The content of the invention
The invention provides a kind of single channel attachment-type pressure control device, the deficiency of above-mentioned prior art is overcome, it can have
Effect solves that the set-up time that existing controlled pressure drilling equipment is present is long, accuracy is poor, waste time and energy, efficiency of construction is relatively low, there is peace
The problem of full hidden danger.
The technical scheme is that realized by following measures:A kind of single channel attachment-type pressure control device, including
First pipeline, first manual slide valve, pressure gauge, the second manual gate have been sequentially connected in series on the first pipeline by import to outlet
Valve, automatic throttle, the first ball valve, the second ball valve, flowmeter, the 3rd ball valve, the 3rd manually gate valve.
Here is the further optimization and/or improvements to foregoing invention technical scheme:
Above-mentioned single channel attachment-type pressure control device also include the first thermometer, the first thermometer be serially connected in first manual slide valve with
On the first pipeline between pressure gauge.
Above-mentioned flow is calculated as coriolis mass flowmeters.
Above-mentioned single channel attachment-type pressure control device also includes the second pipeline, the 3rd pipeline and four-way connection, on the second pipeline
Manual throttle valve is serially connected with, the 4th ball valve is serially connected with the 3rd pipeline, the import of the second pipeline is connected to pressure gauge and second-hand
On the first pipeline between dynamic slide valve, the outlet of the second pipeline and the first fittings of four-way connection, the 3rd pipeline enter
Mouthful with the 3rd fittings of four-way connection, the outlet of the 3rd pipeline is connected between the 3rd ball valve and the 3rd manually gate valve
On first pipeline, the second fittings of the first ball valve and four-way connection, the 4th fittings of the second ball valve and four-way connection.
Above-mentioned single channel attachment-type pressure control device also includes second temperature meter, and second temperature meter is serially connected on the second pipeline.
Reasonable and compact in structure of the present invention, it is easy to use, its first manual slide valve and the 3rd manually gate valve respectively with
Choke manifold is after flange is connected, you can is normally used, realized " plug and play ", convenient and swift, shortens equipment
Set-up time, save human cost and cost of investment;The drawbacks of which overcoming conventional manual's pressure control simultaneously, realizes controlled pressure drilling
When automatically control, and pressure control data can be monitored and be recorded, with it is safe, laborsaving, easy, efficient the characteristics of.
Specific embodiment
The present invention is not limited by following embodiments, can technology according to the present invention scheme and actual conditions determine specifically
Implementation method.
In the present invention, for the ease of description, the description of the relative position relation of each part is according to Figure of description 1
Butut mode be described, such as:The position relationship of forward and backward, upper and lower, left and right etc. is according to the Butut of Figure of description
Direction determines.
With reference to embodiment and accompanying drawing, the invention will be further described:
As shown in Figure 1, the single channel attachment-type pressure control device includes the first pipeline 14, by import to outlet on the first pipeline 14
It has been sequentially connected in series first manual slide valve 1, pressure gauge 3, the second manually gate valve 5, automatic throttle 6, the first ball valve 7, second
Ball valve 8, flowmeter 9, the 3rd ball valve 10, the 3rd manually gate valve 13.The present invention is a kind of single channel attachment-type pressure control device, the
After one manually gate valve 1 is connected with choke manifold 16 by flange respectively with the 3rd manually gate valve 13, you can normally made
With, realize " plug and play ", it is convenient and swift, the equipment set-up time is shortened, save human cost and cost of investment;While its
The drawbacks of overcoming conventional manual's pressure control, automatically controlling when realizing controlled pressure drilling, and pressure control data can be supervised
Survey and record.
Above-mentioned single channel attachment-type pressure control device can be made further optimization and/or improvements according to actual needs:
As shown in Figure 1, above-mentioned single channel attachment-type pressure control device also includes the first thermometer 2, and the first thermometer 2 is serially connected in the
On the first pipeline 14 between one manually gate valve 1 and pressure gauge 3.First thermometer 2 can measure liquid in the first pipeline
Temperature, facilitates Field Force to be monitored and record pressure control data.
As shown in Figure 1, above-mentioned flowmeter 9 is coriolis mass flowmeters.Coriolis mass flowmeters are directly surveyed
Amount mass flow, there is a measuring accuracy very high, measurable fluid it is in extensive range.
