CN106760618B - A kind of inspection platform integral translation construction method - Google Patents

A kind of inspection platform integral translation construction method Download PDF

Info

Publication number
CN106760618B
CN106760618B CN201611149457.4A CN201611149457A CN106760618B CN 106760618 B CN106760618 B CN 106760618B CN 201611149457 A CN201611149457 A CN 201611149457A CN 106760618 B CN106760618 B CN 106760618B
Authority
CN
China
Prior art keywords
sunpender
inspection platform
roof girder
type load
translation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611149457.4A
Other languages
Chinese (zh)
Other versions
CN106760618A (en
Inventor
贾成一
张忠海
李占华
韩玉堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN201611149457.4A priority Critical patent/CN106760618B/en
Publication of CN106760618A publication Critical patent/CN106760618A/en
Application granted granted Critical
Publication of CN106760618B publication Critical patent/CN106760618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/06Pits or building structures for inspection or services

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of inspection platform integral translation construction methods, a c-type load fulcrum ear is respectively connected in the two sides of each sunpender of connection inspection platform first, c-type load fulcrum ear upper center connects a bearing and is mounted on the bottom wing listrium of roof girder, and lower end is connected with sunpender;A traction lifting lug is connected in the sunpender upper end of side corresponding with inspection platform translation direction, draws and connects a motor-driven chain hoist on lifting lug;Corresponding two sunpenders in inspection platform front and rear sides are connected with strut, and all struts are connected with connecting rod;Connecting plate between roof girder and sunpender, which is cut open, disconnects the connection between roof girder and sunpender, inspection platform is moved into installed position by the draw of motor-driven chain hoist, and sunpender is connected with roof girder with one piece of connecting plate, finally remove the translation work that connecting rod, strut, c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug complete inspection platform;By this method convenient and quick construction, work efficiency is improved.

Description

A kind of inspection platform integral translation construction method
One, technical field:
The present invention relates to a kind of inspection platform integral translation construction methods, belong to structural steelwork construction field.
Two, background technique:
Certain steel mill, need to maintenance single track and inspection platform by the AB of iron and steel base steel rolling workshop across 1~2 line because production needs Side direction translates 10 meters eastwards, to meet the maintenance requirement of bridge crane.Because entire work progress does not allow influencing steel mill just Often production, while in the inspection platform adjacent bottom portions of translation to be removed, it has been covered with equipment platform or pipeline, crane is difficult to stand nearby Position carries out operation.By the prior art, when inspection platform is removed, to guarantee to remove going on smoothly for translation operation, need first by operation Roof boarding near area is removed, and falsework platform is welded on bridge crane, is then used relatively large crane, will be overhauled It is placed on after platform removal on the falsework platform welded on bridge crane, is transported using bridge crane to designated position, Inspection platform is installed in place with crane, finally again restores the roof boarding removed in place.It is long by this method construction period, and want Biggish labour cost and machinery expenses are expended, construction cost is increased.
Three, summary of the invention:
The present invention is in view of the shortcomings of the prior art, propose that one kind is easy to operate, a kind of inspection platform of quick construction is integrally put down Move construction method.
The technical problem to be solved in the present invention is that providing a kind of inspection platform integral translation construction method, connecting first The two sides of each sunpender of inspection platform respectively connect a c-type load fulcrum ear, and the c-type load fulcrum ear is process by steel plate, A bearing is connected in the middle part of the upper end and is mounted on the bottom wing listrium of roof girder, lower end and the sunpender phase for connecting inspection platform Connection;Secondly a traction lifting lug is connected at the middle part of the sunpender upper end of side corresponding with inspection platform translation direction, it is described Traction lifting lug is process by steel plate, is provided with circular hole in the middle and is connected a motor-driven chain hoist;It is then with strut that maintenance is flat Corresponding two sunpenders in platform front and rear sides are connected, and all struts are connected with connecting rod;By roof girder and sunpender Between connecting plate cut open and disconnect the connection between roof girder and sunpender, by the draw of motor-driven chain hoist by inspection platform Installed position is moved to, the installed position after inspection platform translation, in the lower flange of roof girder corresponding with sunpender Connect and one piece of connecting plate and it be connected with sunpender on plate, finally remove connecting rod and strut and by c-type load fulcrum ear with hang Bar junction disconnects, and removes the translation work that c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug complete inspection platform.
Beneficial good effect of the invention: operation of the present invention is simple, convenient and efficient, the labour cost and machinery expenses of investment Few, short construction period can significantly reduce construction cost.
Four, Detailed description of the invention
Fig. 1: inspection platform installation site elevational schematic view
Fig. 2: inspection platform installation site side schematic view
Fig. 3: sunpender and inspection platform connection schematic diagram before inspection platform translates
Fig. 4: the load fulcrum ear schematic diagram processed
Fig. 5: schematic diagram when inspection platform translates
Fig. 6: inspection platform translates rear suspension bar and inspection platform connection schematic diagram
Five, specific embodiment
Embodiment one: referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, the present invention relates to a kind of inspection platform integral translations to apply Work method respectively connects a c-type load fulcrum ear 3, the c-type load-bearing in the two sides of each sunpender 2 of connection inspection platform 1 first Lifting lug 3 is process by steel plate, and a bearing 4 is connected in the middle part of the upper end and is mounted on the bottom wing listrium of roof girder 5, lower end It is connected with the sunpender 2 for connecting inspection platform 1;Secondly in sunpender 2 upper end of side corresponding with 1 translation direction of inspection platform Middle part connects a traction lifting lug 6, and the traction lifting lug 6 is process by steel plate, is provided with circular hole in the middle and connects one Motor-driven chain hoist 7;Then corresponding two sunpenders 2 in 1 front and rear sides of inspection platform are connected with strut 8, and will with connecting rod 9 All struts 8 are connected;Connecting plate 10 between roof girder 5 and sunpender 2 is cut open into the company made between roof girder 5 and sunpender 2 Disconnection is connect, inspection platform 1 is moved to by installed position by the draw of motor-driven chain hoist 7, after the translation of inspection platform 1 Installed position connects one piece of connecting plate 11 and by itself and sunpender 2 on the bottom wing listrium of roof girder 5 corresponding with sunpender 2 It is connected, finally removes connecting rod 9 and strut 8 and disconnects c-type load fulcrum ear 3 and 2 junction of sunpender, remove c-type load-bearing and hang Ear 3, motor-driven chain hoist 7 and traction lifting lug 6 complete the translation work of inspection platform.

Claims (1)

1. a kind of inspection platform integral translation construction method respectively connects one in the two sides of each sunpender of connection inspection platform first A c-type load fulcrum ear, the c-type load fulcrum ear are process by steel plate, one bearing of connection and by the c-type in the middle part of the upper end Load fulcrum ear is mounted on the bottom wing listrium of roof girder, and lower end is connected with the sunpender for connecting inspection platform;Secondly with inspection The middle part of the sunpender upper end of the corresponding side in equating stage translation direction connects a traction lifting lug, and the traction lifting lug is added by steel plate Work forms, and is provided with circular hole in the middle and connects a motor-driven chain hoist;It is then with strut that inspection platform front and rear sides are corresponding Two sunpenders be connected, and all struts are connected with connecting rod;Connecting plate between roof girder and sunpender is cut open The connection between roof girder and sunpender is disconnected, inspection platform is moved to by installation site by the draw of motor-driven chain hoist Place, the installed position after inspection platform translation, connects one piece of company on the bottom wing listrium of roof girder corresponding with sunpender It is simultaneously connected by fishplate bar with sunpender, finally removes connecting rod and strut and disconnects c-type load fulcrum ear and sunpender junction, tears open Except c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug, the translation work of inspection platform is completed.
CN201611149457.4A 2016-12-13 2016-12-13 A kind of inspection platform integral translation construction method Active CN106760618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611149457.4A CN106760618B (en) 2016-12-13 2016-12-13 A kind of inspection platform integral translation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611149457.4A CN106760618B (en) 2016-12-13 2016-12-13 A kind of inspection platform integral translation construction method

Publications (2)

Publication Number Publication Date
CN106760618A CN106760618A (en) 2017-05-31
CN106760618B true CN106760618B (en) 2019-06-18

Family

ID=58876840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611149457.4A Active CN106760618B (en) 2016-12-13 2016-12-13 A kind of inspection platform integral translation construction method

Country Status (1)

Country Link
CN (1) CN106760618B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4441583A (en) * 1983-03-28 1984-04-10 Vaught Ronald R Grating cable hanger
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN202755634U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Suspension type operational platform
CN204401997U (en) * 2014-11-26 2015-06-17 华鼎建筑装饰工程有限公司 A kind of suspension type ceiling construction scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4441583A (en) * 1983-03-28 1984-04-10 Vaught Ronald R Grating cable hanger
CN102635226A (en) * 2012-05-04 2012-08-15 常州第一建筑集团有限公司 Flexible hanging self-expansion operating platform and construction method
CN202755634U (en) * 2012-08-07 2013-02-27 中建三局建设工程股份有限公司 Suspension type operational platform
CN204401997U (en) * 2014-11-26 2015-06-17 华鼎建筑装饰工程有限公司 A kind of suspension type ceiling construction scaffold

Also Published As

Publication number Publication date
CN106760618A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN203979647U (en) A kind of detachable recycling guide rail pipe perforator
CN202529736U (en) Combined movable lifting frame
CN204737609U (en) European style hoist girder connection structure
CN203187333U (en) Light carrying device for building block installment
CN202594610U (en) I-shaped beam hoisting device for hoisting of pressure steel pipe tiles
CN203392734U (en) Lifting appliance for maintaining crane
CN106760617B (en) A kind of inspection platform translation construction method
CN106760618B (en) A kind of inspection platform integral translation construction method
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN201999638U (en) Hoisting device for ascending pipe and bridge pipe of coke oven
CN103979429A (en) Cantilever type portal crane
CN202785255U (en) Turnover hoisting tool for reinforced concrete pipe joint
CN106320699A (en) Quick disassembling and assembling method for truss type formwork bracket system
CN206395418U (en) A kind of inspection platform slide device
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN204569127U (en) Steel upright post hoisting jig
CN110820518B (en) Machining and hoisting method for steel arch bridge suspender
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN107740443B (en) The prefabricated ring beam of town road inspection shaft and well seat mounting apparatus and installation method
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN208517821U (en) A kind of simple hoisting apparatus for removing box beam beret slice
CN202346607U (en) Rotary tail exhausting device for equipment hoisting tailstock
CN207293997U (en) A kind of chassis suitable for ultra-large type derrick crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant