CN106760614A - The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude - Google Patents

The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude Download PDF

Info

Publication number
CN106760614A
CN106760614A CN201710147425.9A CN201710147425A CN106760614A CN 106760614 A CN106760614 A CN 106760614A CN 201710147425 A CN201710147425 A CN 201710147425A CN 106760614 A CN106760614 A CN 106760614A
Authority
CN
China
Prior art keywords
support base
skylight frame
roof truss
altitude
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710147425.9A
Other languages
Chinese (zh)
Other versions
CN106760614B (en
Inventor
王代发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710147425.9A priority Critical patent/CN106760614B/en
Publication of CN106760614A publication Critical patent/CN106760614A/en
Application granted granted Critical
Publication of CN106760614B publication Critical patent/CN106760614B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to the strengthening construction device and construction method of roof truss beam under a kind of high-altitude skylight frame, including front support base and back support base;Front support base is connected with back support base by sliding support;Front support base is in groove profile;Sliding support includes vertical portion, horizontal part and rake;The upper end of vertical portion is connected with the rear end of horizontal part;The lower end of vertical portion is connected with back support seat.The reinforced construction method of roof truss beam under high-altitude skylight frame of the present invention, strengthening construction device, making is simple, be easy to grasp, strengthening construction device can reuse, convenient to assemble and disassemble;Will not for a long time influence lower section operation to construct in addition, the duration accelerates, improve efficiency of construction, it is safe and reliable, it is particularly well-suited to narrow space job space.

Description

The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude
Technical field
It is the strengthening construction device for being related to roof truss beam under a kind of high-altitude skylight frame the present invention relates to a kind of construction techniques And construction method.
Background technology
Limitation with country to some production capacity surplus projects, advocates low-carbon environment-friendly, energy-saving and emission-reduction, green construction energetically, Therefore numerous items have to carry out technique adjustment or upgrading, it is necessary to some structures are reinforced to meet design Use functional requirement.For example need to increase on original roofing and wear chimney or ventilation shaft of roofing or the like, it is necessary to be right Former Roof structure structure carries out recalculating accounting, takes necessary reinforcement and strengthening measure.Traditional roof truss beam winds up(Band day Window)Reinforcing is typically with elevator, steel wire rope or jack, and fixing point is used as by roof truss or skylight frame, by strenthening member Be hoisted on roof truss from either inside ground, this method exist ground can not carry out that interspersed operation, work high above the ground be more, danger because It is plain big, the features such as efficiency of construction is slow, and be especially not suitable for shaped steel roof truss lower edge horizontal bars and oblique pull support rod member is more And the narrow situation of ground space.
The content of the invention
For above-mentioned deficiency of the prior art, the present invention provides a kind of raising efficiency of construction, reduces difficulty of construction, safety The reinforced construction method of roof truss beam under the skylight frame of reliable high-altitude.
The technical solution used in the present invention is:
The strengthening construction device of roof truss beam under a kind of high-altitude skylight frame,
Including front support base and back support base;
Front support base is connected with back support base by sliding support;
Front support base is in groove profile;
Sliding support includes vertical portion, horizontal part and rake;
The upper end of vertical portion is connected with the rear end of horizontal part;
The front end of horizontal part is connected with the rear end of rake;
The front end of rake is connected with the middle part of front support base;
The lower end of vertical portion is connected with back support seat.
The rake is 10-20 degree with the angle of horizontal plane.
The reinforcing of roof truss beam is applied under the high-altitude skylight frame of the strengthening construction device of roof truss beam under a kind of skylight frame of use high-altitude Work method, comprises the following steps:
First step crane will be needed reinforcement on component whole lifting to skylight frame both walls roof boarding, and dispersion successively is stacked;
Two groups of slippage brackets are avoided skylight support column and are stuck on roof truss winds up by second step across parapet;
The rod member that needs reinforcement is put into slippage bracket top by the 3rd step, inclines certain angle, will with safety line in the middle of component Its colligation is fixed, and the safety line other end is fixed on skylight frame, to prevent component from dropping;
4th step traction pulls rope and component two ends is put, and allowing component one end to incline certain angle first carries out weather shield It is interior, whole component is all carried out below skylight frame slowly pulling, then component adjustment position on slide holder;
In-house operation personnel slowly pull rope, field operation personnel slowly payout, allow rope all the time in pulling stress Controllable state, slowly by pulling rope make component on slippage bracket parallel slip to install specified location;
5th step carries out reinforcing welding, and release pulls rope and the fixed safety line of safety, next place's reinforcing is then carried out successively.
Present invention beneficial effect compared with the prior art:
The reinforced construction method of roof truss beam under high-altitude skylight frame of the present invention, strengthening construction device, make it is simple, be easy to grasp, plus Gu constructing device can reuse, convenient to assemble and disassemble;Lower section operation will not be for a long time influenceed to construct in addition, the duration accelerates, and raising is applied Work efficiency rate, it is safe and reliable, it is particularly well-suited to narrow space job space.
Brief description of the drawings
Fig. 1 is that the strengthening construction device of roof truss beam under high-altitude skylight frame of the present invention places the structural representation of upper strenthening member Figure;
Fig. 2 is that strenthening member is slid onto the strengthening construction device of roof truss beam under high-altitude skylight frame of the present invention the structural representation of interior Figure;
Fig. 3 is the structural representation of the strengthening construction device use state of roof truss beam under high-altitude skylight frame of the present invention;
Fig. 4 is the structural representation of the strengthening construction device of roof truss beam under high-altitude skylight frame of the present invention.
Critical piece symbol description in accompanying drawing:
In figure:
1st, pull rope 2, roof truss winds up
3rd, safety rope 4, strenthening member
5th, sliding support 6, parapet
7th, roof boarding 8, weather shield
9th, skylight frame 10, roof truss
11st, factory building column 12, front support base
13rd, back support base.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Knowable to accompanying drawing 1-4, the strengthening construction device of roof truss beam under a kind of high-altitude skylight frame,
Including front support base 12 and back support base 13;
Front support base 12 is connected with back support base 13 by sliding support 5;
Front support base 12 is in groove profile;
Sliding support 5 includes vertical portion 51, horizontal part 52 and rake 53;
The upper end of vertical portion 51 is connected with the rear end of horizontal part 52;
The front end of horizontal part 52 is connected with the rear end of rake 53;
The front end of rake 53 is connected with the middle part of front support base 12;
The lower end of vertical portion 51 is connected with back support seat 13.
The rake 53 is 10-20 degree with the angle of horizontal plane.
The reinforcing of roof truss beam is applied under the high-altitude skylight frame of the strengthening construction device of roof truss beam under a kind of skylight frame of use high-altitude Work method, comprises the following steps:
First step crane will be needed reinforcement on component whole lifting to skylight frame both walls roof boarding, and dispersion successively is stacked;
Two groups of slippage brackets are avoided skylight support column and are stuck on roof truss winds up by second step across parapet;
The rod member that needs reinforcement is put into slippage bracket top by the 3rd step, inclines certain angle, and safety line is used in the middle of component(Or Jack)Its colligation is fixed, safety line(Or jack)The other end is fixed on skylight frame, to prevent component from dropping;
4th step traction pulls rope and component two ends is put, and allowing component one end to incline certain angle first carries out weather shield It is interior, whole component is all carried out below skylight frame slowly pulling, then component adjustment position on slide holder;
In-house operation personnel slowly pull rope, field operation personnel slowly payout, allow rope all the time in pulling stress Controllable state, slowly by pulling rope make component on slippage bracket parallel slip to install specified location;
5th step carries out reinforcing welding, and release pulls rope and the fixed safety line of safety(Or jack), then carry out down successively Reinforced at one.
The reinforced construction method of roof truss beam under high-altitude skylight frame of the present invention, strengthening construction device, making is simple, be easy to the palm Hold, strengthening construction device can be reused, convenient to assemble and disassemble;Lower section operation will not be for a long time influenceed to construct in addition, the duration accelerates, and carries Efficiency of construction high, it is safe and reliable, it is particularly well-suited to narrow space job space.
The above, is only presently preferred embodiments of the present invention, not makees any formal to structure of the invention Limitation.Every any simple modification, equivalent variations and modification made to above example according to technical spirit of the invention, Belong in the range of technical scheme.

Claims (3)

1. under a kind of high-altitude skylight frame roof truss beam strengthening construction device, it is characterised in that
Including front support base and back support base;
Front support base is connected with back support base by sliding support;
Front support base is in groove profile;
Sliding support includes vertical portion, horizontal part and rake;
The upper end of vertical portion is connected with the rear end of horizontal part;
The front end of horizontal part is connected with the rear end of rake;
The front end of rake is connected with the middle part of front support base;
The lower end of vertical portion is connected with back support seat.
2. according to claim 1 under the skylight frame of high-altitude roof truss beam strengthening construction device, it is characterised in that:The rake It is 10-20 degree with the angle of horizontal plane.
3. under the high-altitude skylight frame described in a kind of usage right requirement 1-2 any one the strengthening construction device of roof truss beam high-altitude The reinforced construction method of roof truss beam under skylight frame, it is characterised in that comprise the following steps:
First step crane will be needed reinforcement on component whole lifting to skylight frame both walls roof boarding, and dispersion successively is stacked;
Two groups of slippage brackets are avoided skylight support column and are stuck on roof truss winds up by second step across parapet;
The rod member that needs reinforcement is put into slippage bracket top by the 3rd step, inclines certain angle, will with safety line in the middle of component Its colligation is fixed, and the safety line other end is fixed on skylight frame, to prevent component from dropping;
4th step traction pulls rope and component two ends is put, and allowing component one end to incline certain angle first carries out weather shield It is interior, whole component is all carried out below skylight frame slowly pulling, then component adjustment position on slide holder;
In-house operation personnel slowly pull rope, field operation personnel slowly payout, allow rope all the time in pulling stress Controllable state, slowly by pulling rope make component on slippage bracket parallel slip to install specified location;
5th step carries out reinforcing welding, and release pulls rope and the fixed safety line of safety, next place's reinforcing is then carried out successively.
CN201710147425.9A 2017-03-13 2017-03-13 The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude Active CN106760614B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710147425.9A CN106760614B (en) 2017-03-13 2017-03-13 The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710147425.9A CN106760614B (en) 2017-03-13 2017-03-13 The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude

Publications (2)

Publication Number Publication Date
CN106760614A true CN106760614A (en) 2017-05-31
CN106760614B CN106760614B (en) 2019-01-29

Family

ID=58962632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710147425.9A Active CN106760614B (en) 2017-03-13 2017-03-13 The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude

Country Status (1)

Country Link
CN (1) CN106760614B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268764A (en) * 1996-03-28 1997-10-14 Sekisui House Ltd Movable carrier
US20050029041A1 (en) * 2001-01-22 2005-02-10 Robert Garrett Roofmatestm roofing accessories
CN103089024A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Glass reinforced plastics roof framework device
CN103233559A (en) * 2013-01-04 2013-08-07 森特士兴集团股份有限公司 System and method for transporting roof board in air
CN105220691A (en) * 2015-11-04 2016-01-06 上海十三冶建设有限公司 Camber roll formula constructional materials conveying arrangement and using method thereof
CN205918136U (en) * 2016-08-12 2017-02-01 河北建工集团有限责任公司 Novel metal roofing feeding system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268764A (en) * 1996-03-28 1997-10-14 Sekisui House Ltd Movable carrier
US20050029041A1 (en) * 2001-01-22 2005-02-10 Robert Garrett Roofmatestm roofing accessories
CN103233559A (en) * 2013-01-04 2013-08-07 森特士兴集团股份有限公司 System and method for transporting roof board in air
CN103089024A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Glass reinforced plastics roof framework device
CN105220691A (en) * 2015-11-04 2016-01-06 上海十三冶建设有限公司 Camber roll formula constructional materials conveying arrangement and using method thereof
CN205918136U (en) * 2016-08-12 2017-02-01 河北建工集团有限责任公司 Novel metal roofing feeding system

Also Published As

Publication number Publication date
CN106760614B (en) 2019-01-29

Similar Documents

Publication Publication Date Title
CN100557168C (en) A kind of method for high altitude installation of large span steel truss
CN105822072B (en) The lifting construction structure and its construction method of aerial vestibule furred ceiling
CN110228743B (en) Overhead two-to-one suspension ratio construction elevator for elevator shaft traction and operation method thereof
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN101413291A (en) Cable sky dome tower frame raising cable rod accumulation mounting method
CN105625645B (en) Suspension type steel structure lighting skylight construction method
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN105672641A (en) Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof
CN210480530U (en) Elevator shaft traction overhead two-to-one suspension ratio construction elevator
CN106760614A (en) The strengthening construction device and construction method of roof truss beam under the skylight frame of high-altitude
CN209353734U (en) For installing the double-track device of curtain wall
CN108483190B (en) Intelligent aluminum alloy template material conveying device and operation method thereof
CN203257106U (en) Multifunctional power-driven walking type walking system
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN216336266U (en) Assembled building element hoist and mount construction platform structure
WO2004069727A2 (en) Hoist for construction material
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN211473441U (en) Assembled wallboard transportation equipment
CN114541729A (en) Operation method for super high-rise building
CN105715030A (en) Single-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for single-guide-frame multi-stage lifting working platform
CN105781092A (en) Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN111305433A (en) Construction structure and construction method of inclined glass curtain wall of roof steel structure platform
CN105401699A (en) Light roof panel installation walking vehicle and method for installing roof panels
CN205088879U (en) Light roof panel mounting walking car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant