CN109559099A - Early warning rule configuration method, device and the computer equipment of observation system - Google Patents

Early warning rule configuration method, device and the computer equipment of observation system Download PDF

Info

Publication number
CN109559099A
CN109559099A CN201811451407.0A CN201811451407A CN109559099A CN 109559099 A CN109559099 A CN 109559099A CN 201811451407 A CN201811451407 A CN 201811451407A CN 109559099 A CN109559099 A CN 109559099A
Authority
CN
China
Prior art keywords
node
early warning
supervision
operation flow
warning rule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811451407.0A
Other languages
Chinese (zh)
Inventor
吴洪丽
袁博瑞
姜礼明
郭东坡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jingsong Software Technology Co Ltd
Original Assignee
Guangzhou Jingsong Software Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jingsong Software Technology Co Ltd filed Critical Guangzhou Jingsong Software Technology Co Ltd
Priority to CN201811451407.0A priority Critical patent/CN109559099A/en
Publication of CN109559099A publication Critical patent/CN109559099A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/451Execution arrangements for user interfaces
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Abstract

The present invention relates to early warning rule configuration method, device, computer equipment and the computer readable storage mediums of a kind of observation system, and wherein method includes: to show business process map in early warning rule configuration interface;Business process map includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node and the direction line that is connected between adjacent service flow nodes icon;In the supervision node addition instruction for detecting input, display supervision node icon;According to the information of the associated operation flow node of input, associated operation flow node is set as the corresponding supervision node of supervision node icon, and shows the connecting line being connected between supervision node icon operation flow node icon corresponding with associated operation flow node;According to the early warning rule configuration information of input, the early warning rule of the corresponding supervision node of configuration supervision node icon.The visual configuration of early warning rule may be implemented in the above method, improves the allocative efficiency of early warning rule.

