CN106808212A - A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology - Google Patents

A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology Download PDF

Info

Publication number
CN106808212A
CN106808212A CN201710120754.4A CN201710120754A CN106808212A CN 106808212 A CN106808212 A CN 106808212A CN 201710120754 A CN201710120754 A CN 201710120754A CN 106808212 A CN106808212 A CN 106808212A
Authority
CN
China
Prior art keywords
welding
unit
slab
compound plate
finished product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710120754.4A
Other languages
Chinese (zh)
Inventor
刘彬
凌毅
江光彪
张文武
燕顺
董乃勇
何烽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANYU ZHUJIANG STEEL PIPE (LIANYUNGANG) CO Ltd
Original Assignee
PANYU ZHUJIANG STEEL PIPE (LIANYUNGANG) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PANYU ZHUJIANG STEEL PIPE (LIANYUNGANG) CO Ltd filed Critical PANYU ZHUJIANG STEEL PIPE (LIANYUNGANG) CO Ltd
Priority to CN201710120754.4A priority Critical patent/CN106808212A/en
Publication of CN106808212A publication Critical patent/CN106808212A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/06Metal-working plant comprising a number of associated machines or apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/04Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass for both machining and other metal-working operations

Abstract

Set assembly equipment is combined into the invention discloses a kind of dissimilar metal lamination, a number workshop is sequentially provided with compound plate week stock relocation, plasma weldering splicing equipment, welding seam grinding platform, figuring of surface platform, platform for coating, pressure assembly note unit, the automatic gas shield welding of narrow gap banding side unit long, gas shield welding short side edge sealing unit, flaw detection unit, welding finished product base week stock relocation, and No. two workshops are sequentially provided with slab week stock relocation, cross across dolly, turnover panel alignment means, numerical control gantry surface milling attachment, interleaving agent drying unit, vacuum electronic welding unit, welding finished product base week stock relocation;Dissimilar metal of the invention lamination is combined into that set assembly production efficiency of equipment is high, and energy-conserving and environment-protective, the production method of use meets following metallic composite production field developing direction and trend.

Description

A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology
Technical field
The invention belongs to dissimilar metal lamination metallurgical field of compound material, particularly a kind of dissimilar metal lamination is compound complete Assembly equipment and combination blank technology.
Background technology
Advanced composite material (ACM), by substituting pure precious metal using part precious metal, plays group element material respective Advantage, significantly saves precious metal material, realizes the unappeasable performance requirement of single metal, and metallic composite can be wide It is general to be applied to water purification transmission pipeline network, desalinization, wear-and corrosion-resistant class oil gas, chemical industry, pulp conveying pipe network, marine settings, environmental protection The fields such as device fabrication, pressure vessel, meet national industrial policies and forward position direction of scientific rersearch.Metallurgical being combined of domestic lamination passes at present The composite plate system that system technology is combined using " submerged-arc welding of surface grinder(lathe) cleaning+pressure stage weldering+cored solder encapsulates assembly+vacuum degassing " Base process route.Conventional composite plate is produced using Explosion composite technology, is produced using explosion cladding process, and product quality is steady Qualitative difference, low production efficiency, safety and environmental protection risk are big, it is difficult to realize mass production, therefore metallic composite is main at present Produced using metallurgical being combined of lamination, its finished product is with Combined roll or compound plate delivery.
The content of the invention
Technical problem solved by the invention is to provide a kind of dissimilar metal lamination to be combined into set assembly and composite billet side Method.
The technical solution for realizing the object of the invention is:A kind of dissimilar metal lamination is combined into set assembly equipment, No. one Workshop is sequentially provided with compound plate week stock relocation, plasma weldering splicing equipment, welding seam grinding platform, figuring of surface platform, platform for coating, pressure assembly Note unit, the automatic gas shield welding of narrow gap banding side unit long, gas shield welding short side edge sealing unit, flaw detection unit, welding finished product The all stock relocations of base;
No. two workshops be sequentially provided with slab week stock relocation, cross across dolly, turnover panel alignment means, numerical control gantry surface milling attachment, every From agent drying unit, vacuum electronic welding unit, welding finished product base week stock relocation, the interleaving agent drying unit side is provided with gas guarantor Weldering short side edge sealing unit, vacuum electronic welding unit side is provided with flaw detection unit, and the vacuum electronic welding unit is located at In vacuum chamber, wherein compound plate week stock relocation and slab week stock relocation are in same one end.
Preferably, interleaving agent drying unit side is provided with revolving platform.
Preferably, vacuum chamber uses double door vacuum chamber.
A kind of composite slab production method that set assembly equipment is combined into based on dissimilar metal lamination, is comprised the following steps:
Step one, by substrate from slab week stock relocation be lifted on the milling attachment of numerical control gantry surface, the milling of numerical control gantry surface dress Put carries out Milling Process to the surface and four sides of substrate, and all machined surfaces need to be completely exposed fresh metal;Meanwhile, compound plate is from again The all stock relocations of plate are transported to and carry out deprotection film to compound plate on No. two figuring of surface platforms in workshop;
Step 2, substrate and compound plate that surface treatment is completed are lifted into turnover panel alignment means, and substrate and compound plate are turned over Turn and align, substrate and compound plate alignment are combined into combination slab;
Step 3, the substrate and compound plate that will combine slab carry out welding edge sealing, and base is detected with flaw detection unit after welding edge sealing Whether the weld seam of plate and compound plate reaches requirement, and such as weld seam sealing is defective, it is necessary to repair welding again, ultimately forms composite billet semi-finished product The all stock relocations of feeding welding finished product base;
Step 4, composite billet semi-finished product are heated, reach design temperature requirement and answer composite billet semi-finished product are carried out with hot rolling Conjunction is processed;
Step 5, the composite billet semi-finished product to method hot rolling after treated carry out scale, cutting, horizontal strong, vertical strong, pressing;
Step 6, it is last again composite billet semi-finished product are carried out with surface inspection, reconditioning, thickness measuring, it is satisfactory as composite billet into Product.
Preferably, welding is difficult as two kinds of metallicities of substrate and compound plate differ larger in step 3, then welds edge sealing and adopt Assembly is encapsulated with vacuum electron beam, the vacuum electron beam encapsulation assembly is:To be combined in step 2 in slab feeding vacuum chamber, Vacuumized in vacuum chamber, after specified vacuum degree is reached, the slab feeding vacuum electron beam welding that will be combined in step 2 Unit carries out surrounding edge sealing welding, will weld the two-layer combination slab after edge sealing and is hoisted to platform for coating, is needed in combination slab multiple The place face coating interleaving agent of conjunction, feeding drying oven is dried, and about five to ten minutes, two pieces of two-layers of drying is combined into slab Be hoisted to after turnover panel alignment means are alignd, be fed again into vacuum electron beam welding machine group carry out between two blocks of combination slabs four All edge sealing welding, form four layers of composite billet semi-finished product, and assembly is finished.
Preferably, before combination slab feeding vacuum electron beam welding machine group carries out surrounding edge sealing welding in step 3, can be right Combination slab carries out magnetic treatment, to eliminate the high-intensity magnetic field near weld seam.
Preferably, it is easy to welding wire soldering as two kinds of metallicities of substrate and compound plate differ smaller in step 3, then welding envelope Side encapsulates base using gas guarantor/submerged-arc welding, and the gas guarantor/submerged-arc welding encapsulation base is:By the group of the combination of two in step 2 Plywood base is hoisted to platform for coating, needs compound place face to coat interleaving agent in combination slab, then four layer material groups It is combined, into the automatic gas shield welding of narrow gap banding side unit long, gas shield welding short side edge sealing unit, carries out short side long and sealed Dress, and a connecting tube is left as aspirating hole, after surrounding edge sealing is finished, vacuum degassing treatment is carried out, reach the true of regulation Reciprocal of duty cycle rear enclosed tracheae, four layers of composite billet semi-finished product assembly is finished.
Preferably, in step 3 flaw detection unit detection substrate and the weld seam of compound plate uses phased array carrying out flaw detection.
Compared with prior art, its remarkable advantage is the present invention:
(1)The present invention is using " CNC milling machine removing surface+vacuum electron beam welding assembly/CNC milling machine removing surface+pressure is narrow Clearance submerged arc welding technique+vacuumize degasification " process route, it is possible to achieve the Interface composites of metallurgical interfaces 100%, interface bond strength Higher than Standard, and the compound assembly that various heterogeneous material performances differ larger is realized, using narrow-clearance submerged arc welding, kept away Exempted from traditional big groove welded encapsulation, reduce metal cut damage and welding wire use.
(2)Empty electronic welding unit of the invention is located in double door vacuum chamber, using beam bombardment metal faying face, Low heat input and cooling velocity, weldquality is splendid, and efficiency is improved by about one time;
(3)The present invention can encapsulate assembly or gas according to two kinds of performance difference sizes of raw material metal from vacuum electron beam Guarantor/submerged-arc welding encapsulates base, and vacuum electron beam encapsulation assembly technique carries out composite plate assembly, instead of conventional method for brazing assembly work Skill, it is possible to achieve various material metal soldering group base, can be according to composite application field material property, qualitative, quantitative Production, possesses the submerged arc welding super welding performance to be possessed;It is combined using gas guarantor/submerged-arc welding encapsulation blank-making technology Plate assembly, substitutes original tradition submerged-arc welding process, greatly reduces groove size, reduces metal and cuts damage, while dropping significantly The low consumption of welding wire, without cored solder in the case of, good properties of product can also be reached.
(4)The present invention combines the gentle guarantor of vacuum electron beam encapsulation assembly technique/submerged-arc welding encapsulation blank-making technology, Ke Yishi Now multi-level product variety all standing, for different user demands, using different welding procedures, realizes qualitative and quantitative life Produce, there is very strong demonstration and cultivation property to industry.
The present invention is described in further detail below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is that dissimilar metal of the invention lamination is combined into set assembly equipment and combination blank technology structural representation.
Fig. 2 is that dissimilar metal of the invention lamination is combined into set assembly production method flow chart.
Specific embodiment
With reference to Fig. 1, a kind of dissimilar metal lamination of the invention is combined into set assembly equipment, and a workshop is sequentially provided with compound plate All stock relocations 14, plasma weldering splicing equipment 12, welding seam grinding platform 13, figuring of surface platform 4, platform for coating 5, pressure assembly note unit 6, The automatic gas shield welding of narrow gap banding side unit 7 long, gas shield welding short side edge sealing unit 8, flaw detection unit 9, welding finished product base week Stock relocation 16;
No. two workshops are sequentially provided with slab week stock relocation 15, cross across dolly 3, turnover panel alignment means 2, numerical control gantry surface milling attachment 1st, interleaving agent drying unit 10, vacuum electronic welding unit 11, welding finished product base week stock relocation 16, the interleaving agent drying unit 10 Side is provided with gas shield welding short side edge sealing unit 8, and the vacuum electronic welding side of unit 11 is provided with flaw detection unit 9, the vacuum Electronic welding unit 11 is located in vacuum chamber, and wherein compound plate week stock relocation 14 and slab week stock relocation 15 are in same one end.
The side of interleaving agent drying unit 10 is provided with revolving platform, and convenient turnover slab improves utilization space.
Vacuum chamber uses double door vacuum chamber.
With reference to Fig. 2, a kind of composite slab production method that set assembly equipment is combined into based on dissimilar metal lamination, including it is following Step:
Step one, by substrate from slab week stock relocation 15 be lifted on numerical control gantry surface milling attachment 1, the milling of numerical control gantry surface Turning device 1 carries out Milling Process to the surface and four sides of substrate, and all machined surfaces need to be completely exposed fresh metal;Meanwhile, it is multiple Plate is transported to from compound plate week stock relocation 14 and carries out deprotection film to compound plate on No. two figuring of surface platforms 4 in workshop;
Step 2, substrate and compound plate that surface treatment is completed are lifted into turnover panel alignment means 2, and substrate and compound plate are turned over Turn and align, substrate and compound plate alignment are combined into combination slab;
Step 3, the substrate and compound plate that will combine slab carry out welding edge sealing, and base is detected with flaw detection unit 9 after welding edge sealing Whether the weld seam of plate and compound plate reaches requirement, and such as weld seam sealing is defective, it is necessary to repair welding again, ultimately forms composite billet semi-finished product The all stock relocations 16 of feeding welding finished product base;
Step 4, composite billet semi-finished product are heated, reach design temperature requirement and answer composite billet semi-finished product are carried out with hot rolling Conjunction is processed;
Step 5, the composite billet semi-finished product to method hot rolling after treated carry out scale, cutting, horizontal strong, vertical strong, pressing;
Step 6, it is last again composite billet semi-finished product are carried out with surface inspection, reconditioning, thickness measuring, it is satisfactory as composite billet into Product.
Welding is difficult as two kinds of metallicities of substrate and compound plate differ larger in step 3, is then welded edge sealing and is used vacuum electric Beamlet encapsulates assembly, and the vacuum electron beam encapsulation assembly is:To be combined in step 2 in slab feeding vacuum chamber, in vacuum chamber Vacuumized, after specified vacuum degree is reached, the combination slab feeding vacuum electron beam welding machine group 11 in step 2 is entered Row surrounding edge sealing is welded, and will be welded the two-layer combination slab after edge sealing and is hoisted to platform for coating 5, and compound institute is needed in combination slab Interleaving agent is coated in face, feeding drying oven 10 is dried, about five to ten minutes, and two pieces of two-layers of drying are combined into slab handling After being alignd to turnover panel alignment means 2, be fed again into vacuum electron beam welding machine group 11 carry out two pieces combination slabs between four All edge sealing welding, form four layers of composite billet semi-finished product, and assembly is finished, and vacuum electron beam encapsulation assembly instead of conventional method for brazing Assembly technique, it is possible to achieve various material metal soldering group base, such as stainless steel/low-alloy high-strength steel and stainless steel/high tensile pipeline The composite plate of steel, and 825 nickel-base alloys/high tensile pipeline steel composite board, titanium/steel composite material etc., can be according to composite Application field material property, qualitative, quantitative production, possesses the submerged arc welding super welding performance to be possessed.
Before combination slab feeding vacuum electron beam welding machine group 11 carries out surrounding edge sealing welding in step 3, can be to compoboard Base carries out magnetic treatment, and combination slab is lifted into carries out reciprocal demagnetization on demagnetizer, to eliminate the strong magnetic near weld seam , deflection of a beam of electrons is prevented, influence welding quality.
It is easy to welding wire soldering as two kinds of metallicities of substrate and compound plate differ smaller in step 3, then welds edge sealing and use gas Guarantor/submerged-arc welding encapsulates base, and the gas guarantor/submerged-arc welding encapsulation base is:The combination slab of the combination of two in step 2 is hung It is transported to and is hoisted to platform for coating 5, need compound place face to coat interleaving agent in combination slab, then the combination of four layer materials is one Rise, into the automatic gas shield welding of narrow gap banding side unit 7 long, gas shield welding short side edge sealing unit 8, carry out short side long and be packaged, And a connecting tube is left as aspirating hole, and after surrounding edge sealing is finished, vacuum degassing treatment is carried out, reach the vacuum of regulation Rear enclosed tracheae, four layers of composite billet semi-finished product assembly is finished, and gas guarantor/submerged-arc welding encapsulation base substitutes the submerged arc welding of original tradition Technique, greatly reduces groove size, reduces metal and cuts damage, while the consumption of welding wire is greatly reduced, without cored solder situation Under, good properties of product can also be reached.
The weld seam of the detection substrate of flaw detection unit 9 and compound plate in step 3 uses phased array carrying out flaw detection, improves and visits The accuracy of wound.
The present invention combines the gentle guarantor of vacuum electron beam encapsulation assembly technique/submerged-arc welding encapsulation blank-making technology, it is possible to achieve Multi-level product variety all standing, for different user demands, using different welding procedures, realizes qualitative and quantitative production, There is very strong demonstration and cultivation property to industry.
Further detailed description is done to the present invention with reference to embodiment:
Embodiment 1
A kind of dissimilar metal lamination is combined into set assembly equipment, and a workshop is sequentially provided with stock relocation 14, the plasma weldering of compound plate week and spells Tipping standby 12, welding seam grinding platform 13, figuring of surface platform 4, platform for coating 5, the pressure assembly note automatic gas shield welding of unit 6, narrow gap are long Banding side unit 7, gas shield welding short side edge sealing unit 8, flaw detection unit 9, welding finished product base week stock relocation 16;
No. two workshops are sequentially provided with slab week stock relocation 15, cross across dolly 3, turnover panel alignment means 2, numerical control gantry surface milling attachment 1st, interleaving agent drying unit 10, vacuum electronic welding unit 11, welding finished product base week stock relocation 16, the interleaving agent drying unit 10 Side is provided with gas shield welding short side edge sealing unit 8, and the vacuum electronic welding side of unit 11 is provided with flaw detection unit 9, the vacuum Electronic welding unit 11 is located in vacuum chamber, and wherein compound plate week stock relocation 14 and slab week stock relocation 15 are in same one end.
The side of interleaving agent drying unit 10 is provided with revolving platform.
The vacuum chamber uses double door vacuum chamber.
A kind of composite slab production method that set assembly equipment is combined into based on dissimilar metal lamination, is comprised the following steps:
Step one, by substrate from slab week stock relocation 15 be lifted on numerical control gantry surface milling attachment 1, the milling of numerical control gantry surface Turning device 1 carries out Milling Process to the surface and four sides of substrate, and all machined surfaces need to be completely exposed fresh metal;Meanwhile, it is multiple Plate is transported to from compound plate week stock relocation 14 and carries out deprotection film to compound plate on No. two figuring of surface platforms 4 in workshop;
Step 2, substrate and compound plate that surface treatment is completed are lifted into turnover panel alignment means 2, and substrate and compound plate are turned over Turn and align, substrate and compound plate alignment are combined into combination slab;
Step 3, the substrate and compound plate that will combine slab carry out welding edge sealing, such as two kinds of metallicities differences of substrate and compound plate compared with It is big to be difficult welding, then weld edge sealing and assembly is encapsulated using vacuum electron beam, in combination slab feeding vacuum chamber, combination slab is entered Row goes magnetic treatment, to eliminate the high-intensity magnetic field near weld seam, is then vacuumized in vacuum chamber, after specified vacuum degree is reached, Combination slab feeding vacuum electron beam welding machine group 11 in step 2 is carried out into surrounding edge sealing welding, two after edge sealing will be welded Layer combination slab is hoisted to platform for coating 5, needs compound place face to coat interleaving agent in combination slab, and feeding drying oven 10 is carried out Drying, about five to ten minutes, the two-layers combination slab of two pieces of drying is hoisted to after turnover panel alignment means 2 are alignd, again Feeding vacuum electron beam welding machine group 11 carries out the surrounding edge sealing welding between two blocks of combination slabs, formed four layers of composite billet half into Product, whether four layers of the detection substrate of composite billet semi-finished product flaw detection unit 9 and the weld seam of compound plate reach and want after welding edge sealing Ask, such as weld seam sealing is defective, it is necessary to repair welding again, ultimately forms composite billet semi-finished product feeding welding finished product base week stock relocation 16;
Step 4, composite billet semi-finished product are heated, reach design temperature requirement and answer composite billet semi-finished product are carried out with hot rolling Conjunction is processed;
Step 5, the composite billet semi-finished product to method hot rolling after treated carry out scale, cutting, horizontal strong, vertical strong, pressing;
Step 6, it is last again composite billet semi-finished product are carried out with surface inspection, reconditioning, thickness measuring, it is satisfactory as composite billet into Product.
Embodiment 2
A kind of dissimilar metal lamination is combined into set assembly equipment, and a workshop is sequentially provided with stock relocation 14, the plasma weldering of compound plate week and spells Tipping standby 12, welding seam grinding platform 13, figuring of surface platform 4, platform for coating 5, the pressure assembly note automatic gas shield welding of unit 6, narrow gap are long Banding side unit 7, gas shield welding short side edge sealing unit 8, flaw detection unit 9, welding finished product base week stock relocation 16;
No. two workshops are sequentially provided with slab week stock relocation 15, cross across dolly 3, turnover panel alignment means 2, numerical control gantry surface milling attachment 1st, interleaving agent drying unit 10, vacuum electronic welding unit 11, welding finished product base week stock relocation 16, the interleaving agent drying unit 10 Side is provided with gas shield welding short side edge sealing unit 8, and the vacuum electronic welding side of unit 11 is provided with flaw detection unit 9, the vacuum Electronic welding unit 11 is located in vacuum chamber, and wherein compound plate week stock relocation 14 and slab week stock relocation 15 are in same one end.
The side of interleaving agent drying unit 10 is provided with revolving platform.
The vacuum chamber uses double door vacuum chamber.
A kind of composite slab production method that set assembly equipment is combined into based on dissimilar metal lamination, is comprised the following steps:
Step one, by substrate from slab week stock relocation 15 be lifted on numerical control gantry surface milling attachment 1, the milling of numerical control gantry surface Turning device 1 carries out Milling Process to the surface and four sides of substrate, and all machined surfaces need to be completely exposed fresh metal;Meanwhile, it is multiple Plate is transported to from compound plate week stock relocation 14 and carries out deprotection film to compound plate on No. two figuring of surface platforms 4 in workshop;
Step 2, substrate and compound plate that surface treatment is completed are lifted into turnover panel alignment means 2, and substrate and compound plate are turned over Turn and align, substrate and compound plate alignment are combined into combination slab;
Step 3, the substrate and compound plate that will combine slab carry out welding edge sealing, such as two kinds of metallicities differences of substrate and compound plate compared with It is small to be easy to welding wire soldering, then weld edge sealing and base is encapsulated using gas guarantor/submerged-arc welding, by the compoboard of the combination of two in step 2 Base is hoisted to platform for coating 5, needs compound place face to coat interleaving agent in combination slab, and then four layer materials combination exists Together, into the automatic gas shield welding of narrow gap banding side unit 7 long, gas shield welding short side edge sealing unit 8, carry out short side long and sealed Dress, and a connecting tube is left as aspirating hole, after surrounding edge sealing is finished, vacuum degassing treatment is carried out, reach the true of regulation Reciprocal of duty cycle rear enclosed tracheae, four layers of composite billet semi-finished product assembly is finished, the composite billet semi-finished product assembly flaw detection after welding edge sealing Whether the weld seam of inspection unit 9 detection substrate and compound plate reaches requirement, and such as weld seam sealing is defective, it is necessary to repair welding again, finally Form composite billet semi-finished product feeding welding finished product base week stock relocation 16;
Step 4, composite billet semi-finished product are heated, reach design temperature requirement and answer composite billet semi-finished product are carried out with hot rolling Conjunction is processed;
Step 5, the composite billet semi-finished product to method hot rolling after treated carry out scale, cutting, horizontal strong, vertical strong, pressing;
Step 6, it is last again composite billet semi-finished product are carried out with surface inspection, reconditioning, thickness measuring, it is satisfactory as composite billet into Product.

Claims (8)

1. a kind of dissimilar metal lamination is combined into set assembly equipment, it is characterised in that a workshop is sequentially provided with compound plate week stock relocation (14), plasma weldering splicing equipment(12), welding seam grinding platform(13), figuring of surface platform(4), platform for coating(5), pressure assembly note machine Group(6), the automatic gas shield welding of narrow gap banding side unit long(7), gas shield welding short side edge sealing unit(8), flaw detection unit(9)、 The all stock relocations of welding finished product base(16);
No. two workshops are sequentially provided with slab week stock relocation(15), cross across dolly(3), turnover panel alignment means(2), the milling of numerical control gantry surface Turning device(1), interleaving agent drying unit(10), vacuum electronic welding unit(11), welding finished product base week stock relocation(16), it is described every From agent drying unit(10)Side is provided with gas shield welding short side edge sealing unit(8), vacuum electronic welding unit(11)Side is provided with spy Triage tests unit(9), the vacuum electronic welding unit(11)It is located in vacuum chamber, wherein compound plate week stock relocation(14)With slab week Stock relocation(15)In same one end.
2. dissimilar metal lamination according to claim 1 is combined into set assembly equipment, it is characterised in that the interleaving agent dries Equipment for drying(10)Side is provided with revolving platform.
3. dissimilar metal lamination according to claim 1 is combined into set assembly equipment, it is characterised in that the vacuum chamber is adopted Use double door vacuum chamber.
4. a kind of that the composite slab production method for covering assembly equipment is combined into based on dissimilar metal lamination described in claim 1, it is special Levy and be, comprise the following steps:
Step one, by substrate from slab week stock relocation(15)It is lifted into numerical control gantry surface milling attachment(1)On, numerical control gantry table Facing cut turning device(1)Surface and four sides to substrate carry out Milling Process, and all machined surfaces need to be completely exposed fresh metal;Together When, compound plate from compound plate week stock relocation(14)It is transported in No. two figuring of surface platforms in workshop(4)On deprotection film is carried out to compound plate;
Step 2, substrate and compound plate that surface treatment is completed are lifted into turnover panel alignment means(2)On, substrate and compound plate are carried out Upset and alignment, combination slab is combined into by substrate and compound plate alignment;
Step 3, the substrate and compound plate that will combine slab carry out welding edge sealing, and flaw detection unit is used after welding edge sealing(9)Detection Whether the weld seam of substrate and compound plate reaches requirement, and such as weld seam sealing is defective, it is necessary to repair welding again, ultimately form composite billet half into The all stock relocations of product feeding welding finished product base(16);
Step 4, composite billet semi-finished product are heated, reach design temperature requirement and answer composite billet semi-finished product are carried out with hot rolling Conjunction is processed;
Step 5, the composite billet semi-finished product to method hot rolling after treated carry out scale, cutting, horizontal strong, vertical strong, pressing;
Step 6, it is last again composite billet semi-finished product are carried out with surface inspection, reconditioning, thickness measuring, it is satisfactory as composite billet into Product.
5. production method according to claim 3, it is characterised in that such as two kinds of metallicities of substrate and compound plate in step 3 Difference is larger to be difficult welding, then weld edge sealing and encapsulate assembly using vacuum electron beam, and the vacuum electron beam encapsulation assembly is:Will Combined in step 2 in slab feeding vacuum chamber, vacuumized in vacuum chamber, after specified vacuum degree is reached, by step 2 Combination slab feeding vacuum electron beam welding machine group(11)Surrounding edge sealing welding is carried out, the two-layer compoboard after edge sealing will be welded Base is hoisted to platform for coating(5), need compound place face to coat interleaving agent in combination slab, send into drying oven(10)Dried It is dry, about five to ten minutes, the two-layer combination slab of two pieces of drying is hoisted to turnover panel alignment means(2)After being alignd, again Feeding vacuum electron beam welding machine group(11)The surrounding edge sealing welding between two blocks of combination slabs is carried out, four layers of composite billet half is formed Finished product, assembly is finished.
6. production method according to claim 5, it is characterised in that slab feeding electron-bombardment welding is combined in step 3 Pick group(11)Before carrying out surrounding edge sealing welding, magnetic treatment can be carried out to combination slab, to eliminate the high-intensity magnetic field near weld seam.
7. production method according to claim 3, it is characterised in that such as two kinds of metallicities of substrate and compound plate in step 3 Difference is smaller to be easy to welding wire soldering, then weld edge sealing and encapsulate base, the gas guarantor/submerged-arc welding encapsulation system using gas guarantor/submerged-arc welding Base is:The combination slab of the combination of two in step 2 is hoisted to platform for coating(5), need what is be combined in combination slab Place face coats interleaving agent, and then four layer materials are combined, into the automatic gas shield welding of narrow gap banding side unit long(7)、 Gas shield welding short side edge sealing unit(8), carry out short side long and be packaged, and a connecting tube is left as aspirating hole, treat that surrounding is sealed While after finishing, carrying out vacuum degassing treatment, the vacuum rear enclosed tracheae of regulation is reached, four layers of composite billet semi-finished product assembly is complete Finish.
8. production method according to claim 3, it is characterised in that the flaw detection unit in step 3(9)Detection base The weld seam of plate and compound plate uses phased array carrying out flaw detection.
CN201710120754.4A 2017-03-02 2017-03-02 A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology Pending CN106808212A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710120754.4A CN106808212A (en) 2017-03-02 2017-03-02 A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710120754.4A CN106808212A (en) 2017-03-02 2017-03-02 A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology

Publications (1)

Publication Number Publication Date
CN106808212A true CN106808212A (en) 2017-06-09

Family

ID=59115871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710120754.4A Pending CN106808212A (en) 2017-03-02 2017-03-02 A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology

Country Status (1)

Country Link
CN (1) CN106808212A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108453510A (en) * 2018-03-30 2018-08-28 鞍钢股份有限公司 A kind of low-cost high-efficiency assembly production method of composite plate
CN109650256A (en) * 2018-12-14 2019-04-19 中冶南方工程技术有限公司 The automatic assemble method of composite plate blanks and system
CN111283387A (en) * 2020-03-06 2020-06-16 东莞市新凯科技有限公司 Manufacturing process and manufacturing equipment of carbon structure composite steel plate
CN112589467A (en) * 2020-12-27 2021-04-02 山东盛阳金属科技股份有限公司 Pickling titanium plate welding device and welding process thereof
CN113578966A (en) * 2021-08-02 2021-11-02 沈阳科安捷材料技术有限公司 Production process and device of low-cost high-performance stainless steel composite plate coil
CN114393372A (en) * 2021-12-21 2022-04-26 中钢集团邢台机械轧辊有限公司 Preparation method of forged steel composite roller

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001079681A (en) * 1999-09-10 2001-03-27 Nisshinbo Ind Inc Combined sheet metal working machine
CN101913022A (en) * 2010-09-10 2010-12-15 哈尔滨工业大学 Method for welding dissimilar materials of TA15 titanium alloy and chromium bronze through electron beams
CN101913080A (en) * 2010-08-19 2010-12-15 无锡洲翔成套焊接设备有限公司 Tailor welding and correcting integrated machine
CN103231216A (en) * 2013-05-10 2013-08-07 山东亚盛重工股份有限公司 Manufacturing technique and device for composite board
CN206550641U (en) * 2017-03-02 2017-10-13 番禺珠江钢管(连云港)有限公司 A kind of dissimilar metal lamination is combined into set assembly equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001079681A (en) * 1999-09-10 2001-03-27 Nisshinbo Ind Inc Combined sheet metal working machine
CN101913080A (en) * 2010-08-19 2010-12-15 无锡洲翔成套焊接设备有限公司 Tailor welding and correcting integrated machine
CN101913022A (en) * 2010-09-10 2010-12-15 哈尔滨工业大学 Method for welding dissimilar materials of TA15 titanium alloy and chromium bronze through electron beams
CN103231216A (en) * 2013-05-10 2013-08-07 山东亚盛重工股份有限公司 Manufacturing technique and device for composite board
CN206550641U (en) * 2017-03-02 2017-10-13 番禺珠江钢管(连云港)有限公司 A kind of dissimilar metal lamination is combined into set assembly equipment

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108453510A (en) * 2018-03-30 2018-08-28 鞍钢股份有限公司 A kind of low-cost high-efficiency assembly production method of composite plate
CN108453510B (en) * 2018-03-30 2019-12-13 鞍钢股份有限公司 Low-cost efficient assembly production method of composite board
CN109650256A (en) * 2018-12-14 2019-04-19 中冶南方工程技术有限公司 The automatic assemble method of composite plate blanks and system
CN111283387A (en) * 2020-03-06 2020-06-16 东莞市新凯科技有限公司 Manufacturing process and manufacturing equipment of carbon structure composite steel plate
CN112589467A (en) * 2020-12-27 2021-04-02 山东盛阳金属科技股份有限公司 Pickling titanium plate welding device and welding process thereof
CN113578966A (en) * 2021-08-02 2021-11-02 沈阳科安捷材料技术有限公司 Production process and device of low-cost high-performance stainless steel composite plate coil
CN113578966B (en) * 2021-08-02 2023-09-19 沈阳科安捷材料技术有限公司 Production process and device for low-cost high-performance stainless steel composite board roll
CN114393372A (en) * 2021-12-21 2022-04-26 中钢集团邢台机械轧辊有限公司 Preparation method of forged steel composite roller

Similar Documents

Publication Publication Date Title
CN106808212A (en) A kind of dissimilar metal lamination is combined into set assembly equipment and combination blank technology
CN206550641U (en) A kind of dissimilar metal lamination is combined into set assembly equipment
KR102225672B1 (en) Manufacturing method of titanium-steel composite plate
CN104014997A (en) Manufacturing method for stainless steel composite boards
CN104786581B (en) A kind of multilayer stainless compound steel plate and its manufacture method
CN109623097A (en) A kind of compound increasing material device of MIG-TIG
CN106607668A (en) Manufacturing method for stainless steel clad plates allowing coating sides to be easily welded
CN101362249A (en) Girth welding method of duplex stainless steel bimetal composite pipe
CN108526662B (en) Back-surface-free argon-filling welding method for X groove of large-diameter nickel-based composite pipe
JP2008149407A (en) Manufacturing equipment
CN110396689A (en) A kind of laser melting coating strengthens the preparation method of Centrifugal rolling
CN111390350A (en) Submerged-arc welding method for C-276 composite board
CN112355461A (en) Method for welding magnesium target and copper back plate
CN1233947C (en) Manufacturing method for composite metal pipe
CN102744503B (en) Tungsten argon arc welding method using gas transmission activator
CN107914439A (en) A kind of the assembly structure and method of vacuum base rolling titanium clad steel plate
CN107717332A (en) A kind of manufacture method of easily welding bound edge stainless steel clad plate
CN104923935A (en) Method for welding large-thickness slabs having high alloy content
CN103894731A (en) Nickel base alloy electroslag band-electrode surfacing technology
CN107052050A (en) A kind of efficient isolation production method of stainless steel clad plate
CN104801926A (en) Preparation method for blank for producing stainless steel-carbon steel composite sheet
CN104801925A (en) Manufacturing method for blank for producing carbon steel-high carbon steel composite board
CN104827241A (en) Manufacturing method of blanks for producing steel-zirconium composite boards
CN107164714A (en) A kind of method for repairing and mending containing titanium composite panel
CN113529070A (en) Laser cladding preparation method of lining plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170609

WD01 Invention patent application deemed withdrawn after publication