CN106761792A - A kind of full-sleeve full-rotation drill sleeve and shield cutter preceding object thing sweep-out method - Google Patents

A kind of full-sleeve full-rotation drill sleeve and shield cutter preceding object thing sweep-out method Download PDF

Info

Publication number
CN106761792A
CN106761792A CN201710041474.4A CN201710041474A CN106761792A CN 106761792 A CN106761792 A CN 106761792A CN 201710041474 A CN201710041474 A CN 201710041474A CN 106761792 A CN106761792 A CN 106761792A
Authority
CN
China
Prior art keywords
sleeve
full
shield
barrier
cutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710041474.4A
Other languages
Chinese (zh)
Other versions
CN106761792B (en
Inventor
李忠超
蔡兵华
杨新
罗小东
黄超群
张耀东
谢思俊岚
吴丹
卢吉
肖振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Municipal Construction Group Co Ltd
Original Assignee
Wuhan Municipal Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Municipal Construction Group Co Ltd filed Critical Wuhan Municipal Construction Group Co Ltd
Priority to CN201710041474.4A priority Critical patent/CN106761792B/en
Publication of CN106761792A publication Critical patent/CN106761792A/en
Application granted granted Critical
Publication of CN106761792B publication Critical patent/CN106761792B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Abstract

The invention discloses a kind of full-sleeve full-rotation drill sleeve, including sleeve, the upper end of sleeve is connected with slewing drilling machine, and the lower end of sleeve is fixed with hard alloy serrated knife.The invention also discloses a kind of cutter head of shield machine preceding object thing sweep-out method, the method includes:To injecting bentonite in soil pressure cabin;Geological drilling hole is opened up, remove obstacles construction infection scope and the buried depth of shield cutter preceding object thing are determined with bit freezing method;Observation WATER LEVEL CHANGES;Determine the sleeve portion of full-sleeve full-rotation drill and tunneled to underground;The soil body and barrier in cleaning sleeve;The cutting-sleeve opening on sleeve;And the barrier cleared up between sleeve and shield cutter;Sand is backfilled in sleeve, and progressively pulls up sleeve in backfilling process.Beneficial effects of the present invention are:The quick position for determining barrier and buried depth, using full circle swinging full set cylinder rig can fast drilling, pressure water head is circumferentially descended using dewatering well reduction, it is to avoid piping quicksand risk, it is ensured that can be in sleeve upper shed removing obstacles thing.

Description

A kind of full-sleeve full-rotation drill sleeve and shield cutter preceding object thing sweep-out method
Technical field
The present invention relates to shield tunnel construction technology field, and in particular to a kind of full-sleeve full-rotation drill sleeve and shield Cutterhead preceding object thing sweep-out method.
Background technology
During shield tunnel construction, due to the complexity of engineering geological condition and prospecting not enough thoroughly, shield machine exists Boulder, erratic boulder may be run into work progress or the unknown hard objects such as the cable and optical cable left because of front, cause shield driving It is difficult, it is impossible to drilling depth, shield machine is got into a difficult position.At present, when running into such situation during shield-tunneling construction, often first to front Stratum carries out consolidation process, then takes normal pressure to open a position clear and definite shield cutter preceding object species type, and vertical shaft is used in front of cutterhead Or the taking-up that opens a position, abolish barrier.However, there is certain defect in both processing methods:It is with pressure in shield machine to open a position When, pressurize is difficult in soil pressure cabin, and the technical merit requirement to staff in cabin is high;Level of ground water is higher, and shield tunneling face is lost Steady and worker safety's risk is higher;The consolidation process expense of two methods is higher, and the construction period is long, leverages Engineering construction progress.Additionally, existing full-rotating drill sleeve is larger due to sleeve wall thickness, do not possess the bar that opened a position in sleeve wall Part, is not suitable for removing the barrier outside sleeve.
The content of the invention
It is an object of the present invention in view of the shortcomings of the prior art, there is provided a kind of safe and simple full-sleeve full-rotation is bored Machine and shield cutter preceding object thing sweep-out method.
The technical solution adopted by the present invention is:A kind of full-sleeve full-rotation drill sleeve, including sleeve, the upper end of sleeve with Slewing drilling machine is connected, and slewing drilling machine provides rotary power for sleeve;The lower end of sleeve is fixed with hard alloy serrated knife.By above-mentioned side Case, the sleeve is welded by single-unit sleeve is from beginning to end successively, and the wall thickness of sleeve is 20 ~ 30mm.
By such scheme, sleeve top is provided at circumferentially spaced multiple holes for hoist.
The present invention additionally uses a kind of cutter head of shield machine preceding object thing sweep-out method, comprises the following steps:
Step one, each mechanism for closing shield machine, stop driving, and keep the soil pressure stabilization in shield machine soil pressure cabin, to soil Bentonite is injected in ballasting;
Step 2, the offer Novel sleeve for being used for full-sleeve full-rotation drill as described above, and slewing drilling machine etc.;
Step 3, from the shield cutter of shield machine top, adjacent ground surface opens up geological drilling hole, and shield cutter is determined with bit freezing method Remove obstacles construction infection scope and the buried depth of preceding object thing;
Step 4, in the range of construction infection of removing obstacles dewatering well is opened up, carry out bailing test, and monitor pump-out, observe underground SEA LEVEL VARIATION;
Step 5, the sleeve portion for determining full-sleeve full-rotation drill are simultaneously tunneled to underground, sleeve is covered obstacle to greatest extent Thing position;Full-sleeve full-rotation drill is drilled at least 2m below shield tunnel bottom;
The soil body and barrier in step 6, cleaning sleeve;
Step 7, operator is delivered to sleeve bottom, and fresh air is persistently conveyed to sleeve bottom, in real-time monitoring sleeve Oxygen content and other poison gas contents;
Step 8, on sleeve cutting-sleeve opening selected towards shield cutter direction according to sleeve portion and buried depth, it is artificial or Mechanical means excavates the soil body outside sleeve openings, and the barrier cleared up between sleeve and shield cutter;
After the completion of step 9, barrier cleaning, sand is backfilled in sleeve, and progressively sleeve is pulled up in backfilling process;
Step 10, be ready for next stage cleaning.
By such scheme, in step 3, the construction infection of removing obstacles of shield cutter preceding object thing is determined using bit freezing method Scope and buried depth;The bit freezing method is to the direction of shield cutter and by the lateral shield of shield cutter two along shield tunnel axis Structure tunnel axis direction opens up geological drilling hole, and at shield cutter, the spacing in geological drilling hole is smaller.
By such scheme, in step 3, geological drilling hole is opened up using geological drilling rig, the depth in geological drilling hole should surpass Cross 2m below shield tunnel bottom;During drilling, the drill bit of geological drilling rig is not less than 500mm with the distance of shield cutter.
By such scheme, in step 5, full-sleeve full-rotation drill is drilled into below shield tunnel bottom after at least 2m, is led to Cross unlatching dewatering well to draw water, make below underground bearing water potential drop to shield tunnel bottom.
By such scheme, in step 8, sleeve openings are not more than 0.5m2, whether observed after cutting has Sand to show As:If so, continuing to be drawn water lowering of watertable from dewatering well;If nothing, excavated outside sleeve openings using manually or mechanically means The soil body, and the barrier cleared up between sleeve and shield cutter.
By such scheme, in step 3, in coverage of removing obstacles, namely shield cutter front and 1 ~ 2 times of both sides tunnel Interval setting surface subsidence monitoring point in the range of road buried depth, in barrier reset procedure, is supervised with the frequency for being not less than 12h/ times The ground settlement that survey is removed obstacles in coverage deforms.
By such scheme, in step 5, if the soil body or barrier are harder, can be first with the impact drill addi-tional crusher soil body And barrier, then remove the soil body and barrier with hydraulic grab.
Beneficial effects of the present invention are:
1)The present invention can quickly determine position and the buried depth of barrier, can fast drilling, drilling using full circle swinging full set cylinder rig After below to shield tunnel base plate, pressure water head is circumferentially descended using dewatering well reduction, it is to avoid piping quicksand risk, it is ensured that can In sleeve upper shed, the soil body in sleeve and the barrier exposed quickly are removed using hydraulic grab;
2)The present invention is used using the barrier in front of full-sleeve full-rotation drill auxiliary cleaning cutter head of shield machine, its sleeve pipe Q235B steel are rolled and formed, and can pre-set gate-type opening in portion under a bushing, or carry out cutting openings using oxygen-acetylene, are entered And the barrier outside sleeve in front of shield cutter is cleared up, and termination is welded with hard alloy serrated knife, is applicable in all kinds of stratum Driving and the hard barrier of crushing kinds;Compared with existing use rig removing obstacles, without consolidation process after being bored under sleeve, On the one hand construction cost is reduced, also improves construction speed;On the other hand, staff's otch operation in sleeve, also protects The safety of operating personnel is demonstrate,proved;
3)The present invention is safe and efficient, and simple and quick construction and economy can thoroughly remove cutterhead preceding object thing, be engineering reality Shield cutter front is met barrier and cannot be tunneled forward there is provided a kind of easy, efficiently, quick, economic processing method in border, With important practical engineering value.
Brief description of the drawings
Fig. 1 is geological drilling hole position plan in the present invention.
Fig. 2 is dewatering well plane of arrangement figure in the present invention.
Fig. 3 is full-sleeve full-rotation drill plane of arrangement figure in the present invention.
Fig. 4 is ground settlement deformation monitoring plane of arrangement figure in the present invention.
Fig. 5 is the profile of each device location in the present invention.
Fig. 6 is the structural representation of Novel sleeve in the present invention.
Fig. 7 is the connection diagram of hard alloy serrated knife and sleeve in the present invention.
Wherein:1st, tunnel segment structure;2nd, synchronous grouting body;3rd, shield machine;4th, soil pressure cabin;5th, shield cutter;6th, geological drilling Hole;7th, barrier;8th, dewatering well;9th, sleeve;10th, sleeve otch;11st, hole for hoist;12nd, surface subsidence monitoring point;13rd, hard is closed Golden serrated knife.
Specific embodiment
For a better understanding of the present invention, the present invention is further described with specific embodiment below in conjunction with the accompanying drawings.
Shield machine 3 includes shield machine housing, shield cutter 5, soil pressure cabin 4, conveying worm, propulsive mechanism and tunnel segment structure 2, the shield cutter 5 is located at the front portion of shield machine housing, and the rear portion of shield cutter 5 is soil pressure cabin 4, the bottom of soil pressure cabin 4 and spiral shell Rotation conveyer connection, the soil body that shield cutter 5 cuts is entered in soil pressure cabin 4 by the aperture being distributed on shield cutter 5, By the outside that shield machine housing is delivered to positioned at the conveying worm of the bottom soil outlet of soil pressure cabin 4;Shield machine housing surrounding cloth Propelling cylinder is put, propulsive force tunnel segment structure 1 can be delivered evenly to by jack external part head mounted support boots, The outside of tunnel segment structure 1 is synchronous grouting body 2.When the front of shield cutter 5 runs into barrier, hard stop stops driving, to barrier Thing is hindered to be processed.
A kind of full-sleeve full-rotation drill sleeve, including the sleeve 9 that upper end is connected with slewing drilling machine, slewing drilling machine is sleeve 9 provide rotary power, and the lower end of sleeve 9 is welded with hard alloy serrated knife 13, for abolishing pavement concrete, underground obstacle etc. Hard objects;The top of sleeve 9 is provided at circumferentially spaced multiple holes for hoist 11, for lift sleeve 9 and continued access sleeve welded or It is attached with rotary motive power device, as shown in Figure 6 and Figure 7.In the present embodiment, sleeve 9 is made of Q235B steel, its diameter It is 1.5 ~ 2m, wall thickness is 20 ~ 30mm;Single-unit sleeve full-length is 9m, if single-unit length sleeve not enough, can weld 1 ~ 2 section Nigger;The top of sleeve 9 has been arranged circumferentially 10 holes for hoist 11, and the aperture of hole for hoist 11 is 5 ~ 10cm, hole for hoist 11 It is 15cm with the distance between the top of sleeve 9.
A kind of cutter head of shield machine preceding object thing sweep-out method, specifically includes following steps:
Step one, each mechanism for closing shield machine, stop driving, and keep the soil pressure stabilization in shield machine soil pressure cabin 4, to soil Bentonite is injected in ballasting 4, prevents excavation face seepage failure from destroying;
Step 2, offer geological drilling rig and the Novel sleeve for being used for full-sleeve full-rotation drill as described above, and abrasion drill Machine etc.;
Step 3, using geological drilling rig, geological drilling hole 6 is opened up from the shield cutter top adjacent ground surface of shield machine, such as Fig. 1 institutes Show, the construction infection scope of removing obstacles of the preceding object thing 7 of shield cutter 5 is determined with bit freezing method(The plane distribution position of preceding object thing 7 Put)And buried depth;The bit freezing method is to the direction of shield cutter 5 and by 5 liang of lateral shields of shield cutter along shield tunnel axis Structure tunnel axis direction opens up geological drilling hole 6, and at shield cutter 5, the spacing in geological drilling hole 6 is smaller;This implementation In example, the outside diameter of geological drilling rig is 110mm, and the depth in geological drilling hole should exceed 2m below shield tunnel bottom;Drilling When, the drill bit of geological drilling rig is not less than 500mm with the distance of shield cutter 5, in case the bit breakage shield cutter of geological drilling rig 5;
Step 4, in the range of the construction infection of removing obstacles in the both sides of shield cutter 5 and front open up dewatering well 8(As shown in Fig. 2 drop The precipitation ability of well 8 is it is ensured that level of ground water is down to below shield tunnel base plate in the sleeve 9 of full-sleeve full-rotation drill), Bailing test is carried out, and monitors pump-out, observe WATER LEVEL CHANGES;In the present embodiment, the external diameter of dewatering well 8 is 600mm, is taken out Water is not less than 50m3/h;
Step 5, determine the position of sleeve 9 and start slewing drilling machine to underground tunnel(As shown in Fig. 3 ~ 5), make sleeve 9 to greatest extent Covering barrier position;Full-sleeve full-rotation drill is drilled into below shield tunnel bottom after at least 2m, is taken out by dewatering well 8 Water, makes below underground bearing water potential drop to shield tunnel bottom;
The soil body and barrier in step 6, cleaning sleeve 9:If the soil body or barrier are harder, can be aided in first with impact drill The broken soil body and barrier, then remove the soil body and barrier with hydraulic grab;
Step 7, operator is delivered to by the bottom of sleeve 9 using safety rope, and fresh air is persistently conveyed to the bottom of sleeve 9, it is real When monitoring sleeve 9 in oxygen content and other poison gas contents, it is ensured that the safety of operator;
It is step 8, selected towards the direction of shield cutter 5 according to the position of sleeve 9 and buried depth, using oxygen-acetylene cutting in sleeve A 0.5m is cut on 92Sleeve openings 10, observation whether have Sand phenomenon:If so, continuing to be drawn water drop from dewatering well 8 Phreatic low;If nothing, the soil body outside sleeve openings 10 is excavated using manually or mechanically means, and clear up sleeve 9 and shield knife Barrier between disk 5;
After the completion of step 9, barrier cleaning, the backfill sand in sleeve 9, and progressively pull up sleeve 9 in backfilling process;
Step 10, be ready for next stage cleaning.
By the above method, carry out 2 ~ 3 times using full-sleeve full-rotation drill and remove obstacles, you can fully erased shield cutter 5 The barrier in front.In coverage of removing obstacles namely 5 front earth's surface of shield cutter, 1 ~ 2 times of shield tunnel buried depth diameter model Interior interval setting surface subsidence monitoring point 12 is enclosed, as shown in figure 4, in barrier reset procedure, to be not less than the frequency of 12h/ times Rate monitoring is removed obstacles the ground settlement deformation in coverage, prevents from causing ground settlement excessive because of precipitation and underground excavation of removing obstacles, Influence the safety of surrounding building.
The preferred embodiments of the present invention are these are only, is not intended to limit the invention, although with reference to embodiment to this Invention has been described in detail, and for a person skilled in the art, it still can be to described in foregoing embodiments Technical scheme modify, or equivalent is carried out to which part technical characteristic, but it is all in spirit of the invention and Within principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (10)

1. a kind of Novel sleeve for full-sleeve full-rotation drill, it is characterised in that including sleeve, upper end and the revolution of sleeve Rig is connected, and slewing drilling machine provides rotary power for sleeve;The lower end of sleeve is fixed with hard alloy serrated knife.
2. the Novel sleeve of full-sleeve full-rotation drill is used for as claimed in claim 1, it is characterised in that the sleeve is by list Sleeve is from beginning to end successively is welded for section, and the wall thickness of sleeve is 20 ~ 30mm.
3. the Novel sleeve of full-sleeve full-rotation drill is used for as claimed in claim 1, it is characterised in that sleeve top is circumferential Interval setting multiple hole for hoist.
4. a kind of cutter head of shield machine preceding object thing sweep-out method, it is characterised in that comprise the following steps:
Step one, each mechanism for closing shield machine, stop driving, and keep the soil pressure stabilization in shield machine soil pressure cabin, to soil Bentonite is injected in ballasting;
Step 2, the offer Novel sleeve for being used for full-sleeve full-rotation drill as claimed in claim 1, and slewing drilling machine Deng;
Step 3, from the shield cutter of shield machine top, adjacent ground surface opens up geological drilling hole, and shield cutter is determined with bit freezing method Remove obstacles construction infection scope and the buried depth of preceding object thing;
Step 4, in the range of construction infection of removing obstacles dewatering well is opened up, carry out bailing test, and monitor pump-out, observe underground SEA LEVEL VARIATION;
Step 5, the sleeve portion for determining full-sleeve full-rotation drill are simultaneously tunneled to underground, sleeve is covered obstacle to greatest extent Thing position;Full-sleeve full-rotation drill is drilled at least 2m below shield tunnel bottom;
The soil body and barrier in step 6, cleaning sleeve;
Step 7, operator is delivered to sleeve bottom, and fresh air is persistently conveyed to sleeve bottom, in real-time monitoring sleeve Oxygen content and other poison gas contents;
Step 8, on sleeve cutting-sleeve opening selected towards shield cutter direction according to sleeve portion and buried depth, it is artificial or Mechanical means excavates the soil body outside sleeve openings, and the barrier cleared up between sleeve and shield cutter;
After the completion of step 9, barrier cleaning, sand is backfilled in sleeve, and progressively sleeve is pulled up in backfilling process;
Step 10, be ready for next stage cleaning.
5. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 2, adopt Remove obstacles construction infection scope and the buried depth of shield cutter preceding object thing are determined with bit freezing method;The bit freezing method is along shield tunnel Axis opens up geological drilling hole to the direction of shield cutter and by the lateral shield tunnel axis direction of shield cutter two, more connects At nearly shield cutter, the spacing in geological drilling hole is smaller.
6. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 2, adopt Geological drilling hole is opened up with geological drilling rig, the depth in geological drilling hole should exceed 2m below shield tunnel bottom;During drilling, geology The drill bit of rig is not less than 500mm with the distance of shield cutter.
7. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 4, entirely Sleeve pipe full-rotating drill is drilled into below shield tunnel bottom after at least 2m, is drawn water by dewatering well, makes underground bearing water potential drop extremely Below shield tunnel bottom.
8. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 7, set Cylinder opening is not more than 0.5m2, whether observed after cutting has Sand phenomenon:If so, continue to be drawn water from dewatering well reducing underground Water level;If nothing, the soil body outside sleeve openings, and the barrier cleared up between sleeve and shield cutter are excavated using manually or mechanically means Hinder thing.
9. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 3, Remove obstacles in coverage, interval setting surface subsidence monitoring point, in barrier reset procedure, to be not less than the frequency of 12h/ times The ground settlement that monitoring is removed obstacles in coverage deforms.
10. cutter head of shield machine preceding object thing sweep-out method as claimed in claim 4, it is characterised in that in step 5, if The soil body or barrier are harder, can first with the impact drill addi-tional crusher soil body and barrier, then with hydraulic grab remove the soil body and Barrier.
CN201710041474.4A 2017-01-20 2017-01-20 A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method Active CN106761792B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710041474.4A CN106761792B (en) 2017-01-20 2017-01-20 A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710041474.4A CN106761792B (en) 2017-01-20 2017-01-20 A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method

Publications (2)

Publication Number Publication Date
CN106761792A true CN106761792A (en) 2017-05-31
CN106761792B CN106761792B (en) 2019-01-25

Family

ID=58944875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710041474.4A Active CN106761792B (en) 2017-01-20 2017-01-20 A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method

Country Status (1)

Country Link
CN (1) CN106761792B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756748A (en) * 2018-05-25 2018-11-06 上海市机械施工集团有限公司 The sweep-out method of underground obstacle
CN108756896A (en) * 2018-05-25 2018-11-06 上海市机械施工集团有限公司 The method for removing underground obstacle
CN108894744A (en) * 2018-08-29 2018-11-27 中煤特殊凿井有限责任公司 A kind of device for abolishing boulder bit freezing
CN109441454A (en) * 2018-09-11 2019-03-08 广东水电二局股份有限公司 A kind of construction method of underground lonestone reception room
CN109973103A (en) * 2019-03-22 2019-07-05 东北大学 A kind of shield simulation test device of adjustable angle
CN110130913A (en) * 2019-06-26 2019-08-16 中国铁建重工集团股份有限公司 Cutter head of shield machine, shield machine and the stake shield method excessively for tunnel piercing
CN110500121A (en) * 2019-09-20 2019-11-26 杭州华峰地基基础工程有限公司 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone
CN110685700A (en) * 2019-10-16 2020-01-14 中建铁路投资建设集团有限公司 Construction method for cleaning mortar adhered to surface of shield body through ground drilling
CN111706347A (en) * 2020-06-19 2020-09-25 中建富林集团有限公司 Reverse obstacle clearing construction method for jacking pipe
CN112324441A (en) * 2020-10-27 2021-02-05 深圳宏业基岩土科技股份有限公司 Construction method for removing underground shield segments by full-slewing drilling machine
CN114215474A (en) * 2021-11-03 2022-03-22 江苏无锡二建建设集团有限公司 Obstacle removing construction process of full-circle drilling machine
CN115653495A (en) * 2022-11-28 2023-01-31 昆明捷程桩工有限责任公司 Super-large-diameter steel sleeve vertical immersed tube and horizontal drilling coring and obstacle removing construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207779A (en) * 2000-01-24 2001-08-03 Mitsubishi Heavy Ind Ltd Obstacle detecting device for boring tunnel
CN101761083A (en) * 2008-12-24 2010-06-30 上海市基础工程公司 Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle
CN103924980A (en) * 2014-04-24 2014-07-16 上海隧道工程股份有限公司 Obstacle removing construction method
CN105545315A (en) * 2015-12-29 2016-05-04 上海市基础工程集团有限公司 Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN206860184U (en) * 2017-01-20 2018-01-09 武汉市市政建设集团有限公司 A kind of full-sleeve full-rotation drill sleeve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001207779A (en) * 2000-01-24 2001-08-03 Mitsubishi Heavy Ind Ltd Obstacle detecting device for boring tunnel
CN101761083A (en) * 2008-12-24 2010-06-30 上海市基础工程公司 Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle
CN103924980A (en) * 2014-04-24 2014-07-16 上海隧道工程股份有限公司 Obstacle removing construction method
CN105545315A (en) * 2015-12-29 2016-05-04 上海市基础工程集团有限公司 Normal pressure tool replacing method for reinforcing excavation face soil layer in shield tunnel construction
CN206860184U (en) * 2017-01-20 2018-01-09 武汉市市政建设集团有限公司 A kind of full-sleeve full-rotation drill sleeve

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756748A (en) * 2018-05-25 2018-11-06 上海市机械施工集团有限公司 The sweep-out method of underground obstacle
CN108756896A (en) * 2018-05-25 2018-11-06 上海市机械施工集团有限公司 The method for removing underground obstacle
CN108756748B (en) * 2018-05-25 2020-12-01 上海市机械施工集团有限公司 Method for removing underground obstacle
CN108756896B (en) * 2018-05-25 2020-12-01 上海市机械施工集团有限公司 Method for removing underground obstacle
CN108894744A (en) * 2018-08-29 2018-11-27 中煤特殊凿井有限责任公司 A kind of device for abolishing boulder bit freezing
CN109441454A (en) * 2018-09-11 2019-03-08 广东水电二局股份有限公司 A kind of construction method of underground lonestone reception room
CN109973103B (en) * 2019-03-22 2020-04-14 东北大学 Shield simulation test device with adjustable angle
CN109973103A (en) * 2019-03-22 2019-07-05 东北大学 A kind of shield simulation test device of adjustable angle
CN110130913A (en) * 2019-06-26 2019-08-16 中国铁建重工集团股份有限公司 Cutter head of shield machine, shield machine and the stake shield method excessively for tunnel piercing
CN110500121A (en) * 2019-09-20 2019-11-26 杭州华峰地基基础工程有限公司 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone
CN110685700A (en) * 2019-10-16 2020-01-14 中建铁路投资建设集团有限公司 Construction method for cleaning mortar adhered to surface of shield body through ground drilling
CN110685700B (en) * 2019-10-16 2021-01-01 中建铁路投资建设集团有限公司 Construction method for cleaning mortar adhered to surface of shield body through ground drilling
CN111706347A (en) * 2020-06-19 2020-09-25 中建富林集团有限公司 Reverse obstacle clearing construction method for jacking pipe
CN111706347B (en) * 2020-06-19 2021-08-20 中建富林集团有限公司 Reverse obstacle clearing construction method for jacking pipe
CN112324441A (en) * 2020-10-27 2021-02-05 深圳宏业基岩土科技股份有限公司 Construction method for removing underground shield segments by full-slewing drilling machine
CN114215474A (en) * 2021-11-03 2022-03-22 江苏无锡二建建设集团有限公司 Obstacle removing construction process of full-circle drilling machine
CN114215474B (en) * 2021-11-03 2023-09-15 江苏无锡二建建设集团有限公司 Barrier removing construction process of full rotary drilling machine
CN115653495A (en) * 2022-11-28 2023-01-31 昆明捷程桩工有限责任公司 Super-large-diameter steel sleeve vertical immersed tube and horizontal drilling coring and obstacle removing construction method
CN115653495B (en) * 2022-11-28 2023-09-08 昆明捷程桩工有限责任公司 Super-large diameter steel sleeve vertical sinking combined horizontal drilling coring and obstacle removing construction method

Also Published As

Publication number Publication date
CN106761792B (en) 2019-01-25

Similar Documents

Publication Publication Date Title
CN106761792B (en) A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method
CN102758430B (en) Large-diameter rotary digging pile construction technology for ultra-deep dumped unconsolidated soil bodies
CN105257301B (en) A kind of shallow-depth-excavation tunnel weak surrounding rock landslide reinforcing and processing method
CN111335902B (en) Construction method for shield tunneling ground connection wall underpass operation subway station
CN106545007B (en) The method of pile in the stratum that lower part is hard rock stratum
CN106285715B (en) Closely the construction method of first branch bored tunnel is worn in side to balancing earth-pressure shielding machine
CN106088064A (en) A kind of hard stratum precrushing three axle cement mixing pile drilling tool and construction method thereof
CN109322671A (en) A kind of trapped method of getting rid of poverty of shield cutter abrasion
CN105569666A (en) Stratum reinforcing method matched with shield long-distance tunneling normal-pressure tool changing
CN109736811A (en) A kind of vertical shaft machinery tunneling construction method
CN108425682A (en) A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method
CN113692476A (en) Method and system for constructing underground tunnel
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
CN112145210A (en) Anchor cable group removing method for invading shield or pipe-jacking tunnel section
CN112065410A (en) Method for receiving in shield soil body
CN105019917B (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN106593456A (en) Method for setting shield tunneling machine free in water-rich sand cobble stratum due to stuck cutter
CN113446008A (en) Shaft excavation device and construction method thereof
CN206860184U (en) A kind of full-sleeve full-rotation drill sleeve
CN109763826B (en) Frozen rock-soil breaking machine
CN207934897U (en) A kind of shield tool changing ground-connecting-wall ruggedized construction
US5380127A (en) Non-entry method of underground excavation in weak or water bearing grounds
CN209444332U (en) A kind of constructing structure reinforced for boulder group outstanding on shield section
CN111335906B (en) Construction method for drilling boulder
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant