CN106812059B - The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap - Google Patents

The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap Download PDF

Info

Publication number
CN106812059B
CN106812059B CN201710187381.2A CN201710187381A CN106812059B CN 106812059 B CN106812059 B CN 106812059B CN 201710187381 A CN201710187381 A CN 201710187381A CN 106812059 B CN106812059 B CN 106812059B
Authority
CN
China
Prior art keywords
bent cap
plate
bridge
hill
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710187381.2A
Other languages
Chinese (zh)
Other versions
CN106812059A (en
Inventor
吕国跃
李正萍
沈涛
朱忠华
杨泽良
冯斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENG JI CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
HENG JI CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENG JI CONSTRUCTION DEVELOPMENT Co Ltd filed Critical HENG JI CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201710187381.2A priority Critical patent/CN106812059B/en
Publication of CN106812059A publication Critical patent/CN106812059A/en
Application granted granted Critical
Publication of CN106812059B publication Critical patent/CN106812059B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/40Plastics

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Device the invention belongs to bridge construction technical field, in particular on a kind of big longitudinal slope mountain highway halfway up the hill bridge.A kind of attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap designed by the present invention is vertically arranged anchor bar in the junction of adjacent step, the anchor bar is run through by the junction of adjacent triangle voussoir into plate-girder on the bent cap of down-hill end;On the bent cap of up-hill end, it is vertically arranged pvc pipe in the junction of adjacent step, anchor bar is inserted perpendicularly into pvc pipe, and is run through by the junction of adjacent triangle voussoir into plate-girder, while filled bitumen in the gap between pvc pipe and anchor bar;By the way that anchor bar is arranged between beam slab end and bent cap, and use semirigid connection type semi-elastic, it can effectively avoid bridge superstructure from biggish length travel occur, preferably guarantee the safety of bridge, the mountain highway halfway up the hill bridge suitable for longitudinal slope greater than 4% uses.

Description

The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap
Technical field
Dress the invention belongs to bridge construction technical field, in particular on a kind of big longitudinal slope mountain highway halfway up the hill bridge It sets.
Background technique
Halfway up the hill bridge uses less, design and construction for this class formation significant points etc. in similar projects at home Research it is less, in the design and work progress of engineering, face the problems such as route bending radius is small, longitudinal slope is big, especially exist When long and steep downgrade section is more, it may result in the beam slab being held at bent cap on longitudinal slope and glide, result even in collapsing for bridge It collapses.And in Bridge Design, according to " highway bridge and culvert design general specification ", bridge longitudinal slope is not preferably greater than 4%, but in Practical Project In design, the case where bridge longitudinal slope is greater than 4%, often occurs, this brings certain difficulty to big longitudinal slope bridge longitudinal spacing.
At present to reduce beam body longitudinally downslide displacement, reasonable line arrangement can be used, setting beam bottom levels steel plate, setting support limit The modes such as longitudinal block and setting pier consolidation are arranged in position device.But when bridge longitudinal slope is larger, common limit method It can no longer meet requirement.For the longitudinal spacing problem of big longitudinal slope bridge, there are no good solutions at present.
Summary of the invention
Effectively bridge superstructure can be avoided to occur it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of Larger length travel, while simple structure, convenient, the more preferable big longitudinal slope mountain highway halfway up the hill bridge plate for guaranteeing bridge safty of constructing The attachment device of beam and bent cap.
In order to achieve the above object, the company of a kind of big longitudinal slope mountain highway the halfway up the hill bridge plate beam and bent cap designed by the present invention Connection device, it includes plate-girder, bent cap, and plate-girder is placed on bent cap, is set on the plate-girder bottom surface being in contact with bent cap along direction across bridge Several triangle voussoirs are set, several steps are set along direction across bridge in bent cap top surface, the step on the triangle voussoir and bent cap top surface It matches, so that the contact surface of plate-girder and bent cap is in a horizontal state;On the bent cap of down-hill end, hang down in the junction of adjacent step Straight setting anchor bar, the anchor bar are run through by the junction of adjacent triangle voussoir into plate-girder;In the lid of up-hill end Liang Shang is vertically arranged pvc pipe in the junction of adjacent step, and anchor bar is inserted perpendicularly into pvc pipe, and passes through adjacent triangle wedge The junction of block is run through into plate-girder, while filled bitumen in the gap between pvc pipe and anchor bar.
Several blocks of plate-girders can be set between two bent caps along direction across bridge, the bottom surface of every block of plate-girder can be set one piece or Muti-piece triangle voussoir.
The triangle voussoir is that right angle trigonometry voussoir, the right-angle side of right angle trigonometry voussoir and the bottom surface of step and side wall paste It closes;The triangle voussoir can also be acute angle triangle voussoir, angle>=60 degree,<90 degree.
To be tightly combined plate-girder with bent cap top surface, asphalt felt can be padded in junction.
The present invention provides the attachment device of a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap, by beam slab end Anchor bar is set between bent cap, and uses semirigid connection type semi-elastic, bridge top can effectively be avoided to tie There is biggish length travel in structure, preferably guarantees the safety of bridge, and 4% mountain highway halfway up the hill bridge is greater than suitable for longitudinal slope It uses.
Anchor bar is preset at adjacent step while pouring bent cap in such a way that rigidity is hinged in down-hill end Between, lower part pours together with bent cap, when cast-in-place top plate-girder, then by the anchor bar other end it is cast-in-place enter plate-girder.It is going up a slope End, by the way of elasticity consolidation, pvc pipe is preset between adjacent step by when construction while pouring bent cap, cast-in-place Before the plate-girder of top, anchor bar is inserted into, while with the gap between No. 70 bituminous seal pvc pipes and anchor bar, passing through 70 The elasticity modulus of number pitch achievees the purpose that elasticity consolidation, finally by the other end of anchor bar it is cast-in-place enter plate-girder.Consider by Power function influence, plate-girder down-hill end is easy to happen a degree of sliding, and the horizontal force of plate-girder down-hill end is slightly larger than upward slope Section, from fixed effect for, descending is hinged using rigidity, it is more effective using elasticity consolidation to go up a slope.Therefore, the present invention solves simultaneously The slippage for big longitudinal slope mountain highway halfway up the hill bridge ascents and descents section of having determined, has been effectively ensured the safety of big longitudinal slope halfway up the hill bridge And service life.
Detailed description of the invention
Fig. 1 be the embodiment of the present invention 1,2 down-hill ends along bridge to structural schematic diagram.
Fig. 2 is the structural schematic diagram of 1 down-hill end direction across bridge of the embodiment of the present invention.
Fig. 3 be the embodiment of the present invention 1,2 up-hill ends along bridge to structural schematic diagram.
Fig. 4 is the structural schematic diagram of 1 up-hill end direction across bridge of the embodiment of the present invention.
Fig. 5 is the structural schematic diagram of 2 down-hill end direction across bridge of the embodiment of the present invention.
Fig. 6 is the structural schematic diagram of 2 up-hill end direction across bridge of the embodiment of the present invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawing.
Embodiment 1
As Figure 1-Figure 4, the connection of a kind of big longitudinal slope mountain highway the halfway up the hill bridge plate beam and bent cap of the present embodiment description Device, it includes plate-girder 1, bent cap 2, and two pieces of triangle voussoirs are arranged along direction across bridge on the bottom surface being in contact with bent cap in every block of plate-girder 3, two steps 4, the triangle voussoir and the step phase on bent cap top surface are accordingly set on the bent cap top surface below every block of plate-girder Cooperation is so that the contact surface of plate-girder and bent cap is in a horizontal state;The triangle voussoir is right angle trigonometry voussoir, right angle trigonometry voussoir Right-angle side be bonded with the bottom surface of step and side wall;On the bent cap of down-hill end, anchor is vertically arranged in the junction of adjacent step Gu reinforcing bar 5, the anchor bar is run through by the junction of adjacent triangle voussoir into plate-girder;On the bent cap of up-hill end, The junction of adjacent step is vertically arranged pvc pipe 6, and anchor bar 5 is inserted perpendicularly into pvc pipe, and passes through adjacent triangle voussoir Junction is run through into plate-girder, while filled bitumen 7 in the gap between pvc pipe and anchor bar.
Anchor bar 5 is preset between adjacent step 4 while pouring bent cap 2 in down-hill end, construction, lower part with Bent cap pours together, when cast-in-place top plate-girder 1, then by the anchor bar other end it is cast-in-place enter plate-girder.In up-hill end, construction Pvc pipe 6 is preset between adjacent step 4 while pouring bent cap 2, before cast-in-place top plate-girder 1, anchor bar 5 is inserted into, The gap between pvc pipe 6 and anchor bar 5 is sealed with No. 70 pitches 7 simultaneously, bullet is reached by the elasticity modulus of No. 70 pitch Property consolidation purpose, finally by the other end of anchor bar 5 it is cast-in-place enter plate-girder 1.
Embodiment 2
As shown in Fig. 1, Fig. 3, Fig. 5, Fig. 6, a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and lid of the present embodiment description The attachment device of beam, it includes plate-girder 1, bent cap 2, and every block of plate-girder is arranged two pieces along direction across bridge on the bottom surface being in contact with bent cap Triangle voussoir 3, is accordingly arranged two steps 4 on the bent cap top surface below every block of plate-girder, on the triangle voussoir and bent cap top surface Step match so that the contact surface of plate-girder and bent cap is in a horizontal state;The triangle voussoir is acute angle triangle voussoir, angle >=60 degree,<90 degree of degree;On the bent cap of down-hill end, anchor bar 5, the anchoring are vertically arranged in the junction of adjacent step Reinforcing bar is run through by the junction of adjacent triangle voussoir into plate-girder;On the bent cap of up-hill end, in the junction of adjacent step It is vertically arranged pvc pipe 6, anchor bar 5 is inserted perpendicularly into pvc pipe, and is run through by the junction of adjacent triangle voussoir into plate-girder In, while filled bitumen 7 in the gap between pvc pipe and anchor bar.

Claims (5)

1. a kind of attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap, it is characterised in that: including plate-girder, bent cap, Plate-girder is placed on bent cap, several triangle voussoirs is arranged along direction across bridge on the plate-girder bottom surface being in contact with bent cap, on bent cap top Several steps are arranged along direction across bridge in face, and the triangle voussoir is matched with the step on bent cap top surface, so that plate-girder and bent cap Contact surface is in a horizontal state;On the bent cap of down-hill end, anchor bar, the anchoring are vertically arranged in the junction of adjacent step Reinforcing bar is run through by the junction of adjacent triangle voussoir into plate-girder;On the bent cap of up-hill end, in the junction of adjacent step It is vertically arranged pvc pipe, anchor bar is inserted perpendicularly into pvc pipe, and is run through by the junction of adjacent triangle voussoir into plate-girder, Filled bitumen in gap between pvc pipe and anchor bar simultaneously.
2. the attachment device of a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap according to claim 1, feature It is: several blocks of plate-girders is set along direction across bridge between two bent caps, one or more triangle wedge is arranged in the bottom surface of every block of plate-girder Block.
3. the attachment device of a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap according to claim 1 or 2, special Sign is: the triangle voussoir is right angle trigonometry voussoir, and the right-angle side of right angle trigonometry voussoir is bonded with the bottom surface of step and side wall.
4. the attachment device of a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap according to claim 1 or 2, special Sign is: the triangle voussoir be acute angle triangle voussoir, angle>=60 degree,<90 degree.
5. the attachment device of a kind of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap according to claim 1, feature It is: to be tightly combined plate-girder with bent cap top surface, pads asphalt felt in junction.
CN201710187381.2A 2017-03-27 2017-03-27 The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap Active CN106812059B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710187381.2A CN106812059B (en) 2017-03-27 2017-03-27 The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710187381.2A CN106812059B (en) 2017-03-27 2017-03-27 The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap

Publications (2)

Publication Number Publication Date
CN106812059A CN106812059A (en) 2017-06-09
CN106812059B true CN106812059B (en) 2018-12-28

Family

ID=59115365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710187381.2A Active CN106812059B (en) 2017-03-27 2017-03-27 The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap

Country Status (1)

Country Link
CN (1) CN106812059B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183623B (en) * 2018-09-20 2021-07-27 中建市政工程有限公司 Precast beam bottom longitudinal slope construction method and device thereof
CN110396913B (en) * 2019-08-07 2023-12-22 湖南联智科技股份有限公司 Device for preventing pier from deviating in high pier bridge of large longitudinal slope
WO2021022671A1 (en) * 2019-08-07 2021-02-11 湖南联智桥隧技术有限公司 Device for preventing pier deviation of high-pier bridge having large longitudinal slope
CN112211038A (en) * 2020-09-28 2021-01-12 中铁第一勘察设计院集团有限公司 Toothed step face beam body structure under large-gradient condition

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4365276B2 (en) * 2004-06-29 2009-11-18 三井住友建設株式会社 Suspended floor bridge
CN203096603U (en) * 2013-01-21 2013-07-31 陈增顺 Support structure for bridge with cross slope
CN104746420B (en) * 2015-04-08 2016-06-29 福州大学 A kind of construction method of the bridge top and the bottom attachment structure of overcoat rubber cap steel pipe
CN105064209B (en) * 2015-08-25 2017-03-15 上海市政工程设计研究总院(集团)有限公司 A kind of deck paving leveling Rotating fields and its leveling method
CN205576754U (en) * 2016-05-05 2016-09-14 山西交科桥梁隧道加固维护工程有限公司 Spacing crab -bolt of assembled plate -girder
CN206693039U (en) * 2017-03-27 2017-12-01 恒基建设集团有限公司 The attachment means of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap

Also Published As

Publication number Publication date
CN106812059A (en) 2017-06-09

Similar Documents

Publication Publication Date Title
CN106812059B (en) The attachment device of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN209162616U (en) Formula main cable suspension bridge structure outside a kind of tunnel immediately adjacent to bridge
CN103966947B (en) A kind of anti-fall girder apparatus based on bridge beam body damping
CN204039927U (en) A kind of bridge emergency first-aid repair connects bracing or strutting arrangement
CN205529936U (en) Hang basket displacement device
CN209227563U (en) High steep weathering seriously with the rock side slope supporting construction of joints development
CN205135661U (en) Support frame is pour to tunnel secondary
CN206693039U (en) The attachment means of big longitudinal slope mountain highway halfway up the hill bridge plate beam and bent cap
CN104233914A (en) Construction method of portable type country road hardened pavement
CN209039945U (en) A kind of trapezoidal bracket simple beam structure used under the conditions of heavy grade
CN108330813B (en) A kind of novel bridge
CN203821274U (en) Base assembly for protective fence on side of highway
CN207452688U (en) The multistage abutment construction of soil sedimentation after improvement bridge platform
CN214938857U (en) Rail laying transition device for limiting sleeper at urban rail transit communication channel
CN108547224A (en) Short platform box beam push construction method
CN210561528U (en) Pile sheet formula road bed connecting elements that leakproofness is good
CN103696370B (en) A kind of Quick bridge construction method and structure
CN208201613U (en) A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN207079474U (en) The assembling type steel tubing string temporary rest pier Bailey beam support of the high cast-in-place turnout junction girder of pier stud
CN211498543U (en) Steel corrugated plate ladder-shaped arch bridge culvert
CN205576764U (en) Self -align precast concrete box culvert
CN109458195A (en) The construction method of tunnel double-lining under the conditions of tight turn radius
CN207244427U (en) A kind of railway and track traffic H type Frame Pier
CN209307833U (en) A kind of continuous through girder bridge arch bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant