CN106779404A - A kind of pre- alarm method of flow and device - Google Patents
A kind of pre- alarm method of flow and device Download PDFInfo
- Publication number
- CN106779404A CN106779404A CN201611153772.4A CN201611153772A CN106779404A CN 106779404 A CN106779404 A CN 106779404A CN 201611153772 A CN201611153772 A CN 201611153772A CN 106779404 A CN106779404 A CN 106779404A
- Authority
- CN
- China
- Prior art keywords
- flow
- work item
- order
- task
- list
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
This application provides a kind of pre- alarm method of flow and device, because flow template and the process flow operation data are stored in local data base, same local data base is used i.e. in process flow operation component and flow monitoring component implementation procedure, be not in because disparate databases use different model structures, and then need the problem of model conversion, when solving that operation flow data-pushing is to flow monitoring component in the prior art, the problem for also needing the running efficiency of system for carrying out model conversion and causing low.
Description
Technical field
The present invention relates to the communications field, in particular, it is related to a kind of pre- alarm method of flow and device.
Background technology
Alarm is that process of service execution is analyzed from the angle of business activity to flow in advance, capturing service flow number
Calculated and analysis according to line discipline is entered, the staff of correlation is notified according to the pre- alarm change processing situation of configuration, and will advance notice
Alert result is intuitively presented to user with modes such as graphical chart or forms.
In current pre- alarm solution, operation flow data first pass through process flow operation component and are processed, then pass through
Crossing flow monitoring component carries out pre- alarm discriminatory analysis, and process flow operation component and flow monitoring component are relatively independent.Process flow operation
Component is responsible for providing the flow of access platform runtime support, realizes flow combing, process modeling, flow instance and activity
The function such as instance management and state-maintenance.Flow monitoring component is responsible for being monitored flow running, flow monitoring component
The operation flow data specified in process flow operation component are obtained by way of online acquisition according to Supervisory Surveillance Program, then basis
Relevant configuration information enters line discipline and calculates and analyze, and is in intuitively with modes such as graphical charts or form by pre- alarm result
Now give user.
In above-mentioned technical proposal, process flow operation component and flow monitoring component use different databases, due to different
Database employs different model structures, and operation flow data are processed by process flow operation component, then pushed first
To in flow monitoring component, after operation flow data are carried out into model conversion, flow monitoring component can be according to model conversion
Operation flow data afterwards are analyzed, and judge whether to meet pre- alarm conditions.Due to also needing to carry out model conversion, reduce
The operational efficiency of system.
Therefore, a kind of pre- alarm method of the flow that can improve running efficiency of system is needed badly.
The content of the invention
In view of this, the present invention provides a kind of pre- alarm method of flow and device, to solve operation flow in the prior art
When data-pushing is to flow monitoring component, the problem for also needing the running efficiency of system for carrying out model conversion and causing low.
In order to solve the above technical problems, present invention employs following technical scheme:
A kind of pre- alarm method of flow, including:
Detect whether to receive the instruction of the one of flow of click being input into flow list interface;
If detection receives the instruction, the process identification and flow template of the flow that acquisition is clicked;
According to the corresponding hyperlink of the process identification, generation starts form interface;
Flow instance title, the startup order being input into according to the process identification and in the startup form interface, hold
Row flow instance process;
According to the flow template, flow instance is performed;Wherein, during the execution flow instance, according to acquisition
Process flow operation data and the corresponding pre- alarm regulation of the flow template, judge it is described execution flow instance during, institute
State whether process flow operation data meet the pre- alarm regulation;When judging that the process flow operation data meet the advance notice police regulations
Then, pre- alarm result is exported;Wherein, the flow template and the process flow operation data are stored in local data base.
Preferably, it is described according to the process identification and it is described startup form interface be input into flow instance title,
Start order, perform flow instance process, including:
Transfer flow instance interface corresponding with the process identification;
Flow instance title and the startup order as described in the flow instance interface;
Verify the flow instance title of the flow instance interface and the startup order;
Wherein, if the verification passes through, perform described according to the flow template, execution flow instance.
Preferably, it is described according to the flow template, flow instance is performed, including:
According to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Detect whether to receive the n-th of the corresponding task list interface input of the corresponding task of i-th work item
Perform order;Wherein, n=1;
If detection receives described n-th and performs order, according to the corresponding task of i-th work item, generation described i-th
The corresponding work item list of individual work item;
Obtain the flow data being input on the corresponding work item list of i-th work item;
Detect whether to receive the order for performing i-th work item;
If detection receives the order for performing i-th work item, according to described in i-th work item pair
The flow data being input on the work item list answered and the flow template, the generation i+1 work item is corresponding to be held
The task of administrative staff;
Detect whether to receive corresponding task list circle of task in the corresponding operational staff of the i+1 work item
The n-th of face input performs order, wherein, n=n+1;
If detection receives described n-th and performs order, according to described in the corresponding work item list of i-th work item
The flow data of upper input, generates the corresponding work item list of the i+1 work item;
Obtain the flow data being input on the corresponding work item list of the i+1 work item;
Detect whether to receive the order for performing the i+1 work item;
If detection receives the order for performing the i+1 work item, i=i+1 is allowed, described in the return basis
The flow data being input on the corresponding work item list of i-th work item and the flow template, generation described i-th
The task of the corresponding operational staff of+1 work item, until whole flow process example is performed terminating;Wherein, in each and every one work item each
The data generated during the flow data and execution flow instance that are input on corresponding work item list are process flow operation number
According to.
Preferably, it is described according to the flow template, flow instance is performed, including:
According to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Detect whether to receive the n-th of the corresponding task list interface input of the corresponding task of i-th work item
Perform order;Wherein, n=1;
If detection receives described n-th and performs order, according to the corresponding task of i-th work item, generation described i-th
The corresponding work item list of individual work item;
Obtain the flow data being input on the corresponding work item list of i-th work item;
Detect whether to receive the order for performing i-th work item;
If detection receives the order for performing i-th work item, according to the flow template, described the is generated
The task of the corresponding operational staff of i+1 work item;
Detect whether to receive corresponding task list circle of task in the corresponding operational staff of the i+1 work item
The n-th of face input performs order, wherein, n=n+1;
If detection receives described n-th and performs order, the corresponding work item list of the i+1 work item is generated;
Obtain the flow data being input on the corresponding work item list of the i+1 work item;
Detect whether to receive the order for performing the i+1 work item;
If detection receives the order for performing the i+1 work item, i=i+1 is allowed, described in the return basis
Flow template, generates the task of the corresponding operational staff of the i+1 work item, until whole flow process example is performed terminating;
Wherein, it is raw during the flow data and execution flow instance that are input on the corresponding work item list of each and every one work item each
Into data be process flow operation data.
Preferably, it is described according to the process flow operation data for obtaining and the corresponding pre- alarm regulation of the flow template, sentence
During the disconnected execution flow instance, whether the process flow operation data meet the pre- alarm regulation, including:
According to the process flow operation data for obtaining, the corresponding content of pre-set level is obtained;
Judge whether the corresponding content of the pre-set level meets the pre- alarm regulation.
Preferably, the pre- alarm result of output, including:
The pre- alarm result is included in display interface in the way of graphical chart or form;
The pre- alarm result is sent to the corresponding terminal of staff in the way of sending information or send mail.
A kind of pre- alarm device of flow, including:
First detection module, for detecting whether receiving the one of flow of click being input into flow list interface
Instruction;
First acquisition module, if receiving the instruction, the stream that acquisition is clicked for first detection module detection
The process identification and flow template of journey;
First generation module, for according to the corresponding hyperlink of the process identification, generation to start form interface;
Flow instance module, for the flow reality being input into according to the process identification and in the startup form interface
Example title, startup order, perform flow instance process;
Flow instance module is performed, for according to the flow template, performing flow instance;
Flow monitoring module, for it is described execution flow instance during, according to obtain process flow operation data and
The corresponding pre- alarm regulation of the flow template, judges during the execution flow instance, whether is the process flow operation data
Meet the pre- alarm regulation;When judging that the process flow operation data meet the pre- alarm regulation, pre- alarm result is exported;
Wherein, the flow template and the process flow operation data are stored in local data base.
Preferably, the flow instance module includes:
Module is transferred, for transferring flow instance interface corresponding with the process identification;
Receiver module, for the flow instance title as described in the flow instance interface and the startup order;
Correction verification module, the flow instance title and startup life for verifying the flow instance interface
Order;
Wherein, if correction verification module verification passes through, the execution flow instance module performs described according to the stream
Journey template, performs flow instance.
Preferably, the execution flow instance module includes:
Second generation module, for according to the flow template, the corresponding task of i-th work item of generation;Wherein, i=
1;
Second detection module, for detecting whether receiving task corresponding in the corresponding task of i-th work item
The n-th of list interface input performs order;Wherein, n=1;
3rd generation module, if receiving described n-th for second detection module detection performs order, according to described
The corresponding task of i-th work item, generates the corresponding work item list of i-th work item;
Second acquisition module, for obtaining the flow number being input on the corresponding work item list of i-th work item
According to;
3rd detection module, for detecting whether receiving the order for performing i-th work item;
4th generation module, if receiving execution i-th work item for the 3rd detection module detection
Order, according to it is described on the corresponding work item list of i-th work item be input into flow data and the flow
Template, generates the task of the corresponding operational staff of the i+1 work item;
4th detection module, for detecting whether receiving appointing in the corresponding operational staff of the i+1 work item
It is engaged in the n-th of the input of corresponding task list interface performing order, wherein, n=n+1;
5th generation module, if receiving described n-th for the detection of the 4th detection module performs order, according to described in institute
The flow data being input on the corresponding work item list of i-th work item is stated, the corresponding work of the i+1 work item is generated
Item list;
3rd acquisition module, for obtaining the flow being input on the corresponding work item list of the i+1 work item
Data;
5th detection module, for detecting whether receiving the order for performing the i+1 work item;
First control module, if receiving the execution i+1 work for the 5th detection module detection
Order after, allow i=i+1;
4th generation module, is additionally operable to first control module and allows after i=i+1, according to described at described i-th
The flow data being input on the corresponding work item list of work item and the flow template, generate the i+1 work item
The task of corresponding operational staff, until whole flow process example is performed terminating;Wherein, in the corresponding work item of each work item
The data generated during the flow data and execution flow instance that are input on list are process flow operation data.
Preferably, the execution flow instance module includes:
6th generation module, for according to the flow template, the corresponding task of i-th work item of generation;Wherein, i=
1;
6th detection module, for detecting whether receiving task corresponding in the corresponding task of i-th work item
The n-th of list interface input performs order;Wherein, n=1;
7th generation module, if receiving described n-th for the 6th detection module detection performs order, according to described
The corresponding task of i-th work item, generates the corresponding work item list of i-th work item;
4th acquisition module, for obtaining the flow number being input on the corresponding work item list of i-th work item
According to;
7th detection module, for detecting whether receiving the order for performing i-th work item;
8th generation module, if receiving execution i-th work item for the 7th detection module detection
Order, according to the flow template, generate the task of the corresponding operational staff of the i+1 work item;
8th detection module, for detecting whether receiving appointing in the corresponding operational staff of the i+1 work item
It is engaged in the n-th of the input of corresponding task list interface performing order, wherein, n=n+1;
9th generation module, if receiving described n-th for the detection of the 8th detection module performs order, generation described i-th+
The corresponding work item list of 1 work item;
5th acquisition module, for obtaining the flow being input on the corresponding work item list of the i+1 work item
Data;
9th detection module, for detecting whether receiving the order for performing the i+1 work item;
Second control module, if receiving the execution i+1 work for the 9th detection module detection
Order after, allow i=i+1;
8th generation module, is additionally operable to second control module and allows after i=i+1, raw according to the flow template
Into the task of the corresponding operational staff of the i+1 work item, until whole flow process example is performed terminating;Wherein, each
The flow data that is input on the corresponding work item list of individual work item and to perform the data generated during flow instance be stream
Journey service data.
Compared to prior art, the invention has the advantages that:
The invention provides a kind of pre- alarm method of flow and device, detect whether to receive defeated in flow list interface
The instruction of the one of flow of click for entering, if detection receives the instruction, the process identification of the flow that acquisition is clicked with
And flow template, according to the corresponding hyperlink of the process identification, generation starts form interface, according to the process identification and
Flow instance title, startup order in the startup form interface input, perform flow instance process, according to the flow
Template, performs flow instance.Aforesaid operations are the function of process flow operation component, and during the execution flow instance, root
According to the process flow operation data and the corresponding pre- alarm regulation of the flow template that obtain, the execution flow instance process is judged
In, whether the process flow operation data meet the pre- alarm regulation;When judging that the process flow operation data meet described pre-
Alarm regulation, exports pre- alarm result, is the function of flow monitoring component.Because flow template and the flow are transported in this programme
Row data use same in being stored in local data base, i.e. process flow operation component and flow monitoring component implementation procedure
Ground database, is not in, because disparate databases are using different model structures, and then to need the problem of model conversion, is solved
When operation flow data-pushing is to flow monitoring component in the prior art, the system operation for also needing to carry out model conversion and causing is imitated
The low problem of rate.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Inventive embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
The accompanying drawing of offer obtains other accompanying drawings.
A kind of method flow diagram of the pre- alarm method of flow that Fig. 1 is provided for the present invention;
The method flow diagram of the pre- alarm method of another flow that Fig. 2 is provided for the present invention;
The method flow diagram of the pre- alarm method of the third flow that Fig. 3 is provided for the present invention;
A kind of structural representation of the pre- alarm device of flow that Fig. 4 is provided for the present invention;
The structural representation of the pre- alarm device of another flow that Fig. 5 is provided for the present invention;
The structural representation of the pre- alarm device of the third flow that Fig. 6 is provided for the present invention;
The 4th kind of structural representation of the pre- alarm device of flow that Fig. 7 is provided for the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
The embodiment of the invention provides a kind of pre- alarm method of flow, reference picture 1, including:
S101, the instruction for detecting whether to receive the one of flow of click being input into flow list interface;
Specifically, user wants the flow for starting according to self-demand in not actuated flow list interface selection,
Now, the instruction of the one of flow of click of user input can be got, for example, when user wants to ask for leave, just
Click is asked for leave flow.
The process identification and flow template of the flow that S102, acquisition are clicked;
Specifically, when detection receives instruction, the process identification and flow template of the flow being clicked are obtained, wherein,
Each flow has a process identification and a flow template, but, a flow template can correspond to multiple flow realities
Example.
S103, according to the corresponding hyperlink of process identification, generation starts form interface;
It should be noted that each process identification has a hyperlink, and after detection receives instruction, being capable of basis
The corresponding hyperlink of process identification, generation starts form interface, wherein.User input flow number of passes is needed in startup form interface
According to.
S104, the flow instance title being input into according to process identification and in startup form interface, startup order, perform stream
Journey instantiation process;
Wherein, perform flow instance process, exactly create a process for specific flow, this process, it is necessary to
User is starting form interface input flow instance name, such as " flow of asking for leave of Zhang San ".Sometimes also need to be input into flow reality
The content that example is described, after user input complete data, clicks on and starts order, it becomes possible to according to process identification, starts one specifically
Flow instance.
S105, according to flow template, perform flow instance;
Wherein, it is corresponding pre- according to the process flow operation data and flow template for obtaining during flow instance is performed
Alarm regulation, judges during execution flow instance, whether process flow operation data meet pre- alarm regulation;When judge flow transport
Row data meet pre- alarm regulation, export pre- alarm result;Wherein, flow template and process flow operation data are stored in local number
According to storehouse.
It should be noted that according to the process flow operation data for obtaining, judging whether process flow operation data meet advance notice police regulations
Then, then need to be also required to be saved in local data base by the process flow operation data of acquisition, called at any time with facilitating.
Perform flow instance and judge whether process flow operation data meet pre- alarm regulation while carrying out, perform flow
In example procedure, process flow operation data can be produced, whether meet pre- according to process flow operation data real-time judge process flow operation data
Alarm regulation, when judging that process flow operation data meet pre- alarm regulation, exports pre- alarm result.
Wherein, according to the process flow operation data and the corresponding pre- alarm regulation of flow template for obtaining, judge to perform flow
In example procedure, whether process flow operation data meet pre- alarm regulation, including:
According to the process flow operation data for obtaining, the corresponding content of pre-set level is obtained;
Judge whether the corresponding content of pre-set level meets pre- alarm regulation.
Wherein, pre-set level is set in advance, and multiple pre-set levels can be set in a flow instance, and in advance
If index is also equipped with pre-set level threshold value, the pre- alarm regulation in the application can be according to the content of pre-set level different
There are different rules in pre-set level threshold range.
For example, the flow instance of asking for leave of Zhang San, it is assumed that Zhang San ask for leave needs to leader examine, and lead examine when
Between be two days, when Zhang San ask for leave flow instance generate after, leader within the time of two days without examination & approval, then then meet predict
Police regulations then, can export pre- alarm result.
Additionally, pre- alarm result is exported, including:
Pre- alarm result is included in display interface in the way of graphical chart or form;
Pre- alarm result is sent to the corresponding terminal of staff in the way of sending information or send mail.
Wherein, terminal includes mobile phone, flat board or apparatus such as computer.
Specifically, pre- alarm result is included in display interface in the way of graphical chart or form, work can be made
Make staff before the display interface of computer and understand the place that pre- alarm regulation is not met in whole flow process example in time.
Pre- alarm result is sent to the corresponding terminal of staff in the way of sending information or send mail simultaneously,
Can be when staff be outgoing due to need of work, it is also possible to understand the execution error situation of flow instance in time.
It should be noted that according to flow template and pre- alarm regulation, carrying out syntactic analysis, contextual analysis and synthesis
Treatment, can obtain precompile file.Wherein, flow template one precompile file of correspondence.
Include diversified flow template and the corresponding pre- alarm regulation of flow template in local data base, it is each
One pre- alarm regulation of individual flow template correspondence.It should be noted that flow template and the corresponding advance notice police regulations of flow template
It is then good just-ahead-of-time compilation, in having stored in local data base.For example, flow template can be flow template, the silver asked for leave
Flow template of capable examination & approval of transferring accounts etc..It should be noted that local data base is according to flow data and flow monitoring data structure
Build, wherein, flow data include flow definition table, flow instance table, campaign definitions table, active instance table, work item table and
Flow chart model defines table, and flow monitoring data include that flow chart model defines table, pre- alarm factor information table, pre- alarm regulation
Information table and pre- alarm result detail list.
Flow template and the corresponding pre- alarm regulation of flow template are created in workflow editor, wherein,
Workflow editor includes that primitive control, painting canvas management, process modeling, the configuration of pre- alarm regulation, flow issue and flow represent and matches somebody with somebody
Put.
Wherein, primitive control is the unified management to geographic metadata, there is provided based on business process model and symbol BPMN
The selection of the swimming lane of 2.0 standards, event, activity, gateway, line and other (annotation, packets) etc. is used.
Painting canvas management is that the drawing area for developing librarian use various pel Planning procedures is managed, there is provided figure is dragged
Put, the overall of figure amplifies adjustment etc. of being alignd with diminution, pel.
Process modeling refers to that various pels are selected, and draws connecting line between pel, and to primitive attribute editor, is realized
The rapid build of flow chart.
Pre- alarm regulation configuration:Associated monitoring index is configured to operation flow and pre- alarm regulation provides visual volume
Volume, it is easy to carry out monitor in real time to operation flow;
Flow issue refers to the release status of flow, and the flow only issued could visioning procedure example and operational process reality
Example.
It is that flow ways of presentation is configured that flow represents configuration, configuration flow display layout, the pre- alarm prompt of flow
Lamp color, process flow operation state Fill Color etc..
In the present embodiment, detect whether to receive the finger of the one of flow of click being input into flow list interface
Order, if detection receives instruction, the process identification and flow template of the flow that acquisition is clicked are corresponding according to process identification
Hyperlink, generation starts form interface, flow instance title, the startup being input into according to process identification and in startup form interface
Order, performs flow instance process, according to flow template, performs flow instance.Aforesaid operations are the work(of process flow operation component
Can, and during flow instance is performed, according to the process flow operation data and the corresponding pre- alarm regulation of flow template that obtain,
Judge during execution flow instance, whether process flow operation data meet pre- alarm regulation;When judge process flow operation data expire
The pre- alarm regulation of foot, exports pre- alarm result, is the function of flow monitoring component.
Because flow template and process flow operation data are stored in local data base, i.e. process flow operation component and flow monitoring
Same local data base is used in component implementation procedure, be not in because disparate databases are using different model structures,
And then the problem of model conversion is needed, when solving that operation flow data-pushing is to flow monitoring component in the prior art, also need
The low problem of the running efficiency of system that carries out model conversion and cause.
Meanwhile, in the prior art, after pre- alarm model conversion, in addition it is also necessary to the process of executing rule compiling, and in the application
Pre- alarm regulation is good just-ahead-of-time compilation, and is stored in the local database, can reduce the time of rule compiling in the prior art,
Improve the execution efficiency of system.
Additionally, flow monitoring component obtains process flow operation according to Supervisory Surveillance Program by way of online acquisition in the prior art
The operation flow data specified in component, when unstable networks or relatively low bandwidth, it may appear that data acquisition is not in time
Situation, and then the real-time of pre- alarm is influenceed, and in the application, because process flow operation data are stored in local data base
In, flow monitoring component direct access, it is no longer necessary to by way of online acquisition, it is ensured that the real-time of pre- alarm.
Optionally, in another embodiment of the present invention, the flow being input into according to process identification and in startup form interface
Instance name, startup order, perform flow instance process, including:
Transfer flow instance interface corresponding with process identification;
Ordered by flow instance interface flow instance title and startup;
Flow instance title and start order that checking process Instance Interface is received;
Wherein, if verification passes through, perform according to flow template, perform flow instance.
It should be noted that process identification one flow instance interface of correspondence, the flow instance interface flow
Instance name and startup are ordered, and after receiving flow instance title and starting order, there is a process for data check, that is, verify
Flow instance title and startup are ordered, if verification passes through, prove that successful execution flow implementationization is operated, and are now continued executing with
S105, if inspection does not pass through, can not perform S105.
In the present embodiment, verification is ordered by the flow instance title and startup of flow instance interface.When verification passes through
When, perform according to flow template, perform flow instance.
Optionally, in the bright another embodiment of this law, reference picture 2, according to flow template, performs flow instance, including:
S201, according to flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Specifically, as i=1, according to flow template, the corresponding task of generation first job performs first work
In the pending task list of the personnel for making item, first task can be shown.
S202, detect whether to receive the n-th of the corresponding task list interface input of the corresponding task of i-th work item
Perform order;Wherein, n=1;
It should be noted that as i=1 and n=1, detect whether to receive task correspondence corresponding in i-th work item
The input of task list interface n-th performs order, as detect whether to receive task pair corresponding in first job item
The first of the task list interface input answered performs order, that is, performing the pending task row of the personnel of first job
In table, executive button is had, when the personnel for performing first job click on executive button, i.e., can detect and receive first
Perform order.
S203, according to the corresponding task of i-th work item, the corresponding work item list of i-th work item of generation;
Wherein, if detection receives the n-th execution order, according to the corresponding task of i-th work item, i-th work is generated
The corresponding work item list of item;
Specifically, as i=1 and n=1, it is corresponding according to first job if detection receives the first execution order
Task, the corresponding work item list of generation first job;
Specifically, when detection receives the first execution order, that is, perform first job personnel click execution by
Button, now, it becomes possible to according to the corresponding task of first job, generates the corresponding work item list of first job, this
When, it becomes possible to there is first job in the waiting task on the computer of personnel of first job is performed corresponding
List.
By taking the flow of asking for leave of Zhang San as an example, it is assumed that first job is to fill in list of asking for leave, when Zhang San clicks on pending
Work item in business is entitled to fill in single corresponding executive button of asking for leave, and will now jump to and fill in single corresponding display of asking for leave
Interface, includes the contents such as applicant, reason of asking for leave and time of asking for leave on this display interface, now need Zhang San to fill in one by one
Need the data of input.
S204, obtain the flow data being input on the corresponding work item list of i-th work item;
Wherein, the process of Zhang San's fill substance on work item list, is as input into the process of flow data, works as n=1
When, now can just get the flow data being input on the corresponding work item list of first job.Or with Zhang San
Flow of asking for leave as a example by, the information such as applicant, reason of asking for leave and time of asking for leave that Zhang San fills in, the flow data being as input into.
S205, detect whether to receive i-th order of work item of execution;
After the personnel for performing work item click on the button of i-th work item of execution, it becomes possible to which detection receives execution i-th
The order of individual work item, or by taking the flow of asking for leave of Zhang San as an example, Zhang San fills in that work item is entitled to fill in single work of asking for leave
During list, executive button is had below list, after Zhang San clicks on executive button, it becomes possible to which detection receives that execution fills in please
False single order.
S206, according to the flow data and flow template being input on the corresponding work item list of i-th work item, it is raw
Into the task of the corresponding operational staff of i+1 work item;
Wherein, if detection receives i-th order of work item of execution, according in the corresponding work item of i-th work item
The flow data and flow template being input on list, the task of the corresponding operational staff of generation i+1 work item;
Specifically, when the personnel for performing first job fill in the corresponding work item list of first job and
After clicking on the button for performing first job, it becomes possible to according to the flow data filled on first job list and
The trend of flow chart in flow template, the task of the corresponding operational staff of second work item of generation now, is performing second
Second work item will be shown in the waiting task of the personnel of work item, i.e., now needs to perform second people of work item
Member completes to perform the operation of the second work item.
Or by taking the flow of asking for leave of Zhang San as an example, after Zhang San fills in asks for leave single list, it becomes possible to according to
Three contents filled in and flow template, the task of the corresponding operational staff of second work item of generation, it is assumed that second work
Item is that line manager examines, and the line manager of Zhang San is Li Si, it becomes possible to the content and flow template filled according to Zhang San,
The task of Li Si is generated, Li Si can just find the task in the waiting task of oneself.
S207, detect whether to receive the corresponding task list of task in the corresponding operational staff of i+1 work item
The n-th of interface input performs order, wherein, n=n+1;
Specifically, the same with Zhang San, Li Si also searches line manager in the task list of oneself and examines this work item,
Click on its corresponding executive button, it becomes possible to which the task that detection receives the corresponding operational staff of i+1 work item is corresponding
Task list interface input n-th performs order, as i=1 and n=1, i.e., can receive that second work item is corresponding to be held
The second of the corresponding task list interface input of task of administrative staff performs order.
S208, according to the flow data being input on the corresponding work item list of i-th work item, generate i+1 work
Make the corresponding work item list of item;
If specifically, detection receives the n-th execution order, according to defeated on the corresponding work item list of i-th work item
The flow data for entering, the corresponding work item list of generation i+1 work item.
It should be noted that the corresponding work item list of i+1 work item in the present embodiment is according in i-th work
Make the flow data generation of input on the corresponding work item list of item, i.e., in the corresponding work item list of i+1 work item
The flow data being input on the corresponding work item list of i-th work item can be included.
Or by taking the flow of asking for leave of Zhang San as an example, the line manager in the task list of the corresponding line manager Li Si of Zhang San
Examine in the corresponding work item list of this work item, Zhang San can be included and fill in the corresponding work item of single this work item of asking for leave
The content filled in list, i.e., comprising contents such as applicant, reason of asking for leave and times of asking for leave.
S209, the flow data for obtaining the input on the corresponding work item list of i+1 work item;
Specific explanations are similar with step S204, refer to the corresponding explanations of step S204.
S210, detect whether to receive the order for performing i+1 work item;
Specific explanations are similar with step S205, refer to the corresponding explanations of step S205.
S211, allow i=i+1;
If specifically, detection receives the order for performing i+1 work item, allowing i=i+1.
It should be noted that allow after i=i+1, return to step S206, until whole flow process example end of run.
Wherein, the flow data and execution flow instance mistake being input on the corresponding work item list of each work item
The data generated in journey are process flow operation data.
For example, Zhang San fill in work item it is entitled fill in single work item of asking for leave work item list when, it is filled in
Time as process flow operation data a part, and line manager is filling in line manager and is examining the work item of this work item
During list, its time filled in also serves as a part for process flow operation data.
It should be noted is that, during performing flow instance, the parameter related to precompile file is obtained in that,
And then precompile file is able to carry out, obtain compiling file.Wherein, the process from precompile file to compiling file is by monitoring
Engine provides running environment.Process from precompile file to compiling file is according to precompile file and process flow operation data
Construction abstract syntax tree AST syntax trees, and AST syntax trees are parsed, obtain compiling file.
Wherein, it is to provide the running environment for performing flow instance by runtime engine to perform flow instance, and runtime engine is work
Make the core that stream performs service, Workflow enactment service product process example and manages its running at operational process example.
In the implementation procedure of flow instance, Workflow enactment service, according to flow definition and workflow related data, is flow instance
Operation navigated.
Runtime engine mainly includes three modules, i.e. workflow management module, campaign management module and work item management module.
Wherein, workflow management module is responsible for the management of the life cycle of flow instance, provides flow instance relevant information, and
It is responsible for the route between the active instance of the flow instance, current active is finished, is calculated by workflow management module next
Individual or multiple activities, and transfer to campaign management module to be responsible for execution.Work item management module is responsible for being managed human task,
Establishment, assignment, startup, termination and the submission of task including task etc., because the assignment of human task is often with personnel's
In place state, the variation of institutional framework and the change of dispatching rules and often change, therefore when the task of carrying out is assigned, work item
Management module is assigned corresponding performer by calling rule.
In the present embodiment, according to flow template, each work item is performed successively, generating, next work item is corresponding
, it is necessary to using the flow data filled in the corresponding work item list of a upper work item during work item list, even if upper one
The flow data filled in the corresponding work item list of work item is used as the corresponding work item list of the next work item of generation
Foundation.
Optionally, in another embodiment of the present invention, reference picture 3, according to flow template, performs flow instance, including:
S301, according to flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
S303, detect whether to receive the n-th of the corresponding task list interface input of the corresponding task of i-th work item
Perform order;Wherein, n=1;
S303, according to the corresponding task of i-th work item, the corresponding work item list of i-th work item of generation;
Wherein, if detection receives the n-th execution order, according to the corresponding task of i-th work item, i-th work is generated
The corresponding work item list of item.
S304, obtain the flow data being input on the corresponding work item list of i-th work item;
S305, detect whether to receive i-th order of work item of execution;
S306, according to flow template, the task of the corresponding operational staff of generation i+1 work item;
Specifically, if detection receives i-th order of work item of execution, according to flow template, generation i+1 works
The task of the corresponding operational staff of item;
It should be noted that with being generated unlike above-described embodiment, in the present embodiment, i+1 work item is corresponding to be held
The task of administrative staff, it is only necessary to reference flowchart template, it is not necessary to be input into reference on the corresponding work item list of i-th work item
Flow data.Perform after a work item, detected after receiving the order for performing a upper work item, just directly
According to flow template, the task of the corresponding operational staff of generation i+1 work item, i.e. detection receive the upper work of execution
The order of item, it becomes possible to the task of the corresponding operational staff of the next work item of triggering generation, herein, detection is received in execution
One order of work item has only been trigger action.
S307, detect whether to receive the corresponding task list of task in the corresponding operational staff of i+1 work item
The n-th of interface input performs order, wherein, n=n+1;
S308, the corresponding work item list of generation i+1 work item;
If specifically, detection receives the n-th execution order, the corresponding work item list of generation i+1 work item.
It should be noted that it is unlike the embodiments above, the corresponding work item table of i+1 work item is generated herein
List need not use the flow data being input on the corresponding work item list of i-th work item.
S309, the flow data for obtaining the input on the corresponding work item list of i+1 work item;
S310, detect whether to receive the order for performing i+1 work item;
S311, allow i=i+1;
If specifically, detection receives the order for performing i+1 work item, allowing i=i+1;
It should be noted that allow after i=i+1, return to step S306, until whole flow process example is performed terminating;
Wherein, the flow data and execution flow instance mistake being input on the corresponding work item list of each work item
The data generated in journey are process flow operation data.
In the present embodiment, according to flow template, each work item is performed successively, generating, next work item is corresponding
During work item list, it is not necessary to using the flow data filled in the corresponding work item list of a upper work item, that is, go up one
The flow data filled in the corresponding work item list of work item is not as the corresponding work item list of the next work item of generation
Foundation.
Optionally, in another embodiment of the present invention provide a kind of pre- alarm device of flow, reference picture 4, including:
First detection module 101, for detecting whether receive in flow list interface be input into click one of them
The instruction of flow;
First acquisition module 102, if receiving instruction, the flow that acquisition is clicked for the detection of first detection module 101
Process identification and flow template;
First generation module 103, for according to the corresponding hyperlink of process identification, generation to start form interface;
Flow instance module 104, for the flow instance name being input into according to process identification and in startup form interface
Claim, start order, perform flow instance process;
Flow instance module 105 is performed, for according to flow template, performing flow instance;
Flow monitoring module 106, for during flow instance is performed, according to the process flow operation data and stream that obtain
The corresponding pre- alarm regulation of journey template, judges during execution flow instance, whether process flow operation data meet pre- alarm regulation;
When judging that process flow operation data meet pre- alarm regulation, pre- alarm result is exported;Wherein, flow template and process flow operation data
It is stored in local data base.
In the present embodiment, detect whether to receive the finger of the one of flow of click being input into flow list interface
Order, if detection receives instruction, the process identification and flow template of the flow that acquisition is clicked are corresponding according to process identification
Hyperlink, generation starts form interface, flow instance title, the startup being input into according to process identification and in startup form interface
Order, performs flow instance process, according to flow template, performs flow instance.Aforesaid operations are the work(of process flow operation component
Can, and during flow instance is performed, according to the process flow operation data and the corresponding pre- alarm regulation of flow template that obtain,
Judge during execution flow instance, whether process flow operation data meet pre- alarm regulation;When judge process flow operation data expire
The pre- alarm regulation of foot, exports pre- alarm result, is the function of flow monitoring component.
It should be noted that in the present embodiment, the course of work of modules refer to interior in the corresponding embodiments of Fig. 1
Hold, will not be repeated here.
Optionally, in another embodiment of the present invention, reference picture 5, flow instance module 104 includes:
Module 1041 is transferred, for transferring flow instance interface corresponding with process identification;
Receiver module 1042, for being ordered by flow instance interface flow instance title and startup;
Correction verification module 1043, the flow instance title received for checking process Instance Interface and startup are ordered;
Wherein, if the verification of correction verification module 1043 passes through, perform flow instance module 105 and perform according to flow template, hold
Row flow instance.
In the present embodiment, verification is ordered by the flow instance title and startup of flow instance interface.When verification passes through
When, perform according to flow template, perform flow instance.
It should be noted that in the present embodiment, the course of work of modules refer to the corresponding content of above-described embodiment,
Will not be repeated here.
Optionally, in another embodiment of the present invention, performing flow instance module 105 includes:
Second generation module 1051, for according to flow template, the corresponding task of i-th work item of generation;Wherein, i=
1;
Second detection module 1052, for detecting whether receiving task corresponding in the corresponding task of i-th work item
The n-th of list interface input performs order;Wherein, n=1;
3rd generation module 1053, if receiving the n-th execution order for the detection of the second detection module 1052, according to i-th
The corresponding task of individual work item, the corresponding work item list of i-th work item of generation;
Second acquisition module 1054, for obtaining the flow number being input on the corresponding work item list of i-th work item
According to;
3rd detection module 1055, for detecting whether receiving i-th order of work item of execution;
4th generation module 1056, if receiving i-th life of work item of execution for the detection of the 3rd detection module 1055
Order, according to the flow data and flow template that are input on the corresponding work item list of i-th work item, generation i+1
The task of the corresponding operational staff of work item;
4th detection module 1057, for detecting whether receiving appointing in the corresponding operational staff of i+1 work item
It is engaged in the n-th of the input of corresponding task list interface performing order, wherein, n=n+1;
5th generation module 1058, if receiving the n-th execution order for the detection of the 4th detection module 1057, according to the
The flow data being input on the corresponding work item list of i work item, the corresponding work item list of generation i+1 work item;
3rd acquisition module 1059, for obtaining the flow being input on the corresponding work item list of i+1 work item
Data;
5th detection module 10510, for detecting whether receiving the order for performing i+1 work item;
First control module 10511, if receiving execution i+1 work item for the detection of the 5th detection module 10510
Order after, allow i=i+1;
4th generation module 1056, is additionally operable to the first control module 10511 and allows after i=i+1, according in i-th work item
The flow data and flow template being input on corresponding work item list, the corresponding operational staff of generation i+1 work item
Task, until whole flow process example perform terminate;Wherein, the stream being input on the corresponding work item list of each work item
The data that number of passes is generated according to this and during execution flow instance are process flow operation data.
In the present embodiment, according to flow template, each work item is performed successively, generating, next work item is corresponding
, it is necessary to using the flow data filled in the corresponding work item list of a upper work item during work item list, even if upper one
The flow data filled in the corresponding work item list of work item is used as the corresponding work item list of the next work item of generation
Foundation.
It should be noted that in the present embodiment, the course of work of modules refer to the corresponding content of above-described embodiment,
Will not be repeated here.
Optionally, in another embodiment of the present invention, reference picture 7, performing flow instance module 105 includes:
6th generation module 1061, for according to flow template, the corresponding task of i-th work item of generation;Wherein, i=
1;
6th detection module 1062, for detecting whether receiving task corresponding in the corresponding task of i-th work item
The n-th of list interface input performs order;Wherein, n=1;
7th generation module 1063, if receiving the n-th execution order for the detection of the 6th detection module 1062, according to i-th
The corresponding task of individual work item, the corresponding work item list of i-th work item of generation;
4th acquisition module 1064, for obtaining the flow number being input on the corresponding work item list of i-th work item
According to;
7th detection module 1065, for detecting whether receiving i-th order of work item of execution;
8th generation module 1066, if receiving i-th life of work item of execution for the detection of the 7th detection module 1065
Order, according to flow template, the task of the corresponding operational staff of generation i+1 work item;
8th detection module 1067, for detecting whether receiving appointing in the corresponding operational staff of i+1 work item
It is engaged in the n-th of the input of corresponding task list interface performing order, wherein, n=n+1;
9th generation module 1068, the n-th execution order is received if being detected for the 8th detection module 1067, and generation i-th+
The corresponding work item list of 1 work item;
5th acquisition module 1069, for obtaining the flow being input on the corresponding work item list of i+1 work item
Data;
9th detection module 10610, for detecting whether receiving the order for performing i+1 work item;
Second control module 10611, if receiving execution i+1 work item for the detection of the 9th detection module 10610
Order after, allow i=i+1;
8th generation module 1066, is additionally operable to the second control module 10611 and allows after i=i+1, according to flow template, generation
The task of the corresponding operational staff of i+1 work item, until whole flow process example is performed terminating;Wherein, worked at each
The data generated during the flow data and execution flow instance that are input on the corresponding work item list of item are process flow operation
Data.
In the present embodiment, according to flow template, each work item is performed successively, generating, next work item is corresponding
During work item list, it is not necessary to using the flow data filled in the corresponding work item list of a upper work item, that is, go up one
The flow data filled in the corresponding work item list of work item is not as the corresponding work item list of the next work item of generation
Foundation.
It should be noted that in the present embodiment, the course of work of modules refer to the corresponding content of above-described embodiment,
Will not be repeated here.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or uses the present invention.
Various modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The scope most wide for causing.
Claims (10)
1. the pre- alarm method of a kind of flow, it is characterised in that including:
Detect whether to receive the instruction of the one of flow of click being input into flow list interface;
If detection receives the instruction, the process identification and flow template of the flow that acquisition is clicked;
According to the corresponding hyperlink of the process identification, generation starts form interface;
Flow instance title, the startup order being input into according to the process identification and in the startup form interface, perform stream
Journey instantiation process;
According to the flow template, flow instance is performed;Wherein, during the execution flow instance, according to the stream for obtaining
Journey service data and the corresponding pre- alarm regulation of the flow template, judge it is described execution flow instance during, the stream
Whether journey service data meets the pre- alarm regulation;When judging that the process flow operation data meet the pre- alarm regulation,
Export pre- alarm result;Wherein, the flow template and the process flow operation data are stored in local data base.
2. the pre- alarm method of flow according to claim 1, it is characterised in that it is described according to the process identification and
The flow instance title for starting form interface input, startup order, perform flow instance process, including:
Transfer flow instance interface corresponding with the process identification;
Flow instance title and the startup order as described in the flow instance interface;
Verify the flow instance title of the flow instance interface and the startup order;
Wherein, if the verification passes through, perform described according to the flow template, execution flow instance.
3. the pre- alarm method of flow according to claim 1, it is characterised in that described according to the flow template, performs
Flow instance, including:
According to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Detect whether to receive the n-th execution in the corresponding task list interface input of the corresponding task of i-th work item
Order;Wherein, n=1;
If detection receives described n-th and performs order, according to the corresponding task of i-th work item, i-th work is generated
Make the corresponding work item list of item;
Obtain the flow data being input on the corresponding work item list of i-th work item;
Detect whether to receive the order for performing i-th work item;
If detection receives the order for performing i-th work item, according to described corresponding in i-th work item
The flow data being input on work item list and the flow template, generate the corresponding executor of the i+1 work item
The task of member;
Detect whether to receive defeated at the corresponding task list interface of task of the corresponding operational staff of the i+1 work item
N-th for entering performs order, wherein, n=n+1;
If detection receives described n-th and performs order, according to described defeated on the corresponding work item list of i-th work item
The flow data for entering, generates the corresponding work item list of the i+1 work item;
Obtain the flow data being input on the corresponding work item list of the i+1 work item;
Detect whether to receive the order for performing the i+1 work item;
If detection receives the order for performing the i+1 work item, i=i+1 is allowed, in institute described in the return basis
The flow data and the flow template being input on the corresponding work item list of i-th work item are stated, the i+1 is generated
The task of the corresponding operational staff of work item, until whole flow process example is performed terminating;Wherein, in each and every one work item each correspondence
Work item list on be input into flow data and perform flow instance during generate data be process flow operation data.
4. the pre- alarm method of flow according to claim 1, it is characterised in that described according to the flow template, performs
Flow instance, including:
According to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Detect whether to receive the n-th execution in the corresponding task list interface input of the corresponding task of i-th work item
Order;Wherein, n=1;
If detection receives described n-th and performs order, according to the corresponding task of i-th work item, i-th work is generated
Make the corresponding work item list of item;
Obtain the flow data being input on the corresponding work item list of i-th work item;
Detect whether to receive the order for performing i-th work item;
If detection receives the order for performing i-th work item, according to the flow template, the i+1 is generated
The task of the corresponding operational staff of individual work item;
Detect whether to receive defeated at the corresponding task list interface of task of the corresponding operational staff of the i+1 work item
N-th for entering performs order, wherein, n=n+1;
If detection receives described n-th and performs order, the corresponding work item list of the i+1 work item is generated;
Obtain the flow data being input on the corresponding work item list of the i+1 work item;
Detect whether to receive the order for performing the i+1 work item;
If detection receives the order for performing the i+1 work item, i=i+1 is allowed, return is described according to the flow
Template, generates the task of the corresponding operational staff of the i+1 work item, until whole flow process example is performed terminating;Wherein,
Generated during the flow data and execution flow instance that are input on the corresponding work item list of each and every one work item each
Data are process flow operation data.
5. the pre- alarm method of flow according to claim 1, it is characterised in that described according to the process flow operation data for obtaining
And the corresponding pre- alarm regulation of the flow template, during judging the execution flow instance, the process flow operation data
Whether the pre- alarm regulation is met, including:
According to the process flow operation data for obtaining, the corresponding content of pre-set level is obtained;
Judge whether the corresponding content of the pre-set level meets the pre- alarm regulation.
6. the pre- alarm method of flow according to claim 1, it is characterised in that the pre- alarm result of output, including:
The pre- alarm result is included in display interface in the way of graphical chart or form;
The pre- alarm result is sent to the corresponding terminal of staff in the way of sending information or send mail.
7. the pre- alarm device of a kind of flow, it is characterised in that including:
First detection module, for detecting whether receiving the finger of the one of flow of click being input into flow list interface
Order;
First acquisition module, if receiving the instruction for first detection module detection, the flow that acquisition is clicked
Process identification and flow template;
First generation module, for according to the corresponding hyperlink of the process identification, generation to start form interface;
Flow instance module, for the flow instance name being input into according to the process identification and in the startup form interface
Claim, start order, perform flow instance process;
Flow instance module is performed, for according to the flow template, performing flow instance;
Flow monitoring module, for during the execution flow instance, according to the process flow operation data and described for obtaining
The corresponding pre- alarm regulation of flow template, judges during the execution flow instance, whether the process flow operation data meet
The pre- alarm regulation;When judging that the process flow operation data meet the pre- alarm regulation, pre- alarm result is exported;Its
In, the flow template and the process flow operation data are stored in local data base.
8. the pre- alarm device of flow according to claim 7, it is characterised in that the flow instance module includes:
Module is transferred, for transferring flow instance interface corresponding with the process identification;
Receiver module, for the flow instance title as described in the flow instance interface and the startup order;
Correction verification module, for the flow instance title for verifying the flow instance interface and the startup order;
Wherein, if correction verification module verification passes through, the execution flow instance module performs described according to the flow mould
Plate, performs flow instance.
9. the pre- alarm device of flow according to claim 7, it is characterised in that the execution flow instance module includes:
Second generation module, for according to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
Second detection module, for detecting whether receiving task list corresponding in the corresponding task of i-th work item
The n-th of interface input performs order;Wherein, n=1;
3rd generation module, if receiving described n-th for second detection module detection performs order, according to described i-th
The corresponding task of individual work item, generates the corresponding work item list of i-th work item;
Second acquisition module, for obtaining the flow data being input on the corresponding work item list of i-th work item;
3rd detection module, for detecting whether receiving the order for performing i-th work item;
4th generation module, if receiving the life for performing i-th work item for the 3rd detection module detection
Order, according to the flow data being input on the corresponding work item list of i-th work item and the flow template,
Generate the task of the corresponding operational staff of the i+1 work item;
4th detection module, for detecting whether receiving the task pair in the corresponding operational staff of the i+1 work item
The n-th of the task list interface input answered performs order, wherein, n=n+1;
5th generation module, if receiving described n-th and performing order for the detection of the 4th detection module, according to described described the
The flow data being input on the corresponding work item list of i work item, generates the corresponding work item table of the i+1 work item
It is single;
3rd acquisition module, for obtaining the flow data being input on the corresponding work item list of the i+1 work item;
5th detection module, for detecting whether receiving the order for performing the i+1 work item;
First control module, if receiving the execution i+1 work item for the 5th detection module detection
After order, i=i+1 is allowed;
4th generation module, is additionally operable to first control module and allows after i=i+1, according to described in described i-th work
The flow data being input on the corresponding work item list of item and the flow template, generate the i+1 work item correspondence
Operational staff task, until whole flow process example perform terminate;Wherein, in the corresponding work item list of each work item
The data generated during the flow data and execution flow instance of upper input are process flow operation data.
10. the pre- alarm device of flow according to claim 7, it is characterised in that the execution flow instance module includes:
6th generation module, for according to the flow template, the corresponding task of i-th work item of generation;Wherein, i=1;
6th detection module, for detecting whether receiving task list corresponding in the corresponding task of i-th work item
The n-th of interface input performs order;Wherein, n=1;
7th generation module, if receiving described n-th for the 6th detection module detection performs order, according to described i-th
The corresponding task of individual work item, generates the corresponding work item list of i-th work item;
4th acquisition module, for obtaining the flow data being input on the corresponding work item list of i-th work item;
7th detection module, for detecting whether receiving the order for performing i-th work item;
8th generation module, if receiving the life for performing i-th work item for the 7th detection module detection
Order, according to the flow template, generates the task of the corresponding operational staff of the i+1 work item;
8th detection module, for detecting whether receiving the task pair in the corresponding operational staff of the i+1 work item
The n-th of the task list interface input answered performs order, wherein, n=n+1;
9th generation module, if receiving described n-th for the detection of the 8th detection module performs order, generates the i+1
The corresponding work item list of work item;
5th acquisition module, for obtaining the flow data being input on the corresponding work item list of the i+1 work item;
9th detection module, for detecting whether receiving the order for performing the i+1 work item;
Second control module, if receiving the execution i+1 work item for the 9th detection module detection
After order, i=i+1 is allowed;
8th generation module, is additionally operable to second control module and allows after i=i+1, according to the flow template, generates institute
The task of the corresponding operational staff of i+1 work item is stated, until whole flow process example is performed terminating;Wherein, in each work
Make on the corresponding work item list of item be input into flow data and perform flow instance during generate data be flow fortune
Row data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611153772.4A CN106779404B (en) | 2016-12-14 | 2016-12-14 | Flow early warning method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611153772.4A CN106779404B (en) | 2016-12-14 | 2016-12-14 | Flow early warning method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106779404A true CN106779404A (en) | 2017-05-31 |
CN106779404B CN106779404B (en) | 2021-02-05 |
Family
ID=58888231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611153772.4A Active CN106779404B (en) | 2016-12-14 | 2016-12-14 | Flow early warning method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779404B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109191078A (en) * | 2018-09-06 | 2019-01-11 | 山东中创软件商用中间件股份有限公司 | A kind of traffic flow modeling method, device and equipment |
CN109559099A (en) * | 2018-11-30 | 2019-04-02 | 广州净松软件科技有限公司 | Early warning rule configuration method, device and the computer equipment of observation system |
CN112559569A (en) * | 2020-12-11 | 2021-03-26 | 广东电力通信科技有限公司 | Alarm rule processing method for composite condition |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103778511A (en) * | 2014-01-27 | 2014-05-07 | 北京荣之联科技股份有限公司 | Cross-system procedure monitoring method and device |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN104504172A (en) * | 2014-11-27 | 2015-04-08 | 国家电网公司 | Main-standby scheduling model data synchronization method for electricity SCADA (supervisory control and data acquisition) system |
-
2016
- 2016-12-14 CN CN201611153772.4A patent/CN106779404B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103778511A (en) * | 2014-01-27 | 2014-05-07 | 北京荣之联科技股份有限公司 | Cross-system procedure monitoring method and device |
CN104091222A (en) * | 2014-05-08 | 2014-10-08 | 武大吉奥信息技术有限公司 | Workflow engine supporting multimode driving |
CN104504172A (en) * | 2014-11-27 | 2015-04-08 | 国家电网公司 | Main-standby scheduling model data synchronization method for electricity SCADA (supervisory control and data acquisition) system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109191078A (en) * | 2018-09-06 | 2019-01-11 | 山东中创软件商用中间件股份有限公司 | A kind of traffic flow modeling method, device and equipment |
CN109559099A (en) * | 2018-11-30 | 2019-04-02 | 广州净松软件科技有限公司 | Early warning rule configuration method, device and the computer equipment of observation system |
CN112559569A (en) * | 2020-12-11 | 2021-03-26 | 广东电力通信科技有限公司 | Alarm rule processing method for composite condition |
CN112559569B (en) * | 2020-12-11 | 2023-07-21 | 广东电力通信科技有限公司 | Alarm rule processing method for composite condition |
Also Published As
Publication number | Publication date |
---|---|
CN106779404B (en) | 2021-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gehlot et al. | An introduction to systems modeling and simulation with colored petri nets | |
US20090271351A1 (en) | Rules engine test harness | |
CN109684047A (en) | Event-handling method, device, equipment and computer storage medium | |
CN110321413A (en) | Session frame | |
CN104636868A (en) | Application management system for nuclear power station equipment maintenance information and application method thereof | |
CN110149806A (en) | The digital assistants of stack data structures are handled | |
CN113258669B (en) | Networked intelligent scheduling method and terminal based on distribution network maintenance | |
CN109685089A (en) | The system and method for assessment models performance | |
CN106779404A (en) | A kind of pre- alarm method of flow and device | |
CN105468161A (en) | Instruction execution method and device | |
CN103246926A (en) | Goal and scene-based use case-driven requirement elicitation method | |
CN109614319A (en) | Automated testing method, device, electronic equipment and computer-readable medium | |
Kong et al. | Embedding knowledge into BIM: A case study of extending BIM with firefighting plans | |
JP2021018751A (en) | Program, information processing method and information processing device | |
CN108597499B (en) | Voice processing method and voice processing device | |
CN109445388A (en) | Industrial control system data analysis processing device and method based on image recognition | |
CN112988267A (en) | Loading method and device, storage medium and electronic equipment | |
KR102169980B1 (en) | Method for disaster situation propagation and system thereof | |
CN114757155B (en) | Conference document generation method and device | |
CN110083351A (en) | Method and apparatus for generating code | |
CN116010066A (en) | RPA robot and implementation method | |
CN116128696A (en) | Emergency flow detection method, system, electronic equipment and storage medium | |
CN102591779A (en) | Establishing method for workflow-based universal software testing process model | |
CN109947402A (en) | A kind of item development system | |
CN112561276B (en) | Job operation risk demonstration method and device, storage medium and electronic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |