CN212428042U - Scaffold and building body connection fixed knot construct - Google Patents
Scaffold and building body connection fixed knot construct Download PDFInfo
- Publication number
- CN212428042U CN212428042U CN202020716862.5U CN202020716862U CN212428042U CN 212428042 U CN212428042 U CN 212428042U CN 202020716862 U CN202020716862 U CN 202020716862U CN 212428042 U CN212428042 U CN 212428042U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- steel pipe
- building body
- screw rod
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold frame and building body coupling fixed knot construct, including the structure roof beam of each layer of the building body and the scaffold frame of buildding outside the structure roof beam, each layer of structure roof beam leaves a plurality of levels perforation hole when pouring in advance, and a plurality of connecting device are connected scaffold frame and structure roof beam through perforation hole and are fixed. The connecting device includes: a structural beam fixing piece and a steel pipe connecting piece; the utility model is convenient to disassemble and assemble and saves labor; parts of the connecting device can be reused, so that the cost is saved; the bolt pipe on the structural beam has small perforation diameter, and has small influence on the subsequent masonry wall of the building.
Description
Technical Field
The utility model relates to a scaffold frame and building body connection fixed knot construct.
Background
The external scaffold is a scaffold erected on the periphery of a building, is widely used and is mainly used for building external walls, decorating external facades and reinforcing concrete engineering. The scaffold is installed at the periphery of the building, and in order to keep the structure of the outer scaffold stable, the outer scaffold is required to be fixedly connected with the building. The traditional way is to vertically pre-embed one end of a steel pipe within a structural beam of a building, and then to connect the end of the pre-embedded steel pipe extending out of the structural beam as a fixed point with an external scaffold frame body through a horizontal steel pipe and a fastener. This conventional approach has several drawbacks: (1) the number of the pre-buried steel pipes is large, and the pre-buried steel pipes cannot be recycled after being used, so that great waste is caused. (2) When the subsequent infilled wall is built by laying bricks or stones, the embedded steel pipes extending out of the structural beam need to be cut off, and manual waste is caused. (3) When the embedded steel pipe is cut, the outer wall of a building is basically finished, the working space reserved for cutting the steel pipe is small, the use of a cutting tool is limited, the phenomenon that individual steel pipes are not completely cut exists, a large scaffold hole is reserved on the outer wall, and the hidden quality danger of water seepage of the outer wall exists.
Disclosure of Invention
The utility model provides a scaffold frame and building body coupling fixed knot construct guarantees to stabilize between outer scaffold frame and the building body structure roof beam and is connected to can used repeatedly.
The utility model provides a scaffold frame and building body connection fixed knot construct, includes the structure roof beam of each layer of the building body and the scaffold frame of putting up outside the structure roof beam, and each layer of structure roof beam leaves a plurality of horizontal through-holes in advance when pouring, and a plurality of connecting device are connected scaffold frame and structure roof beam through the through-hole and are fixed, connecting device includes: a structural beam fixing piece and a steel pipe connecting piece; the structure beam fixing part comprises a screw rod which horizontally penetrates through and extends out of beam surfaces on two sides of the structure beam, a radial pin hole is formed in the screw rod extending out of the beam surface on the inner side of the structure beam, a wedge-shaped penetrating pin matched with the radial pin hole penetrates through the pin hole and is attached to the beam surface on the inner side of the structure beam, and a locking nut is arranged on the screw rod extending out of the beam surface on the outer side of the structure beam; the locking nut is used for locking and fixing the screw rod and the structural beam after the wedge-shaped penetrating pin penetrates into the pin hole, the steel pipe connecting piece comprises a threaded connecting sleeve and a steel pipe connecting sleeve, the threaded connecting sleeve and the steel pipe connecting sleeve are of an integrated structure coaxially arranged, the threaded connecting sleeve is in threaded connection with the end of the screw rod extending out of the beam surface outside the structural beam, and the steel pipe connecting sleeve is fixedly connected and fixed with the scaffold and the structural beam in a distance-adjustable mode through sleeving and locking with the horizontal steel pipe of the scaffold.
The scheme is further as follows: the steel pipe connecting sleeve is fixedly locked by welding or penetrating a pin after being connected with the horizontal steel pipe of the scaffold.
The scheme is further as follows: the wedge-shaped through pin has an oblique angle of between 10 ° and 15 °.
The scheme is further as follows: elastic anti-slip gaskets are arranged between the wedge-shaped through pin, the locking nut and the beam surfaces on the two sides of the structural beam.
The scheme is further as follows: the length of the screw rod extending out of the outer side beam surface of the structural beam is not less than 50 cm.
The scheme is further as follows: the diameter of the screw is not less than 33 mm.
The utility model discloses an useful part is:
1. all parts of the connecting device of the utility model can be reused, thus saving cost;
2. the utility model is convenient to disassemble and assemble and saves labor;
3. the utility model discloses the bolt pipe perforation diameter on building structure roof beam is little, and is little to the follow-up wall influence of building by laying bricks or stones of building.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Detailed Description
A scaffold and building body connection fixed knot construct, as shown in figure 1, building body connection fixed knot construct including the structure roof beam 1 of each layer of the building body and the scaffold 2 of putting up outside the structure roof beam, each layer of structure roof beam leaves a plurality of horizontal through holes 101 in advance when pouring, and a plurality of connecting device are through penetrating the hole with scaffold and structure roof beam connection fixed, and figure 1 shows that one of them connecting device's connection relation structure, wherein: the connecting device includes: structural beam fixing piece, steel pipe connecting piece. The structure beam fixing part comprises a screw rod 3 which horizontally penetrates through and extends out of beam surfaces on two sides of the structure beam, the length of the screw rod extending out of the beam surface on the outer side of the structure beam is not less than 50 cm, and the diameter of the screw rod is not less than 33 mm. The screw rod extending out of the inner side beam surface of the structural beam is provided with a radial pin hole 301, the pin hole 301 is an axial long hole, a wedge-shaped penetrating pin 4 matched with the radial pin hole penetrates through the pin hole and is attached to the inner side beam surface of the structural beam, and the oblique angle of the wedge-shaped penetrating pin is 10-15 degrees. And a locking nut 5 is arranged on the screw rod extending out of the beam surface at the outer side of the structural beam. The locking nut 5 is used for locking and fixing the screw rod and the structural beam after the wedge-shaped penetrating pin 4 penetrates into the pin hole, and an elastic anti-skidding gasket 6 is arranged between the wedge-shaped penetrating pin 4, the locking nut 5 and beam surfaces on two sides of the structural beam. The steel pipe connecting piece comprises a threaded connecting sleeve 7 and a steel pipe connecting sleeve 8, and the threaded connecting sleeve and the steel pipe connecting sleeve are coaxially arranged to form an integral structure. The threaded connecting sleeve is in threaded connection with a screw rod end extending out of the beam surface on the outer side of the structural beam, and the steel pipe connecting sleeve is fixedly connected with a horizontal steel pipe 201 of the scaffold in a sleeved mode to be fixed and locked, so that the distance between the scaffold and the structural beam is adjustable.
Wherein: the steel pipe adapter sleeve is connected with scaffold horizontal steel pipe and is fixed the lock through welding or penetrating the pin after cup jointing, and this embodiment is the welding lock.
During construction:
the first step is as follows: and the screw is inserted into a plurality of horizontal through holes 101 reserved in advance during pouring of each layer of structural beam, and one end of the screw with the pin hole is positioned on the inner side of the building.
The second step is that: the elastic anti-slip gaskets are sleeved in from the left end and the right end of the screw rod.
The third step: and (4) penetrating the wedge-shaped penetrating pin into the pin hole, and attaching the right-angle surface of the wedge-shaped penetrating pin to the beam surface on the inner side of the building structural beam.
The fourth step: and screwing the locking nut into the screw rod from the end, extending out of the outer side of the structural beam, of the screw rod, and locking the structural beam fixing piece on the structural beam.
And fifthly, connecting and fixing the horizontal steel pipe of the scaffold welded with the steel pipe connecting piece with one end of the screw rod extending out of the outer side of the structural beam in a threaded manner.
And sixthly, connecting and fixing the horizontal steel pipe of the scaffold with other parts of the scaffold.
The embodiment has the advantages that:
1. all parts of the utility model can be repeatedly used, thus saving the cost;
2. the utility model is convenient to disassemble and assemble and saves labor;
3. the utility model discloses the bolt pipe perforation diameter on building structure roof beam is little, and is little to the follow-up wall influence of building by laying bricks or stones of building.
Claims (6)
1. The utility model provides a scaffold frame and building body connection fixed knot construct, includes the structure roof beam of each layer of the building body and the scaffold frame of putting up outside the structure roof beam, its characterized in that, each layer of structure roof beam leave a plurality of horizontal perforation holes in advance when pouring, and a plurality of connecting device are connected scaffold frame and structure roof beam through perforation hole and are fixed, connecting device includes: a structural beam fixing piece and a steel pipe connecting piece; the structure beam fixing part comprises a screw rod which horizontally penetrates through and extends out of beam surfaces on two sides of the structure beam, a radial pin hole is formed in the screw rod extending out of the beam surface on the inner side of the structure beam, a wedge-shaped penetrating pin matched with the radial pin hole penetrates through the pin hole and is attached to the beam surface on the inner side of the structure beam, and a locking nut is arranged on the screw rod extending out of the beam surface on the outer side of the structure beam; the locking nut is used for locking and fixing the screw rod and the structural beam after the wedge-shaped penetrating pin penetrates into the pin hole, the steel pipe connecting piece comprises a threaded connecting sleeve and a steel pipe connecting sleeve, the threaded connecting sleeve and the steel pipe connecting sleeve are of an integrated structure coaxially arranged, the threaded connecting sleeve is in threaded connection with the end of the screw rod extending out of the beam surface outside the structural beam, and the steel pipe connecting sleeve is fixedly connected and fixed with the scaffold and the structural beam in a distance-adjustable mode through sleeving and locking with the horizontal steel pipe of the scaffold.
2. The scaffold and building body connecting and fixing structure as claimed in claim 1, wherein the steel pipe connecting sleeves are fixedly locked by welding or penetrating pins after being sleeved with the horizontal steel pipes of the scaffold.
3. A scaffold to building connection fixation structure as claimed in claim 1, wherein the angle of inclination of the wedge-shaped through pin is between 10 ° and 15 °.
4. The scaffold and building connection and fixation structure as claimed in claim 1, wherein elastic anti-slip gaskets are disposed between the wedge-shaped through pin and the locking nut and between the structural beam and the beam faces on both sides.
5. The scaffold and building body connecting and fixing structure as claimed in claim 1, wherein the length of the screw extending out of the outer beam surface of the structural beam is not less than 50 cm.
6. The scaffold and building body connecting and fixing structure of claim 1, wherein the diameter of the screw is not less than 33 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020716862.5U CN212428042U (en) | 2020-05-06 | 2020-05-06 | Scaffold and building body connection fixed knot construct |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020716862.5U CN212428042U (en) | 2020-05-06 | 2020-05-06 | Scaffold and building body connection fixed knot construct |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212428042U true CN212428042U (en) | 2021-01-29 |
Family
ID=74288345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020716862.5U Active CN212428042U (en) | 2020-05-06 | 2020-05-06 | Scaffold and building body connection fixed knot construct |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212428042U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250429A (en) * | 2021-05-25 | 2021-08-13 | 晟通科技集团有限公司 | Connecting device and scaffold |
CN113585715A (en) * | 2021-08-17 | 2021-11-02 | 中国五冶集团有限公司 | Structure and construction method of bolt type connecting piece |
-
2020
- 2020-05-06 CN CN202020716862.5U patent/CN212428042U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250429A (en) * | 2021-05-25 | 2021-08-13 | 晟通科技集团有限公司 | Connecting device and scaffold |
CN113585715A (en) * | 2021-08-17 | 2021-11-02 | 中国五冶集团有限公司 | Structure and construction method of bolt type connecting piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212428042U (en) | Scaffold and building body connection fixed knot construct | |
CN205400024U (en) | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare | |
CN111236647A (en) | Constructional column oblique split bolt and construction method of fixed template thereof | |
JP2008127897A (en) | Mold holder, construction method of concrete structure using mold holder, and concrete structure constructed by the method | |
CN211257093U (en) | Underground cast-in-place structure outer wall post-cast strip template pre-supporting device | |
CN111851987B (en) | Construction method of attached short-limb I-shaped steel basket pull rod pull-knot type cantilever frame | |
CN215803201U (en) | Novel secondary structure constructional column template mounting | |
CN204402039U (en) | A kind of aluminum alloy mould plate system exterior wall straightening board member | |
CN212224604U (en) | Wall connecting assembly for connecting outer wall scaffold and wall structure | |
CN209837680U (en) | Reinforcing apparatus of tenon fourth of twelve earthly branches structure of cylindrical form board | |
CN104120874A (en) | Assembly type scaffold and wall connecting piece | |
CN204001665U (en) | A kind of scaffold assembling wall-connecting piece | |
CN110924997A (en) | Tunnel secondary lining crack trimming and reinforcing method | |
CN217053959U (en) | Telescopic superimposed sheet bottom plate of reinforcing bar retractable is established to board end | |
CN214575760U (en) | General base of floor formwork | |
CN214885416U (en) | Embedded wall connecting piece | |
CN213927514U (en) | Plug for two end parts of oppositely-pulling screw rod of building template | |
JP2009062775A (en) | Method of connecting and fixing wooden building members to each other | |
CN209179465U (en) | To pull-up screw rod wall-connecting piece | |
CN220365305U (en) | Constructional column template reinforcing tool | |
KR101424347B1 (en) | Shear anchor for joing new and old concrete and method for joining new and old concrete | |
CN112796505A (en) | Scaffold pre-buried sliding groove type wall connecting piece and construction method thereof | |
CN219196736U (en) | A template outer pull rod for construction | |
CN219509145U (en) | Wall body is built by laying bricks or stones and is had no scaffold eye construction structures | |
CN215055203U (en) | Screw type scaffold wall connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |