,禁止用振捣器平仓,上层混凝土振捣要在下层混凝土初凝之前进行,并要求振捣棒插入下层混凝土5cm,以保证上下层混凝土结合紧密;止水带处要由内向外浇注和平振捣;S52. After passing the acceptance check, the concrete is transported to the pouring site by tank truck and pumped to the pouring location. Among them, the free height of concrete blanking is less than 2m to prevent the separation of aggregates. Vibrate with plug-in vibrating rods. When vibrating, Quickly insert and slowly pull out, and the distance between the inserting rods is about 40cm to prevent leakage of vibration. The vibration time of each inserting point must be mastered, so that the concrete surface is horizontal, there is no large amount of air bubbles, no significant sinking, and the surface floats out of the mortar. Accurate, and the vibration must not be under-vibrated, missed or excessively vibrated. It is forbidden to use a vibrator to close the warehouse. The upper layer of concrete should be vibrated before the lower layer of concrete is initially set, and the vibrating rod should be inserted into the lower layer of concrete 5cm to ensure that the upper and lower layers The first layer of concrete is closely combined; the waterstop should be poured and vibrated from the inside to the outside;
S53、顶板模板混凝土浇筑后,在终凝前完成压实、收浆、抹光等工作,终凝后拆除端头板,凿毛外露面;S53. After the roof formwork concrete is poured, compaction, slurry collection, troweling and other work are completed before the final setting, and the end plate is removed after the final setting, and the rough surface is chiseled;
S54、旋松侧向螺旋丝杠;通过侧向转动液压缸带动侧模模板反向转动;旋松垂直螺旋丝杠;且所述顶升油缸落下,使得所述综合管廊预制台车整体下落200mm;驱动所述综合管廊预制台车整体移动,待确定所述顶模模板、侧模模板均已脱离混凝土墙体后,启动所述行走组件,以将其综合管廊预制台车整体牵引至下一综合管廊节段的浇筑位置,由此获得若干预制管廊节段;S54. Unscrew the lateral screw screw; drive the side form template to rotate reversely through the lateral rotation hydraulic cylinder; unscrew the vertical screw screw; and the jacking cylinder falls, so that the integrated pipe gallery prefabricated trolley falls as a whole 200mm; drive the integrated pipe gallery prefabricated trolley to move as a whole. After confirming that the top formwork and side formwork have been separated from the concrete wall, start the walking assembly to pull the integrated pipe gallery prefabricated trolley as a whole To the pouring position of the next comprehensive pipe gallery segment, thus obtaining several prefabricated pipe gallery segments;
以及S55、对混凝土终凝后的预制管廊节段进行养生土工布保湿养护,养护时间为14天。And S55. Carry out moisturizing and curing of the health-care geotextiles for the prefabricated pipe gallery segment after the final setting of the concrete, and the curing time is 14 days.
本实施例中,可采用综合管廊预制台车在相邻管廊节段之间甚至短距离之间进行移动,由此可方便快捷的进行多节段的浇筑,相比现有技术,其可省去大量安装和拆卸模板等部件的时间,对工程成本和工期控制有利,适合机械化大规模生产。In this embodiment, the comprehensive pipe gallery prefabricated trolley can be used to move between adjacent pipe gallery segments or even short distances, so that multi-segment pouring can be carried out conveniently and quickly. Compared with the existing technology, its It can save a lot of time for installing and dismantling parts such as formwork, which is beneficial to engineering cost and construction period control, and is suitable for mechanized large-scale production.
需要说明的是,上述实施例一、二中的技术特征可进行任意组合,组合而成的技术方案均属于本发明的保护范围。It should be noted that the technical features in the first and second embodiments above can be combined arbitrarily, and the combined technical solutions all belong to the protection scope of the present invention.
综上所述,本发明具体如下优点:(1)整体性强,结构简易:门式桁架的整体性较好,但各部件具有可拆性,便于拆卸安装,且门式桁架下部装设行走装置,由此在实际施工时可利用其下部行走装置整体移动;此外,门式桁架作为支撑系统后,后期不需要大量的人工和机动设备来搬运钢架管和模板,由此可大量减少人工费用;(2)采用综合管廊预制台车在相邻管廊节段之间甚至短距离之间进行移动,由此可方便快捷的进行多节段的浇筑,相比现有技术,其可省去大量安装和拆卸模板等部件的时间,对工程成本和工期控制有利,适合机械化大规模生产。In summary, the present invention has the following advantages: (1) Strong integrity and simple structure: the integrity of the portal truss is better, but each part is detachable, which is convenient for disassembly and installation, and the lower part of the portal truss is equipped with a walking device, so that the lower part of the walking device can be used to move as a whole during actual construction; in addition, after the portal truss is used as a support system, it does not require a lot of labor and motorized equipment to carry the steel frame tubes and formwork in the later stage, which can greatly reduce labor costs. (2) The prefabricated trolley of the comprehensive pipe gallery is used to move between adjacent pipe gallery sections or even short distances, so that multi-section pouring can be carried out conveniently and quickly. Compared with the prior art, it can It saves a lot of time for installing and dismantling templates and other components, which is beneficial to engineering cost and construction period control, and is suitable for mechanized large-scale production.
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within range.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810303859.8A CN108687950A (en) | 2018-04-03 | 2018-04-03 | A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810303859.8A CN108687950A (en) | 2018-04-03 | 2018-04-03 | A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108687950A true CN108687950A (en) | 2018-10-23 |
Family
ID=63844885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810303859.8A Pending CN108687950A (en) | 2018-04-03 | 2018-04-03 | A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108687950A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339098A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | A kind of underground pipe gallery removable support template |
CN109610509A (en) * | 2019-01-29 | 2019-04-12 | 甘肃第七建设集团股份有限公司 | A kind of the adjustable die system and construction method of pipe gallery automatic control section |
CN109680720A (en) * | 2019-01-14 | 2019-04-26 | 中交第二航务工程局有限公司 | For the continuous prefabricated construction method of dry-docking immersed tube pipe joint section |
CN110065145A (en) * | 2019-05-31 | 2019-07-30 | 中交武汉港湾工程设计研究院有限公司 | It is a kind of for concrete prefabricated adaptive outer modular system |
CN111098396A (en) * | 2020-01-15 | 2020-05-05 | 广州市市政工程机械施工有限公司 | A hydraulically adjustable multi-chamber prefabricated pipe gallery mould and a manufacturing method of the multi-chamber prefabricated pipe gallery |
CN112518962A (en) * | 2020-12-02 | 2021-03-19 | 上海建工建材科技集团股份有限公司 | Integral double-T-beam pouring mold dismounting device and dismounting method |
CN114789507A (en) * | 2022-05-18 | 2022-07-26 | 河南鸿丰新型建材有限公司 | Production and construction process of ultra-large prefabricated pipe joint |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201982108U (en) * | 2010-12-03 | 2011-09-21 | 中铁五局(集团)有限公司 | Single-track railway tunnel integral type full-hydraulic lining trolley |
CN106854875A (en) * | 2016-12-26 | 2017-06-16 | 宁夏众力管廊科技有限公司 | A kind of pipe gallery construction vehicle die assembly |
CN206538790U (en) * | 2017-03-03 | 2017-10-03 | 湖南五新模板有限公司 | Interior mould trolley is used in a kind of cast-in-place pipe gallery construction |
WO2017166160A1 (en) * | 2016-03-31 | 2017-10-05 | 中交第二航务工程局有限公司 | Short-line match-casting-based precast template system for girder bridge having composite structure and corrugated steel webs |
CN206800451U (en) * | 2017-05-02 | 2017-12-26 | 成都锐龙机械制造有限公司 | A kind of piping lane top board construction chassis and chassis group |
CN208697691U (en) * | 2018-04-03 | 2019-04-05 | 中铁一局集团厦门建设工程有限公司 | A kind of prefabricated trolley of pipe gallery |
-
2018
- 2018-04-03 CN CN201810303859.8A patent/CN108687950A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201982108U (en) * | 2010-12-03 | 2011-09-21 | 中铁五局(集团)有限公司 | Single-track railway tunnel integral type full-hydraulic lining trolley |
WO2017166160A1 (en) * | 2016-03-31 | 2017-10-05 | 中交第二航务工程局有限公司 | Short-line match-casting-based precast template system for girder bridge having composite structure and corrugated steel webs |
CN106854875A (en) * | 2016-12-26 | 2017-06-16 | 宁夏众力管廊科技有限公司 | A kind of pipe gallery construction vehicle die assembly |
CN206538790U (en) * | 2017-03-03 | 2017-10-03 | 湖南五新模板有限公司 | Interior mould trolley is used in a kind of cast-in-place pipe gallery construction |
CN206800451U (en) * | 2017-05-02 | 2017-12-26 | 成都锐龙机械制造有限公司 | A kind of piping lane top board construction chassis and chassis group |
CN208697691U (en) * | 2018-04-03 | 2019-04-05 | 中铁一局集团厦门建设工程有限公司 | A kind of prefabricated trolley of pipe gallery |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339098A (en) * | 2018-11-08 | 2019-02-15 | 北京场道市政工程集团有限公司 | A kind of underground pipe gallery removable support template |
CN109339098B (en) * | 2018-11-08 | 2023-09-22 | 北京场道市政工程集团有限公司 | Portable support template of utility tunnel |
CN109680720A (en) * | 2019-01-14 | 2019-04-26 | 中交第二航务工程局有限公司 | For the continuous prefabricated construction method of dry-docking immersed tube pipe joint section |
CN109610509A (en) * | 2019-01-29 | 2019-04-12 | 甘肃第七建设集团股份有限公司 | A kind of the adjustable die system and construction method of pipe gallery automatic control section |
CN110065145A (en) * | 2019-05-31 | 2019-07-30 | 中交武汉港湾工程设计研究院有限公司 | It is a kind of for concrete prefabricated adaptive outer modular system |
CN110065145B (en) * | 2019-05-31 | 2023-12-12 | 中交武汉港湾工程设计研究院有限公司 | Self-adaptive external mold system for concrete prefabrication |
CN111098396A (en) * | 2020-01-15 | 2020-05-05 | 广州市市政工程机械施工有限公司 | A hydraulically adjustable multi-chamber prefabricated pipe gallery mould and a manufacturing method of the multi-chamber prefabricated pipe gallery |
CN112518962A (en) * | 2020-12-02 | 2021-03-19 | 上海建工建材科技集团股份有限公司 | Integral double-T-beam pouring mold dismounting device and dismounting method |
CN114789507A (en) * | 2022-05-18 | 2022-07-26 | 河南鸿丰新型建材有限公司 | Production and construction process of ultra-large prefabricated pipe joint |
CN114789507B (en) * | 2022-05-18 | 2023-10-20 | 河南鸿丰建筑科技有限公司 | Production and construction process for ultra-large prefabricated pipe joint |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108687950A (en) | A kind of prefabricated trolley of pipe gallery and piping lane method for prefabricating | |
CN110318776B (en) | Tunnel construction method based on inverted arch and inverted arch filling layer replacing steel-concrete composite structure | |
CN108331385B (en) | Inspection pit precast column structure and construction method thereof | |
CN101761092A (en) | Construction method of movable side wall of large overall template of large-span deep foundation pit | |
CN104533456A (en) | Super-large section chamber reinforced concrete modelling construction method | |
CN101363224A (en) | Mobile Foundation Pit Support System and Construction Method | |
CN103470272A (en) | Trolley for concrete construction on multiple sections by employing mining method and construction method thereof | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN114481874B (en) | Prefabricated door type frame assembled box culvert and construction method | |
CN108442405A (en) | A kind of piping lane support construction based on Urban Underground pipe gallery | |
CN202787055U (en) | Pier fixed connection structure of steel structure overhead bridge | |
CN111113628B (en) | Construction method for spraying prefabricated T-shaped beam | |
CN203499697U (en) | Trolley used for concrete construction of various cross sections through mining method | |
CN208697691U (en) | A kind of prefabricated trolley of pipe gallery | |
CN204475184U (en) | Urban light rail viaduct mountain type U beam Construction Supporting System | |
CN106013234A (en) | Construction method for underground comprehensive pipe rack | |
CN113463683A (en) | Double-pipe gallery slip form trolley and double-pipe gallery construction method | |
CN108978699B (en) | Land integral prefabricated bearing platform and production and installation method thereof | |
CN206874289U (en) | Just lining construction hydraulic template trolley | |
CN206220537U (en) | A kind of assembly type truss frame platform | |
CN114197526B (en) | Formwork system with vertical structure by reverse construction method and construction method | |
CN110904998B (en) | Template lining trolley applied to pipe gallery and construction method thereof | |
CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
CN116677061A (en) | Municipal rainwater and sewage inspection well integrated prefabricated installation device and construction method thereof | |
CN112176885B (en) | Quick construction method for turning over mould of bridge group of viaduct Gao Kongxin |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181023 |
|
RJ01 | Rejection of invention patent application after publication |