CN106779386A - Build management system and method in cruise cabin based on Quick Response Code - Google Patents
Build management system and method in cruise cabin based on Quick Response Code Download PDFInfo
- Publication number
- CN106779386A CN106779386A CN201611116861.1A CN201611116861A CN106779386A CN 106779386 A CN106779386 A CN 106779386A CN 201611116861 A CN201611116861 A CN 201611116861A CN 106779386 A CN106779386 A CN 106779386A
- Authority
- CN
- China
- Prior art keywords
- code
- library
- quick response
- response code
- chart
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The present invention provides a kind of cruise cabin based on Quick Response Code and builds management system and method,By two-dimension code label,Quick Response Code sweeps hand-held set,Gateway,History library,Central server,Java standard library is constituted,Two-dimension code label sticks in outfititem surface,Using " code living ",Quick Response Code sweeps hand-held set and code management system living is housed,The history library is used to store the data that code living is included,Java standard library is used for prestore the schedule timetable of each fitting-out module construction and each class standard construction information such as standard key performance indicators of each technological process,Newest data of the central server in real time to being gathered in history library are counted,And be compared with the data in java standard library,And the fitting-out that will be generated builds statistics chart,Manpower processing time matrix chart,Each technology key performance indicators examination chart is preserved to history library,Realize the information system management that large-scale luxury liner cabin is built.
Description
Technical field
Management system and method are built the present invention relates to a kind of cruise cabin based on Quick Response Code, belongs to large-scale luxury liner
Project management field.
Background technology
The construction of large-scale luxury liner accommodation mainly uses prefabricated modular cabin unit (PMCU-
Prefabricated Modular Cabin Unit) technology construction.PMCU by sanitary unit, wall panel system, ceiling system,
Fire resistant doorsets, furniture system, ventilating system and electric system etc. are constituted, and are transported from factory through private carrier after prefabricated completion
To job site, lifting and in-site installation are completed.
Current shipyard is general to carry out manual trace using the printing coding information on outfititem for the management that cabin is built
Management is identified and follows the trail of by way of pasting one-dimensional bar code to outfititem.
Coding information is printed on outfititem carries out manual trace management, not only needs to expend a large amount of manpowers, labour intensity
Greatly, inefficiency, and Data Enter speed is slow, management cost is high, cannot show in time and evaluation item process.And in fitting-out
The one-dimensional bar code pasted on part, then the storage capacity in the presence of itself is small, size is relatively large, space availability ratio is relatively low and is damaged
The defect such as just can not read after bad.Due to building the delayed of data acquisition technology and limitation, it is impossible to which each built to cabin is applied
The progress and technique of work project carry out efficient monitoring in time and manage, and are unfavorable for building the early warning of risk, constrain engineering
Managerial skills are lifted.Meanwhile, huge creation data information is grasped because that cannot collect, lead to not contain significant number to these
According to specialized process is carried out, " increment " that data cannot be realized by " processing " is caused, enjoy that to can't stand that " big data " is brought red
Profit.
The content of the invention
Management system and method are built the invention aims to provide a kind of cruise cabin based on Quick Response Code.
The object of the present invention is achieved like this:Management system is built in cruise cabin based on Quick Response Code, including is attached to Xi
The two-dimension code label on piece installing surface, Quick Response Code sweep hand-held set, gateway, history library, java standard library, central server,
The two-dimension code label using code living, and storage outfititem life cycle full detail, including from manufacture, fortune
Defeated, dealing, use, discarded all information;
The Quick Response Code sweeps hand-held set built with code management system living, can scan acquisition, the webpage of modification code sensing living
Information;
The gateway will realize data sharing and up/down perforation;
The history library is used to store the data that code living is included, including fitting-out module product information data, construction letter
Breath data, build statistics result, manpower processing time matrix result, the KPI Key Performance Indicator of each technique practice of construction and correspondence
Visual Chart;
The java standard library is used for prestore the schedule timetable of each fitting-out module construction and the mark of each technological process
Each class standard construction information such as quasi- KPI Key Performance Indicator;
The central server in real time in history library gather newest data count, and with java standard library in
Data are compared, and the fitting-out construction statistics chart of generation, manpower processing time matrix chart, each technology key performance are referred to
Mark examination chart is preserved to history library, realizes the information system management that large-scale luxury liner cabin is built.
Build management method, including the cruise based on Quick Response Code described in claim 1 in cruise cabin based on Quick Response Code
Management system is built in cabin,
The first step:Two-dimension code label is affixed on the surface of corresponding outfititem;
Second step:When each operation is completed, Quick Response Code sweeps the two-dimension code label that hand-held set is read on outfititem to outfititem
Corresponding new data message is input into after information;
3rd step:The new data message is transmitted into history library through gateway, and central server is in real time in history library
The new data message of collection is counted, and with java standard library in Data Comparison, generation fitting-out builds statistics charts, people
Power processing time matrix chart, each technology key performance indicators examination chart.
Compared with prior art, the beneficial effects of the invention are as follows:1. involved fitting-out is built in large-scale luxury liner cabin
Part type and quantity are all abnormal huge, are no longer applicable traditional one-dimensional bar code technology.This patent uses code living, by short network address
Point to the information for preserving beyond the clouds.Not only information capacity is big, coding range is wide, fault-tolerant ability is strong, durable, and adapts to
Upgrade in time content, greatly improves progress data acquisition capacity.2. large-scale luxury liner cabin construction work amount is huge, technique
Complicated, construction period is short, it is necessary to it is carried out more thoroughgoing and painstaking management to grasp project process comprehensively, prevents the duration from prolonging
By mistake.This patent read the Quick Response Code in fitting-out module and the method for writing production information when each operation is completed by using,
Realize the management specific to each operation condition of construction.3. central server of the invention can be according to collection in history library
Latest data automatically generates fitting-out and builds statistics chart, manpower processing time matrix chart, the examination of each technology key performance indicators
Chart, facilitates manager to get information about project integral constructing progress and the actual KPI Key Performance Indicator of each technique, substantially increases
Build managerial skills and efficiency in cruise cabin.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is flow chart of the invention.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Large-scale luxury liner compartment area construction work amount is huge, and construction period is limited, and its cabin is thousands of and built-in
Luxurious, ornaments are exquisite, equipment is various, and great challenge (example is brought to the project management of engineering:140000 tons of external maturation shipyards of cruise
Build man-hour cable 2200km, pipeline 400km, installed capacity more than 10,000,000 hours and be up to 65MW).
With reference to Fig. 1 to Fig. 2, system of the invention by two-dimension code label 1, Quick Response Code sweep hand-held set 2, gateway 3, history library 4,
Central server 5, java standard library 6 are constituted.
The two-dimension code label sticks in outfititem surface, (is pointed to by short network address and preserved beyond the clouds using " code living "
Information.That is, the information content of code book body living is a short network address, webpage (high in the clouds) information content that it is pointed to can be unlimited
It is many, but code self information amount living is few, easily identification.Even if in addition, cloud content change, code (short network address) of living accordingly
Can keep constant.Equivalent to " information becomes, and code is constant "), stored in code living outfititem life cycle (from manufacture, transport,
Dealing, using, it is discarded) all information.Each outfititem pastes an exclusive two-dimension code label, two-dimension code label equivalent to
The identity card of the mankind, the information of the webpage (high in the clouds) pointed by label, equivalent to the archives of people.
The Quick Response Code sweeps hand tool can accurately be determined for the various transmission means of WCDMA/WIFI/ bluetooths, support GPS location
Position equipment position, and equipped with code management system living, acquisition, webpage (high in the clouds) information of modification code sensing living can be scanned.
Outfititem often carries out a production and construction or transhipment is required for recording the construction informations such as its manpower man-hour in code living or turns
Fortune information.
The gateway is the necessary device for solving data sharing and up/down perforation, on the one hand it and data acquisition device phase
Even, on the other hand it can be connected with KXG.
The history library is used to store the data that code living is included, including fitting-out module product information data, construction letter
Breath data, build statistics result, manpower processing time matrix result, the KPI Key Performance Indicator of each technique practice of construction and correspondence
Visual Chart, the Gantt chart of Visual Chart including each task progress, the actual KPI and standard K PI of each technique are contrasted
Block diagram, project integrally complete the cake chart of situation.According to the data such as date, progress, the manpower man-hour stored in database, profit
Generated with related plug-in unit.
The java standard library is used for prestore the schedule timetable of each fitting-out module construction and the mark of each technological process
Each class standard construction information such as quasi- KPI Key Performance Indicator;
The central server in real time in history library gather newest data count, and with java standard library in
Data are compared, and the fitting-out construction statistics chart of generation, manpower processing time matrix chart, each technology key performance are referred to
Mark examination chart is preserved to history library, realizes the information system management that large-scale luxury liner cabin is built.
Claims (2)
1. management system is built in the cruise cabin based on Quick Response Code, it is characterised in that:Quick Response Code including being attached to outfititem surface
Label, Quick Response Code sweep hand-held set, gateway, history library, java standard library, central server,
The two-dimension code label using code living, and storage outfititem life cycle full detail, including from manufacturing, transport, buy
Sell, use, discarded all information;
The Quick Response Code sweeps hand-held set built with code management system living, can scan acquisition, the info web of modification code sensing living;
The gateway will realize data sharing and up/down perforation;
The history library is used to store the data that code living is included, including fitting-out module product information data, construction information number
According to, build statistics results, manpower processing time matrix result, the KPI Key Performance Indicator of each technique practice of construction and it is corresponding can
Depending on changing chart;
The java standard library is closed for the schedule timetable of each fitting-out module construction that prestores and the standard of each technological process
Each class standard construction information such as key performance indicators;
The central server in real time in history library gather newest data count, and with java standard library in data
It is compared, and the fitting-out of generation is built into statistics chart, manpower processing time matrix chart, each technology key performance indicators and examines
Core chart is preserved to history library, realizes the information system management that large-scale luxury liner cabin is built.
2. management method is built in the cruise cabin based on Quick Response Code, it is characterised in that:Including described in claim 1 based on two dimension
Management system is built in the cruise cabin of code,
The first step:Two-dimension code label is affixed on the surface of corresponding outfititem;
Second step:When each operation is completed, Quick Response Code sweeps the two-dimension code label information that hand-held set is read on outfititem to outfititem
Corresponding new data message is input into afterwards;
3rd step:The new data message is transmitted into history library through gateway, and central server in history library in real time to gathering
New data message counted, and with java standard library in Data Comparison, generation fitting-out builds statistics charts, manpower work
When statistical graph, each technology key performance indicators examination chart.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611116861.1A CN106779386A (en) | 2016-12-07 | 2016-12-07 | Build management system and method in cruise cabin based on Quick Response Code |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611116861.1A CN106779386A (en) | 2016-12-07 | 2016-12-07 | Build management system and method in cruise cabin based on Quick Response Code |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779386A true CN106779386A (en) | 2017-05-31 |
Family
ID=58882294
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611116861.1A Pending CN106779386A (en) | 2016-12-07 | 2016-12-07 | Build management system and method in cruise cabin based on Quick Response Code |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779386A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109711645A (en) * | 2017-10-25 | 2019-05-03 | 北京中盈安信技术服务股份有限公司 | A kind of pipeline construction data management system and method based on two dimensional code |
CN112529519A (en) * | 2020-11-26 | 2021-03-19 | 数字广东网络建设有限公司 | Epidemic prevention information acquisition system, method, device, computer equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103207983A (en) * | 2013-04-28 | 2013-07-17 | 刘腾飞 | Label identification system based on two-dimension code |
CN103778513A (en) * | 2014-02-11 | 2014-05-07 | 云南电力调度控制中心 | IT device operation and maintenance monitoring method based on two-dimensional codes |
CN104156812A (en) * | 2014-08-04 | 2014-11-19 | 江苏鼎思科技发展有限公司 | Construction project construction site original data acquisition system and acquisition method |
CN105160466A (en) * | 2015-08-26 | 2015-12-16 | 中交第二航务工程局有限公司 | Method for applying two-dimensional code to highway engineering |
-
2016
- 2016-12-07 CN CN201611116861.1A patent/CN106779386A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103207983A (en) * | 2013-04-28 | 2013-07-17 | 刘腾飞 | Label identification system based on two-dimension code |
CN103778513A (en) * | 2014-02-11 | 2014-05-07 | 云南电力调度控制中心 | IT device operation and maintenance monitoring method based on two-dimensional codes |
CN104156812A (en) * | 2014-08-04 | 2014-11-19 | 江苏鼎思科技发展有限公司 | Construction project construction site original data acquisition system and acquisition method |
CN105160466A (en) * | 2015-08-26 | 2015-12-16 | 中交第二航务工程局有限公司 | Method for applying two-dimensional code to highway engineering |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109711645A (en) * | 2017-10-25 | 2019-05-03 | 北京中盈安信技术服务股份有限公司 | A kind of pipeline construction data management system and method based on two dimensional code |
CN109711645B (en) * | 2017-10-25 | 2021-07-20 | 北京中盈安信技术服务股份有限公司 | Pipeline construction data management system and method based on two-dimensional code |
CN112529519A (en) * | 2020-11-26 | 2021-03-19 | 数字广东网络建设有限公司 | Epidemic prevention information acquisition system, method, device, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106779406B (en) | MES system based on RFID | |
CN107481349B (en) | Station inspection method and inspection system thereof | |
CN202815875U (en) | Routing inspection system | |
EP3136316A1 (en) | System and method for finding and locating items | |
Ikonen et al. | Use of embedded RFID tags in concrete element supply chains. | |
CN108229782A (en) | A kind of visual production management platform based on cloud | |
CN106990761A (en) | Manufacturing enterprise's production line data acquisition and billboard management system and method | |
CN104067189B (en) | Job management system and job management method | |
CN103150779A (en) | Inspection system and inspection method | |
EP1922597A1 (en) | Fault data management | |
EP2393067A1 (en) | Condition based maintenance support schedule management | |
DE102017207970A1 (en) | Injection molding machine management system | |
CN103106617A (en) | Method and system for monitoring overall process of finished vehicle productive task executive condition | |
CN102376042A (en) | System and method for supervising in-transit logistics information | |
EP2393049A1 (en) | On-board service platform and services for fleet maintenance and management | |
CN104376495A (en) | Wireless monitoring system and method for coal mine electromechanical device overhauling | |
CN106779386A (en) | Build management system and method in cruise cabin based on Quick Response Code | |
Lewis et al. | Maintenance of mobile mine equipment in the information age | |
CN104362739B (en) | Intelligent substation patrol system and method | |
EP2393048A1 (en) | Service platform system architecture for fleet maintenance and management | |
EP2393050A1 (en) | Central service platform and services for fleet maintenance and management | |
CN110348755A (en) | A kind of unmanned plane lifecycle management system and method | |
Denkena et al. | Interpretation and optimization of material flow via system behavior reconstruction | |
EP2393066A1 (en) | Configuration management for a fleet of equipment units | |
CN211402704U (en) | Building site asset management device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |