CN105275022B - 一种建筑基坑作业装置 - Google Patents
一种建筑基坑作业装置 Download PDFInfo
- Publication number
- CN105275022B CN105275022B CN201510778601.XA CN201510778601A CN105275022B CN 105275022 B CN105275022 B CN 105275022B CN 201510778601 A CN201510778601 A CN 201510778601A CN 105275022 B CN105275022 B CN 105275022B
- Authority
- CN
- China
- Prior art keywords
- suspender belt
- crossbeam
- crossbeams
- present
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510778601.XA CN105275022B (zh) | 2015-11-16 | 2015-11-16 | 一种建筑基坑作业装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510778601.XA CN105275022B (zh) | 2015-11-16 | 2015-11-16 | 一种建筑基坑作业装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105275022A CN105275022A (zh) | 2016-01-27 |
CN105275022B true CN105275022B (zh) | 2017-10-31 |
Family
ID=55144779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510778601.XA Expired - Fee Related CN105275022B (zh) | 2015-11-16 | 2015-11-16 | 一种建筑基坑作业装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105275022B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2575352Y (zh) * | 2002-10-29 | 2003-09-24 | 蔡盛忠 | 变距接杆 |
JP2007126862A (ja) * | 2005-11-02 | 2007-05-24 | Fuji Shoji Kk | 建築物用の水害・雪害および土砂災害対策構造 |
CN203079512U (zh) * | 2013-01-16 | 2013-07-24 | 马晓锋 | 一种折叠式吊具 |
CN203755638U (zh) * | 2014-01-26 | 2014-08-06 | 中铁建工集团有限公司 | 吊挂滑移式高空倒斜面作业吊篮 |
-
2015
- 2015-11-16 CN CN201510778601.XA patent/CN105275022B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2575352Y (zh) * | 2002-10-29 | 2003-09-24 | 蔡盛忠 | 变距接杆 |
JP2007126862A (ja) * | 2005-11-02 | 2007-05-24 | Fuji Shoji Kk | 建築物用の水害・雪害および土砂災害対策構造 |
CN203079512U (zh) * | 2013-01-16 | 2013-07-24 | 马晓锋 | 一种折叠式吊具 |
CN203755638U (zh) * | 2014-01-26 | 2014-08-06 | 中铁建工集团有限公司 | 吊挂滑移式高空倒斜面作业吊篮 |
Non-Patent Citations (1)
Title |
---|
张军.采用万能杆件悬吊保护横穿基坑的 1.8m给水管施工技术.《隧道建设》.2013,第33卷(第6期),第521-524页. * |
Also Published As
Publication number | Publication date |
---|---|
CN105275022A (zh) | 2016-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104863597B (zh) | 一种浅埋暗挖大型地下空间的施工方法‑横向洞盖法 | |
CN205024717U (zh) | 一种城市综合管廊沉管段的施工装置 | |
CN105275022B (zh) | 一种建筑基坑作业装置 | |
CN105275023B (zh) | 悬吊式基坑作业装置 | |
CN106639893A (zh) | 一种可调节锚杆钻机底盘 | |
CN108252218A (zh) | 一种大跨度提篮拱桥钢拱肋外包混凝土底模滑移装置 | |
CN203702002U (zh) | 一种简易双向快速滑动架 | |
CN205204778U (zh) | 一种悬吊式考古坑作业装置 | |
CN203878588U (zh) | 一种方便调节长度及方向的混凝土漏斗溜槽装置 | |
Klais et al. | The Grautschenhof contract–Construction of an intermediate access under complex local conditions: Das Baulos Grautschenhof–Errichtung eines Zwischenangriffs unter komplexen Randbedingungen | |
CN205134332U (zh) | 市政排水管线坑槽支护结构 | |
CN212951717U (zh) | 顶管安装管道承托滑动设备 | |
CN109915185B (zh) | 一种tbm中板过站支架体系 | |
CN208362942U (zh) | 现浇箱涵模板支撑架整体移动式施工结构 | |
CN203992473U (zh) | 一种钻孔机构 | |
CN209369865U (zh) | 一种被保护层瓦斯抽采结构 | |
CN206487410U (zh) | 一种钻进机构及小型埋管设备 | |
CN107762400B (zh) | 地下工程洞桩施工用前后位移式低净空钻机 | |
CN207746616U (zh) | 管道焊口组对装置 | |
CN213360015U (zh) | 一种管线施工定向牵引装置 | |
CN211225836U (zh) | 一种可拆卸自适应测斜管安装装置 | |
CN204782723U (zh) | 用于工井内的爬梯 | |
CN204387484U (zh) | 一种管道发送轮组 | |
CN206513304U (zh) | 可移动式冲击钻机施工平台 | |
CN205078915U (zh) | 一种顶管施工用出渣小车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Mingping Inventor after: Zhou Qizhi Inventor after: Zhang Kegang Inventor after: Zhang Zumin Inventor after: Zhou Jun Inventor before: The inventor has waived the right to be mentioned |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20170926 Address after: 11-1-69 No. 434300 Jingzhou city of Hubei province Gongan County Tawau Di Zhen Chan Ling Road Applicant after: Hubei Lida Construction Engineering Group Co., Ltd. Address before: 330052 Nanchang City, Nanchang County, Lake Town, August, Lake Road, Wei Wei, Clear Water Bay dream of the dream of the hospital on the 9 floor, the building of the Applicant before: Luo Guoyou |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171031 Termination date: 20181116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |