CN207934897U - A kind of shield tool changing ground-connecting-wall ruggedized construction - Google Patents
A kind of shield tool changing ground-connecting-wall ruggedized construction Download PDFInfo
- Publication number
- CN207934897U CN207934897U CN201820342041.2U CN201820342041U CN207934897U CN 207934897 U CN207934897 U CN 207934897U CN 201820342041 U CN201820342041 U CN 201820342041U CN 207934897 U CN207934897 U CN 207934897U
- Authority
- CN
- China
- Prior art keywords
- wall
- ground
- tool changing
- shield
- plain concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model is related to tunnel and underground engineering construction technical fields,More particularly to a kind of shield tool changing ground-connecting-wall ruggedized construction,The shield tool changing ground-connecting-wall ruggedized construction of the utility model includes the ground-connecting-wall being arranged on tunnel piercing route,The ground-connecting-wall is plain concrete ground-connecting-wall,And the ground-connecting-wall is arranged at the length position for carrying out tool changing after shield machine driving,By the way that ruggedized construction is arranged on shield driving route in advance,So that carrying out cutter changing when shield driving is at the ruggedized construction,Due to being disposed with ruggedized construction,Therefore normal pressure tool changing can be carried out to cutter,To with simple and efficient possessed by normal pressure tool changing,The advantages that at low cost,Simultaneously,After arranging ruggedized construction,Be not in that excavation face collapses during cutter changing,The problems such as surface subsidence,Ensure surrounding enviroment along tunnel,Effectively prevent the generation of quality accidents.
Description
Technical field
The utility model is related to tunnel and underground engineering construction technical field, especially a kind of shield tool changing ground-connecting-wall is reinforced
Structure.
Background technology
Currently, with the continuous development of China's infrastructure facility, city underground is also developed rapidly, city underground
Running tunnel majority carries out tunneling construction using shield machine.However, when penetrating ground distance of shield is longer or passes through ground
When layer abrasion stratum contour there are sandy gravel, shield cutter abrasion will be very serious, therefore, it has in a planned way to cutter
It is replaced.The common method of shield tool changing at present is normal pressure tool changing and tool changing with pressure.
The normal pressure tool changing method that although opens a position is simple and efficient, but is applicable in geology and is limited in scope, and is only applicable to front of tunnel heading
The extraordinary condition of strata condition, and underground water is not abundant or the geological condition of underground water, applicable geology are not limited in scope,
During this geological conditions rarely occurs in constructing metro tunnel, therefore without representativeness.Tool changing generally use with pressure office
Portion's pneumatic process tool changing, uneven in soil property, native storehouse air pressure cannot maintain, it is difficult to provide the pressurize shape needed for tool changing
State, required air demand is big when tool changing, and compressed air conveying pipeline is long, and duration equipment and gas supply pipeline require high, have process numerous
The shortcomings of more, long in time limit, expensive;Meanwhile be susceptible to during cutter changing pressure abatement cause to jeopardize excavation face it is stable,
The problems such as easily surface subsidence being caused to collapse, and then surrounding enviroment along tunnel are influenced, since pressure reduction causes face to cave in
The accident to cause casualties happens occasionally;In addition, tool changing with pressure is more demanding to operating personnel, and the work under hyperbaric environment
It is larger to operating personnel's actual bodily harm, safety coefficient is low when making.
Utility model content
The goal of the invention of the utility model:It is not suitable for directly opening a position for formation condition in the prior art and carries out normal pressure
When tool changing, using tool changing method with pressure, there are processes that more, of high cost, operating personnel requires high risk big, and easily causes ground
The problem of sedimentation causes quality accidents, provides a kind of shield tool changing ground-connecting-wall ruggedized construction, by advance in shield driving
Ruggedized construction is set on route so that carries out cutter changing when shield driving is at the ruggedized construction, knot is reinforced due to being disposed with
Structure, therefore normal pressure tool changing can be carried out to cutter, it is simple and efficient, at low cost possessed by normal pressure tool changing to have many advantages, such as,
Meanwhile after arranging ruggedized construction, during cutter changing be not in excavation face collapse, surface subsidence the problems such as, ensure tunnel
Surrounding enviroment along the line effectively prevent the generation of quality accidents.
To achieve the goals above, the technical solution adopted in the utility model is:
A kind of shield tool changing ground-connecting-wall ruggedized construction, including the ground-connecting-wall that is arranged on tunnel piercing route, the ground-connecting-wall
For plain concrete ground-connecting-wall, when being needed replacing after shield machine cutter abrasion, this is provided at the tool changing position of driving route
Ground-connecting-wall.
Shield machine is in tunneling process, and with the propulsion of tunnelling footage, tool wear is increasingly severe, after shield machine driving
It needs to carry out tool changing, the distance length of tool changing can rule of thumb judge the abrasion of cutter within the scope of a certain siding-to-siding block length
Amount, then determine shield into Excavation Length carry out cutter changing, to can determine that shield machine driving after carry out tool changing position, because
This determines tool change position, and the ground-connecting-wall is arranged makes the installation position of ground-connecting-wall and shield machine driving laggard at this location
The length position of row tool changing is corresponding, to setting ground-connecting-wall position carry out normal pressure tool changing, avoid the occurrence of excavation face collapse,
The problems such as surface subsidence, ensures construction safety.
Set ground-connecting-wall to plain concrete ground-connecting-wall so that shield machine work progress before and after the tool changing of ground-connecting-wall position
In, normal pressure tool changing can not only be carried out, ensures construction safety, and can also directly be tunneled in ground-connecting-wall, guarantee is continuously applied
Work process will not additionally increase other processes.
By the shield tool changing ground-connecting-wall ruggedized construction of this programme, by directly pouring the form of construction work of ground-connecting-wall wall,
Reach and the tunnel soil body at shield machine tool changing position reinforced, eliminate to bad ground carry out geological prospecting be arranged pile body into
The complex process that row is reinforced on a large scale, construction efficiency higher enable shield machine to be carried out in tunneling process by the reinforcing of ground-connecting-wall
Normal pressure tool changing achievees the purpose that stable, efficient, safety, economy and the quick tool changing that opens a position.
As the preferred embodiment of the utility model, the ground-connecting-wall includes the first width for the reinforcing shield chain-drive section soil body
Plain concrete wall, and the second width plain concrete wall of face is supported, the first width plain concrete wall is arranged in shield machine
The position of tool changing is shut down, closely the first width plain concrete wall front end is arranged the second width plain concrete wall.
Set ground-connecting-wall to include the first width plain concrete wall and the second width plain concrete wall structure type, shield pick
Into after entering the predetermined reinforcing position of the first width plain concrete wall, the direct tool changing under the protection of the second width plain concrete wall is real
Stabilization, efficient, safe and the economic tool changing that opens a position the purpose of existing exchanging knives process.
In the present solution, the first width plain concrete wall of setting and the second width plain concrete wall, the first width plain concrete wall are in
Tool change position, the effect for primarily serving and reinforcing shield head, stablize shield driving form, the second width plain concrete wall is for keeping area
Face is stablized, and ensures the safety of exchanging knives process.
As the preferred embodiment of the utility model, length of the ground-connecting-wall along tunnel piercing direction is the m of 1.2m~3.0,
Width is the m of 6m~12, which extends to ground from 2m below tunnel bottom.
The length of ground-connecting-wall(Thickness)It can be adjusted according to shield cutter thickness, be opened a position method compared to existing shield,
The structure type of this ground-connecting-wall is taken, controllability is strong, and easy to operate quick, method is easily promoted, safety coefficient higher.
Further, length of the ground-connecting-wall along tunnel piercing direction is the m of 1.6m~2.4, and width is the m of 8 m~9,
The ground-connecting-wall extends to ground from 1m below tunnel bottom.
Further, when ground-connecting-wall is set as the structure type of the first width plain concrete wall and the second width plain concrete wall
When, the thickness of unilateral every width ground-connecting-wall is 0.8m ~ 1.2m.
As the preferred embodiment of the utility model, the position that opens a position, position and the shield of opening a position are preset on the shield machine
The installation position that structure machine needs replacing cutter is corresponding.
For construction stratum and shield driving parameter, shield cutter wear extent and true is calculated using experience and prediction technique
Surely it needs the position of tool changing, i.e., actively presets the position that opens a position on shield machine, making to open a position position and needs replacing the installation of cutter
Position is corresponding, carries out tool changing.
By pre-setting the position that opens a position, the normal construction of shield machine is not influenced, and reaches progress tool changing at ground-connecting-wall
When, by opening a position, position rapidly enters, and to quickly and efficiently complete tool changing work, utmostly ensures construction speed.
When using the shield tool changing ground-connecting-wall ruggedized construction of the utility model, according to the construction of following reinforced construction methods
Step carries out:
A, the position that opens a position is preset, according to construction stratum and shield driving parameter prediction shield cutter wear extent, determines shield
Machine needs the position of tool changing, to preset the position that opens a position on shield machine;
B, ground-connecting-wall is constructed, at the length position that tool changing is carried out after being tunneled positioned at shield machine, on tunnel piercing route
Carry out ground-connecting-wall construction;
C, shield machine driving is shut down afterwards in place, and shield machine is tunneled to after being provided with the position of ground-connecting-wall and shut down, shield head
Portion is in the length range of ground-connecting-wall;
D, open a position detection and tool changing, and operating personnel, which enters from the position that opens a position inside shield machine, to be carried out normal pressure and open a position to change
Knife, detection and maintenance work;
E, restore driving, after completing tool changing, close shield machine and open a position position and hatch door, while aerating promotes, until Tu Cang
Middle soil pressure is restored normal after with front stationary soil pressure and is promoted;
The sequence of construction of the step a and step b can be interchangeable.
Take above-mentioned construction method, preset in advance opens a position position, while carrying out ground-connecting-wall construction in advance, does not influence normal shield
Structure construction speed, normal pressure opens a position the method for tool changing in open a position tool changing and rock stratum with pressure compared to conventional ground slip casting pre-reinforcement, we
The construction method of case is influenced small by formation condition, belongs to normal pressure operation, and short time limit, expense are few, is avoided that and geological disaster etc. occurs
Security risk, it is also more secure for the life safety of construction worker.
This programme eliminates by pouring ground-connecting-wall wall in advance and carries out geological prospecting to bad ground and pile body position is arranged
Equal work progress are set, plays the role of stable surrounding soil, protection construction safety, keeps work progress more intuitive, easy, construct
Efficiency also higher.
Further, in the step c, the ground-connecting-wall includes the first width plain concrete wall and the second width plain concrete
Wall, the front end setting of the second width plain concrete wall closely the first width plain concrete wall drilling direction, shield machine will be described
After the completion of first width plain concrete wall driving and shield head enter the first width plain concrete wall range, cutter head of shield machine reaches pre-
If tool change position at after stop driving.
Plain concrete ground-connecting-wall is set and stablizes surrounding soil, the first width plain concrete wall plays the role of retaining wall, makees simultaneously
For the shield reinforcing wall of stop position, in shield driving after shield cutter reaches the shutdown of ground-connecting-wall precalculated position, second
Width plain concrete wall plays the role of firm face and the front soil body is avoided to cave in.Serve as the plain concrete wall of retaining wall effect
Body makes soil strength in front of cutterhead be strengthened, and prevents the geological disasters such as face avalanche, while shield machine can be directly mixed in element
It being tunneled in solidifying soil, entire exchanging knives process is small on shield machine and surrounding soil influence, more excellent compared to other cutter replacing method reinforcement effects,
It can directly keep stablizing in driving exterior wall after tool changing, so that normal pressure is opened a position tool changing suitable for various after reinforcing face
Topographic features.
Further, in the step b, using hydraulic grab cell wall machine trenching construction, slot section is equipped with bentonite when excavating
Mud off is made, and is poured by the way of double duct subaqueous concreting.
Further, when being irrigated using double duct, first arrangement pours frame, keeps pouring frame accurately in place, to right
Conduit is accurately positioned, and ensures concrete pouring quality.
Further, in the step b, when constructing to ground-connecting-wall, include the following steps:
B1, guide channel is excavated, and carries out construction of guide wall;
B2, trenching construction are simutaneously arranged junction block and carry out clear slot;
B3, concrete is poured, before pouring plain concrete, detects groove depth first, it is ensured that at groove depth, be then placed in conduit progress
It pours;
B4, mud discharge.
Further, it when construction of guide wall, is carried out using segmentation, and led in every width and spout hole is set on wall.
Further, during the trenching construction of the step b2, it is disposed with circulating tank and mud pit, the circulating tank is used
In the mud that storing is pumped into grooving, the mud pit includes sedimentation basin, mud production unit and cycling element.
Further, the cycling element includes cyclone and vibrating screen.
In ground-connecting-wall grooving digging process, to ensure that grooving is stablized, fresh mud is continuously supplied into groove,
There is a large amount of mud emission to come out, it is therefore desirable to carry out mud making, while to mud in concreting process under water simultaneously
Slurry is recycled and is handled useless slurry, it is ensured that safety, quality, progress and the civilized construction of construction of diaphragm wall.
Further, in the step b4, discharge or regeneration treatment are carried out after mud discharge.
In conclusion by adopting the above-described technical solution, the utility model has the beneficial effects that:
1, the shield tool changing ground-connecting-wall ruggedized construction of the utility model is preset on shield machine open a position position in advance, can be with
Shield-tunneling construction is carried out at the same time, and does not influence shield-tunneling construction progress, open a position tool changing and rock stratum with pressure compared to conventional ground slip casting pre-reinforcement
Middle normal pressure opens a position the method for tool changing, and it is small that the utility model by ruggedized construction makes tool changing work be influenced by formation condition, belongs to
Normal pressure operation, short time limit, expense is few, avoids the security risk of geological disaster, the person peace of energy effective guarantee construction worker
Entirely;
2, it by arranging ground-connecting-wall on tunnel piercing route, eliminates and geological prospecting is carried out to bad ground and then is arranged
The complex process of pile body position plays the role of stable surrounding soil by ground-connecting-wall, protects construction safety, makes work progress more
It is intuitive, easy to add, construction efficiency higher;
3, plain concrete ground-connecting-wall plays the role of stable surrounding soil, while playing retaining wall, and ground-connecting-wall is set
It is set to the structure type including the first width plain concrete wall and the second width plain concrete wall, the first width plain concrete wall is as shield
Reinforcing wall, when shield driving reaches the second width plain concrete wall until shield cutter, the second width plain concrete wall plays surely
Gu face and the effect for avoiding the front soil body from caving in, prevent the geological disasters such as face avalanche;
4, ground-connecting-wall is set to the structure type of plain concrete ground-connecting-wall so that shield machine is in the tool changing of ground-connecting-wall position
In front and back work progress, normal pressure tool changing can not only be carried out, ensures construction safety, and can also directly be dug in ground-connecting-wall
Into ensureing continuous work progress, will not additionally increase other processes, exchanging knives process influences small, phase to shield machine and surrounding soil
It is more excellent than other cutter replacing method reinforcement effects, it can directly keep stablizing in driving exterior wall after tool changing, reinforce area
The normal pressure tool changing that opens a position is set to be adapted to various topographic features behind face;
5, the length of ground-connecting-wall(Thickness)It can be adjusted according to shield cutter thickness, compared to the existing shield side of opening a position
Method takes the structure type of this ground-connecting-wall, and controllability is strong, and easy to operate quick, method is easily promoted, safety coefficient higher.
Description of the drawings:
Fig. 1 is the tool changing schematic diagram that opens a position of shield tool changing ground-connecting-wall ruggedized construction in the utility model.
Fig. 2 is the tool changing front view that opens a position of shield tool changing ground-connecting-wall ruggedized construction in Fig. 1.
Fig. 3 is the tool changing cross-section diagram that opens a position of shield tool changing ground-connecting-wall ruggedized construction in the utility model.
Fig. 4 is the construction process figure of shield tool changing ground-connecting-wall reinforced construction method in the utility model.
It is marked in figure:1- ground-connecting-walls, 11- the first width plain concrete walls, 12- the second width plain concrete walls, the ground 2-, 3- shields
Structure machine, 4- shield tunnels design axis.
Specific implementation mode
Below in conjunction with the accompanying drawings, the utility model is described in detail.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only explaining this
Utility model is not used to limit the utility model.
Embodiment 1
As shown in Figure 1, Figure 2 and Figure 3, shield tool changing ground-connecting-wall ruggedized construction, including be arranged on tunnel piercing route
Ground-connecting-wall 1, which is plain concrete ground-connecting-wall, when being needed replacing after shield machine cutter abrasion, in changing for driving route
The ground-connecting-wall 1 is provided at knife position.
Shield machine is in tunneling process, and with the propulsion of tunnelling footage, tool wear is increasingly severe, after shield machine driving
It needs to carry out tool changing, the distance length of tool changing can rule of thumb judge the abrasion of cutter within the scope of a certain siding-to-siding block length
Amount, then determine shield into Excavation Length carry out cutter changing, to can determine that shield machine driving after carry out tool changing position, because
This determines tool change position, and the ground-connecting-wall is arranged makes the installation position of ground-connecting-wall and shield machine driving laggard at this location
The length position of row tool changing is corresponding, to setting ground-connecting-wall position carry out normal pressure tool changing, avoid the occurrence of excavation face collapse,
The problems such as surface subsidence, ensures construction safety.
Set ground-connecting-wall to plain concrete ground-connecting-wall so that shield machine work progress before and after the tool changing of ground-connecting-wall position
In, normal pressure tool changing can not only be carried out, ensures construction safety, and can also directly be tunneled in ground-connecting-wall, guarantee is continuously applied
Work process will not additionally increase other processes.
Shield tool changing ground-connecting-wall ruggedized construction through this embodiment, by the construction party for directly pouring ground-connecting-wall wall
Formula reaches and is reinforced to the tunnel soil body at shield machine tool changing position, eliminates and carries out geological prospecting setting stake to bad ground
The complex process that body is reinforced, construction efficiency higher enable shield machine to be carried out often in tunneling process by the reinforcing of ground-connecting-wall
Tool changing is pressed, achievees the purpose that stable, efficient, safety, economy and the quick tool changing that opens a position.
As one such preferred embodiment, ground-connecting-wall 1 designs axis along the center line of tunneling direction with shield tunnel
Line 4 is on the same perpendicular.
As one such embodiment, the ground-connecting-wall 1 includes the first width for the reinforcing shield chain-drive section soil body
Plain concrete wall 11, and the second width plain concrete wall 12 of face is supported, the setting of the first width plain concrete wall 11 exists
Shield machine 3 shuts down the position of tool changing, and closely 11 front end of the first width plain concrete wall is arranged the second width plain concrete wall 12,
After the driving of shield machine 3 enters the predetermined reinforcing position of the first width plain concrete wall 11, under the protection of the second width plain concrete wall 12
The stabilization of exchanging knives process, efficient, safe and the economic tool changing that opens a position purpose, the first width plain concrete wall are realized in direct tool changing
11 are in tool change position, and the effect for primarily serving and reinforcing shield head, stablize shield driving form, the second width plain concrete wall 12 is used for
It keeps face to stablize, ensures the safety of exchanging knives process.
As one such embodiment, length of the ground-connecting-wall 1 along tunnel piercing direction is the m of 1.2m~3.0,
Width is the m of 6m~12, which extends to ground 2 from 2m below tunnel bottom.
As one such preferred embodiment, length of the ground-connecting-wall 1 along tunnel piercing direction is 1.6m~2.4
M, width are the m of 8 m~9, which extends to ground 2 from 1m below tunnel bottom.
Further, when ground-connecting-wall 1 is set as the structure of the first width plain concrete wall 11 and the second width plain concrete wall 12
When form, the thickness of unilateral every width ground-connecting-wall is 0.8m ~ 1.2m.
As one such embodiment, the position that opens a position, position and the shield of opening a position are preset on the shield machine 3
The installation position that machine 3 needs replacing cutter is corresponding.
For construction stratum and shield driving parameter, shield cutter wear extent and true is calculated using experience and prediction technique
Surely it needs the position of tool changing, i.e., actively presets the position that opens a position on shield machine, making to open a position position and needs replacing the installation of cutter
Position is corresponding, carries out tool changing.
Embodiment 2
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the reinforced construction method of shield tool changing ground-connecting-wall, in arranging such as embodiment 1
Shield tool changing ground-connecting-wall ruggedized construction when, according to following construction procedures carry out:
A, the position that opens a position is preset, according to construction stratum and shield driving parameter prediction shield cutter wear extent, determines shield
Machine 3 needs the position of tool changing, to preset the position that opens a position on shield machine 3;
B, ground-connecting-wall 1 is constructed, enterprising in tunnel piercing route at the position for carrying out tool changing after the driving of shield machine 3
Row ground-connecting-wall 1 is constructed;
C, the driving of shield machine 3 is shut down afterwards in place, and the driving of shield machine 3 is shut down to after being provided with the position of ground-connecting-wall 1, shield machine
3 heads are in the length range of ground-connecting-wall 1;
D, open a position detection and tool changing, and operating personnel enters 3 inside progress normal pressure of shield machine from the position that opens a position and opens a position
Tool changing, detection and maintenance work;
E, restore driving, after completing tool changing, close shield machine 3 and open a position position and hatch door, while aerating promotes, until Tu Cang
Middle soil pressure is restored normal after with front stationary soil pressure and is promoted;
The sequence of construction of the step a and step b can be interchangeable.
As one such embodiment, in the step c, the ground-connecting-wall 1 includes the first width plain concrete wall 11
With the second width plain concrete wall 12, the second width plain concrete wall 12 is closely before 11 drilling direction of the first width plain concrete wall
End set, the first width plain concrete wall 11 is tunneled completion to shield machine 3 and shield head enters the first width plain concrete
After 11 range of wall, cutter head of shield machine stops driving after reaching at preset tool change position.
As one such embodiment, in the step b, using hydraulic grab cell wall machine trenching construction, slot section is opened
It is equipped with bentonite when digging and makes mud off, and is poured by the way of double duct subaqueous concreting, using double
When conduit is irrigated, first arrangement pours frame, keeps pouring frame accurately in place, to be accurately positioned to conduit, ensures coagulation
Native pouring quality.
As one such embodiment, in the step b, when constructing to ground-connecting-wall 1, include the following steps:
B1, guide channel is excavated, and carries out construction of guide wall;
B2, trenching construction are simutaneously arranged junction block and carry out clear slot;
B3, concrete is poured, before pouring plain concrete, detects groove depth first, it is ensured that at groove depth, be then placed in conduit progress
It pours;
B4, mud discharge.
Further, it when construction of guide wall, is carried out using segmentation, and led in every width and spout hole is set on wall.
As one such embodiment, during the trenching construction of the step b2, it is disposed with circulating tank and mud
Pond, for putting the mud being pumped into grooving, the mud pit includes sedimentation basin, mud production unit and follows the circulating tank
Ring element, the cycling element include cyclone and vibrating screen.
In ground-connecting-wall grooving digging process, to ensure that grooving is stablized, fresh mud is continuously supplied into groove,
There is a large amount of mud emission to come out, it is therefore desirable to carry out mud making, while to mud in concreting process under water simultaneously
Slurry is recycled and is handled useless slurry, it is ensured that safety, quality, progress and the civilized construction of construction of diaphragm wall.
As one such embodiment, in the step b4, discharge or regeneration treatment are carried out after mud discharge.
As one such embodiment, in the step d, following steps are specifically included:
D1, open a position before forced ventilating and gas detection;
After d2, gas detection qualification, it is gradually opened hatch door, face is primarily determined safely first, it is ensured that safety is steady
Stop the work of foaming system after fixed;
D3, operating personnel replace cutter from warehouse entry inspection inside shield machine, replace standard according to hobboing cutter, scraper, it then follows " tear open
One fills one " tool changing principle, and when each group personnel's tool changing should be used uniformly " being replaced by arm " or " from outside to inside " or " from inside to outside "
Equal tool changing sequence;
D4, tool changing operation are completed, and operating personnel all withdraws rear special messenger and carried out comprehensively to cutter and Tu Cang and cutterhead situation
It checks.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
All any modification, equivalent and improvement etc., should be included in the utility model made by within the spirit and principle of utility model
Protection domain within.
Claims (4)
1. a kind of shield tool changing ground-connecting-wall ruggedized construction, which is characterized in that including the ground-connecting-wall being arranged on tunnel piercing route,
The ground-connecting-wall is plain concrete ground-connecting-wall, when being needed replacing after shield machine cutter abrasion, at the tool changing position of driving route
It is provided with the ground-connecting-wall.
2. shield tool changing ground-connecting-wall ruggedized construction according to claim 1, which is characterized in that the ground-connecting-wall includes being used for
First width plain concrete wall of the reinforcing shield chain-drive section soil body, and support face the second width plain concrete wall, described the
The position that tool changing is shut down in shield machine, the second width plain concrete wall closely the first width element coagulation is arranged in one width plain concrete wall
Cob wall front end is arranged.
3. shield tool changing ground-connecting-wall ruggedized construction according to claim 1, which is characterized in that the ground-connecting-wall is along tunnel digging
Length into direction is the m of 1.2m~3.0, and width is the m of 6m~12, which extends to ground from 2m below tunnel bottom
Face.
4. the shield tool changing ground-connecting-wall ruggedized construction according to one of claim 1-3, which is characterized in that on the shield machine
It is preset with the position that opens a position, the position that opens a position is corresponding with the installation position that shield machine needs replacing cutter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820342041.2U CN207934897U (en) | 2018-03-13 | 2018-03-13 | A kind of shield tool changing ground-connecting-wall ruggedized construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820342041.2U CN207934897U (en) | 2018-03-13 | 2018-03-13 | A kind of shield tool changing ground-connecting-wall ruggedized construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207934897U true CN207934897U (en) | 2018-10-02 |
Family
ID=63654925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820342041.2U Active CN207934897U (en) | 2018-03-13 | 2018-03-13 | A kind of shield tool changing ground-connecting-wall ruggedized construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207934897U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108425682A (en) * | 2018-03-13 | 2018-08-21 | 中铁建大桥工程局集团第二工程有限公司 | A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method |
CN111335910A (en) * | 2020-03-04 | 2020-06-26 | 海南大学 | Method for opening cabin of shield tunneling machine to overhaul and replace cutter |
-
2018
- 2018-03-13 CN CN201820342041.2U patent/CN207934897U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108425682A (en) * | 2018-03-13 | 2018-08-21 | 中铁建大桥工程局集团第二工程有限公司 | A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method |
CN111335910A (en) * | 2020-03-04 | 2020-06-26 | 海南大学 | Method for opening cabin of shield tunneling machine to overhaul and replace cutter |
CN111335910B (en) * | 2020-03-04 | 2021-07-23 | 海南大学 | Method for opening cabin of shield tunneling machine to overhaul and replace cutter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108425682A (en) | A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method | |
CN106761792B (en) | A kind of full-sleeve full-rotation drill sleeve and shield cutter front obstacle sweep-out method | |
CN102425423B (en) | Constructing method for shield entering into hole while passing through pipeline | |
CN109296378B (en) | Down-the-hole drill matched breaking hammer tunneling and excavating construction method | |
CN106285715B (en) | Closely the construction method of first branch bored tunnel is worn in side to balancing earth-pressure shielding machine | |
CN110159274B (en) | Sea area high water pressure shield method tunnel emergency tool changing structure and construction method | |
CN111335902B (en) | Construction method for shield tunneling ground connection wall underpass operation subway station | |
CN106907164A (en) | A kind of water-bed combination of mine shield tunnel docking structure form and its construction method | |
CN105569666A (en) | Stratum reinforcing method matched with shield long-distance tunneling normal-pressure tool changing | |
CN110424969A (en) | It is a kind of elder generation tunnel after stand cut and cover method station construction engineering method | |
CN105201518A (en) | Method for receiving and disassembly of large-diameter slurry balance shield in hole | |
CN111472801A (en) | Construction method for passing existing line under shallow-buried underground excavation drainage gallery | |
CN104675405B (en) | Rectangular pipe jacking machine tunnel entering auxiliary structure and construction method | |
CN207934897U (en) | A kind of shield tool changing ground-connecting-wall ruggedized construction | |
CN112065410B (en) | Method for receiving in shield soil body | |
CN111997639A (en) | Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine | |
CN110905536A (en) | Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel | |
CN206888992U (en) | A kind of water-bed mine shield tunnel combination docking structure form | |
CN104594912A (en) | Method for grinding and penetrating through pile groups through shield tunneling machine | |
CN109989407B (en) | Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway | |
CN208669306U (en) | One kind being adapted to existing tunnel enlarged diameter type shield machine | |
CN106593456A (en) | Method for setting shield tunneling machine free in water-rich sand cobble stratum due to stuck cutter | |
CN211144498U (en) | Novel shield cutter head | |
CN110284893B (en) | Tunneling tool changing method for underwater shield tunnel under ultrahigh water pressure condition | |
CN108119150B (en) | The method of dark-excavated passageway in weak soil |