CN106760586A - Comprehensive floor periphery guard rail and installation method - Google Patents

Comprehensive floor periphery guard rail and installation method Download PDF

Info

Publication number
CN106760586A
CN106760586A CN201710087406.1A CN201710087406A CN106760586A CN 106760586 A CN106760586 A CN 106760586A CN 201710087406 A CN201710087406 A CN 201710087406A CN 106760586 A CN106760586 A CN 106760586A
Authority
CN
China
Prior art keywords
guard rail
rail body
floor
comprehensive
periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710087406.1A
Other languages
Chinese (zh)
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201710087406.1A priority Critical patent/CN106760586A/en
Publication of CN106760586A publication Critical patent/CN106760586A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings

Abstract

The invention belongs to comprehensive floor periphery protection technology field.Lack protection to solve comprehensive floor periphery present in prior art, existing guard rail dismounting inconvenience is unfavorable for that repetitive cycling such as uses at the technical problem.A kind of comprehensive floor periphery guard rail and installation method, including the first guard rail body, the second guard rail body and scalable guard rail body are provided;The side of the side of the first guard rail body, the second guard rail body and scalable guard rail body is detachably connected successively;The opposite side of the first guard rail body is bolted with first post or wall on comprehensive floor periphery;The side of the floor plates near synthesis floor of the first guard rail body, the second guard rail body and scalable guard rail body is bolted with the floor plates of the comprehensive floor;The opposite side of the scalable guard rail body is bolted with second post or wall on comprehensive floor periphery.Convenient disassembly of the present invention, it is reusable, reduce cost.

Description

Comprehensive floor periphery guard rail and installation method
Technical field
The invention belongs to comprehensive floor periphery protection technology field, and in particular to a kind of comprehensive floor periphery guard rail and peace Dress method.
Background technology
In China Democratic National Construction Association's housing project construction, in each comprehensive floor adjacent reinforced concrete bodies framework constructed, its building Easily there are personnel, article and the accident such as fall in layer periphery, it is necessary to which its floor periphery is entered mostly all without safeguard structure, on floor side Row provisional protection.However, comprehensive floor periphery is very big, it is necessary to frequently be installed to guard rail to the demand of guard rail And disassembling section, extremely expend the time;And existing guard rail as a result of welding etc. fixed form, during dismounting, it is necessary to Removed using damage type, so as to be unfavorable for that repetitive cycling is used.
The content of the invention
It is an object of the invention to solve technical problem present in above prior art, there is provided a kind of quick setting is pacified Dress, reusable, provisional protection the comprehensive floor periphery guard rail of energy and installation method.
The purpose of the present invention is achieved through the following technical solutions:
A kind of comprehensive floor periphery guard rail, including the first guard rail body, the second guard rail body and scalable protection Column body;Successively may be used the side of the side of the first guard rail body, the second guard rail body and scalable guard rail body Dismounting connection;The opposite side of the first guard rail body is bolted with first post or wall on comprehensive floor periphery;Institute State the side of the floor plates near synthesis floor of the first guard rail body, the second guard rail body and scalable guard rail body Floor plates with the comprehensive floor are bolted;The opposite side of the scalable guard rail body and comprehensive floor periphery The second post or wall be bolted.
Further improvement is that the second guard rail body is several, and the second adjacent guard rail body mutually may be used Dismounting connects into the second guard rail;The side of second guard rail detachably connects with the side of the first guard rail body Connect;The opposite side of second guard rail is detachably connected with the side of scalable guard rail body;Second guard rail is leaned on The side of the floor plates of nearly synthesis floor is bolted with the floor plates of the comprehensive floor.
Further improvement is that the scalable guard rail body includes the 3rd guard rail body and the 4th guard rail sheet Body, the side of the 3rd guard rail body is slidably connected with the side of the 4th guard rail body;The 3rd guard rail body Opposite side be detachably connected with the opposite side of the second guard rail;The opposite side of the 4th guard rail and comprehensive floor periphery Second post or wall are bolted.
Further improvement be, relative both sides are provided with slide protrusion part on the 3rd guard rail body, described the Four guard rail bodies be provided with for slide protrusion part slide slide rail, the 3rd guard rail body by slide protrusion part with Slide rail is slidably connected.
Further improving is, the side of the first guard rail body, the second guard rail body and scalable guard rail Body is connected by connecting bolt.
Further improvement is that the second adjacent guard rail body is connected by connecting bolt.
Further improvement is that the connecting bolt is made up of a screw rod and two nuts.
A kind of installation method of comprehensive floor periphery guard rail, including step:
A:The comprehensive floor peripheral length of measurement:Each comprehensive floor peripheral length is measured, according to each segment length chi The very little width for determining comprehensive floor periphery guard rail;
B:Make comprehensive floor periphery guard rail:According to comprehensive floor peripheral length, make and carry scalable guard rail sheet The comprehensive floor periphery guard rail of body;
C:It is determined that fixed synthesis floor periphery guard rail installation site:Height according to comprehensive floor periphery guard rail is in building The installation site of fixed synthesis floor periphery guard rail is determined on laminate, wall or post;
D:Comprehensive floor periphery guard rail is installed:Drilled in installation site, protected comprehensive floor periphery by bolt Column is fixed in installation site.
Further improvement is that a diameter of 12-16 millimeters drilled described in the step D, hole depth is 80-100 millimeters, comprehensive The height for closing floor periphery guard rail is 1.2-1.4 meters.
Further improvement is to scribble paint red and white on the comprehensive floor periphery guard rail.
The present invention is relative to the beneficial effect of prior art:Comprehensive floor periphery guard rail of the invention is in each synthesis Floor periphery, collocation setting is carried out according to its each span access location length, is set by comprehensive floor periphery guard rail of the invention Scalable guard rail body, so that comprehensive floor periphery guard rail of the invention being capable of flexible configuration, the different complex buildings of adaptation The requirement on layer periphery;Comprehensive floor periphery guard rail of the invention is located at comprehensive floor periphery by dismountable mode, so that Conveniently removing and installing to reuse, and reduce input cost, save resource;And by spraying fluorescence red and white Paint, luminous paint or reflectorised paint, so that guard rail of the invention is more eye-catching, neat, attractive in appearance, safe, generate larger society Benefit, with application value higher;The present invention to parameters by optimizing so as to reach more preferable protection Effect.Comprehensive floor periphery guard rail installation method of the invention, easy for installation, simple to operate, installation easy to disassemble sends out this Play a part of protection in the more firm comprehensive floor periphery that is fixed on of bright comprehensive floor periphery guard rail.
Brief description of the drawings
Fig. 1 comprehensive floor periphery guard rail overall structure diagrams of the invention.
Wherein, corresponding reference is in accompanying drawing, 1- left sides post or wall, 2- right side posts or wall, 3- the first guard rail sheets Body, 4- the second guard rail bodies, the guard rail bodies of 5- the 3rd, the guard rail bodies of 6- the 4th, 7- floor plates.
Specific embodiment
Below in conjunction with drawings and Examples, the present invention will be described in detail, so that those skilled in the art is reading Can be sufficiently complete on the basis of description of the invention realize technical scheme, and solve the present invention to be solved Problems of the prior art.It should be noted that following is only the preferred embodiment of the present invention, for this area For those of ordinary skill, without departing from the concept of the premise of the invention, various modifications and improvements can be made, these Protection scope of the present invention should be belonged to.
Embodiment 1
As shown in Figure 1, a kind of comprehensive floor periphery guard rail, including the first guard rail body, the second guard rail body With scalable guard rail body;The side of the first guard rail body, the second guard rail body and scalable guard rail body Side be detachably connected successively;The opposite side of the first guard rail body passes through with first post or wall on comprehensive floor periphery Bolt connection;The close synthesis floor of the first guard rail body, the second guard rail body and scalable guard rail body The side of floor plates is bolted with the floor plates of the comprehensive floor;The opposite side of the scalable guard rail body with Second post or wall on comprehensive floor periphery are bolted.
As shown in figure 1, the first guard rail body of the invention, the second guard rail body and scalable guard rail body It is made of protection network or guard rail;Comprehensive floor periphery guard rail of the invention, the left side post or wall on comprehensive floor periphery It is detachably connected with the first guard rail body by bolt;Destruction by the connected mode to post or wall is smaller while being easy to peace Assembly and disassembly;
Successively may be used the side of the side of the first guard rail body, the second guard rail body and scalable guard rail body Dismounting connection;First guard rail body, the second guard rail body and scalable guard rail body are detachably connected successively, so that Each guard rail body is facilitated to dismantle and install;By the first guard rail body, the second guard rail body and scalable guard rail sheet The downside of body is all bolted in floor plates near the side of floor plates, the opposite side of the scalable guard rail body The second post or wall with comprehensive floor periphery are bolted, so as to comprehensive floor periphery guard rail of the invention is firm It is fixed on comprehensive floor periphery and realizes protective action.
Further improvement is that the second guard rail body is several, and the second adjacent guard rail body mutually may be used Dismounting connects into the second guard rail;The side of second guard rail detachably connects with the side of the first guard rail body Connect;The opposite side of second guard rail is detachably connected with the side of scalable guard rail body;Second guard rail is leaned on The side of the floor plates of nearly synthesis floor is bolted with the floor plates of the comprehensive floor.
As shown in figure 1, when the length on comprehensive floor periphery is more long, the second guard rail body of the invention is set to many Individual, the second adjacent guard rail body is interconnected to constitute the second guard rail;As shown in figure 1, the left side of the second guard rail and the It is detachably connected on the right side of one guard rail body;The mode that is detachably connected can be connected with existing removably such as bolt Connect;Similarly, in order to consolidate it is firm fix the second guard rail, by the downside of the second guard rail near the side and building of floor plates Laminate is detachably connected by bolt, so that the second guard rail of the invention carries out increase and decrease according to actual width using.
Further improvement is that the scalable guard rail body includes the 3rd guard rail body and the 4th guard rail sheet Body, the side of the 3rd guard rail body is slidably connected with the side of the 4th guard rail body;The 3rd guard rail body Opposite side be detachably connected with the opposite side of the second guard rail;The opposite side of the 4th guard rail and comprehensive floor periphery Second post or wall are bolted.
As shown in figure 1, in order to strengthen the present invention to the adaptability on different length or the comprehensive floor periphery of width at this Scalable guard rail body is provided with the guard rail of invention, as shown in figure 1, guard rail body of the invention includes the 3rd protection Column body and the 4th guard rail body, by being slidably connected so that this hair for the 3rd guard rail body and the 4th guard rail body Bright guard rail carries out stretching motion by scalable guard rail body, such that it is able to the error according to measurement situation and reality, By the demand for adjusting the scaling of collapsible protective grill body to meet actually used.
Further improvement be, relative both sides are provided with slide protrusion part on the 3rd guard rail body, described the Four guard rail bodies be provided with for slide protrusion part slide slide rail, the 3rd guard rail body by slide protrusion part with Slide rail is slidably connected.
Specifically, slide protrusion part, the 4th are respectively equipped with the 3rd guard rail body upper side edge of the invention and lower side The upper side edge of guard rail body and the relevant position of lower side are provided with slide rail, and the 3rd guard rail body is existed by slide protrusion part The change width of scalable guard rail body is realized in slip in slide rail, so as to adapt to wanting for different comprehensive floor periphery protection Ask.
Further improving is, the side of the first guard rail body, the second guard rail body and scalable guard rail Body is connected by connecting bolt.
Further improvement is that the second adjacent guard rail body is connected by connecting bolt.
Further improvement is that the connecting bolt is made up of a screw rod and two nuts.
Preferably, the screw rod is made of the garden steel of Φ 10- Φ 14.
As shown in figure 1, specifically, the first guard rail body, the second guard rail body and scalable guard rail body pass through Connecting bolt is attached, it is preferable that the right edge of the first guard rail body, the left side of the second guard rail body and right edge Two mounting holes of connecting bolt are equipped with the upper, left side of scalable guard rail body, so as to of the invention first be prevented Guardrail body, the second guard rail body and scalable guard rail body is firm connects as one, while being connected using connecting bolt Connect, convenient dismounting is realized while ensureing that integrated connection is firm and is installed, circulating repetition is used, beneficial to civilized construction, tool There are more preferable social benefit and environmental benefit.
Embodiment 2
A kind of installation method of comprehensive floor periphery guard rail, including step:
A:The comprehensive floor peripheral length of measurement:Each comprehensive floor peripheral length is measured, according to each segment length chi The very little width for determining comprehensive floor periphery guard rail;
B:Make comprehensive floor periphery guard rail:According to comprehensive floor peripheral length, make and carry scalable guard rail sheet The comprehensive floor periphery guard rail of body;
C:It is determined that fixed synthesis floor periphery guard rail installation site:Height according to comprehensive floor periphery guard rail is in building The installation site of fixed synthesis floor periphery guard rail is determined on laminate, wall or post;
D:Comprehensive floor periphery guard rail is installed:Drilled in installation site, protected comprehensive floor periphery by bolt Column is fixed in installation site.
Further improvement is that a diameter of 12-16 millimeters drilled described in the step D, hole depth is 80-100 millimeters, comprehensive The height for closing floor periphery guard rail is 1.2-1.4 meters.
In order to play more preferable protective action, the height of comprehensive floor periphery guard rail of the invention is set as 1.2- 1.4 meters.
Guard rail of the invention is fixed in the hole that hole depth is 80-100 millimeters by bolt, so that of the invention anti- Guardrail is more firm to be fixed on the post on comprehensive floor periphery or wall, so that there is guard rail of the invention stronger protection to imitate Convenient dismounting and installation, use beneficial to repetitive cycling while fruit, so as to economize on resources, produce preferable social benefit and environment Benefit.
Further improvement is to scribble paint red and white on the comprehensive floor periphery guard rail.
In order to play a part of preferably protection and attractive in appearance and highlight indication, set red white on guard rail of the invention Alternate paint, so as to play warning while protection is played a part of.
Specifically, step is as follows:A:The comprehensive floor peripheral length of measurement;Each comprehensive floor peripheral length is surveyed Amount, the specification of the comprehensive floor periphery guard rail of configuration is determined according to each segment length size;B:Make comprehensive floor periphery guard rail: Manufacture and design guard rail of the invention and connecting bolt using angle steel, quarter bend, steel wire etc.;Use the angle steel of 25-40mm, 25- 40mm square shaped pipes, steel wire, 3-5mm steel plates, manufacture and design 1-2m wide, the guard rail of height 1.2mm-1.4mm, and apply red White alternate paint;It is inept to each segment length, using scalable guard rail body configure reach length collocation will Ask;In order to meet the length of the comprehensive each shield segment in floor periphery, width-telescopic ratio is designed and produced for ± 10% scalable protection Column body;C:It is determined that fixed synthesis floor periphery guard rail installation site:Height according to comprehensive floor periphery guard rail is in building The installation site of fixed synthesis floor periphery guard rail is determined on laminate, wall or post;D:Comprehensive floor periphery guard rail is installed: On floor face and at wall, post fixed position line, electric hammer drill Φ 12- Φ 16mm holes, the fixing hole of hole depth 80-100mm, in peace are used Drilled on holding position, comprehensive floor periphery guard rail is fixed in installation site by bolt.Guard rail of the invention is used After finishing, guard rail is first removed, then tear special fixing bolt open, used in next engineering.Recycle again of the invention anti- During guardrail, the paint red and white to damaging carries out touch-up paint.
Record according to this specification can preferably realize technical scheme.

Claims (10)

1. a kind of comprehensive floor periphery guard rail, it is characterised in that including the first guard rail body, the second guard rail body and can Collapsible protective grill body;The one of the side of the first guard rail body, the second guard rail body and scalable guard rail body Side is detachably connected successively;The opposite side of the first guard rail body passes through bolt with first post or wall on comprehensive floor periphery Connection;The floor near synthesis floor of the first guard rail body, the second guard rail body and scalable guard rail body The side of plate is bolted with the floor plates of the comprehensive floor;The opposite side and synthesis of the scalable guard rail body Second post or wall on floor periphery are bolted.
2. comprehensive floor periphery guard rail according to claim 1, it is characterised in that if the second guard rail body is Dry, the second adjacent guard rail body is mutually detachably connected into the second guard rail;The side of second guard rail and institute The side for stating the first guard rail body is detachably connected;The opposite side of second guard rail and the one of scalable guard rail body Side is detachably connected;Second guard rail leads near the side of the floor plates of synthesis floor with the floor plates of the comprehensive floor Cross bolt connection.
3. comprehensive floor periphery guard rail according to claim 1, it is characterised in that the scalable guard rail body bag Include the 3rd guard rail body and the 4th guard rail body, the side of the 3rd guard rail body and the one of the 4th guard rail body Slideslip is connected;The opposite side of the 3rd guard rail body is detachably connected with the opposite side of the second guard rail;Described 4th The opposite side of guard rail is bolted with second post or wall on comprehensive floor periphery.
4. comprehensive floor periphery guard rail according to claim 3, it is characterised in that phase on the 3rd guard rail body To both sides be provided with slide protrusion part, the 4th guard rail body is provided with the slide rail slided for slide protrusion part, institute The 3rd guard rail body is stated to be slidably connected by slide protrusion part and slide rail.
5. comprehensive floor periphery guard rail according to claim 1, it is characterised in that the one of the first guard rail body Side, the second guard rail body and scalable guard rail body are connected by connecting bolt.
6. comprehensive floor periphery guard rail according to claim 2, it is characterised in that the second adjacent guard rail body leads to Cross connecting bolt connection.
7. the comprehensive floor periphery guard rail according to claim 5 or 6, it is characterised in that the connecting bolt is by Screw rod and two nut compositions.
8. a kind of installation method of the comprehensive floor periphery guard rail described in claim 1-6 any one, it is characterised in that bag Include step:
A:The comprehensive floor peripheral length of measurement:Each comprehensive floor peripheral length is measured, it is true according to each segment length size The width of fixed synthesis floor periphery guard rail;
B:Make comprehensive floor periphery guard rail:According to comprehensive floor peripheral length, make with scalable guard rail body Comprehensive floor periphery guard rail;
C:It is determined that fixed synthesis floor periphery guard rail installation site:Height according to comprehensive floor periphery guard rail is in floor The installation site of fixed synthesis floor periphery guard rail is determined on plate, wall or post;
D:Comprehensive floor periphery guard rail is installed:Drilled in installation site, consolidated comprehensive floor periphery guard rail by bolt It is scheduled in installation site.
9. the installation method of comprehensive floor periphery guard rail according to claim 8, it is characterised in that the step D institutes State drilling a diameter of 12-16 millimeters, hole depth is 80-100 millimeters, and the height of comprehensive floor periphery guard rail is 1.2-1.4 meters.
10. the installation method of comprehensive floor periphery guard rail according to claim 8, it is characterised in that the complex building Paint red and white is scribbled on the guard rail of layer periphery.
CN201710087406.1A 2017-02-17 2017-02-17 Comprehensive floor periphery guard rail and installation method Pending CN106760586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710087406.1A CN106760586A (en) 2017-02-17 2017-02-17 Comprehensive floor periphery guard rail and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710087406.1A CN106760586A (en) 2017-02-17 2017-02-17 Comprehensive floor periphery guard rail and installation method

Publications (1)

Publication Number Publication Date
CN106760586A true CN106760586A (en) 2017-05-31

Family

ID=58958912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710087406.1A Pending CN106760586A (en) 2017-02-17 2017-02-17 Comprehensive floor periphery guard rail and installation method

Country Status (1)

Country Link
CN (1) CN106760586A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344337A (en) * 2019-08-08 2019-10-18 上海城建预制构件有限公司 A kind of large scale column general operation platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2486988A1 (en) * 1980-07-15 1982-01-22 Claire Jean Claude Guard rail for building sites - has detachable posts and traverses allowing choice of post spacing
CN102822431A (en) * 2010-02-24 2012-12-12 福姆700私人有限公司 Removable barrier for location on an upper portion of a wall
CN203145488U (en) * 2013-02-07 2013-08-21 洛阳明安建设工程有限公司 Limb protective railings of foundation pit and for building construction
CN204663020U (en) * 2015-04-17 2015-09-23 中国十七冶集团有限公司 Assembling temporary protection railing
CN105804424A (en) * 2016-05-31 2016-07-27 中国冶集团有限公司 Near-edge guard railing for building and mounting method of near-edge guard railing
CN206539048U (en) * 2017-02-17 2017-10-03 中国五冶集团有限公司 Comprehensive floor periphery guard rail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2486988A1 (en) * 1980-07-15 1982-01-22 Claire Jean Claude Guard rail for building sites - has detachable posts and traverses allowing choice of post spacing
CN102822431A (en) * 2010-02-24 2012-12-12 福姆700私人有限公司 Removable barrier for location on an upper portion of a wall
CN203145488U (en) * 2013-02-07 2013-08-21 洛阳明安建设工程有限公司 Limb protective railings of foundation pit and for building construction
CN204663020U (en) * 2015-04-17 2015-09-23 中国十七冶集团有限公司 Assembling temporary protection railing
CN105804424A (en) * 2016-05-31 2016-07-27 中国冶集团有限公司 Near-edge guard railing for building and mounting method of near-edge guard railing
CN206539048U (en) * 2017-02-17 2017-10-03 中国五冶集团有限公司 Comprehensive floor periphery guard rail

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344337A (en) * 2019-08-08 2019-10-18 上海城建预制构件有限公司 A kind of large scale column general operation platform

Similar Documents

Publication Publication Date Title
CN106499202B (en) The portable edge protection column of box-type for safety management in construction site
CN106760586A (en) Comprehensive floor periphery guard rail and installation method
CN206539048U (en) Comprehensive floor periphery guard rail
CN106760585A (en) China Democratic National Construction Association house floor levels hole provisional protection column and installation method
CN203271166U (en) Temporary protective guard for elevator shaft door opening
CN203145488U (en) Limb protective railings of foundation pit and for building construction
CN202157581U (en) Foundation-pit limb shaping protection device
CN210714402U (en) Quick detachable faces limit entrance to a cave guard gate
CN205908105U (en) Electric power facility rail guard
CN201714103U (en) Continuously recyclable edge protection structure
CN203393929U (en) Adjustable temporary protective barrier for stairs
CN202644967U (en) Scaffold tool type wall connecting piece
CN206319567U (en) Cabin hangs inside formula scaffold
CN205976582U (en) Safety protection fence
CN203808539U (en) Protective barrier
CN203977844U (en) A kind of for the fixing steel pipe iron wire fastener of building trade
CN203729852U (en) Assembly type construction site door
CN201261947Y (en) Assembly type escape way
CN209353765U (en) Mobile edge protection
CN203742263U (en) Fencing framework connection structure
CN211473665U (en) Novel assembled steel-wood composite enclosure
CN203961323U (en) Quick lap joint formula guard system
CN209585709U (en) A kind of detachable fire-fighting exhibition booth
CN205637149U (en) Assembled protection canopy of activity board house
CN204174919U (en) Scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531