Description

Early warning rule configuration method, device and the computer equipment of observation system
Technical field
The present invention relates to supervision technical field of data processing, more particularly to a kind of early warning rule configuration side of observation system Method, device, computer equipment and computer readable storage medium.
Background technique
Electronic monitoring system is supervisory organization over administration with network technology, to administrative examination and approval service item implementing monitoring, prison The system superintended and directed.Electronic monitoring system may include the server cluster that one or more servers are constituted, and and server set The object of supervision terminal of each functional department of group's connection supervises node by setting, and it is whole that server cluster collects object of supervision The supervision data of the supervision node of the operation flow carried out are held, and supervision data are analyzed with preset early warning rule, Program, the time limit etc. of working are supervised, when recognizing possible supervision node risk, push warning information to watchdog The user terminal of member facilitates aufsichtsrat to carry out tracking and supervising to possible violation supervision item.
Traditional observation system generally requires the early warning rule write-in backstage manually by design when early warning rule is arranged In program, the operation of early warning rule is realized by background program, when needing to modify to early warning rule, or needs to increase newly Early warning rule when, need to rewrite or modify background program, workload is huge and modification is inconvenient, need to rely on professional programmers Operation, ordinary user is difficult to configuration of the complete independently to early warning rule, and the allocative efficiency of early warning rule is low.
Summary of the invention
Based on this, it is necessary in view of the above technical problems, provide early warning rule configuration method, the dress of a kind of observation system It sets, computer equipment and computer readable storage medium.
A kind of early warning rule configuration method of observation system, comprising the following steps:
Business process map is shown in the first position of early warning rule configuration interface;Business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, shown in the second position of early warning rule configuration interface Supervise node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as supervision section The corresponding supervision node of point icon, and show and be connected to supervision node icon Business Stream corresponding with associated operation flow node Connecting line between journey node icon;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of configuration supervision node icon Then.
The early warning rule configuration method of above-mentioned observation system shows business process map on early warning rule configuration interface, and It is operated according to the input of user, the operation flow node icon of the operation flow node of supervision node and the prison of setting will be configured to Examine the connection display of node icon connecting line, and the early warning rule configuration information inputted according to user, configuration supervision node icon The early warning rule of corresponding supervision node.So as to realize the visual configuration of links early warning rule in operation flow, Facilitate user to observe and modify the early warning rule configuring condition of operation flow node, so that user configuration early warning rule is more convenient Efficiently, the allocative efficiency of the early warning rule of observation system is effectively improved.
In one embodiment, according to the information of the associated operation flow node of user's input, by associated Business Stream Cheng Jiedian is set as the corresponding supervision node of supervision node icon, and shows and be connected to supervision node icon and associated operation flow Connecting line between the corresponding operation flow node icon of node, comprising: detecting the acted on supervision node icon When one trigger action, display supervision node configuration block;It receives user and is input into the supervision node of supervision node configuration block with confidence Breath;Supervision node configuration information includes the information for supervising the associated operation flow node of node;By associated operation flow node It is set as the corresponding supervision node of supervision node icon, and shows and is connected to supervision node icon and associated operation flow node pair The connecting line between operation flow node icon answered.
The technical solution of the present embodiment, when detecting the first trigger action that user acts on supervision node icon, Display supervision node configuration block, user can display supervision node configuration block to supervision the associated operation flow node of node Information configured, it is easy to operate to be easily achieved.
In one embodiment, supervision node configuration block includes the drop-down list of operation flow node;Operation flow node Drop-down list show business process map in each operation flow node option information;It receives user and is input into supervision section The supervision node configuration information of point configuration block;Supervision node configuration information includes the letter for supervising the associated operation flow node of node Breath, comprising: detection user acts on the selection operation of the option of the target service flow nodes in drop-down list, is grasped according to selection Make, using target service flow nodes as the supervision associated operation flow node of node, generating includes the supervision associated industry of node The supervision node configuration information of the information for flow nodes of being engaged in.So as to detect each business obtained in business process map automatically Flow nodes, and generate corresponding alternative option and shown in drop-down list, facilitate user's option and installment needs to be set as supervising The operation flow node of node avoids the cumbersome and error-prone drawback being manually entered.
In one embodiment, supervision node configuration information further includes the letter for supervising the associated co-related risks node of node Breath;The early warning rule configuration method of observation system further include: update supervision node to supervising node repository, and will supervision node association On co-related risks node into risk node library.User can be completed when node is supervised in configuration to the supervision associated wind of node The setting of dangerous node.
In one embodiment, supervision node configuration information further includes the name information for supervising node;Observation system it is pre- Police regulations then configuration method further include: the name information of supervision node is shown in the supervision node icon of display.User can be right The supervision node icon of configuration carries out customized name and shows, facilitates user that supervision node icon is marked, in order to User identifies and distinguishes between supervision node icon.
In one embodiment, the early warning rule configuration information inputted according to user, configuration supervision node icon are corresponding Supervise the early warning rule of node, comprising: when detecting the second trigger action acted on supervision node icon, show early warning Regular configuration block;Receive the early warning rule configuration information that user is input into early warning rule configuration block;Match confidence according to early warning rule Breath generates early warning rule;Early warning rule is updated to early warning rule base, and the supervision by early warning rule association into supervision node repository On node.
The technical solution of the present embodiment, when detecting the second trigger action that user acts on supervision node icon, Show early warning rule configuration block, user can carry out the associated early warning rule of supervision node in the early warning rule configuration block of display Configuration, it is easy to operate to be easily achieved.
In one embodiment, display early warning rule configuration block includes: to obtain the information of operation flow node, according to business The information of flow nodes generates the template options of corresponding early warning rule;Template options include the business category of operation flow node Property option, the associated link attributes section of each operation flow node and Rule of judgment option;Show early warning rule configuration block;In advance Then configuration block includes template options and rule configuration input frame to police regulations;Receive the early warning that user is input into early warning rule configuration block Rule configuration information, comprising: when detecting that user acts on the selection operation of any template options, configure input frame in rule Middle input and indicating template option;When detecting that user acts on the input operation of rule configuration input frame, configured in rule The information that input operation includes is updated in input frame;When instruction is submitted in the early warning rule configuration for detecting user, rule is obtained Information in configuration input frame is input into the early warning rule configuration information of early warning rule configuration block as user.
The technical solution of the present embodiment, automatic detection generate the corresponding mould of item that user configuration early warning rule may need Plate option facilitates user to select to need the link item content that inputs, avoids being manually entered link item and is difficult to remember needs and looks into The cumbersome and error-prone drawback ask improves the efficiency of configuration early warning rule.
In one embodiment, before the first position of early warning rule configuration interface shows business process map, further includes: Obtain the identification information of operation flow;According to identification information, whether inquiry business process has business process map in the database; If so, then transferring business process map;If no, obtain each operation flow node that operation flow includes name information and Each operation flow node handles temporal information, according to the name information of each operation flow node and each operation flow section Point handles temporal information, and generation includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node And the business process map for the direction line being connected between adjacent service flow nodes icon.
The technical solution of the present embodiment calls directly existing when the operation flow needed to configure has business process map Flow chart utilize the title of the operation flow node of acquisition in the operation flow needed to configure there has been no when business process map Information and the temporal information of handling of each operation flow node generate corresponding business process map, can expeditiously complete to industry The acquisition of business flow chart.
In one embodiment, the early warning rule configuration method of observation system further include: act on supervision section detecting When the third trigger action that point diagram is put on, person liable's configuration block is shown;Receive the person liable that user is input into person liable's configuration block Configuration information;According to person liable's configuration information, by the information association of person liable on the supervision node into supervision node repository;Responsibility The information of people is used to that warning information to be pushed to duty when the supervision data-triggered early warning rule for supervising node generates warning information On the user terminal let people.
The technical solution of the present embodiment, by the way that the third trigger action on supervision node icon, user can be convenient ground Configuration is responsible for receiving the person liable of warning information.
A kind of early warning rule configuration device of observation system, comprising:
Business process map display module, for showing business process map in the first position of early warning rule configuration interface;Institute Business process map is stated to include the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node and be connected to Direction line between adjacent service flow nodes icon;
Node icon display module is supervised, when for instructing in the supervision node addition for detecting user's input, in early warning The second position display supervision node icon of regular configuration interface;
Node relating module is supervised, the information of the associated operation flow node for inputting according to user will be associated Operation flow node is set as the corresponding supervision node of the supervision node icon, and show be connected to the supervision node icon and Connecting line between the corresponding operation flow node icon of the associated operation flow node;
Early warning rule configuration module, the early warning rule configuration information for being inputted according to user configure the supervision node The early warning rule of the corresponding supervision node of icon.
A kind of computer equipment can be run on a memory and on a processor including memory, processor and storage Computer program, processor perform the steps of when executing computer program
Business process map is shown in the first position of early warning rule configuration interface;Business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, shown in the second position of early warning rule configuration interface Supervise node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as supervision section The corresponding supervision node of point icon, and show and be connected to supervision node icon Business Stream corresponding with associated operation flow node Connecting line between journey node icon;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of configuration supervision node icon Then.
A kind of computer readable storage medium is stored thereon with computer program, when computer program is executed by processor It performs the steps of
Business process map is shown in the first position of early warning rule configuration interface;Business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, shown in the second position of early warning rule configuration interface Supervise node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as supervision section The corresponding supervision node of point icon, and show and be connected to supervision node icon Business Stream corresponding with associated operation flow node Connecting line between journey node icon;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of configuration supervision node icon Then.
Early warning rule configuration device, computer equipment and the computer readable storage medium of above-mentioned observation system, Ke Yishi On present early warning rule configuration interface, business process map is shown, and operate according to the input of user, will be configured to supervision node The operation flow node icon of operation flow node and the supervision node icon of setting are connected with connecting line and are shown, and according to user The early warning rule configuration information of input, the early warning rule of the corresponding supervision node of configuration supervision node icon.So as to realize The visual configuration of links early warning rule in operation flow facilitates user to observe and modify the pre- police regulations of operation flow node Then configuring condition, so that user configuration early warning rule more convenient and efficient, effectively improves matching for the early warning rule of observation system Set efficiency.
Detailed description of the invention
Fig. 1 is the applied environment figure of the early warning rule configuration method of observation system in one embodiment;
Fig. 2 is the applied environment figure of the early warning rule configuration method of observation system in another embodiment;
Fig. 3 is the flow diagram of the early warning rule configuration method of observation system in one embodiment;
Fig. 4 is the schematic diagram of early warning rule configuration interface in one embodiment;
Fig. 5 is the structural block diagram of the early warning rule configuration device of observation system in one embodiment.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the present invention, not For limiting the present invention.
The early warning rule configuration method of observation system provided by the invention, can be applied to application environment as shown in Figure 1 In.Wherein, user terminal 110 is communicated with server 120 by network, server 120 also with multiple object of supervision terminals 130 communication connections.Server 120 is preset with the prison of the operation flow node in the operation flow for object of supervision terminal 130 Node is examined, the supervision using early warning rule preset in server 120, to the supervision node of the object of supervision terminal 130 of acquisition Data carry out operation, and supervision warning information is generated when operation result is beyond alarm threshold, and push supervision warning information to use Family terminal 110;Wherein, for the setting of supervision the node setting and early warning rule of operation flow node, the application can be passed through The early warning rule configuration method of the observation system of any one embodiment is realized.Wherein, user terminal 102 can be, but not limited to be Various personal computers, laptop, smart phone, tablet computer and portable wearable device, server 120 can be used The server cluster of independent server either multiple servers composition is realized.
In one embodiment, as shown in Fig. 2, server 120 may further include supervision server 121, platform clothes Business device 122 and multiple object of supervision servers 123;It supervises server 121 and Platform Server 122 communicates to connect, platform service Device 122 is communicated to connect with each object of supervision server 123 respectively, each object of supervision server 123 and object of supervision terminal 130 realize that data interchange, supervision server 121 and user terminal 110 realize data interchange.By supervising server 121, platform The server cluster of server 122 and multiple object of supervision servers 123 composition carries out the related data of object of supervision terminal It transfers and transmits, can supervision data reasonably be deployed and be stored according to actual needs, promote the transmission of supervision data And storage efficiency.
In one embodiment, as shown in figure 3, a kind of early warning rule configuration method of observation system is provided, with the party Method is applied to be illustrated for the user terminal in Fig. 1, comprising the following steps:
S310 shows business process map in the first position of early warning rule configuration interface;Business process map includes according to industry The operation flow node icon that is sequentially arranged of time sequencing of business flow nodes and be connected to adjacent service flow nodes icon it Between direction line;
Wherein, early warning rule configuration interface is the display interface for carrying out early warning rule configuration, can pass through user Triggering jumps to the interface, such as early warning rule configuration circle can be jumped to when user clicks the menu item of configuration early warning rule Face.
When user needs to carry out rule configuration to a certain operation flow, user can be by inputting the letter of the operation flow The specified operation flow needed to configure of breath can show operation flow in the first position of early warning rule configuration interface later Figure, wherein first position can according to need setting, such as can be the middle position or upper left of early warning rule configuration interface Angle Position etc..Further, user can also be selected with drag operation by acting on the mouse of business process map to adjust Business process map is whole and part (such as single or multiple operation flow nodes, or be directed toward line) is in early warning rule configuration interface Display position.
S320, in the supervision node addition instruction for detecting user's input, in the second of early warning rule configuration interface Set display supervision node icon;
The input mode for supervising node addition instruction can be there are many different form, such as can pass through the dish for clicking interface The icon of addition supervision node in single column is realized, in another example can pass through keyboard shortcut realization etc..
The second position can be set according to actual needs, for example, can be business process map left side or right side it is pre- If position;Further, user can also be by the mouse selection for acting on supervision node icon and drag operation to adjust prison Node icon is examined in the display position of early warning rule configuration interface.
Wherein, risk node library, supervision node repository and early warning rule base are prestored in server, it is pre- in early warning rule base Police regulations then form incidence relation, the data of supervision node acquisition with preset supervision node;Wherein, risk node refers to some row The violation risk item that power node may occur, supervision node are to weigh main body (object of supervision) in power operational process according to row Risk assessment conclusion under the power item on row power node corresponding to each row power item, i.e. risk classifications and risk class, have reached The row Quan Jiedian that its legal supervision responsibility and power must be exercised to monitor main body, for being supervised to particular row power link node Examining to obtain supervision data, can be accordingly right in order to detect whether a certain risk node generates risk for a risk node Multiple supervision nodes are arranged in risk node association, each corresponding supervision node can be associated with an early warning rule.When The supervision data that any one supervision node generates are judged by associated early warning rule, trigger the early warning rule Rule of judgment When, then can recognizing the risk node, there may be violation items, generate the Risk-warning information of the risk node.
Associated operation flow node is set as by S330 according to the information of the associated operation flow node of user's input The corresponding supervision node of node icon is supervised, and shows that be connected to supervision node icon corresponding with associated operation flow node Connecting line between operation flow node icon;
The input mode of the information of associated operation flow node can there are many, such as can be the dialog box in pop-up Middle input, or can be inputted in preset input frame on early warning rule configuration interface, or can be detection user and make The corresponding industry of operation flow node icon that the trigger action of operation flow node icon on business process map obtains Business flow nodes associated operation flow node as input etc..
S340, according to the early warning rule configuration information that user inputs, the corresponding supervision node of node icon is supervised in configuration Early warning rule.
Early warning rule configuration information can be to be inputted in the dialog box of pop-up, or can be in early warning rule configuration interface Inputted in upper preset input frame etc..
The early warning rule configuration method of above-mentioned observation system shows business process map on early warning rule configuration interface, and It is operated according to the input of user, the operation flow node icon of the operation flow node of supervision node and the prison of setting will be configured to Examine the connection display of node icon connecting line, and the early warning rule configuration information inputted according to user, configuration supervision node icon The early warning rule of corresponding supervision node.So as to realize the visual configuration of links early warning rule in operation flow, Facilitate user to observe and modify the early warning rule configuring condition of operation flow node, so that user configuration early warning rule is more convenient Efficiently, the allocative efficiency of the early warning rule of observation system is effectively improved.
As illustratively, as shown in figure 4, the identification information of process can be reported to a higher authorities for approval in user's input, and configuration early warning is clicked The early warning rule configuration interface 40 of " configuration of supervision rule " after the button of rule, that is, is jumped to, and in early warning rule configuration interface The flow chart 400 of process is reported in 40 displays to a higher authorities for approval, is reported to a higher authorities for approval in the flow chart 400 of process, the industry such as " manual inspection declaration ", " machine is examined ", " people examines " The operation flow node icon 401 of business flow nodes is sequentially arranged according to the order that operation flow node occurs, and adjacent time With the connection of line 402 is directed toward between the operation flow node icon of generation, to indicate the sequencing of operation flow node generation.It Afterwards, user needs to set supervision node for " people examines ", then can supervise pressing for node setting with the link in click tools column 410 Button 411, early warning rule configuration interface 40 can then show that link supervises node icon 420, and user clicks link prison by mouse right button When examining node icon 420, option list 450 can be shown, there is " configuration supervision node ", " customized inspection rule " in option list " setting person liable " three options, user click " configuration supervision node " option, then can be in the drop-down of the dialog box of pop-up The operation flow node that " people examines " is chosen in list, clicks and submits, then the operation flow node of " people examines " can be set as link prison The corresponding supervision node of node icon 420 is examined, and shows the operation flow for being connected to link supervision node icon 420 with " people examines " Connecting line 421 between node icon, later, user can also click link supervision node icon 420 by mouse right button, aobvious " customized supervision rule " option is clicked in the option list 450 shown, is inputted early warning rule in the dialog box of pop-up and is matched confidence Breath, and submission is clicked, the early warning rule configuration information that backstage can be submitted according to user generates corresponding early warning rule, and will give birth to At early warning rule as the supervision node early warning rule.In addition, other than the supervision of configuration service flow nodes rule, The supervision node that entire " reporting process to a higher authorities for approval " operation flow can also be configured, as shown in figure 4, the stream in menu bar 410 can be clicked Journey supervises node and configures button 412, early warning rule configuration interface 40 then can flow for displaying supervise node icon 440, user can be with Process supervision node icon 440 is clicked by right key to carry out the early warning rule of the supervision node of entire " reporting process to a higher authorities for approval " operation flow Configuration.
It in one embodiment, will be associated according to the information of the associated operation flow node of user's input in S330 Operation flow node is set as the corresponding supervision node of supervision node icon, and shows and be connected to supervision node icon and associated industry Connecting line between the corresponding operation flow node icon of flow nodes of being engaged in, comprising: act on supervision node icon detecting On the first trigger action when, display supervision node configuration block;Receive the supervision node that user is input into supervision node configuration block Configuration information;Supervision node configuration information includes the information for supervising the associated operation flow node of node;By associated Business Stream Cheng Jiedian is set as the corresponding supervision node of supervision node icon, and shows and be connected to supervision node icon and associated operation flow Connecting line between the corresponding operation flow node icon of node.
Wherein, the first trigger action can have different forms, and for example, as shown in figure 4, the first trigger action can be Click supervision node icon by mouse right button, selection " the configuration supervision in supervision node icon lower right corner rendering preferences list Point ";Or other possible forms.
The technical solution of the present embodiment, when detecting the first trigger action that user acts on supervision node icon, Display supervision node configuration block, user can display supervision node configuration block to supervision the associated operation flow node of node Information configured, it is easy to operate to be easily achieved.
In one embodiment, supervision node configuration block includes the drop-down list of operation flow node;Operation flow node Drop-down list show business process map in each operation flow node option information;It receives user and is input into supervision section The supervision node configuration information of point configuration block;Supervision node configuration information includes the letter for supervising the associated operation flow node of node Breath, comprising: detection user acts on the selection operation of the option of the target service flow nodes in drop-down list, is grasped according to selection Make, using target service flow nodes as the supervision associated operation flow node of node, generating includes the supervision associated industry of node The supervision node configuration information of the information for flow nodes of being engaged in.So as to detect each business obtained in business process map automatically Flow nodes, and generate corresponding alternative option and shown in drop-down list, facilitate user's option and installment needs to be set as supervising The operation flow node of node avoids the cumbersome and error-prone drawback being manually entered.
In one embodiment, supervision node configuration information further includes the letter for supervising the associated co-related risks node of node Breath;The early warning rule configuration method of observation system further include: update supervision node to supervising node repository, and will supervision node association On co-related risks node into risk node library.User can be completed when node is supervised in configuration to the supervision associated wind of node The setting of dangerous node.
In one embodiment, supervision node configuration information further includes the name information for supervising node;Observation system it is pre- Police regulations then configuration method further include: the name information of supervision node is shown in the supervision node icon of display.User can be right The supervision node icon of configuration carries out customized name and shows, facilitates user that supervision node icon is marked, in order to User identifies and distinguishes between supervision node icon.
In one embodiment, the early warning rule configuration information that S340 is inputted according to user, configuration supervision node icon pair The early warning rule for the supervision node answered, comprising: when detecting the second trigger action acted on supervision node icon, display Early warning rule configuration block;Receive the early warning rule configuration information that user is input into early warning rule configuration block;Matched according to early warning rule Confidence breath generates early warning rule;Early warning rule is updated to early warning rule base, and by early warning rule association into supervision node repository It supervises on node.
Wherein, the second trigger action can have different forms, and for example, as shown in figure 4, the second trigger action can be It clicks supervision node icon by mouse right button, selects " customized supervision in supervision node icon lower right corner rendering preferences list Rule ";Or other possible forms.
The technical solution of the present embodiment, when detecting the second trigger action that user acts on supervision node icon, Show early warning rule configuration block, user can carry out the associated early warning rule of supervision node in the early warning rule configuration block of display Configuration, it is easy to operate to be easily achieved.
In one embodiment, display early warning rule configuration block includes: to obtain the information of operation flow node, according to business The information of flow nodes generates the template options of corresponding early warning rule;Template options include the business category of operation flow node Property option, the associated link attributes section of each operation flow node and Rule of judgment option;Show early warning rule configuration block;In advance Then configuration block includes template options and rule configuration input frame to police regulations;Receive the early warning that user is input into early warning rule configuration block Rule configuration information, comprising: when detecting that user acts on the selection operation of any template options, configure input frame in rule Middle input and indicating template option;When detecting that user acts on the input operation of rule configuration input frame, configured in rule The information that input operation includes is updated in input frame;When instruction is submitted in the early warning rule configuration for detecting user, rule is obtained Information in configuration input frame is input into the early warning rule configuration information of early warning rule configuration block as user.
The technical solution of the present embodiment, automatic detection generate the corresponding mould of item that user configuration early warning rule may need Plate option facilitates user to select to need the link item content that inputs, avoids being manually entered link item and is difficult to remember needs and looks into The cumbersome and error-prone drawback ask improves the efficiency of configuration early warning rule.
In one embodiment, before the first position of early warning rule configuration interface shows business process map, further includes: Obtain the identification information of operation flow;According to identification information, whether inquiry business process has business process map in the database; If so, then transferring business process map;If no, obtain each operation flow node that operation flow includes name information and Each operation flow node handles temporal information, according to the name information of each operation flow node and each operation flow section Point handles temporal information, and generation includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node And the business process map for the direction line being connected between adjacent service flow nodes icon.
The technical solution of the present embodiment calls directly existing when the operation flow needed to configure has business process map Flow chart utilize the title of the operation flow node of acquisition in the operation flow needed to configure there has been no when business process map Information and the temporal information of handling of each operation flow node generate corresponding business process map, can expeditiously complete to industry The acquisition of business flow chart.
In one embodiment, the early warning rule configuration method of observation system further include: act on supervision section detecting When the third trigger action that point diagram is put on, person liable's configuration block is shown;Receive the person liable that user is input into person liable's configuration block Configuration information;According to person liable's configuration information, by the information association of person liable on the supervision node into supervision node repository;Responsibility The information of people is used to that warning information to be pushed to duty when the supervision data-triggered early warning rule for supervising node generates warning information On the user terminal let people.
Wherein, third trigger action can have different forms, and for example, as shown in figure 4, third trigger action can be Click supervision node icon by mouse right button, selection " the setting responsibility in supervision node icon lower right corner rendering preferences list People ";Or other possible forms.
The technical solution of the present embodiment, by the way that the third trigger action on supervision node icon, user can be convenient ground Configuration is responsible for receiving the person liable of warning information.
It should be understood that although each step in above-described embodiment is arranged successively according to number, these steps It is not necessarily successively to be executed according to the sequence of number.Unless expressly stating otherwise herein, the execution of these steps is not Stringent sequence limitation, these steps can execute in other order.Moreover, at least part in the step of above-described embodiment Step may include that perhaps these sub-steps of multiple stages or stage are executed in synchronization to multiple sub-steps It completes, but can execute at different times, the execution sequence in these sub-steps or stage, which is also not necessarily, successively to be carried out, But it can be executed in turn or alternately at least part of the sub-step or stage of other steps or other steps.
In one embodiment, as shown in figure 5, providing a kind of early warning rule configuration device 500 of observation system, packet It includes:
Business process map display module 510, for showing business process map in the first position of early warning rule configuration interface; The business process map includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node and connection Direction line between adjacent service flow nodes icon;
Node icon display module 520 is supervised, when for instructing in the supervision node addition for detecting user's input, pre- Police regulations then configuration interface the second position display supervision node icon;
Node relating module 530 is supervised, the information of the associated operation flow node for inputting according to user will be associated with Operation flow node be set as the corresponding supervision node of the supervision node icon, and show and be connected to the supervision node icon Connecting line between operation flow node icon corresponding with the associated operation flow node;
Early warning rule configuration module 540, the early warning rule configuration information for being inputted according to user configure the supervision section The early warning rule of the corresponding supervision node of point icon.
In one embodiment, node relating module 530 is supervised, comprising:
Node configuration block display module is supervised, for detecting the first trigger action acted on supervision node icon When, display supervision node configuration block;
Node configuration information receiving module is supervised, the supervision node that supervision node configuration block is input into for receiving user is matched Confidence breath;Supervision node configuration information includes the information for supervising the associated operation flow node of node;
Connecting line display module is saved for associated operation flow node to be set as the corresponding supervision of supervision node icon Point, and show the company being connected between supervision node icon operation flow node icon corresponding with associated operation flow node Wiring.
In one embodiment, supervision node configuration block includes the drop-down list of operation flow node;Operation flow node Drop-down list show business process map in each operation flow node option information;
Supervision node configuration information receiving module is further used for: detection user acts on the target service in drop-down list The selection operation of the option of flow nodes, according to selection operation, using target service flow nodes as the supervision associated industry of node Business flow nodes, generating includes the supervision node configuration information for supervising the information of the associated operation flow node of node.
In one embodiment, supervision node configuration information further includes the letter for supervising the associated co-related risks node of node Breath;The early warning rule configuration device of observation system further include: risk node relating module, for update supervision node to supervise section Point library, and supervision node is associated on the co-related risks node into risk node library.
In one embodiment, supervision node configuration information further includes the name information for supervising node;Observation system it is pre- Police regulations then configuration device further include: the title display module for supervising node, for showing prison in the supervision node icon of display Examine the name information of node.
In one embodiment, early warning rule configuration module 540 includes:
Early warning rule configuration block display module, for detecting the second trigger action acted on supervision node icon When, show early warning rule configuration block;
Early warning rule configuration information receiving module, the early warning rule that early warning rule configuration block is input into for receiving user are matched Confidence breath;
Early warning rule generation module, for generating early warning rule according to early warning rule configuration information;
Early warning rule base update module, for updating early warning rule to early warning rule base, and by early warning rule association to supervising It examines on the supervision node in node repository.
In one embodiment, early warning rule configuration block display module includes:
Template options generation module, it is raw according to the information of operation flow node for obtaining the information of operation flow node At the template options of corresponding early warning rule;Template options include the service attribute option of operation flow node, each Business Stream The associated link attributes section of Cheng Jiedian and Rule of judgment option;
Early warning rule configuration block display module, for detecting the second trigger action acted on supervision node icon When, show early warning rule configuration block;Early warning rule configuration block includes template options and rule configuration input frame;
Early warning rule configuration information receiving module is further used for: detecting that user acts on the choosing of any template options When selecting operation, input and indicating template option in rule configuration input frame;Detect user act on rule configuration input When the input operation of frame, the information that input operation includes is updated in rule configuration input frame;In the pre- police regulations for detecting user When then configuring submission instruction, the early warning that the information in rule configuration input frame is input into early warning rule configuration block as user is obtained Rule configuration information.
In one embodiment, the early warning rule configuration device of observation system further include:
Workflow messages obtain module, for obtaining the identification information of operation flow;
Business process map enquiry module, for according to identification information, whether inquiry business process to have industry in the database Business flow chart;
Business process map transfers module, if transferring the business process map for there is business process map;
Business process map generation module, if for obtaining each business that operation flow includes without business process map The name information of flow nodes and each operation flow node handle temporal information, according to the title of each operation flow node Information and each operation flow node handle temporal information, and generation includes sequentially arranging according to the time sequencing of operation flow node The business process map of the operation flow node icon of column and the direction line being connected between adjacent service flow nodes icon.
In one embodiment, the early warning rule configuration device of observation system further include:
Person liable's configuration block display module, for detecting the third trigger action acted on supervision node icon When, show person liable's configuration block;
Person liable's configuration information receiving module is input into the person liable of person liable's configuration block with confidence for receiving user Breath;
Person liable's relating module, for according to person liable's configuration information, by the information association of person liable to supervising node repository In supervision node on;The information of person liable is used to generate warning information in the supervision data-triggered early warning rule of supervision node When, warning information is pushed on the user terminal of person liable.
The specific restriction of early warning rule configuration device about observation system may refer to above for observation system The restriction of early warning rule configuration method, details are not described herein.Each mould in the early warning rule configuration device of above-mentioned observation system Block can be realized fully or partially through software, hardware and combinations thereof.Above-mentioned each module can be embedded in the form of hardware or independence In processor in computer equipment, it can also be stored in a software form in the memory in computer equipment, in order to Processor, which calls, executes the corresponding operation of the above modules.
The early warning rule configuration side of the early warning rule configuration device of observation system of the invention and observation system of the invention Method corresponds, in the technical characteristic and its advantages of the embodiment elaboration of the early warning rule configuration method of above-mentioned observation system Suitable for the embodiment of the early warning rule configuration device of observation system, hereby give notice that.
In one embodiment, a kind of computer equipment is provided, including memory, processor and storage are on a memory And the computer program that can be run on a processor, processor perform the steps of when executing computer program
Business process map is shown in the first position of early warning rule configuration interface;Business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, shown in the second position of early warning rule configuration interface Supervise node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as supervision section The corresponding supervision node of point icon, and show and be connected to supervision node icon Business Stream corresponding with associated operation flow node Connecting line between journey node icon;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of configuration supervision node icon Then.
Above-mentioned computer equipment, when processor executes program, by realizing step as above, so as in early warning rule On configuration interface, shows business process map, and operate according to the input of user, the operation flow node of supervision node will be configured to Operation flow node icon and setting supervision node icon with connecting line connect show, and according to user input pre- police regulations Then configuration information, the early warning rule of the corresponding supervision node of configuration supervision node icon.It is each in operation flow so as to realize The visual configuration of a link early warning rule facilitates user to observe and modify the early warning rule configuring condition of operation flow node, So that user configuration early warning rule more convenient and efficient, effectively improves the allocative efficiency of the early warning rule of observation system.
A kind of computer equipment provided by the embodiment of the present invention, computer executable instructions are not limited to supervision as above The early warning rule configuration method of system operates, and the pre- police regulations of observation system provided by any embodiment of the invention can also be performed The then relevant operation in configuration method, and have corresponding function and beneficial effect.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program performs the steps of when being executed by processor
Business process map is shown in the first position of early warning rule configuration interface;Business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, shown in the second position of early warning rule configuration interface Supervise node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as supervision section The corresponding supervision node of point icon, and show and be connected to supervision node icon Business Stream corresponding with associated operation flow node Connecting line between journey node icon;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of configuration supervision node icon Then.
Above-mentioned computer readable storage medium, the computer program of storage, by realizing step as above, so as to reality On present early warning rule configuration interface, business process map is shown, and operate according to the input of user, will be configured to supervision node The operation flow node icon of operation flow node and the supervision node icon of setting are connected with connecting line and are shown, and according to user The early warning rule configuration information of input, the early warning rule of the corresponding supervision node of configuration supervision node icon.So as to realize The visual configuration of links early warning rule in operation flow facilitates user to observe and modify the pre- police regulations of operation flow node Then configuring condition, so that user configuration early warning rule more convenient and efficient, effectively improves matching for the early warning rule of observation system Set efficiency.
A kind of storage medium comprising computer executable instructions provided by the embodiment of the present invention, computer are executable The early warning rule configuration method operation for instructing the observation system being not limited to the described above, can also be performed any embodiment of that present invention Relevant operation in the early warning rule configuration method of provided observation system, and have corresponding function and beneficial effect.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer It can inquire in storage medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, To any reference of memory, storage, database or other media used in each embodiment provided by the present invention, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of early warning rule configuration method of observation system characterized by comprising
Business process map is shown in the first position of early warning rule configuration interface;The business process map includes according to operation flow The operation flow node icon that the time sequencing of node is sequentially arranged and the finger being connected between adjacent service flow nodes icon To line;
In the supervision node addition instruction for detecting user's input, supervision is shown in the second position of early warning rule configuration interface Node icon;
According to the information of the associated operation flow node of user's input, associated operation flow node is set as the supervision and is saved The corresponding supervision node of point icon, and show that be connected to the supervision node icon corresponding with the associated operation flow node Operation flow node icon between connecting line;
According to the early warning rule configuration information that user inputs, the pre- police regulations of the corresponding supervision node of the supervision node icon are configured Then.
2. the early warning rule configuration method of observation system according to claim 1, which is characterized in that according to user's input Associated operation flow node is set as the corresponding supervision of the supervision node icon and saved by the information of associated operation flow node Point, and show and be connected to supervision node icon operation flow node icon corresponding with the associated operation flow node Between connecting line, comprising:
When detecting the first trigger action acted on the supervision node icon, display supervision node configuration block;
Receive the supervision node configuration information that user is input into the supervision node configuration block;The supervision node configuration information packet Include the information of the supervision associated operation flow node of node;
The associated operation flow node is set as the corresponding supervision node of the supervision node icon, and shows and is connected to institute State the connecting line between supervision node icon operation flow node icon corresponding with the associated operation flow node.
3. the early warning rule configuration method of observation system according to claim 2, which is characterized in that the supervision node is matched Set the drop-down list that frame includes operation flow node;The drop-down list of the operation flow node is shown in the business process map Each operation flow node option information;
The supervision node configuration information for receiving user and being input into the supervision node configuration block;The supervision node matches confidence Breath includes the information of the supervision associated operation flow node of node, comprising:
Detection user acts on the selection operation of the option of the target service flow nodes in the drop-down list, according to the choosing Operation is selected, using the target service flow nodes as the associated operation flow node of supervision node, it includes described for generating Supervise the supervision node configuration information of the information of the associated operation flow node of node.
4. according to claim 1 to the early warning rule configuration method of observation system described in 3 any one, which is characterized in that institute The early warning rule configuration information inputted according to user is stated, the pre- police regulations of the corresponding supervision node of the supervision node icon are configured Then, comprising:
When detecting the second trigger action acted on the supervision node icon, early warning rule configuration block is shown;
Receive the early warning rule configuration information that user is input into the early warning rule configuration block;
According to the early warning rule configuration information, early warning rule is generated;
The early warning rule is updated to early warning rule base, and the supervision by the early warning rule association into supervision node repository On node.
5. the early warning rule configuration method of observation system according to claim 4, which is characterized in that the pre- police regulations of display Then configuration block includes:
The information for obtaining operation flow node generates the mould of corresponding early warning rule according to the information of the operation flow node Plate option;The template options include that the service attribute option of the operation flow node, each operation flow node are associated Link attributes section and Rule of judgment option;
Show early warning rule configuration block;The early warning rule configuration block includes the template options and rule configuration input frame;
The early warning rule configuration information for receiving user and being input into the early warning rule configuration block, comprising:
When detecting that user acts on the selection operation of any template options, inputs and show in the rule configuration input frame Show the template options;
When detecting that user acts on the input operation of the rule configuration input frame, in the rule configuration input frame more The information that the new input operation includes;
When the early warning rule configuration for detecting user is submitted and instructed, the information in the rule configuration input frame is obtained as use Family is input into the early warning rule configuration information of the early warning rule configuration block.
6. according to claim 1 to the early warning rule configuration method of observation system described in 3 any one, which is characterized in that The first position of early warning rule configuration interface is shown before business process map, further includes:
Obtain the identification information of operation flow;
According to the identification information, inquire whether the operation flow has business process map in the database;
If so, then transferring the business process map;
If no, obtain each operation flow node that the operation flow includes name information and each operation flow section Point handles temporal information, according to the name information of each operation flow node and when handling of each operation flow node Between information, generation includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node and being connected to phase The business process map of direction line between adjacent operation flow node icon.
7. according to claim 1 to the early warning rule configuration method of observation system described in 3 any one, which is characterized in that also Include:
When detecting the third trigger action acted on the supervision node icon, person liable's configuration block is shown;
Receive person liable's configuration information that user is input into person liable's configuration block;
According to person liable's configuration information, by the supervision node of the information association of the person liable into supervision node repository On;The information of the person liable is used for when the supervision data-triggered early warning rule of the supervision node generates warning information, will The warning information pushes on the user terminal of the person liable.
8. a kind of early warning rule configuration device of observation system characterized by comprising
Business process map display module, for showing business process map in the first position of early warning rule configuration interface;The industry Business flow chart includes the operation flow node icon being sequentially arranged according to the time sequencing of operation flow node and is connected to adjacent Direction line between operation flow node icon;
Node icon display module is supervised, when for instructing in the supervision node addition for detecting user's input, in early warning rule The second position display supervision node icon of configuration interface;
Supervise node relating module, the information of the associated operation flow node for inputting according to user, by associated business Flow nodes are set as the corresponding supervision node of the supervision node icon, and show be connected to the supervision node icon with it is described Connecting line between the corresponding operation flow node icon of associated operation flow node;
Early warning rule configuration module, the early warning rule configuration information for being inputted according to user configure the supervision node icon The early warning rule of corresponding supervision node.
9. a kind of computer equipment, including memory, processor and it is stored on the memory and can be in the processor The computer program of upper operation, which is characterized in that the processor realized when executing the computer program as claim 1 to The step of early warning rule configuration method of observation system described in 7 any one.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of the early warning rule configuration method of observation system as claimed in any one of claims 1 to 7 is realized when being executed by processor Suddenly.
CN201811451407.0A 2018-11-30 2018-11-30 Early warning rule configuration method, device and the computer equipment of observation system Pending CN109559099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811451407.0A CN109559099A (en) 2018-11-30 2018-11-30 Early warning rule configuration method, device and the computer equipment of observation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811451407.0A CN109559099A (en) 2018-11-30 2018-11-30 Early warning rule configuration method, device and the computer equipment of observation system

Publications (1)

Publication Number Publication Date
CN109559099A true CN109559099A (en) 2019-04-02

Family

ID=65868174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811451407.0A Pending CN109559099A (en) 2018-11-30 2018-11-30 Early warning rule configuration method, device and the computer equipment of observation system

Country Status (1)

Country Link
CN (1) CN109559099A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110264035A (en) * 2019-05-10 2019-09-20 平安科技(深圳)有限公司 Configuration method, device, terminal and the storage medium of workflow
CN110851479A (en) * 2019-11-05 2020-02-28 北京明略软件系统有限公司 Configuration and screening method of early warning detection regulations, application terminal and server
CN112651615A (en) * 2020-12-21 2021-04-13 深圳科诺医学检验实验室 Sample inspection node early warning method, device, system and medium
CN113256256A (en) * 2021-05-28 2021-08-13 北京软通智慧城市科技有限公司 Work order early warning method, device, equipment and storage medium
CN113342846A (en) * 2021-06-29 2021-09-03 福州外语外贸学院 Big data-based early warning and control reminding method and device and computer equipment
CN113986241A (en) * 2021-10-25 2022-01-28 北京元年科技股份有限公司 Configuration method and device of business rules based on knowledge graph

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100162406A1 (en) * 2008-06-12 2010-06-24 Sap Ag Security aspects of soa
CN103208046A (en) * 2012-12-31 2013-07-17 广州奥凯信息咨询有限公司 Workflow engine architecture method and system based on interactive dynamic flow diagram
CN106445506A (en) * 2016-09-06 2017-02-22 北京恒华伟业科技股份有限公司 Business flow chart generation method, device and system
CN106779404A (en) * 2016-12-14 2017-05-31 北京中电普华信息技术有限公司 A kind of pre- alarm method of flow and device
CN107220301A (en) * 2017-05-10 2017-09-29 北京小度信息科技有限公司 The data monitoring method and device of a kind of configurableization
CN107563714A (en) * 2017-07-17 2018-01-09 北京慧点科技有限公司 The method and device of business process map generation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100162406A1 (en) * 2008-06-12 2010-06-24 Sap Ag Security aspects of soa
CN103208046A (en) * 2012-12-31 2013-07-17 广州奥凯信息咨询有限公司 Workflow engine architecture method and system based on interactive dynamic flow diagram
CN106445506A (en) * 2016-09-06 2017-02-22 北京恒华伟业科技股份有限公司 Business flow chart generation method, device and system
CN106779404A (en) * 2016-12-14 2017-05-31 北京中电普华信息技术有限公司 A kind of pre- alarm method of flow and device
CN107220301A (en) * 2017-05-10 2017-09-29 北京小度信息科技有限公司 The data monitoring method and device of a kind of configurableization
CN107563714A (en) * 2017-07-17 2018-01-09 北京慧点科技有限公司 The method and device of business process map generation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张正耀: "《谈廉说纪》", 28 February 2013 *
郑洲: "智能电子监察系统研究与应用", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110264035A (en) * 2019-05-10 2019-09-20 平安科技(深圳)有限公司 Configuration method, device, terminal and the storage medium of workflow
CN110264035B (en) * 2019-05-10 2023-11-10 平安科技(深圳)有限公司 Workflow configuration method, workflow configuration device, terminal and storage medium
CN110851479A (en) * 2019-11-05 2020-02-28 北京明略软件系统有限公司 Configuration and screening method of early warning detection regulations, application terminal and server
CN112651615A (en) * 2020-12-21 2021-04-13 深圳科诺医学检验实验室 Sample inspection node early warning method, device, system and medium
CN113256256A (en) * 2021-05-28 2021-08-13 北京软通智慧城市科技有限公司 Work order early warning method, device, equipment and storage medium
CN113342846A (en) * 2021-06-29 2021-09-03 福州外语外贸学院 Big data-based early warning and control reminding method and device and computer equipment
CN113342846B (en) * 2021-06-29 2024-03-19 福州外语外贸学院 Early warning handle control reminding method and device based on big data and computer equipment
CN113986241A (en) * 2021-10-25 2022-01-28 北京元年科技股份有限公司 Configuration method and device of business rules based on knowledge graph
CN113986241B (en) * 2021-10-25 2022-09-16 北京元年科技股份有限公司 Configuration method and device of business rules based on knowledge graph

Similar Documents

Publication Publication Date Title
CN109559099A (en) Early warning rule configuration method, device and the computer equipment of observation system
EP2924579B1 (en) Event correlation
CN107004185A (en) The pipeline generation of the control actuated for data flow
US10425291B2 (en) System for decomposing events from managed infrastructures with prediction of a networks topology
US10050910B2 (en) Application of neural nets to determine the probability of an event being causal
US20180181666A1 (en) System for decomposing events from managed infrastructures that includes a reference tool signalizer
US11797890B2 (en) Performance manager to autonomously evaluate replacement algorithms
Sufi AI-GlobalEvents: A Software for analyzing, identifying and explaining global events with Artificial Intelligence
US11010220B2 (en) System and methods for decomposing events from managed infrastructures that includes a feedback signalizer functor
US10402428B2 (en) Event clustering system
US11329860B2 (en) System for decomposing events that includes user interface
CN112199276B (en) Method, device, server and storage medium for detecting change of micro-service architecture
US11924018B2 (en) System for decomposing events and unstructured data
CN107463391A (en) Task processing method, device and equipment
US10979304B2 (en) Agent technology system with monitoring policy
US10873508B2 (en) Modularity and similarity graphics system with monitoring policy
US20200177436A1 (en) System for decomposing events and unstructured data
CN110019501A (en) A kind of collecting method, device and terminal device
US11003521B2 (en) System for decomposing events from managed infrastructures with natural language processing
US10693707B2 (en) System for decomposing events from managed infrastructures with semantic clustering
US20210049274A1 (en) Analysis device, analysis method, and recording medium
US11817993B2 (en) System for decomposing events and unstructured data
Sula Secriskai: a machine learning-based tool for cybersecurity risk assessment
US10715379B2 (en) System for decomposing events from managed infrastructures with bitwise operation
US10700919B2 (en) System for decomposing events from managed infrastructures with semantic curvature

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190402