As shown in Figure 1, above-mentioned single channel attachment-type pressure control device also includes the second pipeline 15, the 3rd pipeline 19 and four-way
Joint 20, is serially connected with manual throttle valve 4 on the second pipeline 15, the 4th ball valve 11, the second pipeline 15 are serially connected with the 3rd pipeline 19
Import be connected on the first pipeline 14 between the manually gate valve 5 of pressure gauge 3 and second, the outlet of the second pipeline 15 and four-way
First fittings of joint 20, the import of the 3rd pipeline 19 and the 3rd fittings of four-way connection 20, the 3rd pipeline 19
Outlet is connected on the first pipeline 14 between the 3rd ball valve 10 and the 3rd manually gate valve 13, the first ball valve 7 and four-way connection
4th fittings of 20 the second fittings, the second ball valve 8 and four-way connection 20.So, the present invention can not only be realized
Automatic pressure-controlled function, can also realize aiding in pressure control manually based on drilling team's choke manifold 16, and the stability of a system is higher.It is such as attached
Shown in Fig. 1, the left side of four-way connection 20 is the first joint, and downside is the second joint, and right side is the 3rd joint, and upside connects for the 4th
Head.
As shown in Figure 1, above-mentioned single channel attachment-type pressure control device also includes second temperature meter 12, and second temperature meter 12 is gone here and there
It is connected on the second pipeline 15.Second temperature meter 12 can measure the temperature of liquid in second pipe, facilitate Field Force to pressure control
Data are monitored and record.
Above technical characteristic constitutes highly preferred embodiment of the present invention, and it has stronger adaptability and optimal implementation effect
Really, can according to actual needs increase and decrease non-essential technical characteristic to meet the demand of different situations.
The use process of preferred embodiment:
During normal drilling:Drilling fluid enters from first manual slide valve 1, passes sequentially through the first thermometer 2, pressure gauge 3, second
Manually gate valve 5, automatic throttle 6, the first ball valve 7, the second ball valve 8, flowmeter 9, the 3rd ball valve 10, subsequently into the 3rd hand
Dynamic slide valve 13, after enter liquid-gas separator 17, in this process, the ball of manual throttle valve 4 and the 4th further through the pipeline of connection
Valve 11 is remained off, and automatic throttle 6 realizes self-choke function.
When making up a joint:Drilling fluid by kill manifold enter annular space after, into choke manifold 16, from first manual slide valve
Enter at 1, pass sequentially through the first thermometer 2, pressure gauge 3, the second manually gate valve 5, automatic throttle 6, the first ball valve 7, the
Two ball valves 8, flowmeter 9, the 3rd ball valve 10, subsequently into the 3rd manually gate valve 13, after enter liquid further through the pipeline of connection
Gas separating device 17, in this process, the ball valve 11 of manual throttle valve 4 and the 4th is remained off, and automatic throttle 6 is realized automatically
Throttling function.
When changing the glue heart:Annular preventer 18 is closed, drilling fluid by kill manifold enter annular space after, into choke manifold
16 pipelines, from first manual slide valve 1 enter, pass sequentially through the first thermometer 2, pressure gauge 3, the second manually gate valve 5, from
Dynamic choke valve 6, the first ball valve 7, the second ball valve 8, flowmeter 9, the 3rd ball valve 10, subsequently into the 3rd manually gate valve 13, after
Pipeline further through connection enters liquid-gas separator 17, and in this process, the ball valve 11 of manual throttle valve 4 and the 4th remains turned-off shape
State, automatic throttle 6 realizes self-choke function.
When automatic throttle 6 is damaged:Drilling fluid enters from first manual slide valve 1, pass sequentially through the first thermometer 2,
Pressure gauge 3, manual throttle valve 4, second temperature meter 12, the second ball valve 8, flowmeter 9, the 3rd ball valve 10, subsequently into the 3rd hand
Dynamic slide valve 13, after enter liquid-gas separator 17 further through the pipeline of connection, in this process, the second manually gate valve 5 and the
Four ball valves 11 are remained off, and manual throttle valve 4 realizes manual throttle function.
When coriolis mass flowmeters are damaged:Drilling fluid enters from first manual slide valve 1, passes sequentially through the first temperature
Degree meter 2, pressure gauge 3, the second manually gate valve 5, automatic throttle 6, the first ball valve 7, the 4th ball valve 11, subsequently into the 3rd hand
Dynamic slide valve 13, after enter liquid-gas separator 17, in this process, manual throttle valve 4, the second ball valve further through the pipeline of connection
8 and the 3rd ball valve 10 remain off, automatic throttle 6 realizes self-choke function.
During into normal well control or detaching equipment:Close first manual slide valve 1 and the 3rd manually gate valve 13.