CN106835926A - 一种小边主跨比预应力混凝土连续梁桥及其施工方法 - Google Patents
一种小边主跨比预应力混凝土连续梁桥及其施工方法 Download PDFInfo
- Publication number
- CN106835926A CN106835926A CN201710088952.7A CN201710088952A CN106835926A CN 106835926 A CN106835926 A CN 106835926A CN 201710088952 A CN201710088952 A CN 201710088952A CN 106835926 A CN106835926 A CN 106835926A
- Authority
- CN
- China
- Prior art keywords
- end bay
- main span
- construction
- pier
- abutment pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D1/00—Bridges in general
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种小边主跨比预应力混凝土连续梁桥及其施工方法。本发明的技术要点是:该结构体系不设边跨合拢段,在边墩设置边墩拉压支座,其边主跨比值较小,为0.5~0.55;在边跨配置合理的边跨通长预应力筋,在边跨设置边跨永久配重段。施工时先在边跨施加临时配重,完成主跨合龙;再完成体系转换,并在主跨合理施加临时配重,边跨继续悬浇;最后在边跨边墩安装边墩拉压支座,且在边墩附近边跨箱梁内浇筑配重混凝土,完成边跨和全桥的施工。本发明通过合理的结构设计方案,取消常规设置的边跨现浇段和边跨合拢段,适用于不便于搭设边跨支架的预应力混凝土连续梁桥,为解决大跨预应力混凝土连续梁桥的施工难题提供新的设计思路。
Description
技术领域
本发明属于预应力混凝土连续梁桥技术领域,具体涉及一种小边主跨比预应力混凝土连续梁桥及其施工方法。
背景技术
预应力混凝土连续梁桥由于结构受力明确、跨越能力较大、行车舒适、造价低廉、且适用于多种施工方法,大量应用于我国已建或筹建的桥梁工程中。
目前,大跨预应力混凝土连续梁桥最大跨径已突破150m,一般采用对称悬浇法施工,边主跨比值一般为0.6~0.8,设有边跨合拢段、边跨支架现浇段和主跨合拢段。
目前,大跨预应力混凝土连续梁桥的施工流程为:(1)首先完成基础和桥墩的施工;(2)利用支架(或托架)浇筑零号块,并设置墩梁固结体系;(3)在零号块安装挂篮;(4)利用挂篮平台,对称悬浇后续各梁段至主跨最大悬臂状态;(5)搭设边跨支架(或托架),进行预压,安装边跨模板和钢筋,浇筑边跨现浇段;(6)张拉边跨预应力,拆除边跨满堂支架;(7)拆除墩梁临时固结体系,完成体系转换;(8)浇筑主跨合拢段,张拉主跨预应力;(9)施工桥面系,防撞护栏等附属设施;(10)完成全桥施工。
对于山区或者跨江跨河的深水区桥梁而言,边跨现浇段的支架或者托架搭设难度较大,支架预压、拆除施工亦极为不便。支架施工的风险较高,变形过大甚至垮塌的工程案例屡见不鲜。此外,边跨合拢段需要在边跨支架现浇段施工完毕之后再进行合拢,工序转换复杂,工期长。因此,现有大跨预应力混凝土连续梁桥施工时涉及边跨合拢段、边跨支架现浇段的施工,具有工期长、风险大和造价高的缺点。
发明内容
本发明的目的之一在于针对大跨预应力混凝土连续梁桥的上述施工难题,提供一种具有较好的安全性和经济性的小边主跨比预应力混凝土连续梁桥。
该小边主跨比预应力混凝土连续梁桥,包括基础、承台、主墩、边墩、主墩支座、主梁;其特征在于:该结构体系不设边跨合拢段,在边墩设置边墩拉压支座,其边主跨比值较小,为0.5~0.55;在边跨配置合理的边跨通长预应力筋,在边跨设置边跨永久配重段。
具体的,所述边跨设置的边跨永久配重段是采用在边墩附近边跨箱梁内浇筑配重混凝土或者是采用增大边墩支座附近截面以增大边跨的结构自重。
本发明的目的之二在于提供上述小边主跨比预应力混凝土连续梁桥的施工方法,该施工方法的特点是:施工时先在边跨施加临时配重,完成主跨合龙;再完成体系转换,在主跨合理施加临时配重,边跨继续悬浇;最后在边跨边墩安装边墩拉压支座,且在边墩附近边跨箱梁内浇筑配重混凝土,完成边跨和全桥的施工。
该施工方法包括如下具体步骤:
(1)桥梁基础及桥墩的施工;
(2)完成基础和桥墩施工后,利用支架或托架浇筑主墩零号块,并建立主墩墩梁临时固结体系;
(3)在零号块安装挂篮,对称悬浇1号块,张拉1号块预应力,按照此施工方式循环施工至最大悬臂节段,达到主跨最大悬臂状态;
(4)在边跨进行边跨临时配重的施工,利用挂篮为合拢平台,完成主跨合拢段浇筑,待强并张拉主跨预应力;
(5)在主跨预应力张拉完毕之后,进行体系转换,即拆除主墩墩梁临时固结体系,主墩支座处于工作状态;
(6)利用挂篮为合拢平台,在主跨进行主跨临时配重的施工,完成边跨全悬臂段的浇筑,待强并张拉边跨预应力;
(7)拆除挂篮和主跨临时配重,在边跨边墩安装边墩拉压支座,且在边墩附近边跨箱梁内浇筑配重混凝土,完成边跨永久配重段的施工;
(8)最后完成桥面铺装,防撞护栏等附属设施的施工。
本发明通过合理的结构设计方案,取消常规设置的边跨现浇段和边跨合拢段,辅以合理的施工方法,提出了一种小边主跨比预应力混凝土连续梁桥及其施工方法。本发明特别适用于不便于搭设边跨支架的预应力混凝土连续梁桥,可为解决大跨预应力混凝土连续梁桥的施工难题提供新的设计思路。
本发明的设计原理如下:
由上述可知,由于本发明的梁桥结构边主跨比较小,边跨自重较轻,因此在边跨需要进行配重。配重可采用灌注重度混凝土的措施,或者采用增大截面法,使边墩支座不出现或不致出现过大的拉力。
由边主跨比较小导致的另一个问题是,边跨主梁有可能在运营期间上翘。因此,在边墩设置拉压支座,使支座满足抗拉和抗压要求。同时应保证边墩支座在受拉状态时,边墩混凝土不致开裂。
本发明提出的上述梁桥结构体系,在施工和运营阶段均应满足《公路桥涵设计通用规范》(JTG D60-2015)、《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTG D62-2012)以及《公路桥涵施工技术规范》(JTG/T F50-2011)等相关行业规范要求。施工和运营阶段均应进行承载能力验算、预应力混凝土的应力验算、抗裂验算、变形计算、预应力损失验算及端部锚固区等方面的验算。
对于结构设计而言,承载力验算应使结构满足:
式中:γ0为结构的重要性系数,S和R分别为荷载效应和结构承载力的设计值;fd为材料强度设计值;为几何参数设计值。
对于结构应力验算,应分别考虑短暂状况和持久状况,需满足以下规范要求:
在短暂状况下,混凝土的压应力应满足:
式中:f′ck为制作、运输、安装各施工阶段的混凝土轴心抗压强度标准值,可按强度标准值表内查得到。
对于持久状况:
(1)预应力混凝土受弯主梁正截面混凝土的最大压应力满足:
σkc+σpt≤0.5fck;
式中:σkc为荷载标准值产生的混凝土法向压应力;σpt为预应力产生的混凝土法向拉应力;fck为混凝土轴心抗压强度标准值。
(2)受拉区预应力钢筋的最大拉应力限值:
对于钢绞线、钢丝:σpe+σp≤0.65fpk;
对于精轧螺纹钢:σpe+σp≤0.80fpk;
式中:σpe为受拉区预应力钢筋扣除全部预应力损失后的有效预应力;σp为荷载产生的预应力钢筋应力增量;fpk为预应力钢筋抗拉强度标准值。
(3)预应力混凝土受弯主梁正截面混凝土的主压应力σcp应满足σcp≤0.6fck。
对于施工设计而言,与传统的连续梁桥相比,由于本发明取消了边跨合拢段和支架现浇段,先进行主跨合拢段施工。在主跨合龙时,为保证施工安全,配重应满足弯矩平衡。对于施工阶段的挠度验算,应满足悬臂端的最大挠度不应超过悬臂长度的1/300。
附图说明
图1是本发明的成桥立面图。
图2是本发明的预应力筋配置示意图。
图3和图4是本发明的两种边墩附近箱梁横截面配重示意图。
图5至图11是本发明的具体施工流程示意图。
图12是本发明所涉及的结构体系详细设计施工流程框图。
图1至图11中,各部件标记是:1、基础;2、承台;3、主墩;4、边墩;5、主墩支座;6、主梁;7、边墩拉压支座;8、边跨永久配重段;9、边跨通长预应力筋;10、配重混凝土;11、增大截面;12、墩梁临时固结体系;13、零号块;14、挂篮;15、主跨最大悬臂节段;16、边跨临时配重;17、主跨合拢段;18、主跨临时配重;19、边跨全悬臂段。
具体实施方式
下面结合具体实施例和附图对本发明作进一步详细的描述。
如图1~图12所示,本实施例以一座主跨为150m,主跨合拢段为2m,边跨为77m,边主跨比为0.513的小边主跨比三跨连续梁桥为例,详细阐明本发明小边主跨比预应力混凝土连续梁桥及其施工方法。
参见图1、图2,本实施例的小边主跨比预应力混凝土连续梁桥,包括基础1、承台2、主墩3、边墩4、主墩支座5、主梁6;其边主跨比值较小,为0.513;在边墩4上设置边墩拉压支座7和边跨永久配重段8;在边跨配置经过检算合理的边跨通长预应力筋9,该配筋应满足使得结构在施工和使用阶段各种荷载作用下结构应力和位移满足规范要求。参见图3和图4,边跨永久配重段8可采用两种方式,图3所示是边跨永久配重段8采用在边跨箱梁内浇筑配重混凝土10的方式;图4所示是边跨永久配重段8采用增大边墩支座附近截面11以增大边跨的结构自重的方式。
参见图5至图11,本发明上述实施例的施工方法如下:
(1)参见图5,首先是桥梁基础1、承台2及主墩3、边墩4的施工。
(2)参见图6,完成下部结构施工后,利用支架或托架浇筑零号块13,并建立墩梁临时固结体系12。
(3)参见图7,在零号块安装挂篮14,对称悬浇1号块,张拉1号块预应力,按照此施工方式循环施工至主跨最大悬臂节段15,达到主跨最大悬臂状态。
(4)参见图8,在边跨进行边跨临时配重16的施工,利用挂篮14作为合拢平台,完成主跨合拢段17的浇筑,待强并张拉主跨预应力。
(5)参见图9,在主跨预应力张拉完毕之后,进行体系转换,即拆除墩梁临时固结体系12,主墩支座5处于工作状态。
(6)参见图10,利用挂篮为合拢平台,在主跨施加主跨临时(平衡)配重18,完成边跨全悬臂段19的浇筑,待强并张拉边跨预应力。
(7)参见图11,拆除挂篮14和主跨临时配重18,在边跨边墩安装边墩拉压支座7,且在边跨边墩附近箱梁内浇筑配重混凝土10,完成边跨永久配重段8的施工。
(8)最后完成桥面铺装,防撞护栏等附属设施的施工。
参见图12,是本发明所涉及的结构体系详细设计施工流程框图。
首先进行结构总体设计,主要包括主跨跨径,由小边主跨比控制的边跨跨径,再进行截面设计,主梁配筋、拉压支座以及配重设计。
然后对本发明的结构体系进行承载力设计与验算,确保其在施工以及运营过程中结构的刚度、强度和稳定性等各项设计指标均满足规范要求。
最后是施工流程设计,具体施工流程同图5~图11,在此不进行赘述。
以上所述仅为本发明的实施案例,并不用于限制本发明。对于本领域而言,本发明可有各种设计上的改变和变化。凡在本发明的精神和原则之内,所做的任何局部修改、局部改进和局部功能等同替换等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种小边主跨比预应力混凝土连续梁桥,包括基础、承台、主墩、边墩、主墩支座、主梁;其特征在于:该结构体系不设边跨合拢段,在边墩设置边墩拉压支座,其边主跨比值较小,为0.5~0.55;在边跨配置合理的边跨通长预应力筋,在边跨设置边跨永久配重段。
2.根据权利要求1所述的小边主跨比预应力混凝土连续梁桥,其特征在于:所述边跨设置的边跨永久配重段是采用在边墩附近边跨箱梁内浇筑配重混凝土。
3.根据权利要求1所述的小边主跨比预应力混凝土连续梁桥,其特征在于:所述边跨设置的边跨永久配重段是采用增大边墩支座附近截面以增大边跨的结构自重。
4.一种如权利要求1所述小边主跨比预应力混凝土连续梁桥的施工方法,其特征在于:施工时先在边跨施加临时配重,完成主跨合龙;再完成体系转换,在主跨合理施加临时配重,边跨继续悬浇;最后在边跨边墩安装边墩拉压支座,且在边墩附近边跨箱梁内浇筑配重混凝土,完成边跨和全桥的施工。
5.根据权利要求4所述小边主跨比预应力混凝土连续梁桥的施工方法,其特征在于:它包括如下具体步骤:
(1)桥梁基础及桥墩的施工;
(2)完成基础和桥墩施工后,利用支架或托架浇筑主墩零号块,并建立主墩墩梁临时固结体系;
(3)在零号块安装挂篮,对称悬浇1号块,张拉1号块预应力,按照此施工方式循环施工至最大悬臂节段,达到主跨最大悬臂状态;
(4)在边跨进行边跨临时配重的施工,利用挂篮为合拢平台,完成主跨合拢段浇筑,待强并张拉主跨预应力;
(5)在主跨预应力张拉完毕之后,进行体系转换,即拆除主墩墩梁临时固结体系,主墩支座处于工作状态;
(6)利用挂篮为合拢平台,在主跨进行主跨临时配重的施工,完成边跨全悬臂段的浇筑,待强并张拉边跨预应力;
(7)拆除挂篮和主跨临时配重,在边跨边墩安装边墩拉压支座,且在边墩附近边跨箱梁内浇筑配重混凝土,完成边跨永久配重段的施工;
(8)最后完成桥面铺装,防撞护栏等附属设施的施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710088952.7A CN106835926A (zh) | 2017-02-20 | 2017-02-20 | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710088952.7A CN106835926A (zh) | 2017-02-20 | 2017-02-20 | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106835926A true CN106835926A (zh) | 2017-06-13 |
Family
ID=59128625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710088952.7A Pending CN106835926A (zh) | 2017-02-20 | 2017-02-20 | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106835926A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724244A (zh) * | 2017-10-26 | 2018-02-23 | 中铁第四勘察设计院集团有限公司 | 无支座连续刚构边跨梁段组成的临时t构及其施工方法 |
CN108108565A (zh) * | 2017-12-29 | 2018-06-01 | 中铁二局第工程有限公司 | 基于软件辅助设计的边跨现浇段无配重支架施工方法 |
CN110172927A (zh) * | 2019-07-09 | 2019-08-27 | 招商局重庆交通科研设计院有限公司 | 预应力混凝土连续梁桥和连续刚构的跨中合拢段施工方法 |
CN111364377A (zh) * | 2020-03-12 | 2020-07-03 | 中铁大桥局武汉桥梁特种技术有限公司 | 一种混凝土连续梁桥改造施工方法 |
CN111636310A (zh) * | 2020-06-22 | 2020-09-08 | 中铁二十三局集团第三工程有限公司 | 不对称斜拉桥压重混凝土施工方法 |
CN113073560A (zh) * | 2021-03-18 | 2021-07-06 | 中铁大桥局集团有限公司 | 一种连续梁边跨无合龙段的直线段吊架装置及施工方法 |
CN113722801A (zh) * | 2021-09-07 | 2021-11-30 | 中国铁路设计集团有限公司 | 一种智能生成悬浇法混凝土梁桥施工阶段的方法 |
CN115162138A (zh) * | 2022-07-07 | 2022-10-11 | 中铁二院工程集团有限责任公司 | 一种连续梁构造及其施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1580413A (zh) * | 2003-08-08 | 2005-02-16 | 北京建达道桥咨询有限公司 | 无落地支架的连续刚构桥边跨合拢的方法 |
CN102518046A (zh) * | 2011-12-29 | 2012-06-27 | 广东冠粤路桥有限公司 | 一种消除悬臂施工连续梁的支座沉陷次内力的方法 |
KR20120117362A (ko) * | 2011-04-15 | 2012-10-24 | 브이에스엘코리아 주식회사 | 이동식 작업차와 이동식 작업차를 이용한 교량의 시공 방법 |
CN104727231A (zh) * | 2015-04-03 | 2015-06-24 | 中铁第五勘察设计院集团有限公司 | 悬臂灌注法施工连续梁及连续刚构桥几何参数结构 |
-
2017
- 2017-02-20 CN CN201710088952.7A patent/CN106835926A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1580413A (zh) * | 2003-08-08 | 2005-02-16 | 北京建达道桥咨询有限公司 | 无落地支架的连续刚构桥边跨合拢的方法 |
KR20120117362A (ko) * | 2011-04-15 | 2012-10-24 | 브이에스엘코리아 주식회사 | 이동식 작업차와 이동식 작업차를 이용한 교량의 시공 방법 |
CN102518046A (zh) * | 2011-12-29 | 2012-06-27 | 广东冠粤路桥有限公司 | 一种消除悬臂施工连续梁的支座沉陷次内力的方法 |
CN104727231A (zh) * | 2015-04-03 | 2015-06-24 | 中铁第五勘察设计院集团有限公司 | 悬臂灌注法施工连续梁及连续刚构桥几何参数结构 |
Non-Patent Citations (1)
Title |
---|
吴鑫淼等: "《桥梁工程》", 31 May 2013 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724244A (zh) * | 2017-10-26 | 2018-02-23 | 中铁第四勘察设计院集团有限公司 | 无支座连续刚构边跨梁段组成的临时t构及其施工方法 |
CN108108565A (zh) * | 2017-12-29 | 2018-06-01 | 中铁二局第工程有限公司 | 基于软件辅助设计的边跨现浇段无配重支架施工方法 |
CN110172927A (zh) * | 2019-07-09 | 2019-08-27 | 招商局重庆交通科研设计院有限公司 | 预应力混凝土连续梁桥和连续刚构的跨中合拢段施工方法 |
CN111364377A (zh) * | 2020-03-12 | 2020-07-03 | 中铁大桥局武汉桥梁特种技术有限公司 | 一种混凝土连续梁桥改造施工方法 |
CN111364377B (zh) * | 2020-03-12 | 2021-08-27 | 中铁大桥局武汉桥梁特种技术有限公司 | 一种混凝土连续梁桥改造施工方法 |
CN111636310A (zh) * | 2020-06-22 | 2020-09-08 | 中铁二十三局集团第三工程有限公司 | 不对称斜拉桥压重混凝土施工方法 |
CN111636310B (zh) * | 2020-06-22 | 2022-01-25 | 中铁二十三局集团第三工程有限公司 | 不对称斜拉桥压重混凝土施工方法 |
CN113073560A (zh) * | 2021-03-18 | 2021-07-06 | 中铁大桥局集团有限公司 | 一种连续梁边跨无合龙段的直线段吊架装置及施工方法 |
CN113722801A (zh) * | 2021-09-07 | 2021-11-30 | 中国铁路设计集团有限公司 | 一种智能生成悬浇法混凝土梁桥施工阶段的方法 |
CN115162138A (zh) * | 2022-07-07 | 2022-10-11 | 中铁二院工程集团有限责任公司 | 一种连续梁构造及其施工方法 |
CN115162138B (zh) * | 2022-07-07 | 2024-05-14 | 中铁二院工程集团有限责任公司 | 一种连续梁构造及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106835926A (zh) | 一种小边主跨比预应力混凝土连续梁桥及其施工方法 | |
Hurst | Prestressed concrete design | |
Maya et al. | Experimental assessment of connections for precast concrete frames using ultra high performance fibre reinforced concrete | |
Lin et al. | Fatigue tests on straight steel–concrete composite beams subjected to hogging moment | |
CN106758871A (zh) | 一种全悬臂施工预应力混凝土连续刚构桥及其施工方法 | |
CN106906733A (zh) | 一种无边跨合龙段小边主跨比连续刚构桥及其施工方法 | |
CN106894347B (zh) | 一种基于现浇整体化层调坡的拼接桥及桥梁改扩建方法 | |
CN102168405A (zh) | 矮塔斜拉桥钢混混合y形塔施工工法 | |
CN103966953B (zh) | 基于无粘结钢绞线预应力后张的大跨度混凝土梁施工方法 | |
CN106012791B (zh) | 三跨波腹工梁‑横波‑三钢砼组合t型连续梁 | |
Deng et al. | Experimental study on asynchronous construction for composite bridges with corrugated steel webs | |
Yao et al. | Mechanical behavior of an innovative steel–concrete joint for long-span railway hybrid box girder cable-stayed bridges | |
Hanna et al. | Adjacent box girders without internal diaphragms or posttensioned joints. | |
Gao et al. | Shear-slip behaviour of prefabricated composite shear stud connectors in composite bridges | |
Valipour et al. | Arching behaviour of precast concrete slabs in a deconstructable composite bridge deck | |
Zhou et al. | Transverse analysis of full-scale precast segmental box girder segments with corrugated steel webs: experimental tests and FE modelling | |
CN111797449B (zh) | 分层浇筑混凝土梁合理高度的判断方法 | |
CN206887771U (zh) | 一种小跨径板梁施工平台结构 | |
CN111625895A (zh) | 支架不均匀沉降混凝土梁的受力安全判断方法 | |
Shin | Ultra-high performance concrete (UHCP) precast segmental bridges | |
CN112069584B (zh) | 一种铁路用延性构造墩的设计方法 | |
CN111563344B (zh) | 分层浇筑混凝土首层梁受力安全判断方法 | |
Hu et al. | Experimental research and numerical analysis on mechanical behavior of lightweight-design precast bent caps with large cantilevers | |
CN110080461A (zh) | 一种预应力再生混凝土空腹叠合梁 | |
Vineeth et al. | Design Concept of Pre-Stressed Balanced Cantilever Segmental Bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |