CN105275022A - 一种建筑基坑作业装置 - Google Patents

一种建筑基坑作业装置 Download PDF

Info

Publication number
CN105275022A
CN105275022A CN201510778601.XA CN201510778601A CN105275022A CN 105275022 A CN105275022 A CN 105275022A CN 201510778601 A CN201510778601 A CN 201510778601A CN 105275022 A CN105275022 A CN 105275022A
Authority
CN
China
Prior art keywords
foundation pit
building foundation
operating device
suspender belt
present
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510778601.XA
Other languages
English (en)
Other versions
CN105275022B (zh
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Lida Construction Engineering Group Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510778601.XA priority Critical patent/CN105275022B/zh
Publication of CN105275022A publication Critical patent/CN105275022A/zh
Application granted granted Critical
Publication of CN105275022B publication Critical patent/CN105275022B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种建筑基坑作业装置,其特征在于包括两根横梁和吊带,吊带两端分别连接在两根横梁的中段,横梁的连端设有定位钎;本发明使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时作业人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。

Description

一种建筑基坑作业装置
技术领域
本发明涉及一种野外作业的装置,特别是一种建筑基坑作业装置。
背景技术
现代文明发展至今,人类仍在不倦的探索世界,试图揭开远古未被记载的历史,了解世界的起源,只有了解了过去才会更好的创造未来,这些都要靠考古来实现,随着国家对这方面投入的增加,我国的的考古事业正在快速发展和壮大。在社会大建设的推进过程中,大拆大建使得大量地下文明被发现,如果来不及考古开发记录这些文明很快就会被破坏,这样考古学者就必须第一时间兵分多路去挖掘考查,然而由于挖坑设备,不可能每个考察点都备齐所有考古设备,如在挖坑时站在坑里挖,会破坏坑里的文物,但又不能像重要挖掘点那样每个小坑都配备吊车,这也是不现实的,这对考古效率和效果都是有影响的,这些问题仍有待于进一步的解决。
在建筑施工工地的基坑作业的,市政工程的下水管道的井坑作业上,野外勘探的井坑作业上,以及采矿的井坑作业上,都会存在坑壁和坑内地面由于各种原因不能踩踏的问题,这些问题仍有待于进一步的解决。
发明内容
为了解决上述问题,本发明提供了一种建筑基坑作业装置。
本发明采用的技术方案为:一种建筑基坑作业装置,其特征在于包括两根横梁和吊带,吊带两端分别连接在两根横梁的中段,横梁的连端设有定位钎。
本发明也可以说是一种悬吊式考古坑作业装置,所述每根横梁上套设有套管,套管与横梁之间设有滚珠或滚轮,横梁上设有滚珠或滚轮滚动的轨道。
本发明也可以说是一种吊带式入坑作业设备,所述每根横梁上套设有两段套管,吊带为两条,两条吊带分别与两根横梁上的同侧套管连接。
进一步的,所述横梁为中空管,中空管侧壁中段设有纵向豁口,中空管内设有与其同轴的滑动杆,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接。
进一步的,所述每根横梁中空管内设有两段滑动杆,吊带为两条,两条吊带分别与两根横梁内的同侧滑动杆连接。
进一步的,所述滑动杆两端分别设有定位孔,配合定位孔设有固定钎。
进一步的,所述滑动杆上连接有两条吊带。
进一步的,所述两条吊带中其中一条较另一条长。
进一步的,所述吊带长度方向上的中线两侧分别分布有绑带。
进一步的,所述吊带长度方向上的中线两侧分别设有可以挂接的挂钩和挂环。
本发明可以说是一种建筑基坑作业装置,是可以广泛应用在建筑施工工地作业的装置。
本发明还可以应用在市政工程的下水管道的井坑作业上,是一种市政工程的下水管的作业设备。
本发明还可以应用在野外勘探的井坑作业上,是一种野外勘探的作业设备。
本发明还可以应用在采矿的井坑作业上,是一种矿井的作业设备。
本发明使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时作业人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。
附图说明
图1为本发明实施例一整体结构示意图。
图2为本发明实施例二整体结构示意图。
图3为本发明实施例二剖视结构示意图及局部放大图。
图4为本发明实施例三剖视结构示意图。
图5为本发明实施例四整体结构示意图。
图6为本发明实施例五整体结构示意图。
图7为本发明实施例五剖视结构示意图及局部放大图。
图8为本发明实施例六剖视结构示意图。
图中标号名称:1横梁;2吊带;3定位钎;4套管;5滚珠;6滚轮;7纵向豁口;8滑动杆;9定位孔。
具体实施方式
本发明实施例一如图1所示,该建筑基坑作业装置,包括两根横梁1和吊带2,吊带两端分别固定连接在两根横梁的中段,横梁的连端设有定位钎3;本实施例使用时,将横梁两端搭在坑口,利用定位钎定位,使吊带悬挂在坑内,此时考查人员就可以在吊带上在工作面操作,而且本发明不用时将两根横梁靠拢用吊带卷起来,便于携带,而且成本低,可以大面积应用,解决踩踏工作面的问题。
本发明实施例二如图2、3所示,该建筑基坑作业装置,每根横梁上套设有套管4,套管与横梁之间设有滚珠5,横梁和套管上均设有滚珠滚动的轨道,使用时吊带可以纵向移动,更便于操作,实施时也可以在套管上连接两条吊带。
本发明实施例三如图4所示,该建筑基坑作业装置与实施例二不同之处在于滚珠用滚轮6代替,同样可以使套管在横梁上滑动。
本发明实施例四如图5所示,该建筑基坑作业装置每根横梁上套设有两段套管,吊带为两条,两条吊带分别与两根横梁上的同侧套管连接,两条吊带中其中一条较另一条长,可以适应不同高度工作面作业,而且两个吊带间距可调,可两人操作,更便捷,实施时两条吊带也可以同样高度。
本发明实施例五如图6、7所示,该建筑基坑作业装置横梁为中空管,中空管侧壁中段设有纵向豁口7,中空管内设有与其同轴的滑动杆8,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接,滑动杆两端分别设有定位孔9,配合定位孔设有固定钎;本实施例使用时横梁固定在坑口,滑动杆移动可以使吊带纵向移动,移动到适当位置后可以用定位钎由定位孔插入底面进行定位,更平稳,该滑杆上也可以连接两条乃至更多吊带,满足更多工位的需求。
本发明实施例六如图8所示,该建筑基坑作业装置每根横梁中空管内设有两段滑动杆,吊带为两条,两条吊带分别与两根横梁内的同侧滑动杆连接,两吊带可以单独滑动,更便于使用。
实施时,还可在吊带长度方向上的中线两侧分别分布有绑带,或在吊带长度方向上的中线两侧分别设有可以挂接的挂钩和挂环,这样吊带就可以通过挂钩与挂环挂接、绑带与绑带绑结使吊带折叠或堆积,调节长度,适应更深坑的挖掘;定位钎还可为折叠结构便于收纳。
综上所述仅为本发明具体实施例,但并不局限于实施例,还可各技术特征重新组合更多实现方式,凡在不脱离本发明构思的情况下,依本申请所做的等效修饰和现有技术添加均视为本发明技术范畴。

Claims (1)

1.一种建筑基坑作业装置,其特征在于包括两根横梁和吊带,吊带两端分别连接在两根横梁的中段,横梁的连端设有定位钎;所述横梁为中空管,中空管侧壁中段设有纵向豁口,中空管内设有与其同轴的滑动杆,滑动杆与中空管内壁间设有滚珠或滚轮,吊带两端分别与两滑动杆连接。
CN201510778601.XA 2015-11-16 2015-11-16 一种建筑基坑作业装置 Expired - Fee Related CN105275022B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510778601.XA CN105275022B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510778601.XA CN105275022B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业装置

Publications (2)

Publication Number Publication Date
CN105275022A true CN105275022A (zh) 2016-01-27
CN105275022B CN105275022B (zh) 2017-10-31

Family

ID=55144779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510778601.XA Expired - Fee Related CN105275022B (zh) 2015-11-16 2015-11-16 一种建筑基坑作业装置

Country Status (1)

Country Link
CN (1) CN105275022B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2575352Y (zh) * 2002-10-29 2003-09-24 蔡盛忠 变距接杆
JP2007126862A (ja) * 2005-11-02 2007-05-24 Fuji Shoji Kk 建築物用の水害・雪害および土砂災害対策構造
CN203079512U (zh) * 2013-01-16 2013-07-24 马晓锋 一种折叠式吊具
CN203755638U (zh) * 2014-01-26 2014-08-06 中铁建工集团有限公司 吊挂滑移式高空倒斜面作业吊篮

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2575352Y (zh) * 2002-10-29 2003-09-24 蔡盛忠 变距接杆
JP2007126862A (ja) * 2005-11-02 2007-05-24 Fuji Shoji Kk 建築物用の水害・雪害および土砂災害対策構造
CN203079512U (zh) * 2013-01-16 2013-07-24 马晓锋 一种折叠式吊具
CN203755638U (zh) * 2014-01-26 2014-08-06 中铁建工集团有限公司 吊挂滑移式高空倒斜面作业吊篮

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张军: "采用万能杆件悬吊保护横穿基坑的1.8m给水管施工技术", 《隧道建设》 *

Also Published As

Publication number Publication date
CN105275022B (zh) 2017-10-31

Similar Documents

Publication Publication Date Title
CN203783492U (zh) 深孔钻设备的钻管的传送装置
CN101851922B (zh) 用全套管钻机切断地下锚索/杆的处理方法
CN106436718A (zh) 一种地铁基坑大跨度支撑体系及其施工方法
CN206386085U (zh) 一种煤矿用钻孔装置
CN105275022A (zh) 一种建筑基坑作业装置
CN105275023A (zh) 悬吊式基坑作业装置
CN205204778U (zh) 一种悬吊式考古坑作业装置
CN107762400B (zh) 地下工程洞桩施工用前后位移式低净空钻机
CN203702002U (zh) 一种简易双向快速滑动架
CN107091053B (zh) 地下工程桩基础成孔用左右位移式低净空钻机
CN211898417U (zh) 一种基于绞吸式地连墙局部替代排桩支护的施工结构
CN102644285B (zh) 锚索钻孔防塌孔施工方法
CN107035317A (zh) 一种新型钻探装置
CN209339867U (zh) 一种地质钻探用单臂吊环
CN206769807U (zh) 一种新型钻探装置
CN205743772U (zh) 一种立体式钻杆输送装置
CN205527401U (zh) 一种沉井用简易双吊篮门吊
CN109047850A (zh) 钢梁钻孔胎具
CN204491681U (zh) 一种工字钢接头的地下连续墙渗漏检测预埋管装置
CN221002615U (zh) 一种便于提高灌注桩成孔精度的钻机基座
CN219653673U (zh) 一种水上作业钻探和静力触探双平台结构
CN202840397U (zh) 折叠电缆槽
CN204662522U (zh) 基桩静载荷检测台
CN207556505U (zh) 一种简易围护结构侵限测量工具
CN206737836U (zh) 一种井场钻具专用承托装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Mingping

Inventor after: Zhou Qizhi

Inventor after: Zhang Kegang

Inventor after: Zhang Zumin

Inventor after: Zhou Jun

Inventor before: The inventor has waived the right to be mentioned

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170926

Address after: 11-1-69 No. 434300 Jingzhou city of Hubei province Gongan County Tawau Di Zhen Chan Ling Road

Applicant after: Hubei Lida Construction Engineering Group Co., Ltd.

Address before: 330052 Nanchang City, Nanchang County, Lake Town, August, Lake Road, Wei Wei, Clear Water Bay dream of the dream of the hospital on the 9 floor, the building of the

Applicant before: Luo Guoyou

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171031

Termination date: 20181116

CF01 Termination of patent right due to non-payment of annual fee