CN102493349B - Method for prefabricating and erecting box girders by using bailey beam - Google Patents
Method for prefabricating and erecting box girders by using bailey beam Download PDFInfo
- Publication number
- CN102493349B CN102493349B CN201110428825XA CN201110428825A CN102493349B CN 102493349 B CN102493349 B CN 102493349B CN 201110428825X A CN201110428825X A CN 201110428825XA CN 201110428825 A CN201110428825 A CN 201110428825A CN 102493349 B CN102493349 B CN 102493349B
- Authority
- CN
- China
- Prior art keywords
- box girder
- case
- bailey beam
- bridge pier
- striding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种利用贝雷梁进行箱梁预制架设施工方法,在第一跨的边跨桥台上架设桥台台帽并在第二跨的两侧桥墩上分别架设第一、第二桥墩盖梁;在桥台台帽、第一、二桥墩盖梁上分别间隔设置至少两块支座垫石,然后在桥台台帽、第一、二桥墩盖梁的一块支座垫石上沿纵向通长架一道贝雷梁;在贝雷梁上安装台座;在台座上进行第一、二跨第一片箱梁的制备;将制备完成的第一、二跨的第一片箱梁从贝雷梁的台座上横移到第一、二跨上进行安装直至将除贝雷梁位置的所有箱梁安装完毕;制备贝雷梁位置的箱梁并将该箱梁放置在与贝雷梁相邻位置的箱梁上;拆除贝雷梁,安装贝雷梁位置的箱梁。本方法提高了劳动生产效率。
The invention discloses a prefabricated box girder erection construction method using Bailey girders. The abutment cap is erected on the side span abutment of the first span, and the first and second abutment caps are respectively erected on the two side piers of the second span. Bridge pier cover beams: At least two support pad stones are arranged at intervals on the abutment cap, the first and second pier cover beams respectively, and then on the abutment cap, the first and second bridge pier cover Longitudinally erect a Bailey beam; install a pedestal on the Bailey beam; prepare the first box girder of the first and second spans on the pedestal; place the prepared first and second spans of the first box girder from Move the pedestal of the Bailey beam to the first and second spans for installation until all the box girders except the Bailey beam are installed; prepare the box girder at the Bailey beam position and place the box girder adjacent to the Bailey beam On the box girder at the position; remove the Bailey beam and install the box girder at the Bailey beam position. The method improves labor production efficiency.
Description
技术领域 technical field
本发明涉及一种箱梁预制架设施工方法,尤其涉及一种利用贝雷梁进行箱梁预制架设施工方法。The invention relates to a construction method for prefabricated erection of box girders, in particular to a construction method for prefabricated erection of box girders by using Bailey beams.
背景技术 Background technique
在桥梁建设中,预制箱梁是建设桥梁施工最为普遍采用的一种桥梁上部结构形式。目前对于跨越深谷、大河、急流的预应力混凝土连续刚构桥。下部结构主桥桥墩采用空心薄壁墩,桩基础,上部构造主桥采用悬臂浇筑的施工方法进行施工,而对于引桥上部结构多采用后张法预应力箱梁。对于片数多的箱梁在预制场预制,按架梁顺序依次架设施工是比较常见的方法,而对于箱梁片数少,引桥处的地势又高差起伏大,地势复杂时,按常规的在预制场预制箱梁、架设方法,施工比较困难,经济上也不合理。In bridge construction, prefabricated box girder is the most commonly used bridge superstructure form in bridge construction. Currently, prestressed concrete continuous rigid frame bridges spanning deep valleys, large rivers and rapids. The piers of the main bridge of the lower structure adopt hollow thin-walled piers and pile foundations, and the main bridge of the upper structure adopts the construction method of cantilever pouring, while the upper structure of the approach bridge mostly adopts post-tensioning prestressed box girder. For the prefabrication of a large number of box girders in the prefabrication field, it is a common method to erect the construction in sequence according to the order of the girders. For the case of a small number of box girders, the terrain at the approach bridge has large elevation differences, and the terrain is complex. The prefabricated box girder and erection method in the prefabrication yard are relatively difficult to construct and economically unreasonable.
通过检索得知已授权的专利:Authorized patents obtained by searching:
1 申请号为CN201010232662.3的中国专利公开了“后张预制预应力混凝土箱梁的安装方法”,本发明涉及一种后张预制预应力混凝土箱梁的安装方法。后张预制预应力混凝土箱梁的安装方法,其特征在于它包括如下步骤:1)支撑装置的安装:在一个预应力筋张拉段内,沿后张预制预应力混凝土箱梁安装的方向铺设第一支撑架和第二支撑架,在第一支撑架上铺设第一滑道,在第二支撑架上铺设第二滑道;2)后张预制预应力混凝土箱梁的安装:①采用起吊重量为100t龙门吊将5-12块后张预制预应力混凝土箱梁吊运放置在支撑装置的第一滑道和第二滑道上;②通过手动葫芦将后张预制预应力混凝土箱梁在第一滑道和第二滑道上行走将相邻的两块后张预制预应力混凝土箱进行拼装。1 The Chinese patent application number CN201010232662.3 discloses "installation method of post-tensioned prefabricated prestressed concrete box girder", and the present invention relates to an installation method of post-tensioned prefabricated prestressed concrete box girder. The installation method of post-tensioned prefabricated prestressed concrete box girder is characterized in that it comprises the following steps: 1) installation of supporting device: in a prestressed tendon tension section, lay along the direction that post-tensioned prefabricated prestressed concrete box girder is installed The first support frame and the second support frame, the first slideway is laid on the first support frame, and the second slideway is laid on the second support frame; 2) The installation of the post-tensioned prefabricated prestressed concrete box girder: ① adopt lifting A gantry crane with a weight of 100t lifts 5-12 post-tensioned precast prestressed concrete box girders and places them on the first slideway and the second slideway of the support device; Walking on the slideway and the second slideway assembles two adjacent post-tensioned prefabricated prestressed concrete boxes.
2 申请号为:CN201010285591.3的中国专利公开了“一种大型混凝土箱梁高空分段预制、移梁、存梁、拼装的施工方法”,本发明公开了一种大型混凝土箱梁高空分段预制、移梁、存梁、拼装的施工方法,其特征是包括以下步骤:1)搭设高桩预制平台;2)在高桩预制平台和桥墩之间搭设移梁钢管支架和钢滑轨;3)在高桩预制平台上浇筑匹配梁段;4)将已浇筑好的匹配梁段作为下一个待浇新梁段一端的端模,浇筑新梁段;5)新梁段浇筑好后,将匹配梁段运至设计位置作为待拼装梁段,同时将新梁段前移作为下一个匹配梁段;6)将待拼装梁段纵向移到已拼梁段端部的匹配面作为拼装梁段,调整拼装梁段的位置使其符合与桥墩上已拼梁段进行拼接的要求;7)将拼装梁段与已拼梁段进行拼接。本发明的施工方法通过梁段的分段预制及长时间的存梁,有效的使预制梁段在自由状态下完成梁体的大部分收缩变形,消除相邻梁段因龄期不同而产生的收缩差,从而消除裂缝。2 The Chinese patent with the application number: CN201010285591.3 discloses "a construction method for high-altitude segmental prefabrication, moving, storage, and assembly of a large concrete box girder". The present invention discloses a high-altitude segmental The construction method of prefabrication, moving beams, storing beams, and assembling is characterized in that it includes the following steps: 1) erecting a high-pile prefabricated platform; 2) erecting a beam-moving steel pipe support and a steel slide rail between the high-piled prefabricated platform and the pier; 3. ) pouring the matching beam section on the high pile prefabricated platform; 4) using the poured matching beam section as the end formwork of one end of the next new beam section to be poured, and pouring the new beam section; 5) after the new beam section is poured, place the The matching beam segment is transported to the design position as the beam segment to be assembled, and the new beam segment is moved forward as the next matching beam segment; 6) The beam segment to be assembled is moved longitudinally to the matching surface at the end of the assembled beam segment as the assembled beam segment, and the assembled beam is adjusted The position of the segment makes it meet the requirements for splicing with the already spliced beam segment on the pier; 7) splicing the assembled beam segment with the spliced beam segment. The construction method of the present invention effectively enables the prefabricated beam section to complete most of the shrinkage deformation of the beam body in a free state through the segmental prefabrication of the beam section and the long-term storage of the beam, and eliminates the shrinkage difference of adjacent beam sections due to different ages , thereby eliminating cracks.
第1项专利公开的专利“后张预制预应力混凝土箱梁的安装方法”在地形高差起伏大,地势复杂的山谷河流的大桥中不适用。The patent "installation method of post-tensioned prefabricated prestressed concrete box girder" disclosed in the first patent is not suitable for bridges in valleys and rivers with large terrain height difference and complex terrain.
第2项专利公开的箱梁高空分段预制、移梁、存梁、拼装的施工方法的发明目的是消除裂缝。The invention purpose of the construction method of box girder high-altitude segmental prefabrication, moving beams, storing beams and assembling disclosed in the second patent is to eliminate cracks.
发明内容 Contents of the invention
本发明的一个目的在于克服现有技术的不足,提供一种在地形高差起伏大,地势复杂时一种利用贝雷梁进行箱梁预制架设施工方法,采用该方法提高了劳动生产效率,节约了成本,节省了工期。An object of the present invention is to overcome the deficiencies in the prior art, to provide a kind of method for prefabricated erection of box girders using Bailey beams when the terrain height difference is large and the terrain is complex, and the method improves labor production efficiency and saves The cost is reduced and the construction period is saved.
本发明的一种利用贝雷梁进行箱梁预制架设施工方法,它包括以下步骤:A kind of utilization Bailey beam of the present invention carries out box girder prefabricated erection construction method, it comprises the following steps:
(1)在已施工完的第一跨的边跨桥台上架设桥台台帽并在已施工完的第二跨的两侧桥墩上分别架设第二桥墩盖梁和第一桥墩盖梁;(1) Erect the abutment cap on the side span abutment of the first span that has been constructed and erect the second pier cap beam and the first pier cap girder respectively on the piers on both sides of the second span that has been constructed;
(2)在所述的桥台台帽、第一和第二桥墩盖梁上分别间隔设置至少两块支座垫石,然后在桥台台帽、第一和第二桥墩盖梁的一块支座垫石上沿纵向通长架一道贝雷梁;(2) At least two support pad stones are respectively arranged at intervals on the abutment cap, the first and second pier cap beams, and then one of the abutment caps, the first and the second pier cap girder supports A Bailey beam is erected along the longitudinal length on the cushion stone;
(3)在所述的贝雷梁上安装台座;(3) a pedestal is installed on the Bailey beam;
(4)在所述的台座上进行第一跨和第二跨第一片箱梁的制备;(4) Carry out the preparation of first span and second span first sheet box girder on described pedestal;
(5)将制备完成的第一跨和第二跨的第一片箱梁从贝雷梁的台座上横移到第一跨和第二跨上放置第一片箱梁的位置上进行安装,其中第一跨的第一片箱梁的两端架设在桥台台帽和第一桥墩盖梁相对应设置的支座垫石上,第二跨第一片箱梁的两端架设在第一桥墩盖梁和第二桥墩盖梁相对应设置的支座垫石上;(5) Move the prepared first piece of box girder of the first span and the second span from the pedestal of the Bailey beam to the position where the first piece of box girder is placed on the first span and the second span for installation, The two ends of the first piece of box girder in the first span are erected on the supporting pad stones corresponding to the abutment cap and the first pier cover beam, and the two ends of the first piece of box girder in the second span are erected on the first pier Covering beams and second pier cover beams correspondingly set on the supporting pad stone;
(6)重复所述的步骤(4)和(5),直至将除贝雷梁位置的所有箱梁安装完毕;(6) Repeat steps (4) and (5) until all box girders except Bailey beam positions are installed;
(7)制备贝雷梁位置的箱梁并将贝雷梁位置的箱梁放置在与贝雷梁相邻位置的箱梁上;(7) Prepare the box girder at the Bailey beam position and place the box girder at the Bailey beam position on the box girder adjacent to the Bailey beam;
(8)拆除所述的贝雷梁,将与贝雷梁相邻位置的箱梁上的贝雷梁位置的箱梁移至贝雷梁处的支座垫石上进行安装。(8) Remove the Bailey beam, and move the box girder at the Bailey beam position on the box girder adjacent to the Bailey beam to the supporting pad stone at the Bailey beam place for installation.
本发明的有益效果是:本方法由于箱梁的预制架设是在桥跨上利用贝雷梁进行施工,不受地理环境影响,因而适用于地形高差起伏大,地势复杂的地区;又由于移梁时省去了龙门吊、架桥机等大型设备的安装,因而提高了劳动生产效率,节约了成本,节省了工期。The beneficial effect of the present invention is: because the prefabricated erection of the box girder is carried out on the span of the bridge using Bailey beams, the method is not affected by the geographical environment, so it is suitable for areas with large terrain height difference and complex terrain; The beam time saves the installation of large equipment such as gantry cranes and bridge erecting machines, thus improving labor production efficiency, saving costs, and saving construction periods.
附图说明 Description of drawings
图1是本发明的一种利用贝雷梁进行箱梁预制架设施工方法的贝雷梁安装俯视示意图;Fig. 1 is a kind of Bailey beam that utilizes Bailey beam to carry out box girder prefabricated erection construction method of the present invention the Bailey beam installation top view diagram;
图2是本发明的一种利用贝雷梁进行箱梁预制架设施工方法的贝雷梁台座安装俯视示意图;Fig. 2 is a kind of Bailey beam pedestal installation top view schematic diagram that utilizes Bailey beam to carry out box girder prefabricated erection construction method of the present invention;
图3是本发明的一种利用贝雷梁进行箱梁预制架设施工方法的箱梁底模板安装俯视示意图;Fig. 3 is a kind of box girder bottom template installation top view schematic diagram that utilizes Bailey beam to carry out box girder prefabricated erection construction method of the present invention;
图4是本发明的一种利用贝雷梁进行箱梁预制架设施工方法的立面示意图;Fig. 4 is a kind of elevation schematic diagram that utilizes Bailey beam to carry out box girder prefabricated erection construction method of the present invention;
图5是本发明的一种利用贝雷梁进行箱梁预制架设施工方法的箱梁移梁安装俯视示意图。Fig. 5 is a top view schematic diagram of box girder moving beam installation of a construction method of prefabricated box girder erection using Bailey beams according to the present invention.
具体实施方式 Detailed ways
下面结合附图和具体实施例对本发明作以详细描述。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
如附图所示的本发明的一种利用贝雷梁进行箱梁预制架设施工方法,它包括以下步骤:(1)在已施工完的第一跨1的边跨桥台上架设桥台台帽4并在已施工完的第二跨2的两侧桥墩上分别架设第二桥墩盖梁5-2和第一桥墩盖梁5-1;(2)在所述的桥台台帽4、第一和第二桥墩盖梁5-1、5-2上分别间隔设置至少两块支座垫石6-2、7-2、8-2,然后在桥台台帽4、第一和第二桥墩盖梁5-1、5-2的一块支座垫石上沿纵向通长架一道贝雷梁3;(3)在所述的贝雷梁3上安装台座;(4)在所述的台座上进行第一跨和第二跨第一片箱梁的制备;(5)将制备完成的第一跨和第二跨的第一片箱梁从贝雷梁的台座上横移到第一跨1和第二跨2上放置第一片箱梁的位置上进行安装,其中第一跨的第一片箱梁的两端架设在桥台台帽和第一桥墩盖梁相对应设置的支座垫石上,第二跨第一片箱梁的两端架设在第一桥墩盖梁和第二桥墩盖梁相对应设置的支座垫石上;;(6)重复所述的步骤(4)和(5),直至将除贝雷梁3位置的所有箱梁安装完毕;(7)制备贝雷梁3位置的箱梁并将贝雷梁3位置的箱梁放置在与贝雷梁3相邻位置的箱梁上;(8)拆除所述的贝雷梁3,将与贝雷梁相邻位置的箱梁上的贝雷梁位置的箱梁移至贝雷梁处的支座垫石上进行安装。所述的箱梁的制备采用常规现有的方法即可。该方法可参见《公路桥涵施工技术规范2011》。A kind of utilization Bailey beam of the present invention as shown in the accompanying drawing carries out box girder prefabricated erection construction method, and it comprises the following steps: (1) set up abutment abutment on the side span abutment of the
优选的所述的步骤(3)中的台座的安装包括以下步骤:(a)在所述的贝雷梁上横向间隔铺设多块槽钢9;(b)在所述的多块槽钢的顶部沿纵向通长铺设多根工字钢11。优点是保证箱梁模板的安装就位和箱梁底的平整度,使台座有足够的承载力,而且结构安全。The installation of the pedestal in the preferred described step (3) includes the following steps: (a) laying a plurality of channel steels 9 at intervals on the described Bailey beam; A plurality of I-
进一步优选的在所述的步骤(a)和(b)之间包括在槽钢上用砂袋进行满荷载预压步骤。优点是:确保台座基础稳固,保证箱梁预制时外形尺寸不发生变化;避免在施工过程中引起台座下沉弯曲;保证了箱梁底模设置的反拱值不变。Further preferably, between the above steps (a) and (b), there is a step of performing full-load preloading on the channel steel with sand bags. The advantages are: to ensure the foundation of the pedestal is stable, to ensure that the external dimensions of the box girder do not change during prefabrication; to avoid sinking and bending of the pedestal during the construction process; to ensure that the reverse arch value set by the bottom formwork of the box girder remains unchanged.
进一步优选的,在所述的步骤(2)中,当所述的支座垫石为四块时,将所述的贝雷梁3沿纵向通长架设在桥台台帽、第一和第二桥墩盖梁的第二块支座垫石上,并且在所述的步骤(7)中将贝雷梁位置的箱梁放置在与贝雷梁相邻位置的第三和第四箱梁的中间位置上。优点是承载受力安全,现场施工操作方便。Further preferably, in the step (2), when there are four support pad stones, the Bailey
实施例1Example 1
(1)在已施工完的第一跨1的边跨桥台上架设桥台台帽4并在已施工完的第二跨2的两侧桥墩上分别架设第二桥墩盖梁5-2和第一桥墩盖梁5-1;(2)在所述的桥台台帽4、第一和第二桥墩盖梁5-1、5-2上分别间隔设置四块支座垫石,然后在桥台台帽4、第一和第二桥墩盖梁5-1、5-2的第二块支座垫石上沿纵向通长架一道贝雷梁3;(3)在所述的贝雷梁3上安装台座;台座安装的步骤为:在所述的贝雷梁3上横向间隔铺设多块槽钢9;(b)在所述的多块槽钢9的顶部沿纵向通长铺设三根工字钢11;(4)所述的第一跨1、第二跨2每跨包括四片箱梁12-1、12-2、12-3、12-4、13-1、13-2、13-3、13-4,在所述的台座上进行第一跨和第二跨第一片箱梁12-4、13-4的制备;(5)将制备完成的第一片第一跨和第二跨的箱梁从贝雷梁的台座上横移到第一跨和第二跨的放置第一片箱梁12-4、13-4的位置上进行安装;其中第一跨的第一片箱梁的两端架设在桥台台帽和第一桥墩盖梁相对应设置的支座垫石上,第二跨第一片箱梁的两端架设在第一桥墩盖梁和第二桥墩盖梁相对应设置的支座垫石上;(6)重复所述的步骤(4)和(5),直至将除贝雷梁3位置的所有箱梁安装完毕;(7)制备贝雷梁位置的箱梁并将贝雷梁位置的箱梁放置在与贝雷梁相邻位置的第一跨的第三箱梁12-3和第四箱梁12-4以及第二跨的第三箱梁13-3和第四箱梁13-4的中间位置上;(8)拆除所述的贝雷梁3,将贝雷梁位置的箱梁12-2、13-2移至贝雷梁处的支座垫石上进行安装。(1) Erect the
优点是:对于箱梁片数少,引桥处的地势又高差起伏大,地势复杂时,采用本专利方法进行施工,可使箱梁预制架设都在桥跨上利用贝雷梁进行,贝雷梁可随时架设和拆除,非常方便,不受地理环境影响。省去了龙门吊、架桥机等大型设备的安装,因而提高了劳动生产效率,节约了成本,节省了工期,而且经济合理。The advantage is: when the number of box girders is small, the terrain at the approach bridge has large height fluctuations, and the terrain is complex, the patented method can be used for construction, so that the prefabricated erection of the box girder can be carried out on the bridge span by using the Bailey beam. The beam can be erected and dismantled at any time, which is very convenient and not affected by the geographical environment. The installation of large-scale equipment such as gantry cranes and bridge erecting machines is omitted, thereby improving labor production efficiency, saving costs and construction periods, and is economical and reasonable.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110428825XA CN102493349B (en) | 2011-12-16 | 2011-12-16 | Method for prefabricating and erecting box girders by using bailey beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201110428825XA CN102493349B (en) | 2011-12-16 | 2011-12-16 | Method for prefabricating and erecting box girders by using bailey beam |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102493349A CN102493349A (en) | 2012-06-13 |
| CN102493349B true CN102493349B (en) | 2013-08-21 |
Family
ID=46185205
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201110428825XA Active CN102493349B (en) | 2011-12-16 | 2011-12-16 | Method for prefabricating and erecting box girders by using bailey beam |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102493349B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104631332B (en) * | 2015-01-16 | 2016-08-24 | 中国电建集团成都勘测设计研究院有限公司 | PC T beam precast erection construction method |
| CN105464403B (en) * | 2015-12-16 | 2018-02-16 | 华煜建设集团有限公司 | A kind of simple connection bridge |
| CN106012847B (en) * | 2016-05-27 | 2018-01-02 | 中交四公局第二工程有限公司 | Bailey bracket supports precast hollow slab technique |
| CN111395178A (en) * | 2020-03-25 | 2020-07-10 | 中电建十一局工程有限公司 | A construction method of single-span 40m long prestressed T beam |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1061117C (en) * | 1994-02-25 | 2001-01-24 | 铁道建筑研究设计院 | Bridge span erecting machine |
| JP3728657B2 (en) * | 2000-09-26 | 2005-12-21 | 清水建設株式会社 | Railway bridge replacement method |
| JP3844743B2 (en) * | 2003-03-24 | 2006-11-15 | オリエンタル建設株式会社 | Box girder bridge structure and its construction method |
| CN1635224A (en) * | 2003-12-30 | 2005-07-06 | 上海市政工程设计研究院 | Bridge structure and construction method therefor |
| CN1311134C (en) * | 2004-11-25 | 2007-04-18 | 中铁大桥局股份有限公司 | Down beam type bridge-erecting machine and bridge erecting method thereof |
| CN201065512Y (en) * | 2007-06-28 | 2008-05-28 | 宏润建设集团股份有限公司 | Beret truss beam bridging machine |
| CN101392501A (en) * | 2007-09-17 | 2009-03-25 | 上海远东国际桥梁建设有限公司 | Erection method for wide span steel box bridge |
-
2011
- 2011-12-16 CN CN201110428825XA patent/CN102493349B/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| CN102493349A (en) | 2012-06-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103669226B (en) | River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method | |
| CN101424073A (en) | Bridge deck and steel girder second combination method for whole arch precasted steel-concrete composite continuous box girder | |
| CN105568866A (en) | Incremental launching construction method for large-span steel box girder spanning constructed road | |
| CN203229874U (en) | Repeatedly used cast-in-place support system for simply-supported beam | |
| CN102587286A (en) | Simply supported-continuous construction method for bridge superstructure | |
| CN108867310A (en) | The short rib T beam bridge of pretensioning prestressed concrete and its construction method | |
| CN100441779C (en) | Bridge construction method with prefabricated translation in place in the air | |
| CN102154988A (en) | Arch-after-girder construction method of large-span steel box tacked arch bridge | |
| CN107044090A (en) | A kind of construction method of dual deck bridge | |
| CN202000251U (en) | Cylindrical hollow prefabricated prestressed concrete pier structure | |
| CN203270461U (en) | Bailey beam support without buttress in soft foundation | |
| CN109778700B (en) | Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road | |
| CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
| CN111749133A (en) | Beam-arch combined rigid frame bridge and construction method of bridge pier thereof | |
| CN105133484A (en) | Cable-stayed bridge structure with high and low towers for partial ground anchors | |
| CN102493349A (en) | A construction method of box girder prefabricated erection using Bailey beam | |
| CN203654200U (en) | No. 0 block support for box girder of river-crossing prestressed concrete continuous beam bridge | |
| CN206233656U (en) | Steel frame mill building structure | |
| CN210684429U (en) | A kind of long-span tied arch bridge approach bridge jacking system | |
| CN116289629A (en) | Pushing construction method for steel box girder of large-span basket type tied-arch bridge | |
| CN202369930U (en) | Door opening type bearing framed bent device for multiplayer concrete box girder | |
| CN111622091A (en) | Stress test method for prefabricated bridge pier | |
| CN116254783A (en) | A high-level falling beam construction method suitable for the erection of prefabricated box girders on high-speed railways | |
| CN115961549A (en) | Rear-feeding beam type erection construction method for large-tonnage whole-section steel beam of cable-stayed bridge | |
| CN110863435B (en) | Movable type segmental assembling box girder transverse steel beam tensioning work platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |