CN101413291A - Cable sky dome tower frame raising cable rod accumulation mounting method - Google Patents

Cable sky dome tower frame raising cable rod accumulation mounting method Download PDF

Info

Publication number
CN101413291A
CN101413291A CNA2008102343621A CN200810234362A CN101413291A CN 101413291 A CN101413291 A CN 101413291A CN A2008102343621 A CNA2008102343621 A CN A2008102343621A CN 200810234362 A CN200810234362 A CN 200810234362A CN 101413291 A CN101413291 A CN 101413291A
Authority
CN
China
Prior art keywords
notochord
cable
rope
carrying member
outer shroud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102343621A
Other languages
Chinese (zh)
Other versions
CN101413291B (en
Inventor
郭正兴
宗钟凌
罗斌
王永泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2008102343621A priority Critical patent/CN101413291B/en
Publication of CN101413291A publication Critical patent/CN101413291A/en
Application granted granted Critical
Publication of CN101413291B publication Critical patent/CN101413291B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a method for cumulatively mounting a cable dome tower lifting cable rod, which comprises the following steps: mounting a lifting tower slightly higher than the mounting height of the vertex of a cable dome structure according to the design elevation of a cable dome and a corresponding position of a central bearing member; mounting a multipoint synchronous lifting device on the top of the tower; connecting an inner ring cable system of a notochord net with the central bearing member and connecting an outer ring cable system of the notochord net with an outer ring beam through auxiliary traction cables; evenly lifting the central bearing member through a lifting device on the top of the tower with the traction of an outer ring notochord and the lifting of the central bearing member in the lifting process, wherein the whole notochord net is lifted synchronously in a catenary mode; cumulatively and expansively mounting each ring cable, masts and stay cables positioned at different mounting heights while lifting the central bearing member; and after all the traction cables and the masts are mounted, forming outer ring stayed cables through tensioning by stages.

Description

Cable sky dome tower frame raising cable rod accumulation mounting method
Technical field
The present invention is a kind of installation of rope bar and prestressed stretch-draw shaping are carried out in Construction of Civil Engineering to the construction of novel rope dome steric strain structure method that is used for.The technical field that belongs to the cable dome structure construction and installation.
Background technology
Cable dome structure is a kind of novel full tension structure system, by at the notochord that winds up, form at the oblique cord of lower edge and the mast that links between the last quarter rope, must could produce the rigidity of structure of necessity by stretching rope, forms stable load system.Drag-line can be various ways such as the half parallel twisting of high-strength steel tow, many steel stranded wire assembled cables or rod iron pull bar.Domestic and international known cable dome structure construction and installation manufacturing process, its key step is: (1) places the center load-carrying member; (2) hang notochord, an end links to each other with outer-ring beam, and an end is connected with the center load-carrying member; (3) the center load-carrying member is supported or is lifted to a certain height by loop wheel machine by the interim pylon in center; (4) by ring mast, strop and oblique cord are installed; (5) stage by stage or the single tension oblique cord structure finally is shaped.Known cable dome structure construction and installation manufacturing process, all need notochord is carried out the traction of longer distance or center ring shelved certain altitude and use could making notochord hang than large traction to be installed on the outer-ring beam, this is to the ability and the sync pulling technical requirements height of pulling equipment, the tractive force of notochord in being pulled process is excessive and stressed also comparatively complicated simultaneously, finally cause difficulty of construction to strengthen, the security risk of construction strengthens, and the duration is longer.In addition, because during known cable dome structure construction and installation are shaped, the bracing frame height of pulling force ring is shelved at the center or height that loop wheel machine lifts immobilizes, regulated at will height easily, if it is unreasonable that center load-carrying member bracing frame or lift highly designs, the installation of part drag-line may need bigger external force to force traction in place, and this is stressed all unfavorable to drag-line, mast and node, difficulty of construction is bigger, the safety deficiency of installation operation.
Summary of the invention
Technical problem: the be shaped notochord that exists and oblique cord traction difficulty and tractive force are installed are strengthened for overcoming rope bar in the existing cable dome structure construction, center load-carrying member bearing height immobilizes, cause by unfavorable factors such as strop bar installation amount of high-altitude operation increasing and construction safety risk increasings, the present invention proposes a kind of cable sky dome tower frame raising cable rod accumulation mounting method, can not only reduce the distance and the difficulty of notochord traction, and can each strop bar be installed by the expansion while promoting of center load-carrying member, bearing height that can regulated at will center load-carrying member, the rope bar that conveniently is positioned at differing heights point is installed and traction stretch-draw, the installation difficulty of cable dome structure is significantly reduced, increased rope bar installation process safe.
Technical scheme: cable sky dome tower frame raising cable rod accumulation mounting method of the present invention, be according to the correspondence position setting of the design elevation of rope dome and center load-carrying member lifting pylon a little more than cable dome structure summit setting height(from bottom), at tower top the synchronous lifting means of multiple spot is set, strop system in the notochord net is linked to each other with the center load-carrying member, outer strop is to link to each other with outer-ring beam with the auxiliary traction rope, the lifting means of tower top evenly promotes the center load-carrying member, be accompanied by the traction of outer shroud notochord and the lifting of center load-carrying member in the lifting process, whole notochord net is the stretched wire wire and promotes synchronously thereupon, what be positioned at different setting height(from bottom)s while promoting respectively encircles strop, the expansion accumulation of mast and oblique cord is installed, after treating that all drag-lines and mast install, outer shroud oblique cord is carried out stretch-draw forming stage by stage.
This mounting method is divided into the following step:
The first step: the center load-carrying member of rope dome is installed on the precalculated position;
Second step: set up the lifting pylon, lifting means is installed and is linked to each other with the center load-carrying member through raising sling;
The 3rd step: each member spelling of notochord rope net, and interior ansa rope linked to each other with the center load-carrying member, the outer shroud notochord links to each other with outer-ring beam through the notochord drag cable;
The 4th step: the lifting means that promotes tower top drives raising sling the center load-carrying member is promoted, and in the lifting process, constantly adjusts notochord rope net catenary sag, simultaneously through notochord drag cable traction outer shroud notochord;
The 5th step: follow the hoisting depth of notochord rope net, ring oblique cord, middle ring oblique cord, middle ring mast and middle ring strop in installing respectively;
The 6th step: the outer shroud notochord is anchored on the outer-ring beam;
The 7th step: outer shroud mast and outer shroud strop are installed, and the outer shroud oblique cord are linked to each other with outer-ring beam by the oblique cord drag cable;
The 8th step: the outer shroud oblique cord is anchored on the outer-ring beam;
The 9th step: promote the center load-carrying member to rational position, stretch-draw outer shroud oblique cord to structure finally is shaped stage by stage;
The tenth step: remove and promote pylon, lifting means and raising sling.
The concrete operation method in second step is: according to the design elevation and the structural arrangement form of rope dome, heart load-carrying member correspondence position is set up the lifting pylon therein, promotes the pylon scaffolding height and regulates requirement a little more than rope dome design elevation with the hoisting depth that satisfies the center load-carrying member; Lifting means is installed promoting tower top, its installation site needs corresponding with the suspension centre of center load-carrying member, equipment to be hoisted install and fixing after, link to each other formation lifting system with the center load-carrying member through raising sling.
The concrete operation method in the 4th step is: the notochord rope net for the treatment of the rope dome installs, the lifting system install to be shaped, the outer shroud notochord with after outer-ring beam is connected, is implemented synchronous lifting by lifting means to the center load-carrying member through the notochord drag cable; In the lifting process, by lifting means the hoisting depth of center load-carrying member is controlled, implemented the adjustment of notochord rope net catenary sag, simultaneously, externally the ansa rope is implemented traction.
The concrete operation method in the 5th step is: according to the hoisting depth of center load-carrying member, regulate the catenary sag of notochord rope net, when in distance satisfies between the node of notochord rope net and grandstand or the ground, encircling oblique cord, middle ring oblique cord or middle ring mast installing space demand, promptly each rope bar is installed; Each rope bar erection sequence is a preface to satisfy installing space.
The concrete operation method in the 9th step is: in the stretching process, constantly adjust the hoisting depth of center load-carrying member by lifting means, with stretch-draw demand that satisfies the outer shroud oblique cord and the stretching force of adjusting the outer shroud oblique cord; Unload lift hoist cable before the stretch-draw of outer shroud oblique cord afterbody, not with condition that any supporting member links to each other under, the outer shroud oblique cord of rope dome is carried out final stretch-draw.
Beneficial effect: cable sky dome tower frame raising cable rod accumulation mounting method of the present invention according to the design elevation of rope dome and the correspondence position of center load-carrying member, is provided with the lifting pylon a little more than rope dome summit design elevation, and lifting means and raising sling is installed.By lifting, drive the notochord rope net that is attached thereto and promote the center load-carrying member.In the installation process, can change the hoisting depth of center load-carrying member easily, and cooperate with the drag cable auxiliary traction of outer shroud notochord and outer shroud oblique cord, can not only significantly reduce the distance of drawing and required drag cable power, reduced the difficulty of construction that the traction of notochord and oblique cord is in place, and follow the slow lifting of center load-carrying member and notochord rope net, near ground or see other rope bars are installed in the altitude range of table top, reduced the high-altitude installation work amount, and make things convenient for the in place and stretch-draw of drag-line, guaranteed the safety in the work progress.
Description of drawings
The present invention is described in more detail below in conjunction with drawings and Examples:
Fig. 1~Fig. 6 is a cable sky dome tower frame raising cable rod accumulation mounting method schematic diagram of the present invention.
Have among the figure: interior ansa rope 101, middle ansa rope 102, outer shroud notochord 103, interior ring oblique cord 201, middle ring oblique cord 202, outer shroud oblique cord 203, middle ring mast 301, outer shroud mast 302, middle ring strop 401, outer shroud strop 402, center load-carrying member 501, lifting pylon 601, lifting means 602, raising sling 603, notochord drag cable 701, oblique cord drag cable 702, outer-ring beam 801, grandstand 901, ground 902.
The specific embodiment
The present invention is the correspondence position according to the design elevation of rope dome and center load-carrying member, setting is a little more than the lifting pylon of rope dome summit design elevation, the center load-carrying member is evenly promoted, the traction and the center load-carrying member that are accompanied by whole notochord rope net in the lifting process promote, whole notochord rope net is also promoting simultaneously, and strop respectively thereupon, the expansion accumulation of mast and oblique cord is installed, rope bar erection sequence can by each mounting points overhead or the height of step surface adjust, after treating that all drag-lines and mast install, outer shroud oblique cord is carried out stretch-draw forming stage by stage.
Be specially center load-carrying member 501 and be positioned over ground, center, place, install and promote pylon 601 and lifting means 602, carry out putting rope and linking the node installation of outer shroud notochord 103, middle ansa rope 102 and interior ansa rope 101 simultaneously on ground, form notochord rope net, and utilize notochord drag cable 701 that outer shroud notochord 103 is connected in outer-ring beam 801 (Fig. 1); The lifting means 602 that promotes pylon 601 tops drives 603 pairs of center load-carrying members 501 of raising sling and promotes, notochord drag cable 701 traction outer shroud notochords 103 are adjusted notochord net stretched wire wire sag simultaneously, according to the differing heights of notochord rope net node, ring oblique cord 201, middle ring oblique cord 202, middle ring mast 301 and middle ring strop 401 in installing respectively; Continue lifting center load-carrying member 501, continue traction notochord drag cable 701, make the outer shroud notochord be anchored in outer-ring beam 801 (Fig. 2); Oblique cord drag cable 702 is connected with outer oblique cord 203 temporarily, and outer shroud mast 302 and outer shroud strop 402 (Fig. 3) are installed, and being positioned at the rope bar erection sequence that respectively encircles mounting points can change adjustment with the hoisting depth of notochord rope net; The outer oblique cord 203 of oblique cord drag cable 702 tractions puts in place, is anchored in outer-ring beam 801, promotes center load-carrying member 501 to rational position (Fig. 4); The outer oblique cord 203 (Fig. 5) of stretch-draw stage by stage; Finally be shaped up to structure, and remove lifting pylon 601, lifting means 602 and raising sling 603 (Fig. 6).

Claims (5)

1. cable sky dome tower frame raising cable rod accumulation mounting method is characterized in that this mounting method is divided into the following step:
The first step: the center load-carrying member (501) of rope dome is installed on the precalculated position;
Second step: set up and promote pylon (601), lifting means (602) is installed and is linked to each other with center load-carrying member (501) through raising sling (603);
The 3rd step: each member spelling of notochord rope net, and interior ansa rope (101) linked to each other with center load-carrying member (501), outer shroud notochord (103) links to each other with outer-ring beam (801) through notochord drag cable (701);
The 4th step: the lifting means (602) that promotes pylon (601) top drives raising sling (603) center load-carrying member (501) is promoted, in the lifting process, constantly adjust notochord rope net catenary sag, simultaneously through notochord drag cable (701) traction outer shroud notochord (103);
The 5th step: follow the hoisting depth of notochord rope net, ring oblique cord (201), middle ring oblique cord (202), middle ring mast (301) and middle ring strop (401) in installing respectively;
The 6th step: outer shroud notochord (103) is anchored on the outer-ring beam (801);
The 7th step: outer shroud mast (302) and outer shroud strop (402) are installed, and outer shroud oblique cord (203) are linked to each other with outer-ring beam (801) by oblique cord drag cable (702);
The 8th step: outer shroud oblique cord (203) is anchored on the outer-ring beam (801);
The 9th step: promote center load-carrying member (501) to rational position, stretch-draw outer shroud oblique cord (203) to structure finally is shaped stage by stage;
The tenth step: remove and promote pylon (601), lifting means (602) and raising sling (603).
2. cable sky dome tower frame raising cable rod accumulation mounting method according to claim 1, the concrete operation method that it is characterized in that for second step is: according to the design elevation and the structural arrangement form of rope dome, heart load-carrying member (501) correspondence position is set up and is promoted pylon (601) therein, promotes pylon (601) scaffolding height and regulates requirement a little more than rope dome design elevation with the hoisting depth that satisfies center load-carrying member (501); Promoting pylon (601) top installation lifting means (602), its installation site needs corresponding with the suspension centre of center load-carrying member (501), equipment to be hoisted (602) install and fixing after, link to each other formation lifting system with center load-carrying member (501) through raising sling (603).
3. cable sky dome tower frame raising cable rod accumulation mounting method according to claim 1, the concrete operation method that it is characterized in that for the 4th step is: the notochord rope net for the treatment of the rope dome installs, the lifting system install to be shaped, outer shroud notochord (103) through notochord drag cable (701) with after outer-ring beam (801) is connected, by lifting means (602) to center load-carrying member (501) enforcement lifting synchronously; In the lifting process, by lifting means (602) hoisting depth of center load-carrying member (501) is controlled, implemented the adjustment of notochord rope net catenary sag, simultaneously, externally ansa rope (103) is implemented traction.
4. cable sky dome tower frame raising cable rod accumulation mounting method according to claim 1, the concrete operation method that it is characterized in that for the 5th step is: according to the hoisting depth of center load-carrying member (501), regulate the catenary sag of notochord rope net, when in distance satisfies between the node of notochord rope net and grandstand (901) or ground (902), encircling oblique cord (201), middle ring oblique cord (202) or middle ring mast (301) installing space demand, promptly each rope bar is installed; Each rope bar erection sequence is a preface to satisfy installing space.
5. cable sky dome tower frame raising cable rod accumulation mounting method according to claim 1, the concrete operation method that it is characterized in that for the 9th step is: in the stretching process, constantly adjust the hoisting depth of center load-carrying member (501) by lifting means (602), with stretch-draw demand that satisfies outer shroud oblique cord (203) and the stretching force of adjusting outer shroud oblique cord (203); Unload lift hoist cable (603) before outer shroud oblique cord (203) the afterbody stretch-draw, not with condition that any supporting member links to each other under, the outer shroud oblique cord (203) of rope dome is carried out final stretch-draw.
CN2008102343621A 2008-11-12 2008-11-12 Accumulation mounting method for cable sky dome tower frame raising cable rod Expired - Fee Related CN101413291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102343621A CN101413291B (en) 2008-11-12 2008-11-12 Accumulation mounting method for cable sky dome tower frame raising cable rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102343621A CN101413291B (en) 2008-11-12 2008-11-12 Accumulation mounting method for cable sky dome tower frame raising cable rod

Publications (2)

Publication Number Publication Date
CN101413291A true CN101413291A (en) 2009-04-22
CN101413291B CN101413291B (en) 2010-07-07

Family

ID=40594008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102343621A Expired - Fee Related CN101413291B (en) 2008-11-12 2008-11-12 Accumulation mounting method for cable sky dome tower frame raising cable rod

Country Status (1)

Country Link
CN (1) CN101413291B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582095B (en) * 2009-06-19 2010-10-27 东南大学 Non-linear dynamic finite element method for determining cable-strut system static balancing state
CN102912989A (en) * 2012-11-14 2013-02-06 淮海工学院 Installation method for steel reticulated shell and cable dome combined structure
CN103615064A (en) * 2013-11-27 2014-03-05 浙江精工钢结构集团有限公司 Cable dome and mounting method thereof
CN103696494A (en) * 2013-12-11 2014-04-02 中冶天工上海十三冶建设有限公司 Computer control hydraulic synchronous hoisting construction method for complex space truss structure
CN104234200A (en) * 2014-09-24 2014-12-24 东南大学 Ring-by-ring lifting mounting method for suspendome cable-bar system
CN104420656A (en) * 2013-08-29 2015-03-18 上海宝冶集团有限公司 Traction tension forming mounting method of spherical rib annular type cable dome structure
CN106088601A (en) * 2016-07-11 2016-11-09 中建二局第二建筑工程有限公司华东分公司 The construction method of umbrella cable-membrane analysis
CN107130688A (en) * 2017-05-18 2017-09-05 中国建筑第八工程局有限公司 Suo Cheng networks are without moulding bed construction method
CN111042542A (en) * 2019-12-18 2020-04-21 中建科工集团有限公司 Cumulative lifting method for large-span unequal-height bidirectional curved surface net rack
CN111101600A (en) * 2019-11-20 2020-05-05 北京市建筑工程研究院有限责任公司 Construction method of double-oblique-arch hyperbolic paraboloid cable net structure with limited construction space

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582095B (en) * 2009-06-19 2010-10-27 东南大学 Non-linear dynamic finite element method for determining cable-strut system static balancing state
CN102912989A (en) * 2012-11-14 2013-02-06 淮海工学院 Installation method for steel reticulated shell and cable dome combined structure
CN104420656A (en) * 2013-08-29 2015-03-18 上海宝冶集团有限公司 Traction tension forming mounting method of spherical rib annular type cable dome structure
CN103615064A (en) * 2013-11-27 2014-03-05 浙江精工钢结构集团有限公司 Cable dome and mounting method thereof
CN103615064B (en) * 2013-11-27 2016-09-07 浙江精工钢结构集团有限公司 A kind of Cable dome and installation method thereof
CN103696494B (en) * 2013-12-11 2016-03-30 中冶天工上海十三冶建设有限公司 The computer of complex space trussed construction controls hydraulic synchronizing lifting construction method
CN103696494A (en) * 2013-12-11 2014-04-02 中冶天工上海十三冶建设有限公司 Computer control hydraulic synchronous hoisting construction method for complex space truss structure
CN104234200A (en) * 2014-09-24 2014-12-24 东南大学 Ring-by-ring lifting mounting method for suspendome cable-bar system
CN106088601A (en) * 2016-07-11 2016-11-09 中建二局第二建筑工程有限公司华东分公司 The construction method of umbrella cable-membrane analysis
CN107130688A (en) * 2017-05-18 2017-09-05 中国建筑第八工程局有限公司 Suo Cheng networks are without moulding bed construction method
CN111101600A (en) * 2019-11-20 2020-05-05 北京市建筑工程研究院有限责任公司 Construction method of double-oblique-arch hyperbolic paraboloid cable net structure with limited construction space
CN111101600B (en) * 2019-11-20 2021-04-02 北京市建筑工程研究院有限责任公司 Construction method of double-oblique-arch hyperbolic paraboloid cable net structure with limited construction space
CN111042542A (en) * 2019-12-18 2020-04-21 中建科工集团有限公司 Cumulative lifting method for large-span unequal-height bidirectional curved surface net rack

Also Published As

Publication number Publication date
CN101413291B (en) 2010-07-07

Similar Documents

Publication Publication Date Title
CN101413291B (en) Accumulation mounting method for cable sky dome tower frame raising cable rod
CN201458596U (en) Crane with self-dismounting device
CN102146732B (en) Extra-large-area hyperboloid welding ball network frame sliding construction method
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN101423180B (en) Method for lifting a crane boom
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN104284857A (en) Heavy lifting apparatus and method
US10815687B2 (en) Wind turbine assembly system and associated method
CN202997425U (en) Hoisting device capable of replacing suspension type insulator chain under electrified state
CN113137054A (en) Method for setting inverted hoisting power equipment in attached lifting scaffold
CN101649683A (en) Method for hoisting power transmission iron tower by assembly holding pole technology
CN2761563Y (en) Special crane for extra-high, banding, autolifting type wind power generator
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN211037986U (en) Multistage lifting circular stage
RU2727300C2 (en) Mounting method of a nacelle in an upper part of a tower
CN200978204Y (en) Floor type bar holding hoister
CN105645275B (en) Cable hoist and its construction method
CN114776038B (en) Steel truss installation structure and step unloading method thereof
CN116395578A (en) Erection method and erection device of power transmission tower
CN203529795U (en) Special aerial conveyor
CN201825635U (en) Hoisting structure of power station boiler
CN211973127U (en) Temporary support dismantling device
CN201660378U (en) Tower crane specially used for vertical wind driven generator
CN212050137U (en) Hoisting system for preventing truss sheet of arch structure from inclining
CN103539020A (en) Novel hoisting construction method and special hanging device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20211112