CN106760618B - A kind of inspection platform integral translation construction method - Google Patents
A kind of inspection platform integral translation construction method Download PDFInfo
- Publication number
- CN106760618B CN106760618B CN201611149457.4A CN201611149457A CN106760618B CN 106760618 B CN106760618 B CN 106760618B CN 201611149457 A CN201611149457 A CN 201611149457A CN 106760618 B CN106760618 B CN 106760618B
- Authority
- CN
- China
- Prior art keywords
- sunpender
- inspection platform
- roof girder
- type load
- translation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/06—Separating, lifting, removing of buildings; Making a new sub-structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
- E04H5/06—Pits or building structures for inspection or services
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of inspection platform integral translation construction methods, a c-type load fulcrum ear is respectively connected in the two sides of each sunpender of connection inspection platform first, c-type load fulcrum ear upper center connects a bearing and is mounted on the bottom wing listrium of roof girder, and lower end is connected with sunpender;A traction lifting lug is connected in the sunpender upper end of side corresponding with inspection platform translation direction, draws and connects a motor-driven chain hoist on lifting lug;Corresponding two sunpenders in inspection platform front and rear sides are connected with strut, and all struts are connected with connecting rod;Connecting plate between roof girder and sunpender, which is cut open, disconnects the connection between roof girder and sunpender, inspection platform is moved into installed position by the draw of motor-driven chain hoist, and sunpender is connected with roof girder with one piece of connecting plate, finally remove the translation work that connecting rod, strut, c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug complete inspection platform;By this method convenient and quick construction, work efficiency is improved.
Description
One, technical field:
The present invention relates to a kind of inspection platform integral translation construction methods, belong to structural steelwork construction field.
Two, background technique:
Certain steel mill, need to maintenance single track and inspection platform by the AB of iron and steel base steel rolling workshop across 1~2 line because production needs
Side direction translates 10 meters eastwards, to meet the maintenance requirement of bridge crane.Because entire work progress does not allow influencing steel mill just
Often production, while in the inspection platform adjacent bottom portions of translation to be removed, it has been covered with equipment platform or pipeline, crane is difficult to stand nearby
Position carries out operation.By the prior art, when inspection platform is removed, to guarantee to remove going on smoothly for translation operation, need first by operation
Roof boarding near area is removed, and falsework platform is welded on bridge crane, is then used relatively large crane, will be overhauled
It is placed on after platform removal on the falsework platform welded on bridge crane, is transported using bridge crane to designated position,
Inspection platform is installed in place with crane, finally again restores the roof boarding removed in place.It is long by this method construction period, and want
Biggish labour cost and machinery expenses are expended, construction cost is increased.
Three, summary of the invention:
The present invention is in view of the shortcomings of the prior art, propose that one kind is easy to operate, a kind of inspection platform of quick construction is integrally put down
Move construction method.
The technical problem to be solved in the present invention is that providing a kind of inspection platform integral translation construction method, connecting first
The two sides of each sunpender of inspection platform respectively connect a c-type load fulcrum ear, and the c-type load fulcrum ear is process by steel plate,
A bearing is connected in the middle part of the upper end and is mounted on the bottom wing listrium of roof girder, lower end and the sunpender phase for connecting inspection platform
Connection;Secondly a traction lifting lug is connected at the middle part of the sunpender upper end of side corresponding with inspection platform translation direction, it is described
Traction lifting lug is process by steel plate, is provided with circular hole in the middle and is connected a motor-driven chain hoist;It is then with strut that maintenance is flat
Corresponding two sunpenders in platform front and rear sides are connected, and all struts are connected with connecting rod;By roof girder and sunpender
Between connecting plate cut open and disconnect the connection between roof girder and sunpender, by the draw of motor-driven chain hoist by inspection platform
Installed position is moved to, the installed position after inspection platform translation, in the lower flange of roof girder corresponding with sunpender
Connect and one piece of connecting plate and it be connected with sunpender on plate, finally remove connecting rod and strut and by c-type load fulcrum ear with hang
Bar junction disconnects, and removes the translation work that c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug complete inspection platform.
Beneficial good effect of the invention: operation of the present invention is simple, convenient and efficient, the labour cost and machinery expenses of investment
Few, short construction period can significantly reduce construction cost.
Four, Detailed description of the invention
Fig. 1: inspection platform installation site elevational schematic view
Fig. 2: inspection platform installation site side schematic view
Fig. 3: sunpender and inspection platform connection schematic diagram before inspection platform translates
Fig. 4: the load fulcrum ear schematic diagram processed
Fig. 5: schematic diagram when inspection platform translates
Fig. 6: inspection platform translates rear suspension bar and inspection platform connection schematic diagram
Five, specific embodiment
Embodiment one: referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, the present invention relates to a kind of inspection platform integral translations to apply
Work method respectively connects a c-type load fulcrum ear 3, the c-type load-bearing in the two sides of each sunpender 2 of connection inspection platform 1 first
Lifting lug 3 is process by steel plate, and a bearing 4 is connected in the middle part of the upper end and is mounted on the bottom wing listrium of roof girder 5, lower end
It is connected with the sunpender 2 for connecting inspection platform 1;Secondly in sunpender 2 upper end of side corresponding with 1 translation direction of inspection platform
Middle part connects a traction lifting lug 6, and the traction lifting lug 6 is process by steel plate, is provided with circular hole in the middle and connects one
Motor-driven chain hoist 7;Then corresponding two sunpenders 2 in 1 front and rear sides of inspection platform are connected with strut 8, and will with connecting rod 9
All struts 8 are connected;Connecting plate 10 between roof girder 5 and sunpender 2 is cut open into the company made between roof girder 5 and sunpender 2
Disconnection is connect, inspection platform 1 is moved to by installed position by the draw of motor-driven chain hoist 7, after the translation of inspection platform 1
Installed position connects one piece of connecting plate 11 and by itself and sunpender 2 on the bottom wing listrium of roof girder 5 corresponding with sunpender 2
It is connected, finally removes connecting rod 9 and strut 8 and disconnects c-type load fulcrum ear 3 and 2 junction of sunpender, remove c-type load-bearing and hang
Ear 3, motor-driven chain hoist 7 and traction lifting lug 6 complete the translation work of inspection platform.
Claims (1)
1. a kind of inspection platform integral translation construction method respectively connects one in the two sides of each sunpender of connection inspection platform first
A c-type load fulcrum ear, the c-type load fulcrum ear are process by steel plate, one bearing of connection and by the c-type in the middle part of the upper end
Load fulcrum ear is mounted on the bottom wing listrium of roof girder, and lower end is connected with the sunpender for connecting inspection platform;Secondly with inspection
The middle part of the sunpender upper end of the corresponding side in equating stage translation direction connects a traction lifting lug, and the traction lifting lug is added by steel plate
Work forms, and is provided with circular hole in the middle and connects a motor-driven chain hoist;It is then with strut that inspection platform front and rear sides are corresponding
Two sunpenders be connected, and all struts are connected with connecting rod;Connecting plate between roof girder and sunpender is cut open
The connection between roof girder and sunpender is disconnected, inspection platform is moved to by installation site by the draw of motor-driven chain hoist
Place, the installed position after inspection platform translation, connects one piece of company on the bottom wing listrium of roof girder corresponding with sunpender
It is simultaneously connected by fishplate bar with sunpender, finally removes connecting rod and strut and disconnects c-type load fulcrum ear and sunpender junction, tears open
Except c-type load fulcrum ear, motor-driven chain hoist and traction lifting lug, the translation work of inspection platform is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611149457.4A CN106760618B (en) | 2016-12-13 | 2016-12-13 | A kind of inspection platform integral translation construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611149457.4A CN106760618B (en) | 2016-12-13 | 2016-12-13 | A kind of inspection platform integral translation construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106760618A CN106760618A (en) | 2017-05-31 |
CN106760618B true CN106760618B (en) | 2019-06-18 |
Family
ID=58876840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611149457.4A Active CN106760618B (en) | 2016-12-13 | 2016-12-13 | A kind of inspection platform integral translation construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760618B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4441583A (en) * | 1983-03-28 | 1984-04-10 | Vaught Ronald R | Grating cable hanger |
CN102635226A (en) * | 2012-05-04 | 2012-08-15 | 常州第一建筑集团有限公司 | Flexible hanging self-expansion operating platform and construction method |
CN202755634U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Suspension type operational platform |
CN204401997U (en) * | 2014-11-26 | 2015-06-17 | 华鼎建筑装饰工程有限公司 | A kind of suspension type ceiling construction scaffold |
-
2016
- 2016-12-13 CN CN201611149457.4A patent/CN106760618B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4441583A (en) * | 1983-03-28 | 1984-04-10 | Vaught Ronald R | Grating cable hanger |
CN102635226A (en) * | 2012-05-04 | 2012-08-15 | 常州第一建筑集团有限公司 | Flexible hanging self-expansion operating platform and construction method |
CN202755634U (en) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | Suspension type operational platform |
CN204401997U (en) * | 2014-11-26 | 2015-06-17 | 华鼎建筑装饰工程有限公司 | A kind of suspension type ceiling construction scaffold |
Also Published As
Publication number | Publication date |
---|---|
CN106760618A (en) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201882763U (en) | Special carrying pole type beam of double-machine lifting crane | |
CN203979647U (en) | A kind of detachable recycling guide rail pipe perforator | |
CN202529736U (en) | Combined movable lifting frame | |
CN204737609U (en) | European style hoist girder connection structure | |
CN203187333U (en) | Light carrying device for building block installment | |
CN202594610U (en) | I-shaped beam hoisting device for hoisting of pressure steel pipe tiles | |
CN203392734U (en) | Lifting appliance for maintaining crane | |
CN106760617B (en) | A kind of inspection platform translation construction method | |
CN106760618B (en) | A kind of inspection platform integral translation construction method | |
CN212599995U (en) | Welding installation equipment for hot-melt welded pipe | |
CN201999638U (en) | Hoisting device for ascending pipe and bridge pipe of coke oven | |
CN103979429A (en) | Cantilever type portal crane | |
CN202785255U (en) | Turnover hoisting tool for reinforced concrete pipe joint | |
CN106320699A (en) | Quick disassembling and assembling method for truss type formwork bracket system | |
CN206395418U (en) | A kind of inspection platform slide device | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN204569127U (en) | Steel upright post hoisting jig | |
CN110820518B (en) | Machining and hoisting method for steel arch bridge suspender | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN107740443B (en) | The prefabricated ring beam of town road inspection shaft and well seat mounting apparatus and installation method | |
CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
CN206256382U (en) | It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed | |
CN208517821U (en) | A kind of simple hoisting apparatus for removing box beam beret slice | |
CN202346607U (en) | Rotary tail exhausting device for equipment hoisting tailstock | |
CN207293997U (en) | A kind of chassis suitable for ultra-large type derrick crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |