CN106836576A - A kind of cladding component suitable for aerated concrete block work matter - Google Patents
A kind of cladding component suitable for aerated concrete block work matter Download PDFInfo
- Publication number
- CN106836576A CN106836576A CN201710130674.7A CN201710130674A CN106836576A CN 106836576 A CN106836576 A CN 106836576A CN 201710130674 A CN201710130674 A CN 201710130674A CN 106836576 A CN106836576 A CN 106836576A
- Authority
- CN
- China
- Prior art keywords
- dry
- barrel
- blind nut
- screw rod
- draw point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/90—Curtain walls comprising panels directly attached to the structure
Abstract
Concretely it is a kind of cladding component suitable for aerated concrete block work matter the present invention relates to a kind of stone material dry suspending component of building decoration.Multiple rows of draw point is fixed with described storage syringe, notch is provided with storage syringe, the hole for being provided with and matching with draw point quantity, size is provided with barrel nail barrel inside notch, horizontal direction is welded with two panels inserted sheet at nail barrel Single port;Described screw rod matches with barrel, and screw rod one end is provided with blind nut, and blind nut is provided with dental impression;The mode for fixing pin present invention employs interpolation type realizes brick, aerated-block wall dry-hang stone becomes a kind of possibility;The stone material dry suspending of welding steel structure class, eliminates the construction link of channel-section steel welding on year-on-year basis, therefore saves material with manually, and cost is reduced to whole construction streamline cost, therefore this construction technology can save manufacturing cost.In addition dry-hang stone seam crossing has a screw for circle.
Description
The application is Application No.:2015103669854, the applying date is:On 06 26th, 2015, innovation and creation name
Referred to as《A kind of cladding component construction technology suitable for aerated concrete block work matter》Divisional application.
Technical field
Concretely it is that one kind is built suitable for air entrained concrete the present invention relates to a kind of stone material dry suspending component of building decoration
The cladding component of block wall matter.
Background technology
Stone material dry-hanging method also known as hang-in-air method.It is a kind of new construction technology in current wall decoration.The method is with metal
Ornamental stone is directly hung on suspension member into metope or sky is hung on steelframe, is not required to stickup of being in the milk again.Its principle is in body junction
Main stress point is set on structure, stone material is fixed on building by metal hanger, form stone decoration curtain wall.The technique is profit
With corrosion resistant bolt and corrosion resistant flexible connecting member, the ornamental stones such as granite, artificial marble are directly hung over into building
The outer surface of structure, reserves the cavity of 40 ~ 50mm between stone material and structure.The facing made with this technique, on wind-force and ground
Allow to produce appropriate displacement in the presence of brisance, to absorb part wind-force and seismic force, and crackle will not occur and come off.When
After wind-force seismic force disappears, stone material also resets with structure.Dry-hang stone curtain wall intensity, the thickness for being related to stone material in itself is long
Size wide and the formula of cladding fixation side one.According to metal and stone curtain wall engineering legislation(JGJl33-2001)Will
Ask:Stone material thickness for stone curtain wall is no less than 25mm, and stone area is not preferably greater than 1.5 ㎡, and suspension member is typically using stainless
Steel suspension member.Angle iron connecting piece, stainless steel, bolt, welding rod, structure glue should have material prove, product certificate and inspection
Report.In construction technology, cladding primary and secondary framework(That is column and crossbeam)Structural stability should meet design requirement.Consider
To the convenience of engineering construction, the arrangement of column should be engaged with the arrangement of the vertical seam of stone material;The arrangement of crossbeam should be with stone material
Laterally the arrangement of seam is engaged.The connection of column and structure:On wall body structure embedded iron, column and embedded iron are set every 2 meters
By short circuit(No. 10 channel-section steels)Welding, in view of the influence of temperature stress when column is constructed, every 6 meters of disconnections, centre sets 15mm's
Gap.Noting gap will stagger the junction of crossbeam.Crossbeam also should be taken into account the influence of temperature stress with the connection of column, even
Connected the connection of corner brace, bolt and column.Column is generally protected with structural plane with crossbeam according to the size of keel, the convenience of construction
The spacing of 30-50mm is stayed, is so conducive to the installation of stand column and beam, but favourable elimination is constructed(Structural plane, column and crossbeam)
Error, the column channel-section steel of engineering use, crossbeam angle steel size should meet design requirement.The construction technology and attention thing of summary
, on dry-fasten stone on external wall, core should be noted what time be:One is must be fixed with expansion bolt before dry-hang stone
Channel-section steel, the second is fixed wall is necessary for concrete wall.
The content of the invention
The present invention provides a kind of cladding component suitable for aerated concrete block work matter, so as to solve tradition steelframe at present
The limitation of stone material dry suspending, there is provided a kind of without steelframe welding, it is also possible to built by laying bricks or stones for aerating in outer wall body material, the material of brick wall
During matter, the cladding of stone material is carried out.
The present invention solves its above-mentioned technical problem and uses following technical scheme:It is a kind of to be built suitable for air entrained concrete
The cladding component of block wall matter, described cladding component its be mainly configured with:Nail barrel, draw point, barrel, notch, screw rod, blind nut, storage
Syringe, inserted sheet, are fixed with multiple rows of draw point on described storage syringe, notch is provided with storage syringe, and barrel nail barrel is provided with inside notch
On be provided with the hole matched with draw point quantity, size, horizontal direction is welded with two panels inserted sheet at nail barrel Single port;Described spiral shell
Bar matches with barrel, and screw rod one end is provided with blind nut, and blind nut is provided with dental impression;
Described a kind of cladding component suitable for aerated concrete block work matter, it is characterised in that construction technology is:
1)Determine the material of dry-hanging wall wall matter:By the way of the perforate of surface, confirm that wall material is air-entrained concrete building block;
2)Setting-out is carried out to the particular location of wall surface dry-hang according to construction design drawing:By black mark-line ejected position.
3)Boring of electric hammer:Line line cross, T word joints according to black mark-line ejection are drilled, and are cleaned out after drilling
Dust in hole;Drilling depth and aperture are according to design requirement;
4)Cutting machine cut groove:Size, position according to inserted sheet carry out cutting groove on dry-hanging wall;
5)Area according to dry-hanging wall carries out, by batch placement nail barrel, placing depth, position on the dry-hanging wall hole for having drilled through
Put and be defined by the complete card entry slot of inserted sheet;
6)Storage syringe is turned by notch to rotate, ensure that draw point is all stabbed out outside nail barrel after rotation using spanner;
7)Screw rod is screwed into barrel, it is the 1/3 ~ 1/2 of screw rod to be screwed into depth;
8)The angle lap pretreatment of dry-hung plate:Square dry-hung plate corner is carried out grinding the treatment for shelving angle;
9)Shelve dry-hung plate:To treat that cladding sheet material block-by-block is held on screw rod;
10)Blind nut is turned using the screwdriver for matching so that screw rod in barrel to tightening:
11)The opposite joint of blind nut:Gap tendency according to dry-hung plate, blind nut carries out cross, T words, right angle opposite joint;
12)Blind nut sealing is fixed:Transparence instantaneous solidification liquid is instilled on the inside of blind nut to carry out sealing and fixes.
Above-mentioned blind nut is provided with dental impression, and its road dental impression can be divided into three kinds:Cross road dental impression, T words road dental impression, right angle road
Dental impression.
Its a diameter of 0.8cm ~ 3cm of above-mentioned nail barrel, length is 5cm ~ 22cm.
Above-mentioned its row of multiple rows of draw point is 4 ~ 12 rows, and the draw point quantity often arranged is 6 ~ 20.
Beneficial effect of the present invention:The mode for employing interpolation type fixation pin realizes brick, aerated-block wall dry-hang stone
Become a kind of possible;The stone material dry suspending of welding steel structure class, eliminates the construction link of channel-section steel welding on year-on-year basis, therefore saves material
With it is artificial, cost is reduced to whole construction streamline cost, therefore this construction technology can save manufacturing cost.In addition it is cladding
Stone material seam crossing has a screw for circle, and this construction can reach two effects, one is monoblock stone curtain wall attractive in appearance,
Secondly the difficulty of constructor is reduction of, because every piece of stone curtain wall stitching portion is without opposite joint again.Therefore the present invention can reach
Save manufacturing cost, reduce constructor difficulty, so that soft wall dry-hang stone becomes a reality.
Brief description of the drawings
Fig. 1 is a kind of wall pin structure schematic diagram of cladding component suitable for aerated concrete block work matter of the invention.
Fig. 2 is a kind of nail barrel structural representation of cladding component suitable for aerated concrete block work matter of the invention.
Fig. 3 is a kind of cladding signal of the present embodiment of cladding component suitable for aerated concrete block work matter of the invention
Figure.
Fig. 4 is a kind of dry hanging schematic diagram of stone curtain wall.
Fig. 5 is applied to the treated dry-hang stone of the present embodiment for a kind of.
Fig. 6 follows closely the generalized section of fixing stone for the wall of the present embodiment.
Fig. 7 is a kind of schematic diagram of the wall nail pattern of cladding component suitable for aerated concrete block work matter of the invention.
1- nail barrels in figure, 2- draw points, 3- barrels, 4- notches, 5- screw rods, 6- blind nuts, 7- storage syringes, 8- inserted sheets.
Specific embodiment
1-7 makes a detailed explanation to specific embodiment of the invention below in conjunction with the accompanying drawings.
Embodiment:A kind of cladding component suitable for aerated concrete block work matter, described its main structure of cladding component
Make:Nail barrel 1, draw point 2, barrel 3, notch 4, screw rod 5, blind nut 6, storage syringe 7, inserted sheet 8, are fixed with described storage syringe 7
Multiple rows of draw point 2, notch 4 is provided with storage syringe 7, and barrel 3 is provided with inside notch 4;It is provided with nail barrel 1 and the quantity of draw point 2, size phase
The hole of matching, horizontal direction is welded with two panels inserted sheet 8 at the Single port of nail barrel 1;Described screw rod 5 matches with barrel 3, screw rod
5 one end are provided with blind nut 6, and blind nut 6 is provided with dental impression;
Described a kind of cladding component suitable for aerated concrete block work matter, it is characterised in that construction technology is:
1)Determine the material of dry-hanging wall wall matter:By the way of the perforate of surface, confirm that wall material is air-entrained concrete building block;
2)Setting-out is carried out to the particular location of wall surface dry-hang according to construction design drawing:By black mark-line ejected position;
3)Boring of electric hammer:Line line cross, T word joints according to black mark-line ejection are drilled, and hole is cleaned out after drilling
Interior dust;Drilling depth and aperture are according to design requirement;
4)Cutting machine cut groove:Size, position according to inserted sheet 8 carry out cutting groove on dry-hanging wall;
5)Area according to dry-hanging wall carries out, by batch placement nail barrel 1, placing depth, position on the dry-hanging wall hole for having drilled through
Put and be defined by the complete card entry slot of inserted sheet 8;
6)Storage syringe 7 is turned by notch 4 to rotate, ensure that draw point 2 is all stabbed out outside nail barrel 1 after rotation using spanner;
7)Screw rod 5 is screwed into barrel 3, it is the 1/3 ~ 1/2 of screw rod 5 to be screwed into depth;
8)The angle lap pretreatment of dry-hung plate:Square dry-hung plate corner is carried out grinding the treatment for shelving angle;
9)Shelve dry-hung plate:To treat that cladding sheet material block-by-block is held on screw rod 5;
10)Blind nut 6 is turned using the screwdriver for matching so that screw rod 5 in barrel 3 to tightening:
11)The opposite joint of blind nut 6:Gap tendency according to dry-hung plate, blind nut 6 carries out cross, T words, right angle opposite joint;
12)The sealing of blind nut 6 is fixed:Sealing is carried out in the inner side of blind nut 6 instillation transparence instantaneous solidification liquid to fix.
Described blind nut 6 is provided with dental impression, and its road dental impression can be divided into three kinds:Cross road dental impression, T words road dental impression, right angle
Road dental impression.
Its a diameter of 0.8cm ~ 3cm of described nail barrel 1, length is 5cm ~ 22cm.
Described its row of multiple rows of draw point 2 is 4 ~ 12 rows, and the quantity of draw point 2 often arranged is 6 ~ 20.
The present invention is new construction technology, has abandoned pedestal pattern of traditional steelframe expansion welding as dry-hang stone,
The mode of pin type expansion in syringe is employed, the firm fixation of nail barrel 1 is realized, it is every according to the nail barrel 1 for actually calculating the design
Square centimeter can resist the pulling force of limiting value 65kg, this excellent pull resistance to meet the requirement of dry-hang stone from far away,
And the matrix of stone material dry suspending can select it is more preferably extensive.
Claims (4)
1. a kind of cladding component suitable for aerated concrete block work matter, described cladding component its be mainly configured with:Nail barrel
(1), draw point(2), barrel(3), notch(4), screw rod(5), blind nut(6), storage syringe(7), inserted sheet(8), it is characterised in that:Storage pin
Cylinder(7)On be fixed with multiple rows of draw point(2), store up syringe(7)Inside it is provided with notch(4), notch(4)Inside is provided with barrel(3);Nail barrel
(1)On be provided with and draw point(2)The hole that quantity, size match, nail barrel(1)Horizontal direction is welded with two panels inserted sheet at Single port
(8);Described screw rod(5)With barrel(3)Match, screw rod(5)One end is provided with blind nut(6), blind nut(6)It is provided with dental impression;
Described a kind of cladding component suitable for aerated concrete block work matter, it is characterised in that construction technology is:
1)Determine the material of dry-hanging wall wall matter:By the way of the perforate of surface, confirm that wall material is air-entrained concrete building block;
2)Setting-out is carried out to the particular location of wall surface dry-hang according to construction design drawing:By black mark-line ejected position;
3)Boring of electric hammer:Line line cross, T word joints according to black mark-line ejection are drilled, and hole is cleaned out after drilling
Interior dust;Drilling depth and aperture are according to design requirement;
4)Cutting machine cut groove:According to inserted sheet(8)Size, position carry out cutting groove on dry-hanging wall;
5)Area according to dry-hanging wall is carried out by batch placement nail barrel on the dry-hanging wall hole for having drilled through(1), placement depth,
Press inserted sheet in position(8)It is defined in complete card entry slot;
6)Notch is passed through using spanner(4)Turn storage syringe(7)Rotation, ensures draw point after rotation(2)All stab out nail barrel(1)
Outward;
7)By screw rod(5)It is screwed into barrel(3)It is interior, depth is screwed into for screw rod(5)1/3 ~ 1/2;
8)The angle lap pretreatment of dry-hung plate:Square dry-hung plate corner is carried out grinding the treatment for shelving angle;
9)Shelve dry-hung plate:To treat that cladding sheet material block-by-block is held on screw rod(5)On;
10)Blind nut is turned using the screwdriver for matching(6)So that screw rod(5)To barrel(3)Inside tighten:
11)Blind nut(6)Opposite joint:Gap tendency according to dry-hung plate, blind nut(6)Carry out cross, T words, right angle opposite joint;
12)Blind nut(6)Sealing is fixed:In blind nut(6)Inner side instillation transparence instantaneous solidification liquid carries out sealing and fixes.
2. a kind of cladding component suitable for aerated concrete block work matter according to claim 1, it is characterised in that institute
The blind nut stated(6)Dental impression is provided with, its road dental impression can be divided into three kinds:Cross road dental impression, T words road dental impression, right angle road dental impression.
3. a kind of cladding component suitable for aerated concrete block work matter according to claim 1, it is characterised in that institute
The nail barrel stated(1)Its a diameter of 0.8cm ~ 3cm, length is 5cm ~ 22cm.
4. a kind of cladding component suitable for aerated concrete block work matter according to claim 1, it is characterised in that institute
The multiple rows of draw point stated(2)Its row is 4 ~ 12 rows, the draw point often arranged(2)Quantity is 6 ~ 20.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710130674.7A CN106836576B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component suitable for aerated concrete block work matter |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710130674.7A CN106836576B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component suitable for aerated concrete block work matter |
CN201510366985.4A CN104929285B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component construction technology suitable for aerated concrete block work matter |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510366985.4A Division CN104929285B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component construction technology suitable for aerated concrete block work matter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106836576A true CN106836576A (en) | 2017-06-13 |
CN106836576B CN106836576B (en) | 2018-12-25 |
Family
ID=54116690
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710130674.7A Active CN106836576B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component suitable for aerated concrete block work matter |
CN201510366985.4A Active CN104929285B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component construction technology suitable for aerated concrete block work matter |
CN201810739961.2A Pending CN108797860A (en) | 2015-06-26 | 2015-06-26 | A kind of curtain wall face dry hanging construction method being fixed on concrete segment |
CN201710130691.0A Active CN106836577B (en) | 2015-06-26 | 2015-06-26 | A kind of method of building stone curtain wall dried hanging |
Family Applications After (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510366985.4A Active CN104929285B (en) | 2015-06-26 | 2015-06-26 | A kind of cladding component construction technology suitable for aerated concrete block work matter |
CN201810739961.2A Pending CN108797860A (en) | 2015-06-26 | 2015-06-26 | A kind of curtain wall face dry hanging construction method being fixed on concrete segment |
CN201710130691.0A Active CN106836577B (en) | 2015-06-26 | 2015-06-26 | A kind of method of building stone curtain wall dried hanging |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN106836576B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107327053B (en) * | 2016-03-28 | 2019-03-26 | 淮阴工学院 | Glue injection type horizontal push device and curtain wall installing structure |
CN108104335B (en) * | 2017-11-17 | 2023-10-20 | 苏州科技大学 | Assembled flexible dry hanging system of curtain wall |
CN113684976B (en) * | 2021-08-25 | 2022-09-23 | 重庆市渝海建设(集团)有限公司 | Roof waterproof structure and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2515712A1 (en) * | 1981-11-04 | 1983-05-06 | Hilti Ag | CARRIER PROFILE FOR FIXING WITH SPREADING OF FACADE COVERING ELEMENTS ON BUILDING PARTS |
CN2091378U (en) * | 1991-05-13 | 1991-12-25 | 陈彭江 | Divided expansion screw |
CN201241454Y (en) * | 2008-08-15 | 2009-05-20 | 张俊尧 | Non-keel dried hanging fastener |
CN103225642A (en) * | 2013-05-10 | 2013-07-31 | 江苏永昊高强度螺栓有限公司 | Internal forced ejection type anti-loose anti-skid expansion bolt |
DE102012101845A1 (en) * | 2012-03-06 | 2013-09-12 | Fischerwerke Gmbh & Co. Kg | Method for connecting facing formwork with anchorage base by dowel system, involves placing gauge in expansion dowel, and applying test load on gauge for checking holding force of expansion dowel in facing formwork |
CN203531309U (en) * | 2013-10-23 | 2014-04-09 | 华煜建设集团有限公司 | Hanging pasting component for large-specification tile |
CN203906478U (en) * | 2014-05-21 | 2014-10-29 | 中港长江建设工程有限公司 | Novel expansion bolt |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01256642A (en) * | 1988-04-07 | 1989-10-13 | Asahi Glass Kenzai Kk | Mounting structure for lightweight aerated concrete panel |
CN200993145Y (en) * | 2006-12-15 | 2007-12-19 | 陈姚建平 | Fast expansion screw |
CN201255163Y (en) * | 2008-09-12 | 2009-06-10 | 杨少华 | Suspension fixing clip type screw |
KR20140031062A (en) * | 2012-09-04 | 2014-03-12 | 기세진 | Anchor bolt |
CN202767272U (en) * | 2012-09-10 | 2013-03-06 | 虞新华 | Outer-wall external thermal insulation system formed by small heat preservation precast slab in assembly mode |
CN103967901B (en) * | 2014-05-21 | 2016-09-14 | 中港长江建设工程有限公司 | A kind of upset bolt |
-
2015
- 2015-06-26 CN CN201710130674.7A patent/CN106836576B/en active Active
- 2015-06-26 CN CN201510366985.4A patent/CN104929285B/en active Active
- 2015-06-26 CN CN201810739961.2A patent/CN108797860A/en active Pending
- 2015-06-26 CN CN201710130691.0A patent/CN106836577B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2515712A1 (en) * | 1981-11-04 | 1983-05-06 | Hilti Ag | CARRIER PROFILE FOR FIXING WITH SPREADING OF FACADE COVERING ELEMENTS ON BUILDING PARTS |
CN2091378U (en) * | 1991-05-13 | 1991-12-25 | 陈彭江 | Divided expansion screw |
CN201241454Y (en) * | 2008-08-15 | 2009-05-20 | 张俊尧 | Non-keel dried hanging fastener |
DE102012101845A1 (en) * | 2012-03-06 | 2013-09-12 | Fischerwerke Gmbh & Co. Kg | Method for connecting facing formwork with anchorage base by dowel system, involves placing gauge in expansion dowel, and applying test load on gauge for checking holding force of expansion dowel in facing formwork |
CN103225642A (en) * | 2013-05-10 | 2013-07-31 | 江苏永昊高强度螺栓有限公司 | Internal forced ejection type anti-loose anti-skid expansion bolt |
CN203531309U (en) * | 2013-10-23 | 2014-04-09 | 华煜建设集团有限公司 | Hanging pasting component for large-specification tile |
CN203906478U (en) * | 2014-05-21 | 2014-10-29 | 中港长江建设工程有限公司 | Novel expansion bolt |
Also Published As
Publication number | Publication date |
---|---|
CN106836576B (en) | 2018-12-25 |
CN106836577A (en) | 2017-06-13 |
CN104929285A (en) | 2015-09-23 |
CN106836577B (en) | 2019-01-11 |
CN108797860A (en) | 2018-11-13 |
CN104929285B (en) | 2017-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929285B (en) | A kind of cladding component construction technology suitable for aerated concrete block work matter | |
CN207177263U (en) | A kind of recyclable multi-functional pre-buried wall-connecting piece | |
CN206245663U (en) | Heavy terrace expansion joint connector | |
CN204715763U (en) | A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure | |
CN105178986B (en) | Variable curve mold for lining positioning of earth-sheltered dwelling and construction technology of variable-curve mold | |
CN104372923B (en) | Scaffolding | |
CN206319259U (en) | Suitable for the support system of assembled architecture and bridge construction | |
CN212428042U (en) | Scaffold and building body connection fixed knot construct | |
CN207332050U (en) | A kind of marble dried hanging hang structure | |
CN207160423U (en) | Full grout sleeve system and its sleeve holder | |
CN206128624U (en) | Complete wooden structural grouping instrument formula wall form system | |
CN205089332U (en) | Immature soil kiln occupies lining cutting location with variable curve mould | |
CN201460201U (en) | Module-connecting combined energy-saving thermal insulation wall construction formwork | |
CN205276578U (en) | Curtain point strutting arrangement | |
CN204609303U (en) | A kind of template split bolt device | |
CN206554510U (en) | Bolt assembly for improving architectural engineering concrete seam quality | |
CN103628649A (en) | Veneer anchoring component containing heat insulating material of concrete wall for construction | |
CN206545367U (en) | A kind of indoor flooring movement joint decoration device | |
CN213014749U (en) | Wall heat-insulating layer bracket | |
CN206801091U (en) | A kind of spring stress shore frame for repairing ancient wall | |
CN207484884U (en) | A kind of steel construction of skin dry hanging granite decorative panel | |
CN203654753U (en) | Dabbing device for concrete | |
CN206428936U (en) | A kind of wooden facing hanging plate fixed structure | |
CN214575440U (en) | Combined chamfering construction tool | |
CN204662981U (en) | Steel form shelf type suspension scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181108 Address after: 225117 Chaoyang East Road, Fang Xiang Town, Hanjiang District, Yangzhou, Jiangsu, 1 Applicant after: Jiangsu and the world energy saving Polytron Technologies Inc Address before: 312090 No. 462, Xiao Ku village, sun Duan Town, Yuecheng District, Shaoxing, Zhejiang Applicant before: Jin Guoxin |
|
GR01 | Patent grant | ||
GR01 | Patent grant |