CN104032774A - Real-time rubber waterstop monitoring method for immersed tunnel and rubber waterstop - Google Patents

Real-time rubber waterstop monitoring method for immersed tunnel and rubber waterstop Download PDF

Info

Publication number
CN104032774A
CN104032774A CN201410174960.XA CN201410174960A CN104032774A CN 104032774 A CN104032774 A CN 104032774A CN 201410174960 A CN201410174960 A CN 201410174960A CN 104032774 A CN104032774 A CN 104032774A
Authority
CN
China
Prior art keywords
fastening band
rubber
rubber fastening
real
center sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410174960.XA
Other languages
Chinese (zh)
Other versions
CN104032774B (en
Inventor
罗勇欢
陈忠海
王伟强
冯正林
周函宇
庾光忠
宁响亮
郭红锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuzhou Times New Material Technology Co Ltd
Original Assignee
Zhuzhou Times New Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Times New Material Technology Co Ltd filed Critical Zhuzhou Times New Material Technology Co Ltd
Priority to CN201410174960.XA priority Critical patent/CN104032774B/en
Publication of CN104032774A publication Critical patent/CN104032774A/en
Application granted granted Critical
Publication of CN104032774B publication Critical patent/CN104032774B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a real-time rubber waterstop monitoring method for an immersed tunnel. By acquiring operation data of the rubber waterstop in the immersed tunnel in real time and comparing the operation data with experiential data of the rubber waterstop so as to analyze real-time operation state of the rubber waterstop, real-time monitoring for the rubber waterstop is realized, faulted rubber waterstop can be maintained or replaced immediately when any abnormality is found, and practical significance is realized for safety operation of the tunnel. The invention further discloses the rubber waterstop which comprises a rubber body with a middle air bag, strengthening curtain cloth for increasing compressive strength of the rubber waterstop is arranged inside rubber of the middle air bag, an air nozzle is arranged on the middle air bag, and an air gauge is arranged outside the air nozzle; the middle air bag penetrates a waterstop body and is connected with the outside via the air nozzle which is provided with the digital-display air gauge, so that relative air exchange and quantified internal pressure adjustment can be performed, and quantified adjustment and control for compression amount of the rubber waterstop are achieved.

Description

Towards rubber fastening band method for real-time monitoring and rubber fastening band thereof for immersed tube tunnel
Technical field
The present invention relates to the method for real-time monitoring of rubber fastening band, be specifically related to a kind of method for real-time monitoring and type inflatable rubber fastening band thereof towards immersed tube tunnel rubber fastening band.
Background technology
Concrete is pressed the common You San of joint seal structural shape road water-stopping system at present: seam bottom waterstop, seam middle part sealing and seam table portion sealing.Generally, for the keypoint part of key project, common three road water-stopping systems use simultaneously, but a lot of engineering only arranges seam middle part water-stopping system conventionally one; In work progress, the deformation joint complex structure of structure, arranges waterstop difficulty of construction therein larger, in work progress, also, easily by mounted waterstop displacement and distortion, is difficult to ensure the installation quality of waterstop simultaneously.
In the daily operation in tunnel, daily monitoring and maintenance are manually carried out in basic dependence, detection and replacing for rubber fastening band all have very large difficulty, generally can only just can remedy nosing into after the situation of leaking, so not only inefficiency, and occur illustrating while leaking situation that the operation situation in tunnel is very poor, have huge potential safety hazard.If rubber fastening band is monitored in real time, once occur extremely in time the rubber fastening band breaking down being safeguarded or being changed, the safe operation that ensures tunnel is of great immediate significance.At present, what the first of immersed tube tunnel hermetic seal system protection both at home and abroad adopted substantially is GINA rubber fastening band, uphold although this rubber fastening band can adapt to differential settlement and the large displacement of pipeline section the distortion causing, can play better stagnant water effect, its shortcoming is:
1, required precision is high, in actual mechanical process, cannot quantitatively control, in installation process, because the tube coupling sinking required precision to immersed tube tunnel is very high, but can not connect by the contraposition that regulates the size of GINA rubber fastening band compression height realize immersed tube tube coupling, tend to cause in installation process, occur crooked etc.
2, process function is more single, and decrement size that cannot Quantitative Monitoring GINA rubber fastening band cannot shift to an earlier date the sealing operating condition of anticipation GINA rubber fastening band,
3, due to the existence of rubber slack, easily cause water stopping function lost efficacy, and conventional structure do not have restorative, sealing lost efficacy after cannot complete reparation.
4, isostructural GINA rubber fastening band cost is higher, and material expense is large, must rely on a large amount of rubber to fill GINA rubber fastening band main part.
In sum, the conventional GINA rubber fastening band of a large amount of employing at present, mainly contains tip, body and bottom three parts and forms, by the narrow structure division in compression tip, reach the quick sealing of immersed tube tunnel, continue to be compressed to body, can better maintain long sealing requirement, but the limitation of this structure is very large, function ratio is more single, and installation accuracy is had relatively high expectations, in service cannot quantitatively monitoring, long-term meeting in service is because the appearance of rubber slack causes stagnant water effect to be lost.
Find through retrieval, name is called the utility model patent of " a kind of bar-shape hermetic seal air bag " and has recorded a kind of bar-shape hermetic seal air bag, it is characterized in that: described bar-shape hermetic seal air bag is provided with Valve for aerocyst 1, the cross section of air bag is pancake, respectively there is a transitional inclined-plane 2 for air bag overlap joint at two ends, make the sealing of air bag junction reliable, can effectively solve the problem sealing between object, especially solve a difficult problem for the waterstop sealing between casing stake hole and pile body in water, bar-shape hermetic seal air bag is not only applicable to the sealing of the circumferential weld of various forms, can also be applicable to vertical masonry joint, the sealing of plane.The utility model patent that name is called " hollow is inflatable, water-bound seam waterproof rubber strip " discloses that a kind of hollow is inflatable, water-bound seam waterproof rubber strip.It belongs to subterranean tunnel architectural waterproof material, applicable to current common tunnel construction and underground construction.Its structure is oval, and section structure is divided into sealing surface, fire hose and union, and outside flat seal face, inner side fire hose are integrated, union is planted in flank through ectonexine; The section structure of its oval rubber fastening band of the utility model makes sealing surface in the time of work realize controllability, produce the vertical changing of the relative positions of 500mm and the horizontal changing of the relative positions of 50mm between ground fissure place upper lower burrs agent structure time, the agent structure of water proof rubber is not destroyed, obstructing surface is connected in two flanks with ellipse, multiple tracks water-proof wire is set in sealing surface main body, its main body bends in the reserved seam of tunnel main body with annular, and water-proof wire can be set to one or multi-channel.Above-mentioned two kinds of structures can realize the water stopping function at simple bar shaped seam and plane suture place, but do not there is fastness function, can produce floating, require very high to installed surface, decrement is smaller, is not suitable for deep water field and the immersed tube tunnel hermetic seal function with flexible joint field.
Summary of the invention
The object of the invention is to for above-mentioned technical problem provide a kind of by gather the real time data of rubber fastening band and empirical data compare to realize real-time monitoring to rubber fastening band towards immersed tube tunnel rubber fastening band method for real-time monitoring.The present invention also provides a kind of energy quantitatively regulating and controlling and monitoring, can realize the type inflatable rubber fastening band of tunnel pipe connector place water stopping function safe and convenient, not only can meet decrement and the shearing displacement of the large displacement in tunnel pipe connector place, thus and can be by regulating the expansion of center sleeve and compressive state quantitatively regulate the decrement of rubber fastening band.
The present invention solves the problems of the technologies described above adopted technical scheme:
A kind of method of using the real-time monitoring of rubber fastening band towards immersed tube tunnel, by gathering the real time data of rubber fastening band, and the real time data collecting and rubber fastening band operating experience curve are analyzed to the real time status of rear acquisition rubber water-proof tape running, thereby realize the real-time monitoring to rubber fastening band; Comprise the following steps:
S1: obtain rubber fastening band operating experience curve 3;
S2: the real-time monitor data that gathers rubber fastening band;
S3: real-time monitor data and experience curve 3 are compared, realize the real-time monitoring to rubber fastening band;
Wherein, if real-time monitor data and experience curve 3 match, rubber fastening band is stable;
If in real time monitor data does not match with experience curve 3, by valve to center sleeve aerating ftercompction, carry out internal regulation, until real-time monitor data and experience curve 3 match.
Comprise body of rubber, center sleeve and valve at the rubber fastening band described in above-mentioned steps; Described center sleeve is arranged on described body of rubber middle part; On described center sleeve, be provided with the valve that passes described body of rubber.
In the present invention, described S1 comprises the following steps:
S21: rubber fastening band is carried out to software simulation analysis, determine the air pressure of rubber fastening band center sleeve under different bearer power and the change curve 1 of rubber fastening band decrement;
S22: rubber fastening band is carried out to type approval test, obtain the air pressure of rubber fastening band center sleeve under different bearer power and the variation relation curve 2 of rubber fastening band decrement;
S23: change curve 1 and change curve 2 are contrasted, and permanent compression set and the aging phenomenon of comprehensive rubber fastening band, carry out matching by change curve 1 and change curve 2, and carry out corresponding correction, obtains rubber fastening band operating experience curve 3.
The service data of the method for supervising that the present invention records rubber fastening band in immersed tube tunnel by Real-time Collection, and compare and draw the real-time running state of rubber fastening band with the empirical data of rubber fastening band, realize the real-time monitoring to rubber fastening band, once occur extremely can in time the rubber fastening band breaking down being safeguarded or being changed, the safe operation that ensures tunnel be of great immediate significance.
The present invention also provides a kind of type inflatable rubber fastening band that can apply above-mentioned method for supervising, comprise: described body of rubber middle part arranges center sleeve, the rubber inside of center sleeve is provided with reinforcement cord, and valve is set on center sleeve, and valve arranges air gauge outward; The rubber inside of center sleeve is provided with reinforcement cord, for increasing the compressive strength of rubber fastening band; Center sleeve passes waterstop body by valve and is connected with outside maintenance, can carry out relevant gas exchange, thereby realizes the adjusting of rubber fastening band decrement; On valve, is furnished with digital-display air pressure table, the quantification that can realize internal pressure regulates, thereby realize the quantitatively regulating and controlling of rubber fastening band decrement, this is in immersed tube tube coupling installation and operation process, and the dynamic change to rubber fastening band and effective monitoring have very large directive significance; Simultaneously, by regulating expansion and the compressive state of center sleeve, can there is the slack producing under the long-term tension and compression operating mode of efficient recovery elastomeric material, stop rubber fastening band because slack changes the sealing Problem of Failure causing, thereby reach greatly hermetic seal effect, improve life-span and the safety of tunnel operation; Center sleeve is to have certain thickness high elastic rubber, and the large I of thickness designs according to product applying working condition, and center sleeve inside is provided with strengthens the compressive strength of cord for augmented airbag, and curtain cloth layer arranges according to actual needs; Center sleeve cross sectional shape can be circular, can be also oval other shape that waits; Because rubber fastening band belongs to strip rubber product, the quantity of center sleeve and valve can be carried out subsection setup according to rubber water-proof strip length, also can, according to later stage operational monitoring needs, key position point be fixed a point to arrange.
In the present invention, capsule in the middle of waterstop body of rubber middle part arranges, center sleeve adopts certain thickness high elastic rubber; The rubber inside of center sleeve is provided with reinforcement cord, for increasing the compressive strength of rubber fastening band, on center sleeve, be provided with manometric valve, by regulating manometric numerical value, thereby control expansion and the compressive state of center sleeve, the decrement of quantitatively controlling rubber fastening band, has solved above-mentioned quantitative adjusting problem.The center sleeve that described body of rubber middle part arranges, sectional view can be circle, also can be oval grade for arbitrary shape; On described center sleeve, be provided with valve, valve can arrange in place according to actual needs.Because rubber fastening band belongs to strip rubber product, the quantity of center sleeve and valve can be carried out subsection setup according to rubber water-proof strip length, also can, according to later stage operational monitoring needs, key position point be fixed a point to arrange.
In the present invention, by the ftercompction to center sleeve, improve the swelling state of inside air bag, thereby reach the quantitative lifting of rubber fastening band height, solved the slack problem of above-mentioned existence.
The present invention has quantitatively regulating and controlling function, and waterstop body of rubber middle part arranges center sleeve, and center sleeve adopts certain thickness high elastic rubber manufacture; Rubber inside is provided with the reinforcement cord of certain number of plies, for increasing waterstop compressive strength; On center sleeve, be provided with manometric valve, by regulating manometric numerical value, thereby control expansion and the compressive state of center sleeve, reach the decrement of quantitative control rubber fastening band, and can be by reading real-time monitoring and the data acquisition of manometric Numerical Implementation to rubber fastening band running status.
The present invention has repair function, by the ftercompction to center sleeve, improves the swelling state of inside air bag, thereby reaches the quantitative lifting of rubber fastening band height.
Type inflatable rubber fastening band provided by the present invention compared with prior art, have the following advantages: one, described waterstop body of rubber middle part is provided with the center sleeve of strengthening cord, thereby by the expansion of center sleeve and the decrement of compressive state adjusting rubber fastening band, can fully adapt to, because of the moderate finite deformation that the temperature difference, matrix sedimentation etc. are former thereby occur, make type inflatable rubber fastening band telescopicing performance better; Its two, on the center sleeve of type inflatable rubber fastening band, be provided with barometric valve, workable, and the effective monitoring of the decrement size that can easily realize waterstop in installation and operation process.
In sum, the invention provides a kind of can realization rubber fastening band is carried out to the method for monitoring in real time, by on rubber fastening band, arrange data collection point to rubber fastening band the working condition in immersed tube tunnel monitor in real time, and according to monitoring situation, rubber fastening band is carried out to state adjustment, ensure that rubber fastening band is in best duty or safeguards replacing, the present invention also makes larger improvement for traditional rubber water-proof band structure, by being set in rubber fastening band inside, inflatable center sleeve make waterstop not only can bear larger displacement and the shearing of sinking tunnel section seam, this type inflatable rubber fastening band is also convenient to site operation installation simultaneously.This structure design is specially adapted to large displacement compression and shears in the waterstop sealing system of the immersed tube tunnel tube coupling joint requiring, good technical support is provided to this type of engineering, can also solve reliably the sealing problem of immersed tube tunnel tube coupling gap at joint, thus the safety of extending structure and shelf life.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the method for real-time monitoring of the present invention;
Fig. 2 is the structural representation of rubber fastening band of the present invention.
In figure: 1. body of rubber, 2. center sleeve, 3. air gauge, 4. valve, 5. strengthens cord.
Detailed description of the invention
In order to be illustrated more clearly in the technical scheme of the embodiment of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
In immersed tube tunnel, the sealing characteristic of rubber fastening band is determining the normal operation conditions of immersed tube tunnel, and rubber fastening band is as the main water-tight device of immersed tube tunnel, and its operating condition is directly determining the operation in tunnel especially; " ten tunnels nine leak " existing for industry, its main cause is that the installation of rubber fastening band and detection all have very large difficulty because immersed tube tunnel is subaqueous construction, operation under water.In immersed tube tunnel, the waterproof action of rubber fastening band is played to the decrement that topmost influence factor is rubber fastening band, the decrement of rubber fastening band has directly determined the success or not of immersed tube tunnel waterproof.Therefore, the operation conditions of the rubber fastening band in immersed tube tunnel is monitored and is very important, at present conventional monitoring means be calculated value according to rubber fastening band to rubber fastening band the decrement in immersed tube tunnel estimate, thereby the operation conditions of immersed tube tunnel is estimated.This method for supervising is feasible in theory, but crosses in title and often occur that result of calculation shows that the decrement of rubber fastening band can meet the needs of the normal operation of immersed tube tunnel in practical application, but the problem of leaking has appearred in immersed tube tunnel.The basic reason that why there will be this situation is exactly because above-mentioned computational methods itself exist larger error, and be all generally after the situation of leaking appears in immersed tube tunnel, just to carry out computational analysis, the data of calculating cannot contrast with the actual operating data of rubber fastening band, and reference significance is little in actual applications.
Therefore, as shown in Figure 1, the present embodiment proposes a kind of method of the real-time monitoring towards immersed tube tunnel rubber fastening band, the real time data that is arranged on the rubber fastening band in immersed tube tunnel by collection is carried out statistical analysis, then the real time data collecting and rubber fastening band operating experience curve are analyzed to the real time status of rear acquisition rubber water-proof tape running, thereby realize the real-time monitoring to rubber fastening band; Comprise the following steps:
S1: obtain rubber fastening band operating experience curve 3;
S2: the real-time monitor data that gathers rubber fastening band;
S3: real-time monitor data and experience curve 3 are compared to analysis, obtain the current running status of rubber fastening band, realize the real-time monitoring to rubber fastening band.
Wherein, if real-time monitor data and experience curve 3 match, rubber fastening band is stable;
If monitor data and experience curve 3 do not match in real time, rubber fastening band, in abnormal running state, needs in time rubber fastening band to be safeguarded to replacing, to ensure the safety in tunnel.
Comprise body of rubber, center sleeve and valve at the rubber fastening band described in above-mentioned steps; Described center sleeve is arranged on described body of rubber middle part; On described center sleeve, be provided with the valve that passes described body of rubber; When real-time monitor data and experience curve 3 do not match, to center sleeve aerating ftercompction, the decrement of rubber fastening band is carried out to internal regulation by valve, until monitor data and experience curve 3 match in real time.
In the present invention, described S1 comprises the following steps:
S21: rubber fastening band is carried out to software simulation analysis, determine the air pressure of rubber fastening band center sleeve under different bearer power and the change curve 1 of rubber fastening band decrement;
S22: rubber fastening band is carried out to type approval test, obtain the air pressure of rubber fastening band center sleeve under different bearer power and the variation relation curve 2 of rubber fastening band decrement;
S23: change curve 1 and change curve 2 are contrasted, and permanent compression set and the aging phenomenon of comprehensive rubber fastening band, carry out matching by change curve 1 and change curve 2, and carry out corresponding correction, obtains rubber fastening band operating experience curve 3.
The present invention gathers the real-time running data of rubber fastening band automatically by data collection point being set on the rubber fastening band of immersed tube tunnel,
This patent is by introducing the collection of real time data, and handled easily person gathers in any moment, and gatherer process is simple and convenient, and the waterstop operating experience curve then data and producer being provided carries out check analysis, thereby judges the operating condition of waterstop.Specific implementation method is: first according to software simulation analysis, determine air pressure and the waterstop decrement change curve 1 of waterstop center sleeve under different bearer power of this rubber fastening band, obtain rough term of reference, then by the type approval test to rubber water-proof carries product, draw the relation curve 2 of center sleeve air pressure and decrement under different bearer power, then two curves are contrasted, and consider permanent compression set and the aging phenomenon of product, two curves are carried out to matching, and carry out corresponding correction, thereby obtain more accurate air pressure and decrement change curve, as immersed tube tunnel with in real time monitoring of rubber fastening band with reference to index, then real-time monitor data and experience curve 3 are compared, judge operating condition, if coincide, represent stable, otherwise need outside aerating ftercompction, carry out internal regulation, reach and meet.
As shown in Figure 2, the present invention also provides a kind of rubber fastening band of type inflatable, comprising: body of rubber 1 middle part arranges center sleeve 2, and the rubber inside of center sleeve 2 is provided with strengthens cord 5, valve 4 is set, the outer air gauge 3 that arranges of valve 4 on center sleeve 2; The rubber inside of center sleeve 2 is provided with strengthens cord 5, for increasing the compressive strength of rubber fastening band; Center sleeve 2 is connected with outside maintenance through waterstop body by valve 4, can carry out relevant gas exchange, thereby realizes the adjusting of rubber fastening band decrement; On valve 4, is furnished with digital-display air pressure table 3, the quantification that can realize internal pressure regulates, thereby realize the quantitatively regulating and controlling of rubber fastening band decrement, this is in immersed tube tube coupling installation and operation process, and the dynamic change to rubber fastening band and effective monitoring have very large directive significance; Simultaneously, by regulating expansion and the compressive state of center sleeve 2, can there is the slack producing under the long-term tension and compression operating mode of efficient recovery elastomeric material, stop rubber fastening band because slack changes the sealing Problem of Failure causing, thereby reach greatly hermetic seal effect, improve life-span and the safety of tunnel operation; Center sleeve 2 is to have certain thickness high elastic rubber, and the large I of thickness designs according to product applying working condition, and center sleeve 2 inside are provided with strengthens the compressive strength of cord 5 for augmented airbag, and curtain cloth layer arranges according to actual needs; Center sleeve 2 cross sectional shapes can be circular, can be also oval other shape that waits; Because rubber fastening band belongs to strip rubber product, the quantity of center sleeve 2 and valve 4 can be carried out subsection setup according to rubber water-proof strip length, also can, according to later stage operational monitoring needs, key position point be fixed a point to arrange.
In the present invention, capsule in the middle of waterstop body of rubber 1 middle part arranges, center sleeve 2 adopts certain thickness high elastic rubber; The rubber inside of center sleeve 2 is provided with strengthens cord 5, for increasing the compressive strength of rubber fastening band, on center sleeve 2, be provided with manometric valve 4, by regulating manometric numerical value, thereby control expansion and the compressive state of center sleeve 2, the decrement of quantitatively controlling rubber fastening band, has solved above-mentioned quantitative adjusting problem.The center sleeve 2 that body of rubber 1 middle part arranges, sectional view can be circle, also can be oval grade for arbitrary shape; Center sleeve 2 on be provided with valve 4, valve 4 can arrange in place according to actual needs.Because rubber fastening band belongs to strip rubber product, the quantity of center sleeve 2 and valve 4 can be carried out subsection setup according to rubber water-proof strip length, also can, according to later stage operational monitoring needs, key position point be fixed a point to arrange.
In the present invention, by the ftercompction to center sleeve 2, improve the swelling state of inside air bag, thereby reach the quantitative lifting of rubber fastening band height, solved the slack problem of above-mentioned existence.
The present invention has quantitatively regulating and controlling function, and waterstop body of rubber 1 middle part arranges center sleeve 2, and center sleeve 2 adopts certain thickness high elastic rubber; Rubber inside is provided with the reinforcement cord 5 of certain number of plies, for increasing waterstop compressive strength; On center sleeve 2, be provided with manometric valve 4, by regulating manometric numerical value, thereby control expansion and the compressive state of center sleeve 2, reach the decrement of quantitative control rubber fastening band.
The present invention has repair function, by the ftercompction to center sleeve 2, improves the swelling state of inside air bag, thereby reaches the quantitative lifting of rubber fastening band height.
Type inflatable rubber fastening band provided by the present invention compared with prior art, have the following advantages: one, waterstop body of rubber 1 middle part be provided with and strengthen the center sleeve 2 of cord 5, thereby by the expansion of center sleeve 2 and the decrement of compressive state adjusting rubber fastening band, can fully adapt to, because of the moderate finite deformation that the temperature difference, matrix sedimentation etc. are former thereby occur, make type inflatable rubber fastening band telescopicing performance better; Its two, on the center sleeve 2 of type inflatable rubber fastening band, be provided with the valve 4 of air gauge 3, workable, and the effective monitoring of the decrement size that can easily realize waterstop in installation and operation process.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (9)

1. use the method for the real-time monitoring of rubber fastening band towards immersed tube tunnel for one kind, it is characterized in that: by gathering the real time data of rubber fastening band, and the real time data collecting and rubber fastening band operating experience curve are analyzed to the real time status of rear acquisition rubber water-proof tape running, thereby realize the real-time monitoring to rubber fastening band; Comprise the following steps:
S1: obtain rubber fastening band operating experience curve 3;
S2: the real-time monitor data that gathers rubber fastening band;
S3: real-time monitor data and experience curve 3 are compared, realize the real-time monitoring to rubber fastening band;
Wherein, if real-time monitor data and experience curve 3 match, rubber fastening band is stable;
If monitor data and experience curve 3 do not match in real time, rubber fastening band is in abnormal running state.
2. a kind of method of using the real-time monitoring of rubber fastening band towards immersed tube tunnel as claimed in claim 1, is characterized in that: described rubber fastening band comprises body of rubber, center sleeve and valve; Described center sleeve is arranged on described body of rubber middle part; On described center sleeve, be provided with the valve that passes described body of rubber.
3. a kind of method of using the real-time monitoring of rubber fastening band towards immersed tube tunnel as claimed in claim 2, it is characterized in that: in S3, in the time that real-time monitor data and experience curve 3 do not match, by valve to center sleeve aerating ftercompction, the decrement of rubber fastening band is carried out to internal regulation, until real-time monitor data and experience curve 3 match.
4. a kind of method of using the real-time monitoring of rubber fastening band towards immersed tube tunnel as claimed in claim 1, is characterized in that: described S1 comprises the following steps:
S21: rubber fastening band is carried out to software simulation analysis, determine the air pressure of rubber fastening band center sleeve under different bearer power and the change curve 1 of rubber fastening band decrement;
S22: rubber fastening band is carried out to type approval test, obtain the air pressure of rubber fastening band center sleeve under different bearer power and the variation relation curve 2 of rubber fastening band decrement;
S23: change curve 1 and change curve 2 are contrasted, and permanent compression set and the aging phenomenon of comprehensive rubber fastening band, carry out matching by change curve 1 and change curve 2, and carry out corresponding correction, obtains rubber fastening band operating experience curve 3.
5. a rubber fastening band, is characterized in that: comprise body of rubber, center sleeve and valve; Described center sleeve is arranged on described body of rubber middle part; On described center sleeve, be provided with the valve that passes described body of rubber.
6. a kind of rubber fastening band as claimed in claim 5, is characterized in that: in described center sleeve, be provided with reinforcement cord.
7. a kind of rubber fastening band as claimed in claim 5, is characterized in that: on described valve, be provided with pressure meter.
8. a kind of rubber fastening band as claimed in claim 5, is characterized in that: the cross section of described air bag is for circular or oval.
9. a kind of rubber fastening band as described in claim 5 to 8, is characterized in that: described air bag is multiple, and subsection setup is in described body of rubber inside.
CN201410174960.XA 2014-04-29 2014-04-29 Towards the method for the real-time monitoring of immersed tube tunnel rubber fastening band Active CN104032774B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410174960.XA CN104032774B (en) 2014-04-29 2014-04-29 Towards the method for the real-time monitoring of immersed tube tunnel rubber fastening band

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410174960.XA CN104032774B (en) 2014-04-29 2014-04-29 Towards the method for the real-time monitoring of immersed tube tunnel rubber fastening band

Publications (2)

Publication Number Publication Date
CN104032774A true CN104032774A (en) 2014-09-10
CN104032774B CN104032774B (en) 2016-02-03

Family

ID=51463751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410174960.XA Active CN104032774B (en) 2014-04-29 2014-04-29 Towards the method for the real-time monitoring of immersed tube tunnel rubber fastening band

Country Status (1)

Country Link
CN (1) CN104032774B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569077A (en) * 2014-10-17 2016-05-11 株洲时代新材料科技股份有限公司 Sectional continuous vulcanization method for inflatable GINA rubber waterstop
CN106638999A (en) * 2016-10-18 2017-05-10 中国建筑第八工程局有限公司 Waterstop structure for air bag and waterstop method of structure
CN107190777A (en) * 2017-06-30 2017-09-22 中交航局第二工程有限公司 Immersed tube tunnel final joint docking system and docking calculation
CN111305168A (en) * 2019-07-24 2020-06-19 江苏省太湖水利规划设计研究院有限公司 Bag type water stop structure for gate

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2523682A1 (en) * 1982-03-22 1983-09-23 Joint Francais Pneumatic, inflatable joint for surfaces - has two inflatable, interconnected air chambers in housing between two surfaces
CN201288340Y (en) * 2008-09-22 2009-08-12 钟爱民 Bar-shaped hermetic seal gasbag
CN202466526U (en) * 2011-12-31 2012-10-03 文淑凤 Water stop structure of dam pressure zone
CN202690084U (en) * 2012-06-30 2013-01-23 西北橡胶塑料研究设计院 Hollow inflatable waterproof rubber tape for water structure seam

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2523682A1 (en) * 1982-03-22 1983-09-23 Joint Francais Pneumatic, inflatable joint for surfaces - has two inflatable, interconnected air chambers in housing between two surfaces
CN201288340Y (en) * 2008-09-22 2009-08-12 钟爱民 Bar-shaped hermetic seal gasbag
CN202466526U (en) * 2011-12-31 2012-10-03 文淑凤 Water stop structure of dam pressure zone
CN202690084U (en) * 2012-06-30 2013-01-23 西北橡胶塑料研究设计院 Hollow inflatable waterproof rubber tape for water structure seam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
童明成等: "大型中空橡胶止水带的研制", 《"温橡"杯2012年橡胶制品新技术交流暨信息发布会论文集》, 31 October 2012 (2012-10-31) *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569077A (en) * 2014-10-17 2016-05-11 株洲时代新材料科技股份有限公司 Sectional continuous vulcanization method for inflatable GINA rubber waterstop
CN106638999A (en) * 2016-10-18 2017-05-10 中国建筑第八工程局有限公司 Waterstop structure for air bag and waterstop method of structure
CN107190777A (en) * 2017-06-30 2017-09-22 中交航局第二工程有限公司 Immersed tube tunnel final joint docking system and docking calculation
CN107190777B (en) * 2017-06-30 2020-04-24 中交一航局第二工程有限公司 Butt joint system and butt joint method for final joint of immersed tunnel
CN111305168A (en) * 2019-07-24 2020-06-19 江苏省太湖水利规划设计研究院有限公司 Bag type water stop structure for gate

Also Published As

Publication number Publication date
CN104032774B (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN110230499B (en) Active protection structure of shield near-penetration operation tunnel in water-rich soft soil area and construction method
CN104032774B (en) Towards the method for the real-time monitoring of immersed tube tunnel rubber fastening band
WO2021026961A1 (en) Self-adaptive gas release rod and shallow gas controlled gas release recovery system and method
CN107503727B (en) It is a kind of that a layer hydraulic fracturing range investigation method is worn based on in-situ stress monitoring
CN204875933U (en) Deep pressure -bearing artesian well shutoff system
CN110030430B (en) Pipe jacking construction method for steel cylinder concrete pipe
CN211423695U (en) Non-excavation drainage pipe slip casting prosthetic devices
CN114135249A (en) Reusable and automatic pressure supplementing gas extraction drilling and sealing system and working method thereof
CN109706934B (en) Curtain grouting water plugging device in pressure-bearing water stratum and working method thereof
CN111119865A (en) Method for visually finding leakage of casing damage well underground nitrogen gas lift negative pressure
CN210687784U (en) Flow manifold group for fracturing
CN105134285A (en) Three-blocking and two-injecting gas extraction hole sealing method
CN112796700A (en) Experimental method for plugging performance of temporary plugging agent for fracturing
CN108612546B (en) Horizontal grouting construction method in closed environment
CN114509350B (en) Segment joint double-channel waterproof test device and method for simulating inner cavity water pressure effect
CN110685677A (en) Water control simulation experiment device and experiment method for horizontal well of heterogeneous oil reservoir
CN113818904B (en) Pipe jacking construction method for penetrating through leakage area of existing sewage pipe
CN206267201U (en) Uplift is than surveying device
CN203008855U (en) Three-stage throttling blow-off manifold
CN207212329U (en) One kind tests pipe device core assembly and tests pipe device
CN216381321U (en) Reusable and automatic pressure supplementing gas extraction drilling and sealing system
CN207278231U (en) A kind of conversion pipe hanger short circuit being badly in need of for gas well liquid loading
CN205261129U (en) Face upward in pit hole segmentation water injection survey in leaking stoppage of drilling rod protect water installation
CN111058785A (en) Adjustable connecting device suitable for manifold connection
CN216866641U (en) Fire-free recoverable wellhead device for oil well yield detection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant