CN106779453A - For the integrated managing and control system of rail vehicle production - Google Patents
For the integrated managing and control system of rail vehicle production Download PDFInfo
- Publication number
- CN106779453A CN106779453A CN201611240162.8A CN201611240162A CN106779453A CN 106779453 A CN106779453 A CN 106779453A CN 201611240162 A CN201611240162 A CN 201611240162A CN 106779453 A CN106779453 A CN 106779453A
- Authority
- CN
- China
- Prior art keywords
- production
- module
- abnormal
- control system
- rail vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Controllable the invention discloses progresses such as one kind production dispensing, production tasks, production exception record can timely respond to corresponding responsibility people, the strong integrated managing and control system for rail vehicle production of abnormal information trackability.It includes manufacturing schedule enquiry module, abnormal information processing module, material allocation enquiry module, bar code module, intelligent distribution dolly module and mobile terminal;Operation progress, production exception, material are allotted by the overall salary strategies of links, and packed by technological meanses such as mobile terminal, wireless coverage, laser guidances by the coordinated between above-mentioned module, intelligence manufacture is realized.
Description
Technical field
The present invention relates to a kind of production line managing and control system for rail vehicle production, specifically refer to a kind of for rail
The integrated managing and control system of road vehicle production.
Background technology
In recent years, China greatly develops track traffic;Subway, light rail, high ferro have become the business card in city, the generation of country
Speech.But for be engaged in track transportation industry we know very well that we are walked in generation at the aspect such as Integration ofTechnology, product be supporting
The prostatitis on boundary, but we also have a certain distance with world-class track traffic enterprise in production efficiency.
The inventor of present patent application is in practice, it has been found that at present still there is life in the rail vehicle line production system of China
The product dispensing time is long, and production task is more, and progress is difficult to control, and exception record can not timely respond to phase during vehicle production
Person liable is answered, abnormal information trackability is low, easily the progress for producing is caused serious to drag the phase weak point such as to influence.
The content of the invention
The technical problem to be solved in the present invention is to provide that the progresses such as a kind of production dispensing, production task are controllable, and production is abnormal
Record can timely respond to corresponding responsibility people, the strong integrated management and control system for rail vehicle production of abnormal information trackability
System.
In order to solve the above technical problems, the technical scheme that the present invention is provided is:It is a kind of for rail vehicle production it is integrated
Managing and control system, it includes manufacturing schedule enquiry module, abnormal information processing module, material allocation enquiry module, bar code mould
Block, intelligent distribution dolly module and mobile terminal;
Described manufacturing schedule enquiry module, for vehicle all process steps to be utilized into color management, identifies its different conditions, passes through
ERP, OA software interconnection, show the current manufacturing schedule of vehicle manufacture overall process, and abnormality processing state in real time;
Described abnormal information processing module, for all production abnormal informations of vehicle to be carried into report in station, by time triggered,
Production is abnormal to be reported step by step, it is ensured that the abnormal treatment in time of production;Abnormal lighting control system can be alarmed by red greenish-yellow tri coloured lantern;
Described material allocation enquiry module, for the material allocation state of storehouse can be shown in real time by billboard, according to
Production calendar can be chosen automatically, and material short-term information can be predicted in advance;When occurring abnormal, Realtime Alerts;
Described bar code module, for realizing one yard of a thing, enters line interface and merges with enterprise key software ERP, bar code
For material arrival, quality inspection, storage, selection, collection with etc. material intermediate links realize the service of overall process, it is ensured that material supply
Efficiently and accurately;
Described intelligent distribution dolly module include for automatic delivery AGV go-carts, described AGV go-carts by laser guidance,
Precise positioning navigates surely;
Described mobile terminal includes mobile phone, notebook, flat board, described mobile terminal can in the whole nation even all over the world,
Implement to understand the situation of production scene, process abnormal problem;
Connected by communicating wireless signals between above-mentioned each module.
Preferably, described wireless signal refers to WIFI signal;Described WIFI signal covering all departments and production car.
After said structure, the present invention has the advantages that:The problem that the technical program is solved is that logistics collection is matched somebody with somebody
Drag slow, need to ensure to construct preceding materials and parts elder generation in place;Production task performs confusion, and it is low that papery list browses efficiency, needs production management to appoint
Business is very clear, it is not necessary to independent query analysis of losing time;The abnormal paper record of production is difficult to search positioning, and can review
Property low, the abnormality processing that need to construct Real-time Feedback, solution is supervised in time, it is ensured that production it is not dilatory.
In sum, it is controllable the invention provides one kind production dispensing, the progress such as production task, production exception record energy and
When be responsive to corresponding responsibility people, the strong integrated managing and control system for rail vehicle production of abnormal information trackability.
Brief description of the drawings
Fig. 1 is the general frame schematic diagram of the integrated managing and control system for rail vehicle production in the present invention.
Fig. 2 is the present invention for operation production billboard in the integrated managing and control system specific embodiment one of rail vehicle production
Figure.
Fig. 3 is the present invention different for operation production billboard in the integrated managing and control system specific embodiment one of rail vehicle production
Often report is schemed.
Fig. 4 is the present invention for dispensing the total billboard of state in the integrated managing and control system specific embodiment one of rail vehicle production
Figure.
Fig. 5 is the present invention for dispensing progress status in the integrated managing and control system specific embodiment one of rail vehicle production
Figure.
Fig. 6 is the present invention for manufacturing schedule billboard in the integrated managing and control system specific embodiment one of rail vehicle production
Figure.
Fig. 7 is that the present invention sees for same day operation progress in the integrated managing and control system specific embodiment one of rail vehicle production
Plate figure.
Fig. 8 is that for being produced in the integrated managing and control system specific embodiment one of rail vehicle production, exception is comprehensive to be seen the present invention
Plate figure.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
With reference to accompanying drawing 1, a kind of integrated managing and control system for rail vehicle production, it include manufacturing schedule enquiry module,
Abnormal information processing module, material allocation enquiry module, bar code module, intelligent distribution dolly module and mobile terminal;
Described manufacturing schedule enquiry module, for vehicle all process steps to be utilized into color management, identifies its different conditions, passes through
ERP, OA software interconnection, show the current manufacturing schedule of vehicle manufacture overall process, and abnormality processing state in real time;
Described abnormal information processing module, for all production abnormal informations of vehicle to be carried into report in station, by time triggered,
Production is abnormal to be reported step by step, it is ensured that the abnormal treatment in time of production;Abnormal lighting control system can be alarmed by red greenish-yellow tri coloured lantern;Institute
The tri coloured lantern complete Based Intelligent Control of alarm stated(Can recognize when the abnormality of foreground position current vehicle);
Described material allocation enquiry module, for the material allocation state of storehouse can be shown in real time by billboard, according to
Production calendar can be chosen automatically, and material short-term information can be predicted in advance;When occurring abnormal, Realtime Alerts;
Described bar code module, for realizing one yard of a thing, enters line interface and merges with enterprise key software ERP, bar code
For material arrival, quality inspection, storage, selection, collection with etc. material intermediate links realize the service of overall process, it is ensured that material supply
Efficiently and accurately;
Described intelligent distribution dolly module include for automatic delivery AGV go-carts, described AGV go-carts by laser guidance,
Precise positioning navigates surely;
Described mobile terminal includes mobile phone, notebook, flat board, described mobile terminal can in the whole nation even all over the world,
Implement to understand the situation of production scene, process abnormal problem;
Connected by communicating wireless signals between above-mentioned each module.
Preferably, described wireless signal refers to WIFI signal;Described WIFI signal covering all departments and production car.
After said structure, the present invention has the advantages that:The problem that the technical program is solved is that logistics collection is matched somebody with somebody
Drag slow, need to ensure to construct preceding materials and parts elder generation in place;Production task performs confusion, and it is low that papery list browses efficiency, needs production management to appoint
Business is very clear, it is not necessary to independent query analysis of losing time;The abnormal paper record of production is difficult to search positioning, and can review
Property low, the abnormality processing that need to construct Real-time Feedback, solution is supervised in time, it is ensured that production it is not dilatory.
The development & construction for producing integrated control platform in addition are precedents in Chinese track traffic enterprise, have started Chinese rail
The beginning of road transportation industry production information, it is different from lean management, Instructing manufacture, Waste reduction, raising operating efficiency, solution
The aspects such as Chang Wenti are started with and solve the disadvantage that track traffic enterprise is all present, and for the industry of track traffic manufacturing industry provides treasured
Expensive experience, it is reported that in colleague field, manufacturing schedule is urged without perfect system platform management at present, and it is intelligentized
Managed Solution, thus our whole systems successful operation, car production efficiency increased one times in helping Wuhan, and benefit increases aobvious
Write.
In sum, it is controllable the invention provides one kind production dispensing, the progress such as production task, production exception record energy and
When be responsive to corresponding responsibility people, the strong integrated managing and control system for rail vehicle production of abnormal information trackability.
During specific implementation, further combined with accompanying drawing 2 to accompanying drawing 8, system of the present invention is to pass through when actually used
Hardware gathers information and realizes scheduling and management and control, and result is processed and shown by software systems in real time, specifically
Display figure and corresponding billboard be referred to accompanying drawing and be configured.This programme realizes information-based and mechanization Two-wheeled,
Our low production efficiencies are effectively solved, product tracks the problems such as not in time, obtains production efficiency and rise and product extremely
Quality dual income really up to the mark.
Above to the present invention and embodiments thereof be described, the description does not have restricted, shown in accompanying drawing also only
It is one of embodiments of the present invention, actual structure is not limited thereto.If all in all ordinary skill people of this area
Member is enlightened by it, similar to the technical scheme without designing for creativeness in the case where the invention objective is not departed from
Frame mode and embodiment, protection scope of the present invention all should be belonged to.
Claims (2)
1. it is a kind of for rail vehicle production integrated managing and control system, it is characterised in that:It includes manufacturing schedule enquiry module, different
Normal message processing module, material allocation enquiry module, bar code module, intelligent distribution dolly module and mobile terminal;
Described manufacturing schedule enquiry module, for vehicle all process steps to be utilized into color management, identifies its different conditions, passes through
ERP, OA software interconnection, show the current manufacturing schedule of vehicle manufacture overall process, and abnormality processing state in real time;
Described abnormal information processing module, for all production abnormal informations of vehicle to be carried into report in station, by time triggered,
Production is abnormal to be reported step by step, it is ensured that the abnormal treatment in time of production;Abnormal lighting control system can be alarmed by red greenish-yellow tri coloured lantern;
Described material allocation enquiry module, for the material allocation state of storehouse can be shown in real time by billboard, according to
Production calendar can be chosen automatically, and material short-term information can be predicted in advance;When occurring abnormal, Realtime Alerts;
Described bar code module, for realizing one yard of a thing, enters line interface and merges with enterprise key software ERP, bar code
For material arrival, quality inspection, storage, selection, collection with etc. material intermediate links realize the service of overall process, it is ensured that material supply
Efficiently and accurately;
Described intelligent distribution dolly module include for automatic delivery AGV go-carts, described AGV go-carts by laser guidance,
Precise positioning navigates surely;
Described mobile terminal includes mobile phone, notebook, flat board, described mobile terminal can in the whole nation even all over the world,
Implement to understand the situation of production scene, process abnormal problem;
Connected by communicating wireless signals between above-mentioned each module.
2. it is according to claim 1 for rail vehicle production integrated managing and control system, it is characterised in that:Described is wireless
Signal refers to WIFI signal;Described WIFI signal covering all departments and production car.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611240162.8A CN106779453A (en) | 2016-12-29 | 2016-12-29 | For the integrated managing and control system of rail vehicle production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611240162.8A CN106779453A (en) | 2016-12-29 | 2016-12-29 | For the integrated managing and control system of rail vehicle production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779453A true CN106779453A (en) | 2017-05-31 |
Family
ID=58924031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611240162.8A Pending CN106779453A (en) | 2016-12-29 | 2016-12-29 | For the integrated managing and control system of rail vehicle production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779453A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113408052A (en) * | 2021-06-17 | 2021-09-17 | 江南造船(集团)有限责任公司 | Ship production preparation method, system, medium and terminal based on three-dimensional ship model |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110018039A (en) * | 2009-08-17 | 2011-02-23 | 현대중공업 주식회사 | System for changing materials data when vessel is constructed |
CN202575301U (en) * | 2012-03-01 | 2012-12-05 | 毛振刚 | Laser guidance type automatic carrier system |
CN103106617A (en) * | 2013-01-21 | 2013-05-15 | 重庆大学 | Method and system for monitoring overall process of finished vehicle productive task executive condition |
CN103366265A (en) * | 2013-07-29 | 2013-10-23 | 南车南京浦镇车辆有限公司 | Station beat type distribution method based on enterprise internal logistics |
CN103475702A (en) * | 2013-09-04 | 2013-12-25 | 重庆大学 | Networked outside processing progress real-time control method based on mobile terminal |
-
2016
- 2016-12-29 CN CN201611240162.8A patent/CN106779453A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110018039A (en) * | 2009-08-17 | 2011-02-23 | 현대중공업 주식회사 | System for changing materials data when vessel is constructed |
CN202575301U (en) * | 2012-03-01 | 2012-12-05 | 毛振刚 | Laser guidance type automatic carrier system |
CN103106617A (en) * | 2013-01-21 | 2013-05-15 | 重庆大学 | Method and system for monitoring overall process of finished vehicle productive task executive condition |
CN103366265A (en) * | 2013-07-29 | 2013-10-23 | 南车南京浦镇车辆有限公司 | Station beat type distribution method based on enterprise internal logistics |
CN103475702A (en) * | 2013-09-04 | 2013-12-25 | 重庆大学 | Networked outside processing progress real-time control method based on mobile terminal |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113408052A (en) * | 2021-06-17 | 2021-09-17 | 江南造船(集团)有限责任公司 | Ship production preparation method, system, medium and terminal based on three-dimensional ship model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhai et al. | An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong | |
CN204155310U (en) | Big Dipper car networking logistics information service platform | |
CN101956568B (en) | Mining management system and working method thereof | |
CN107065888A (en) | One kind is based on magnetic navigation robot and navigation scheduling system and method | |
CN108171410A (en) | A kind of railway freight wisdom station total management system and its application | |
CN110979405B (en) | Guiding method and device based on multi-scene passenger flow control | |
CN109151003A (en) | Device intelligence Internet of things system | |
CN104401820A (en) | Elevator management system | |
CN106250990A (en) | A kind of electric automobile equipment maintenance and management system | |
CN103338349A (en) | Intelligent mass video signal screening and display access method based on VW and system based on VW | |
US20210012656A1 (en) | Emergency vehicle warning indication system | |
CN110135786A (en) | A kind of storage radio frequency and method based on Internet of Things monitoring | |
CN107895480A (en) | A kind of intellectual inducing scheme based on traffic congestion event | |
Zekavat et al. | Holonic construction management: Unified framework for ICT-supported process control | |
CN202929468U (en) | Digital sanitation intelligent monitoring and scheduling system | |
CN102442514B (en) | Digitalized cigarette dumping method | |
CN106779453A (en) | For the integrated managing and control system of rail vehicle production | |
CN204211289U (en) | Lift management system | |
CN106296092A (en) | Logistic management system based on RFID | |
CN202758392U (en) | Logistics distribution automatic indicating device based on the Internet of Things | |
CN106976676B (en) | A kind of warehousing system, production line and commodity distribution control method | |
CN109859523A (en) | A kind of basement parking position intelligence division processing method based on BIM | |
CN202103786U (en) | Road automobile flow video monitoring statistical system | |
CN115222244A (en) | Method for guaranteeing supply of materials based on special conditions | |
CN202939638U (en) | Intelligent warehouse logistics system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |