Prior art keywords
waistband
segment
steel pile
pile casting
deep layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910892892.3A
Other languages
Chinese (zh)
Inventor
陈钢
陈梅琴
陆兴江
马永库
何宜龙
汤建红
黄益江
任海丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Huafeng Foundation Engineering Co Ltd
Original Assignee
Hangzhou Huafeng Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Huafeng Foundation Engineering Co Ltd filed Critical Hangzhou Huafeng Foundation Engineering Co Ltd
Priority to CN201910892892.3A priority Critical patent/CN110500121A/en
Publication of CN110500121A publication Critical patent/CN110500121A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/24Knuckle joints or links between arch members

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone, solve the problem of that metro shield protection zone requires big traditional protecting tube embedding form of construction work to be unable to satisfy construction demand the buried depth of steel pile casting.The segment of present apparatus steel pile casting includes the lowermost coxopodite, the epimerite of the top, one or more standard knot for being arranged between epimerite and coxopodite, outer sheath above and below adjacent segment at docking is equipped with waistband, waistband lower half portion is welded and fixed with downside segment, waistband top half is welded and fixed with upside segment, waistband top half ring circumferential direction is uniformly provided with four and embraces grasping holes, it is adjacent embrace to be equipped between grasping holes be fully welded fixed upper welding hole with upside segment lower end outer wall, the two sidewalls of the waistband symmetrically open up that there are two holes for hoist above upper welding hole by top.The present invention can be completed the construction of the deep layer steel pile casting of big depth, be guaranteed the intensity being welded to connect, facilitate alignment, improve efficiency using the progressive rotation static pressure construction of merogenesis.

Description

A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone
Technical field
The invention belongs to urban engineering project fields, are related to a kind of underground pile foundation constructing structure, in particular to a kind of subway The progressive steel pile casting of deep layer more piece of shield protection zone.
Background technique
With China's expanding economy, urban population density is constantly promoted, and Vehicle's quantity is continuously improved per capita, city The case where pressure of face traffic is increasing, especially morning and evening peak period, bottom surface traffic congestion is increasingly severe.For above-mentioned feelings Condition, side builds overhead, grade separation to builders on the ground, builds the rail traffics such as subway below ground, forms three-dimensional traffic Network alleviates the case where going on a journey congestion.
Subway construction needs to need along subway in underground progress shield in order to guarantee the stabilization of hypogee structure Metro shield protection zone delimited, to ensure construction safety.When the bridge facility of the overhead of ground, grade separation etc., Bridge Pile design Positioning it is excessively close from metro shield sideline when, according to subway peace comment requirement, it is necessary to constructed using perturbation flowing mode.Using biography System technique: such as abrasion drill, churning driven, long spire take soil that can be unsatisfactory for requiring.Therefore embedded deep layer steel pile casting is selected to go again Piling work.Since metro shield depth is deeper, embedded steel pile casting depth is commonly designed generally at 30 meters or more, depth is big, applies Work difficulty is big, and conventional static pressure can not construct to designed elevation, it is therefore desirable to which merogenesis construction is applied using rotary static pressure method Work.How merogenesis construction in by each segment rapid abutting joint, and guarantee accurate alignment, guarantee docking high reliability, be ensure apply Working medium amount and the emphasis for improving construction efficiency.
Summary of the invention
Big it is an object of the invention to require for buried depth of the metro shield protection zone to steel pile casting, traditional steel pile casting buries If form of construction work is unable to satisfy the problem of construction demand, a kind of progressive steel shield of deep layer more piece of metro shield protection zone is provided Cylinder, using the steel pile casting form of construction work that more piece is progressive, adjacent segments cylinder is fixed using belt type, and connection is reliable, alignment effect Good, difficulty of construction is low.
The technical solution adopted by the present invention to solve the technical problems is: a kind of deep layer more piece of metro shield protection zone is passed Into formula steel pile casting, steel pile casting is the concatenated tubular structure in multiple segments or more, it is characterised in that: the segment of steel pile casting includes most lower The coxopodite at end, the epimerite of the top, one or more standard knot for being arranged between epimerite and coxopodite, it is right above and below adjacent segment The outer sheath for meeting place is equipped with waistband, and the waistband lower half portion is welded and fixed with downside segment, and waistband top half and upside are saved Section is welded and fixed, and waistband top half ring circumferential direction is uniformly provided with four grasping holes of embracing for connecting with power source, and adjacent embraces It is equipped between grasping holes and is fully welded fixed upper welding hole with upside segment lower end outer wall, the two sidewalls of the waistband are on upper welding hole Side leans on top symmetrically to open up, and there are two holes for hoist.This programme is welded and fixed adjacent segment using waistband, waistband and upside Segment, downside segment are that clearance fit is welded and fixed.Waistband and coxopodite, epimerite, standard knot are prefabrication molding, to applying Work on-site assembly.When construction, each waistband is welded and fixed with corresponding downside segment by design, coxopodite construction is first carried out, will push up The coxopodite that waistband has been welded in portion is welded and fixed, and then carries out lifting positioning using the hole for hoist of waistband, downside segment is using rotation Formula static pressure method is constructed, and a grasping holes of embracing for waistband can be used as to embrace and grab anchor point at this time, coxopodite static pressure in place after, then by top The standard knot for having welded waistband is lifted into above coxopodite, and the bottom end of standard knot is inserted in the waistband above coxopodite and weld admittedly Fixed, the construction of deep layer steel pile casting is completed in such progressive construction of merogenesis.
Preferably, setting in the bottom end ring week of the upside segment at the waistband, there are four the pin hole being aligned with armful grasping holes, institutes The aperture for stating pin hole is less than the aperture for embracing grasping holes, and pin is inserted at described armful of grasping holes and pin hole, and the outer end of pin and waistband are embraced It is fully welded between grasping holes hole wall.Grasping holes of embracing on waistband grabs positioning for embracing in downside segmental construction, in upside segmental construction When, it embraces grasping holes and is used as outer pin hole, be fully welded fixation after grasping holes and pin hole pin joint will be embraced using pin, guarantee bonding strength.
It is connect preferably, the top of the waistband is fully welded with the outer wall ring round angle of upside segment.
Connect preferably, the waistband bottom end is fully welded with downside segment outer wall ring round angle, downside segment top with Waistband inner wall ring round angle is fully welded connection.
Preferably, being uniformly provided with several lower welding holes the waistband lower half portion ring week, lower welding hole and downside are saved The outer wall of section is fully welded fixation.
Preferably, the lower end of the coxopodite is equipped with the bottom boots of annular, the wall thickness of the bottom boots is greater than the wall thickness of coxopodite, bottom The inner wall of boots and the inner wall of coxopodite are concordant, and the bottom of the bottom boots is evenly arranged with several gums, are embedded with tooth in the gum Plate.The structure of bottom boots, which prevents from encountering in spinning process, has barrier to guarantee that bottom is indeformable.Tooth plate guarantees the pressure of rotation static pressure Enter effect.
Preferably, the tooth plate includes the internal gear being arranged alternately and outer tooth plate, the internal gear, which slopes inwardly, to be protruded Setting, maximum protrusion thickness are no more than 10mm;The outer tooth plate is inclined outwardly protrusion setting, and maximum protrusion thickness is no more than 10mm, the internal gear and outer tooth plate are one end protrusion counterclockwise.
Preferably, ring Zhou Caiyong V-type is fully welded at the coxopodite lower end and bottom boots upper end docking.
Preferably, the top two sidewalls of the epimerite be symmetrically arranged with two holes for hoist, hole for hoist lower section ring week uniformly If there are four or eight are embraced grasping holes.Without waistband when epimerite lifting and rotation static pressure, directly lifts and embrace and grab positioning.
Steel pile casting of the invention can complete applying for the deep layer steel pile casting of big depth using the progressive rotation static pressure construction of merogenesis Work, the present apparatus use switching device of the waistband as upper-lower segment, can not only guarantee the intensity being welded to connect, but also facilitate alignment, Construction quality is ensured;And the hole bit architecture of waistband can be used as lifting point when merogenesis is constructed and embrace and concentrates on work at selected units, and facilitate construction, Improve efficiency.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the invention.
Fig. 2 is the half-section diagram that coxopodite of the invention is connect as downside segment with waistband.
Fig. 3 is the connection structure half-section diagram of standard knot of the invention as upside segment and waistband.
In figure: 1, coxopodite, 2, standard knot, 3, epimerite, 4, waistband, 5, hole for hoist, 6, armful grasping holes, 7, bottom boots, 8, tooth plate, 9, Upper welding hole, 10, lower welding hole, 11, pin hole, 12, pin.
Specific embodiment
Below by specific embodiment and in conjunction with attached drawing, the present invention is further described.
Embodiment: a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone, as shown in Figure 1.The steel of the present apparatus Casing be multiple segments above and below concatenated tubular structure, the segment of steel pile casting include the lowermost coxopodite 1, the top epimerite 3, One or more standard knot 2 between epimerite and coxopodite is set, and the outer sheath above and below adjacent segment at docking is equipped with waistband 4, the waistband lower half portion is welded and fixed with downside segment, and waistband top half is welded and fixed with upside segment.
As shown in Fig. 2, coxopodite 1 is used as downside segment and waistband to weld.4 top half ring circumferential direction of waistband is uniformly provided with four A to embrace grasping holes 6 for what is connect with power source, adjacent embracing is fixed equipped with being fully welded with upside segment lower end outer wall between grasping holes Upper welding hole 9, the two sidewalls of the waistband are symmetrically opened up by top there are two hole for hoist 5 above upper welding hole.4 bottom end of waistband It is fully welded and connect with 1 outer wall ring round angle of coxopodite, 1 top of coxopodite is fully welded with 4 inner wall ring round angle of waistband and connect.Waistband lower half portion It is uniformly provided with several lower welding holes 10 ring week, the outer wall of lower welding hole and coxopodite is fully welded fixation.When standard knot is used as downside section When section is welded with waistband, the connection structure between connection structure and coxopodite and waistband is identical.The lower end of coxopodite 1 is equipped with annular Ring Zhou Caiyong V-type is fully welded at bottom boots 7, coxopodite lower end and bottom boots upper end docking.The wall thickness of the bottom boots 7 is greater than the wall thickness of coxopodite 1, The inner wall of bottom boots and the inner wall of coxopodite are concordant, and the bottom of the bottom boots is evenly arranged with several gums, are embedded in the gum Tooth plate 8.Tooth plate includes the internal gear being arranged alternately and outer tooth plate, and the internal gear, which slopes inwardly, protrudes setting, and maximum protrusion is thick Degree is no more than 10mm;The outer tooth plate is inclined outwardly protrusion setting, and maximum protrusion thickness is no more than 10mm, the internal gear and outer Tooth plate is one end protrusion counterclockwise.
As shown in figure 3, standard knot 2 is used as upside segment and waistband 4 to weld.The top of waistband 4 and the outer wall ring of standard knot 2 Round angle is fully welded connection.It sets in the bottom end ring week of standard knot 2 there are four the pin hole 11 being aligned with armful grasping holes, the aperture of the pin hole is less than The aperture of grasping holes 6 is embraced, pin 12 is inserted at described armful of grasping holes 6 and pin hole 11, the outer end of pin 12 and waistband embrace 6 hole wall of grasping holes Between be fully welded.Welding hole 9 is fully welded with 2 lower end outer wall of standard knot on waistband.Using above identical when epimerite is used as upside segment Welding structure.
When construction, each waistband is welded and fixed with corresponding downside segment by design, coxopodite construction is first carried out, top is welded The coxopodite for having connect waistband is welded and fixed, and then carries out lifting positioning using the hole for hoist of waistband, downside segment is using rotary quiet Platen press is constructed, and a grasping holes of embracing for waistband can be used as to embrace and grab anchor point at this time, coxopodite static pressure in place after, then top is welded The standard knot of waistband is lifted into above coxopodite, the bottom end of standard knot is inserted in the waistband above coxopodite is welded and fixed, The progressive construction of such merogenesis, completes the construction of deep layer steel pile casting.
Present apparatus construction location comments requirement according to subway peace, it is necessary to use perturbation apart from metro shield protection zone less than 6m Flowing mode is constructed.Using traditional handicraft: such as abrasion drill, churning driven, long spire take soil that can be unsatisfactory for requiring, therefore select Select embedded deep layer steel pile casting row piling work again.Conventional static pressure can not construct to designed elevation, it is therefore desirable to which merogenesis construction is adopted It is constructed with rotary static pressure method.In the arrangement and method for construction of the present embodiment, three sections of steel pile casting point, including an epimerite, a mark Quasi- section, a coxopodite, every section length 10m.The outer diameter 1180mm of each segment, using the steel of 16mm wall thickness.Waistband height 450mm, outer diameter 1210mm, wall thickness 12mm.Bottom boots wall thickness 25mm.Embracing grasping holes and hole for hoist is the aperture 50mm, upper welding hole and Lower welding hole is the aperture 30mm, the aperture pin hole 40mm.

Claims (9)

1. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone, steel pile casting is the concatenated tubular in multiple segments or more Structure, it is characterised in that: the segment of steel pile casting include the lowermost coxopodite, the epimerite of the top, setting epimerite and coxopodite it Between one or more standard knot, the outer sheath above and below adjacent segment at docking is equipped with waistband, the waistband lower half portion with Downside segment is welded and fixed, and waistband top half is welded and fixed with upside segment, and waistband top half ring circumferential direction is uniformly provided with Four grasping holes of embracing for connecting with power source, adjacent embracing are fixed equipped with being fully welded with upside segment lower end outer wall between grasping holes Upper welding hole, the two sidewalls of the waistband are symmetrically opened up by top there are two hole for hoist above upper welding hole.
2. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 1, it is characterised in that: It sets in the bottom end ring week of upside segment at the waistband there are four the pin hole being aligned with armful grasping holes, the aperture of the pin hole, which is less than, embraces The aperture of grasping holes is inserted with pin at described armful of grasping holes and pin hole, and the outer end of pin and waistband are embraced to be fully welded between grasping holes hole wall.
3. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 1, it is characterised in that: The top of the waistband is fully welded with the outer wall ring round angle of upside segment and connect.
4. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 1, it is characterised in that: The waistband bottom end is fully welded with downside segment outer wall ring round angle and connect, and downside segment top is fully welded with waistband inner wall ring round angle Connection.
5. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 4, it is characterised in that: It is uniformly provided with several lower welding holes the waistband lower half portion ring week, lower welding hole and the outer wall of downside segment are fully welded fixation.
6. a kind of progressive steel shield of the deep layer more piece of metro shield protection zone described according to claim 1 or 2 or 3 or 4 or 5 Cylinder, it is characterised in that: the lower end of the coxopodite is equipped with the bottom boots of annular, and the wall thickness of the bottom boots is greater than the wall thickness of coxopodite, bottom boots Inner wall it is concordant with the inner wall of coxopodite, the bottom of the bottom boots is evenly arranged with several gums, is embedded with tooth plate in the gum.
7. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 6, it is characterised in that: The tooth plate includes the internal gear being arranged alternately and outer tooth plate, and the internal gear, which slopes inwardly, protrudes setting, maximum protrusion thickness No more than 10mm;The outer tooth plate is inclined outwardly protrusion setting, and maximum protrusion thickness is no more than 10mm, the internal gear and external tooth Plate is one end protrusion counterclockwise.
8. a kind of progressive steel pile casting of deep layer more piece of metro shield protection zone according to claim 6, it is characterised in that: Ring Zhou Caiyong V-type is fully welded at the coxopodite lower end and bottom boots upper end docking.
9. a kind of progressive steel shield of the deep layer more piece of metro shield protection zone described according to claim 1 or 2 or 3 or 4 or 5 Cylinder, it is characterised in that: the top two sidewalls of the epimerite are symmetrically arranged with two holes for hoist, the lower section ring week of hole for hoist is uniformly provided with Four or eight are embraced grasping holes.
CN201910892892.3A 2019-09-20 2019-09-20 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone Pending CN110500121A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910892892.3A CN110500121A (en) 2019-09-20 2019-09-20 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910892892.3A CN110500121A (en) 2019-09-20 2019-09-20 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone

Publications (1)

Publication Number Publication Date
CN110500121A true CN110500121A (en) 2019-11-26

Family

ID=68592273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910892892.3A Pending CN110500121A (en) 2019-09-20 2019-09-20 A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone

Country Status (1)

Country Link
CN (1) CN110500121A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299549A (en) * 1993-04-16 1994-10-25 Taisei Corp Existing phc pile with hanging device
CN101153491A (en) * 2006-09-29 2008-04-02 石午江 Borehole wall-protection back cover and method for manufacturing large diameter hollow concrete pile
CN101634146A (en) * 2008-07-24 2010-01-27 邢利奥 Manually digging hole full-steel cylinder-wall protecting construction device for building pile foundation and construction method thereof
CN202730756U (en) * 2012-07-13 2013-02-13 中铁二十四局集团上海铁建工程有限公司 Sleeve connection device for drilling cast-in-situ bored pipe construction
JP2015194059A (en) * 2014-03-31 2015-11-05 前田製管株式会社 Steel pipe concrete composite pile and integrated construction method with footing part concrete
RU2597420C1 (en) * 2015-05-25 2016-09-10 Константин Львович Горячев Composite screw pile, device and method of screwing composite screw pile
CN106761792A (en) * 2017-01-20 2017-05-31 武汉市市政建设集团有限公司 A kind of full-sleeve full-rotation drill sleeve and shield cutter preceding object thing sweep-out method
CN206736902U (en) * 2017-04-20 2017-12-12 武汉交通职业学院 A kind of subway foundation pit cast-in-situ bored pile casing
CN208395848U (en) * 2018-06-29 2019-01-18 中铁二十二局集团第三工程有限公司 Assist the assembled interim retaining wall of the steel of pile foundation concrete dado construction
CN109797740A (en) * 2019-03-27 2019-05-24 湖北中南岩土工程有限公司 A kind of cast-in-situ bored pile and its construction method across underground civil defence structure
CN210714727U (en) * 2019-09-20 2020-06-09 杭州华峰地基基础工程有限公司 Deep multi-section progressive steel casing of subway shield protection area

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299549A (en) * 1993-04-16 1994-10-25 Taisei Corp Existing phc pile with hanging device
CN101153491A (en) * 2006-09-29 2008-04-02 石午江 Borehole wall-protection back cover and method for manufacturing large diameter hollow concrete pile
CN101634146A (en) * 2008-07-24 2010-01-27 邢利奥 Manually digging hole full-steel cylinder-wall protecting construction device for building pile foundation and construction method thereof
CN202730756U (en) * 2012-07-13 2013-02-13 中铁二十四局集团上海铁建工程有限公司 Sleeve connection device for drilling cast-in-situ bored pipe construction
JP2015194059A (en) * 2014-03-31 2015-11-05 前田製管株式会社 Steel pipe concrete composite pile and integrated construction method with footing part concrete
RU2597420C1 (en) * 2015-05-25 2016-09-10 Константин Львович Горячев Composite screw pile, device and method of screwing composite screw pile
CN106761792A (en) * 2017-01-20 2017-05-31 武汉市市政建设集团有限公司 A kind of full-sleeve full-rotation drill sleeve and shield cutter preceding object thing sweep-out method
CN206736902U (en) * 2017-04-20 2017-12-12 武汉交通职业学院 A kind of subway foundation pit cast-in-situ bored pile casing
CN208395848U (en) * 2018-06-29 2019-01-18 中铁二十二局集团第三工程有限公司 Assist the assembled interim retaining wall of the steel of pile foundation concrete dado construction
CN109797740A (en) * 2019-03-27 2019-05-24 湖北中南岩土工程有限公司 A kind of cast-in-situ bored pile and its construction method across underground civil defence structure
CN210714727U (en) * 2019-09-20 2020-06-09 杭州华峰地基基础工程有限公司 Deep multi-section progressive steel casing of subway shield protection area

Similar Documents

Publication Publication Date Title
CN105781577B (en) Dodecagon section of jurisdiction and pipe-plate lining structure for shield tunnel construction
CN201981532U (en) Bearing type super deep underground continuous wall adaptor
CN204266193U (en) Pile foundation steel bar cage locator
CN107460882A (en) A kind of retaining piles construction method of deep basal pit closing sealing
CN214573952U (en) Wall brushing device for bored pile hole
CN207812276U (en) A kind of modularization precast assembly cushion cap for municipal overpass
CN107190762A (en) A kind of piling strtucture for reducing side friction
CN107420640A (en) Attachment means between jacking construction end-protecting device and jacking construction steel pipe
CN109371963A (en) Back taper steel jacket box and its construction method in water in the prefabricated constructing tie beam of pier foundation
CN209838429U (en) Back anchor shield constructs lining cutting supporting construction
CN103485333A (en) Corrugated hollow steel pipe friction pile and construction method thereof
CN111705782A (en) Prefabricated underground diaphragm wall, underground diaphragm wall structure and construction method
CN103452115B (en) A kind of utilize send at the bottom of bushing type after intubate the construction method that post-grouting device carries out constructing
CN110500121A (en) A kind of progressive steel pile casting of deep layer more piece of metro shield protection zone
CN206308810U (en) Connect wall locking notch pipe water sealing structure
CN210714727U (en) Deep multi-section progressive steel casing of subway shield protection area
CN111877308B (en) Hydraulic hammering type prestressed concrete pipe pile construction method for soft soil foundation
CN206111200U (en) Rectangular shield digs tube coupling in top
CN210917394U (en) Foundation pit support pile
CN106351235A (en) Assembled type four-combined-round-steel-pipe concrete inner support structure and manufacturing method
CN107859034A (en) Large diameter pile foundation spillage immediate processing method
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN202688990U (en) Steel-concrete structure for reinforcing bored cast-in-place pile with insufficient concrete mark
CN210263015U (en) Prefabricated wall unit for underground continuous wall
CN213143030U (en) Prefabricated underground continuous wall and underground continuous wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination