CN106812160B - 一种建筑基坑作业的装置 - Google Patents

一种建筑基坑作业的装置 Download PDF

Info

Publication number
CN106812160B
CN106812160B CN201710154967.9A CN201710154967A CN106812160B CN 106812160 B CN106812160 B CN 106812160B CN 201710154967 A CN201710154967 A CN 201710154967A CN 106812160 B CN106812160 B CN 106812160B
Authority
CN
China
Prior art keywords
suspender belt
crossbeam
present
crossbeams
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710154967.9A
Other languages
English (en)
Other versions
CN106812160A (zh
Inventor
陈谨青
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongchuang International Construction Group Co., Ltd.
Original Assignee
Sichuan Jiexin Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jiexin Construction Engineering Co Ltd filed Critical Sichuan Jiexin Construction Engineering Co Ltd
Priority to CN201710154967.9A priority Critical patent/CN106812160B/zh
Publication of CN106812160A publication Critical patent/CN106812160A/zh
Application granted granted Critical
Publication of CN106812160B publication Critical patent/CN106812160B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/305Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables specially adapted for tanks, silos or similar vessels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Abstract

本发明公开了一种建筑基坑作业的装置,其特征在于包括两根横梁和吊带,吊带两端分别连接在两根横梁的中段,横梁的两端设有定位钎;本发明使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时作业人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。

Description

一种建筑基坑作业的装置
本申请是申请日为2015年11月16日,申请号为2015107803157,发明名称为“悬吊式基坑作业装置”的专利的分案申请。
技术领域
本发明涉及一种野外作业的装置,特别是一种建筑基坑作业的装置。
背景技术
现代文明发展至今,人类仍在不倦的探索世界,试图揭开远古未被记载的历史,了解世界的起源,只有了解了过去才会更好的创造未来,这些都要靠考古来实现,随着国家对这方面投入的增加,我国的的考古事业正在快速发展和壮大。在社会大建设的推进过程中,大拆大建使得大量地下文明被发现,如果来不及考古开发记录这些文明很快就会被破坏,这样考古学者就必须第一时间兵分多路去挖掘考查,然而由于挖坑设备,不可能每个考察点都备齐所有考古设备,如在挖坑时站在坑里挖,会破坏坑里的文物,但又不能像重要挖掘点那样每个小坑都配备吊车,这也是不现实的,这对考古效率和效果都是有影响的,这些问题仍有待于进一步的解决。
在建筑施工工地的基坑作业的,市政工程的下水管道的井坑作业上,野外勘探的井坑作业上,以及采矿的井坑作业上,都会存在坑壁和坑内地面由于各种原因不能踩踏的问题,这些问题仍有待于进一步的解决。
发明内容
为了解决上述问题,本发明提供了一种建筑基坑作业的装置。
本发明采用的技术方案为:一种建筑基坑作业的装置,其特征在于包括两根横梁和吊带,吊带两端分别连接在两根横梁的中段,横梁的两端设有定位钎。
本发明也可以说是一种悬吊式考古坑作业装置,所述每根横梁上套设有套管,套管与横梁之间设有滚珠或滚轮,横梁上设有滚珠或滚轮滚动的轨道。
本发明也可以说是一种吊带式入坑作业设备,所述每根横梁上套设有两段套管,吊带为两条,两条吊带分别与两根横梁上的同侧套管连接。
进一步的,所述横梁为中空管,中空管侧壁中段设有纵向豁口,中空管内设有与其同轴的滑动杆,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接。
进一步的,所述每根横梁中空管内设有两段滑动杆,吊带为两条,两条吊带分别与两根横梁内的同侧滑动杆连接。
进一步的,所述滑动杆两端分别设有定位孔,配合定位孔设有固定钎。
进一步的,所述滑动杆上连接有两条吊带。
进一步的,所述两条吊带中其中一条较另一条长。
进一步的,所述吊带长度方向上的中线两侧分别分布有绑带。
进一步的,所述吊带长度方向上的中线两侧分别设有可以挂接的挂钩和挂环。
本发明可以说是一种建筑基坑作业的机械,是可以广泛应用在建筑施工工地作业的机械。
本发明还可以应用在市政工程的下水管道的井坑作业上,是一种市政工程的下水管的作业设备。
本发明还可以应用在野外勘探的井坑作业上,是一种野外勘探的作业设备。
本发明还可以应用在采矿的井坑作业上,是一种矿井的作业设备。
本发明使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时作业人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。
附图说明
图1为本发明实施例一整体结构示意图。
图2为本发明实施例二整体结构示意图。
图3为本发明实施例二剖视结构示意图及局部放大图。
图4为本发明实施例三剖视结构示意图。
图5为本发明实施例四整体结构示意图。
图6为本发明实施例五整体结构示意图。
图7为本发明实施例五剖视结构示意图及局部放大图。
图8为本发明实施例六剖视结构示意图。
图中标号名称:1横梁;2吊带;3定位钎;4套管;5滚珠;6滚轮;7纵向豁口;8滑动杆;9定位孔。
具体实施方式
本发明实施例一如图1所示,该建筑基坑作业的装置,包括两根横梁1和吊带2,吊带两端分别固定连接在两根横梁的中段,横梁的两端设有定位钎3;本实施例使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时考查人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。
本发明实施例二如图2、3所示,该建筑基坑作业的装置,每根横梁上套设有套管4,套管与横梁之间设有滚珠5,横梁和套管上均设有滚珠滚动的轨道,使用时吊带可以纵向移动,更便于操作,实施时也可以在套管上连接两条吊带。
本发明实施例三如图4所示,该建筑基坑作业的装置与实施例二不同之处在于滚珠用滚轮6代替,同样可以使套管在横梁上滑动。
本发明实施例四如图5所示,该建筑基坑作业的装置每根横梁上套设有两段套管,吊带为两条,两条吊带分别与两根横梁上的同侧套管连接,两条吊带中其中一条较另一条长,可以适应不同高度工作面作业,而且两个吊带间距可调,可两人操作,更便捷,实施时两条吊带也可以同样高度。
本发明实施例五如图6、7所示,该建筑基坑作业的装置横梁为中空管,中空管侧壁中段设有纵向豁口7,中空管内设有与其同轴的滑动杆8,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接,滑动杆两端分别设有定位孔9,配合定位孔设有固定钎;本实施例使用时横梁固定在坑口,滑动杆移动可以使吊带纵向移动,移动到适当位置后可以用定位钎由定位孔插入底面进行定位,更平稳,该滑杆上也可以连接两条乃至更多吊带,满足更多工位的需求。
本发明实施例六如图8所示,该建筑基坑作业的装置每根横梁中空管内设有两段滑动杆,吊带为两条,两条吊带分别与两根横梁内的同侧滑动杆连接,两吊带可以单独滑动,更便于使用。
实施时,还可在吊带长度方向上的中线两侧分别分布有绑带,或在吊带长度方向上的中线两侧分别设有可以挂接的挂钩和挂环,这样吊带就可以通过挂钩与挂环挂接、绑带与绑带绑结使吊带折叠或堆积,调节长度,适应更深坑的挖掘;定位钎还可为折叠结构便于收纳。
综上所述仅为本发明具体实施例,但并不局限于实施例,还可各技术特征重新组合更多实现方式,凡在不脱离本发明构思的情况下,依本申请所做的等效修饰和现有技术添加均视为本发明技术范畴。

Claims (1)

1.一种建筑基坑作业的装置,其特征在于包括两根横梁和吊带,横梁的两端设有定位钎;所述横梁为中空管,中空管侧壁中段设有纵向豁口,中空管内设有与其同轴的滑动杆,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接;每根横梁中空管内设有两段滑动杆,吊带为两条,两条吊带分别与两根横梁内的同侧滑动杆连接,两条吊带中其中一条较另一条长。
CN201710154967.9A 2015-11-16 2015-11-16 一种建筑基坑作业的装置 Active CN106812160B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710154967.9A CN106812160B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业的装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201510780315.7A CN105275023B (zh) 2015-11-16 2015-11-16 悬吊式基坑作业装置
CN201710154967.9A CN106812160B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业的装置

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510780315.7A Division CN105275023B (zh) 2015-11-16 2015-11-16 悬吊式基坑作业装置

Publications (2)

Publication Number Publication Date
CN106812160A CN106812160A (zh) 2017-06-09
CN106812160B true CN106812160B (zh) 2019-03-26

Family

ID=55144780

Family Applications (10)

Application Number Title Priority Date Filing Date
CN201710154871.2A Pending CN106894623A (zh) 2015-11-16 2015-11-16 矿井的井下作业设备
CN201710154872.7A Active CN106930332B (zh) 2015-11-16 2015-11-16 吊带式基坑作业设备
CN201710154824.8A Active CN106759369B (zh) 2015-11-16 2015-11-16 一种野外勘探的作业设备
CN201710154823.3A Active CN106759368B (zh) 2015-11-16 2015-11-16 一种矿井的作业设备
CN201710154969.8A Active CN106894419B (zh) 2015-11-16 2015-11-16 野外勘探的基坑作业设备
CN201710154825.2A Active CN106759370B (zh) 2015-11-16 2015-11-16 一种市政工程的下水管的坑道作业设备
CN201710154873.1A Pending CN106894624A (zh) 2015-11-16 2015-11-16 建筑施工的基坑作业装置
CN201510780315.7A Active CN105275023B (zh) 2015-11-16 2015-11-16 悬吊式基坑作业装置
CN201710154967.9A Active CN106812160B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业的装置
CN201710154968.3A Active CN106812161B (zh) 2015-11-16 2015-11-16 一种吊带式建筑基坑作业设备

Family Applications Before (8)

Application Number Title Priority Date Filing Date
CN201710154871.2A Pending CN106894623A (zh) 2015-11-16 2015-11-16 矿井的井下作业设备
CN201710154872.7A Active CN106930332B (zh) 2015-11-16 2015-11-16 吊带式基坑作业设备
CN201710154824.8A Active CN106759369B (zh) 2015-11-16 2015-11-16 一种野外勘探的作业设备
CN201710154823.3A Active CN106759368B (zh) 2015-11-16 2015-11-16 一种矿井的作业设备
CN201710154969.8A Active CN106894419B (zh) 2015-11-16 2015-11-16 野外勘探的基坑作业设备
CN201710154825.2A Active CN106759370B (zh) 2015-11-16 2015-11-16 一种市政工程的下水管的坑道作业设备
CN201710154873.1A Pending CN106894624A (zh) 2015-11-16 2015-11-16 建筑施工的基坑作业装置
CN201510780315.7A Active CN105275023B (zh) 2015-11-16 2015-11-16 悬吊式基坑作业装置

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710154968.3A Active CN106812161B (zh) 2015-11-16 2015-11-16 一种吊带式建筑基坑作业设备

Country Status (1)

Country Link
CN (10) CN106894623A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
CN2575352Y (zh) * 2002-10-29 2003-09-24 蔡盛忠 变距接杆
CN101898715A (zh) * 2010-06-30 2010-12-01 中煤第五建设有限公司 立井井筒吊桶
CN102251742A (zh) * 2011-05-16 2011-11-23 王万兴 工作面板及具有该工作面板的工作平台梯
CN202520316U (zh) * 2012-04-13 2012-11-07 中铁十七局集团第三工程有限公司 隧道竖井施工用悬吊式安全隔离装置
CN103754750A (zh) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 吊具
CN203596548U (zh) * 2013-10-23 2014-05-14 国家电网公司 输电线路防震锤更换作业工具

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007126862A (ja) * 2005-11-02 2007-05-24 Fuji Shoji Kk 建築物用の水害・雪害および土砂災害対策構造
CN201362556Y (zh) * 2009-01-09 2009-12-16 中建三局建设工程股份有限公司 一种土方吊运装置
CN201524360U (zh) * 2009-09-29 2010-07-14 武汉胜发机电研究所 自动升降高楼烈火逃生器
CN202687753U (zh) * 2012-05-24 2013-01-23 福建祥锦实业有限公司 一种盘头起吊装置
JP5978081B2 (ja) * 2012-09-19 2016-08-24 樋脇 就三 切断機
CN203079512U (zh) * 2013-01-16 2013-07-24 马晓锋 一种折叠式吊具
CN203755638U (zh) * 2014-01-26 2014-08-06 中铁建工集团有限公司 吊挂滑移式高空倒斜面作业吊篮
CN203889878U (zh) * 2014-04-23 2014-10-22 中建一局钢结构工程有限公司 彩钢板垂直运输工具
CN204125032U (zh) * 2014-09-01 2015-01-28 浙江尚鼎工业炉有限公司 一种料具吊装机构
CN204645580U (zh) * 2015-05-17 2015-09-16 高伟 一种建筑吊架

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB930552A (en) * 1958-12-04 1963-07-03 Gutehoffnungshuette Sterkrade Improvements relating to guides for mine or other shafts
CN2575352Y (zh) * 2002-10-29 2003-09-24 蔡盛忠 变距接杆
CN101898715A (zh) * 2010-06-30 2010-12-01 中煤第五建设有限公司 立井井筒吊桶
CN102251742A (zh) * 2011-05-16 2011-11-23 王万兴 工作面板及具有该工作面板的工作平台梯
CN202520316U (zh) * 2012-04-13 2012-11-07 中铁十七局集团第三工程有限公司 隧道竖井施工用悬吊式安全隔离装置
CN203596548U (zh) * 2013-10-23 2014-05-14 国家电网公司 输电线路防震锤更换作业工具
CN103754750A (zh) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 吊具

Also Published As

Publication number Publication date
CN106894623A (zh) 2017-06-27
CN106759369B (zh) 2019-01-11
CN106894419A (zh) 2017-06-27
CN106894419B (zh) 2019-01-08
CN106759368B (zh) 2018-12-18
CN106759368A (zh) 2017-05-31
CN106759370B (zh) 2019-02-12
CN106812161B (zh) 2019-01-08
CN106812161A (zh) 2017-06-09
CN106759370A (zh) 2017-05-31
CN106930332B (zh) 2019-01-25
CN105275023B (zh) 2017-12-12
CN105275023A (zh) 2016-01-27
CN106930332A (zh) 2017-07-07
CN106759369A (zh) 2017-05-31
CN106812160A (zh) 2017-06-09
CN106894624A (zh) 2017-06-27

Similar Documents

Publication Publication Date Title
CN104210960A (zh) 一种龙门吊
CN106812160B (zh) 一种建筑基坑作业的装置
CN206386085U (zh) 一种煤矿用钻孔装置
EP2351903A3 (de) Verfahren und Anordnung zum Herstellen und/oder Aufweiten einer Erdbohrung
CN203144059U (zh) 后顶撑式活络头
CN105275022B (zh) 一种建筑基坑作业装置
CN205977086U (zh) 一种用于综合管廊管道支架的爬梯
CN205838507U (zh) 一种电力工程用撬棍
CN109668747B (zh) 机械法联络通道掘进机接收模型试验平台及其试验方法
Klais et al. The Grautschenhof contract–Construction of an intermediate access under complex local conditions: Das Baulos Grautschenhof–Errichtung eines Zwischenangriffs unter komplexen Randbedingungen
CN104330830B (zh) 一种磁性体顶面埋深预测方法及装置
CN203978470U (zh) 一种可移动的液压支架支护装置
CN205204778U (zh) 一种悬吊式考古坑作业装置
CN204924829U (zh) 植物生长土壤硬度监测装置
CN107035317A (zh) 一种新型钻探装置
CN203728481U (zh) 一种液压三角顶破障装置
CN206769807U (zh) 一种新型钻探装置
CN204804874U (zh) 一种矿难救助机器人列车
CN216588614U (zh) 适用于新开救援隧道时的排土装置
CN207375621U (zh) 一种用于升压站机舱移动式行车的行走机构
CN209177923U (zh) 三维工作台防坠落装置
CN107780844A (zh) 一种可调节锚杆钻机底盘
DE920540C (de) Antrieb fuer Foerderbaender, insbesondere fuer Stahlgliederbaender
CN104210941A (zh) 新型龙门吊
CN205740247U (zh) 一种三维移动升降平台

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181227

Address after: 610031 No. 1-1-2, 28 Yinsha Nanjie, Jinniu District, Chengdu City, Sichuan Province

Applicant after: Sichuan Jiexin Construction Engineering Co. Ltd.

Address before: 330003 song Bai lane, Xihu District, Nanchang, Jiangxi Province, No. 47

Applicant before: Wu Min

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 1405, floor 14, unit 1, building 15, No. 293, Section 2, rongbei Commercial Avenue, Jinniu District, Chengdu City, Sichuan Province

Patentee after: Zhongchuang International Construction Group Co., Ltd.

Address before: 610031 No. 1-1-2, 28 Yinsha Nanjie, Jinniu District, Chengdu City, Sichuan Province

Patentee before: Sichuan Jiexin Construction Engineering Co., Ltd.

CP03 Change of name, title or address