CN106760451B - Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof - Google Patents

Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof Download PDF

Info

Publication number
CN106760451B
CN106760451B CN201611023019.3A CN201611023019A CN106760451B CN 106760451 B CN106760451 B CN 106760451B CN 201611023019 A CN201611023019 A CN 201611023019A CN 106760451 B CN106760451 B CN 106760451B
Authority
CN
China
Prior art keywords
platform
clinch
staircase
support
discharging platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611023019.3A
Other languages
Chinese (zh)
Other versions
CN106760451A (en
Inventor
傅宇
都毅
陈适
王炳
秦红
高昌权
张宇
刘明俊
刘宇洪
刘聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction Engineering No 7 Construction Engineering Co Ltd
Chengdu Construction Industry Group Co Ltd
Original Assignee
Chengdu Construction Engineering No 7 Construction Engineering Co Ltd
Chengdu Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction Engineering No 7 Construction Engineering Co Ltd, Chengdu Construction Industry Group Co Ltd filed Critical Chengdu Construction Engineering No 7 Construction Engineering Co Ltd
Priority to CN201611023019.3A priority Critical patent/CN106760451B/en
Publication of CN106760451A publication Critical patent/CN106760451A/en
Application granted granted Critical
Publication of CN106760451B publication Critical patent/CN106760451B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G27/00Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/15Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
    • E04G2001/156Stackable platforms

Abstract

The invention discloses a kind of assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof, the mounting tool type stair in the elevator of the assembled architecture, for for the channel above and below construction personnel, in the staircase of the assembled architecture, before the precast stair of corresponding floor does not lift placement, collapsible operation and discharging platform are hung to respective storey in staircase, the both ends of the collapsible operation and discharging platform are overlapped on the corresponding terraced beam of precast stair, for for workpiece turnover and operating platform.The present invention utilizes the space of elevator and staircase, vertical staircase structure is set in elevator, by elevator using as the construction channel of building, collapsible operation and discharging platform are overlapped on the corresponding terraced beam of precast stair in staircase simultaneously, by staircase using as the turnover space of architectural workpieces, not only the requirement of assembled arthitecutral structure beauty green construction had been met, but also has solved the problems, such as the upper and lower and workpiece turnover of construction personnel.

Description

Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting Combination constructing method thereof
Technical field
The invention belongs to technical field of building construction, in particular to a kind of assembled architecture is constructed collapsible operation and discharging The combination constructing method thereof of platform and tool type stairs lifting.
Background technique
In traditional construction, the channel of construction personnel and the discharging of workpiece are along external wall and set up overhanging Frame uses integral lifting rack, and sets up discharging platform on suspension scaffold and connect upper layer built-in fitting with wirerope.But it is filling With in formula construction, since external wall is precast shear wall, can not later period aperture on the wall, therefore can not be outer in building Wall sets up the suspension scaffold construction channel interim as construction personnel and discharging platform, and when the form of construction work of use precast stair, Precast stair is all then precast stair to be hung to corresponding position after the construction of the overall structure of corresponding floor and carries out construction peace Dress then causes after eliminating external climbing frame as construction channel, in this way according to the form of construction work of precast stair, so that not having The construction channel of operator, and in existing building construction the escalator of construction building be by the way of closed protective, To avoid personnel's falling accident, while needing to have enough to meet the need lot of materials in construction, if building is outer can not to set up discharging platform, Also resulting in workpiece can not be had enough to meet the need.
Summary of the invention
It is an object of the invention to: in view of the above problems, providing one kind can make full use of building elevator work For the construction channel of construction personnel, while the assembled architecture for utilizing staircase to carry out architectural workpieces turnover is constructed collapsible operation And the combination constructing method thereof of discharging platform and tool type stairs lifting.
The technical scheme of the present invention is realized as follows: the collapsible operation of assembled architecture construction and discharging platform and tool The combination constructing method thereof of formula stair lifting, it is characterised in that: the mounting tool type stair in the elevator of the assembled architecture, For in the staircase of the assembled architecture, not hung in the precast stair of corresponding floor for the channel above and below construction personnel Before dress is placed, collapsible operation and discharging platform are hung to respective storey in staircase, the collapsible operation and discharging are flat The both ends of platform are overlapped on the corresponding terraced beam of precast stair, for for workpiece turnover and operating platform.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method, the tool type stairs include structural framing and stair assembly, and the structural framing is by upright bar and cross bar group At the concrete construction method that the tool type stairs are installed in the elevator of assembled architecture is:
Firstly, preburied component is installed in advance before elevator casting concrete, and if being installed from one layer or basement, correction It can be installed after the structural framing of tool type stairs;If being installed from two layers, first vertically it is laid at least in elevator with lift port The upright bar of three I-steel, the I-steel and tool type stairs is corrected in same plane, then displacement structure frame;
Secondly, the company's wall member being arranged on structural framing and the preburied component being arranged in elevator are correspondingly connected with, and Staircase boards, half space and guard rail are installed on structural framing;
Finally, stair assembly is connected and fixed with structural framing, the stair assembly forms construction in elevator Channel.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method, the even wall member are made of attachment base and positioning pin, and the attachment base is fixedly connected with structural framing, described Positioning pin is vertically arranged and upper end is fixedly connected with attachment base, and the preburied component is by fixing piece and support ear board group at institute It states fixing piece to be embedded in the concrete walls of elevator, the support otic placode is fixedly connected with fixing piece and is placed in elevator coagulation Outside cob wall, it is provided with jack on the support otic placode, when installation, the positioning pin of the even wall member is inserted into support from top to bottom The attachment base of the jack of otic placode, the even wall member is placed in the upper surface of support otic placode.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method, the collapsible operation and discharging platform include stacking platform, are symmetrically arranged at the stacking platform both ends There is foldable clinch hinged therewith, collapsible operation and discharging platform is hung in staircase by tower crane, when the folding When stacked operation and discharging platform are in hoisting process, the foldable clinch at the stacking platform both ends is naturally drooped, and works as institute Collapsible operation and discharging platform are stated when being hung to respective storey in staircase, the foldable overlap at the stacking platform both ends Be not overlapped on the corresponding terraced beam of precast stair, the foldable clinch at the stacking platform and its both ends collectively form operation and Discharging table top.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method is respectively welded platform support in the two sides of the bottom edge of the stacking platform, foldable takes described The two sides of the bottom edge of socket part is respectively welded clinch supporting element corresponding with platform support, as the collapsible behaviour When work and discharging platform are overlapped on terraced beam, the clinch supporting element at the platform support and its both ends is on the same line.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method is provided with installation site adjustably limiter in clinch supporting element bottom, when the stacking platform two When the foldable clinch at end is overlapped on the corresponding terraced beam of precast stair, limiter is mounted on clinch supporting element and is made Limiter is born against at the inner side end of corresponding terraced beam.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method, the stacking platform are spliced by two parts platform structure, on the two sides of the bottom side of every Partial flats structure Platform support is provided at edge, every Partial flats structure both ends are cut with scissors with the foldable clinch of corresponding width respectively It connects, is provided with clinch supporting element in the two sides of the bottom edge of the foldable clinch of correspondence, the protective fence setting exists The upper outside edge of two parts platform structure, lift staircase in one side precast stair when, staircase another side after Continue and puts operation and discharging platform for taking.
Assembled architecture of the present invention construct it is collapsible operation and discharging platform and tool type stairs lifting combination Construction method is provided with folding end fixator, the folding in the hinged place lower part of the stacking platform and foldable clinch Folded end fixator includes that platform support and fixing seat and support bolt on clinch supporting element is arranged in, in the support It has been disposed radially positioning protrusion on bolt, has been provided with the positioning groove with positioning protrusion corresponding matching on the fixing seat, When the foldable clinch at the stacking platform both ends is overlapped on the corresponding terraced beam of precast stair, support bolt is inserted into At fixing seat, and positioning protrusion is placed in corresponding positioning groove by rotational support bolt, make the support bolt and consolidate Reservation is cooperatively connected and guarantees that support bolt will not move, and left and right two parts of the support bolt are respectively used to support heap It is laid flat platform and foldable clinch;After to floor overall structure construction, then by the collapsible operation and discharging of staircase Platform is hung, and the precast stair of the floor is finally hung in staircase and carries out construction and installation.
Vertical staircase structure is arranged using the space of elevator and staircase in the present invention in elevator, by elevator benefit It is used as the construction channel of building, while collapsible operation and discharging platform are overlapped on the corresponding ladder of precast stair in staircase Liang Shang had both met assembled arthitecutral structure beauty green construction by staircase using as the turnover space of architectural workpieces It is required that and solve the problems, such as the upper and lower and workpiece turnover of construction personnel, especially suitable for industrialization assembled architecture construction.
Detailed description of the invention
Fig. 1 and 2 is the structural schematic diagram of tool type stairs in the present invention.
Fig. 3 is the partial enlarged view at company's wall member of tool type stairs in the present invention.
Fig. 4 is company's wall member of tool type stairs in the present invention and the partial enlarged view of preburied component junction.
Fig. 5 and Fig. 6 is the structural schematic diagram of collapsible operation and discharging platform in the present invention.
Fig. 7 is the main view of Fig. 5.
Fig. 8 is the structural schematic diagram of the folding end fixator of collapsible operation and discharging platform in the present invention.
Marked in the figure: 1 is structural framing, 1a is upright bar, and 1b is cross bar, and 1c is scissors strut, and 2 are for even wall member, 2a Attachment base, 2b are positioning pin, and 3 be preburied component, and 3a is fixing piece, and 3b is support otic placode, and 4 be staircase boards, and 5 be half space, 6 It is extension for leak preventing, 7,8 be guard rail, and 9 be stacking platform, and 10 be foldable clinch, and 11 be terraced beam, and 12 be flat Platform supporting element, 13 be clinch supporting element, and 14 be protective fence, and 15 be articulation piece, and 16 be limiter, and 17 fix for folded end Device, 18 be fixing seat, and 19 be support bolt, and 20 be positioning protrusion, and 21 be positioning groove.
Specific embodiment
With reference to the accompanying drawing, the present invention is described in detail.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
As shown in figures 1-8, a kind of assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting Combination constructing method thereof, specifically: the mounting tool type stair in the elevator of the assembled architecture, for for construction personnel Under channel before the precast stair of corresponding floor does not lift placement, will be folded in the staircase of the assembled architecture Formula operation and discharging platform are hung to respective storey in staircase, and the both ends of the collapsible operation and discharging platform are overlapped on prefabricated On the corresponding terraced beam of stair, for for workpiece turnover and operating platform.
As illustrated in fig. 1 and 2, the tool type stairs include that structural framing 1 and the stair connecting with structural framing 1 are total At the structural framing 1 is made of upright bar 1a and cross bar 1b, and the cross bar 1b is connect with upright bar 1a, horizontal in adjacent upper layer and lower layer Scissors strut 1c is provided between bar, support and vertical bearing load are played the role of in upright bar, and cross bar plays connection and shares load Effect, scissors strut play the role of improve frame body stability, the upright bar 1a use multisection type splicing construction, adjacent two In section upright bar rod piece, the anchored end that the tail portion of the preceding paragraph upright bar rod piece is inserted vertically into next section of upright bar rod piece upper end is fixed, It must not exceed 50% connector rate according to the same section of code requirement;1 periphery of structural framing is provided with multiple even wall members 2, The preburied component 3 with even 2 corresponding matching of wall member is embedded in the elevator, the tool-type vertical traffic stair pass through Multiple even wall members 2 are connected with corresponding preburied component 3 respectively and are mounted in elevator, and the elevator is provided with I-shaped Steel, the structural framing 1 are mounted on I-steel, and the stair assembly forms construction channel in elevator.
Wherein, the stair assembly is made of several stairway units, and the stairway unit is applied as the upper and lower of construction personnel Work channel, each stairway unit Corresponding matching first floor, each stairway unit include staircase boards 4 and half space 5, described Staircase boards 4 and half space 5 are connect with structural framing 1 respectively, and the half space 5 is arranged between adjacent staircase boards 4, each In the corresponding stairway unit of floor, the staircase boards 4 of bottom extend to its corresponding lower layer's floor and extension 7 is taken and is placed on correspondence On lower layer's floor, the upper layer floor that the staircase boards 4 of the top are corresponding is flushed, and 4 side of staircase boards is elevator inner wall, Its other side is provided with guard rail 8, and the staircase boards 4 and half space 5 are detachable by bolt and structural framing 1 respectively Ground assembly connection;Object strike accident is caused to prevent the gap of tool or material between stair and elevator from falling, institute It states and is provided with leak preventing 6 at the gap between 5 periphery of half space and elevator inner wall, the leak preventing 6 and rest are flat 5 corresponding sides edge of platform is hinged.
As shown in Figures 3 and 4, the even wall member 2 is made of attachment base 2a and positioning pin 2b, and the attachment base 2a is fixed to be connected It connects on upright bar 1a, the positioning pin 2b is vertically arranged and upper end is fixedly connected with attachment base 2a, and the preburied component 3 is by solid Determine part 3a and support otic placode 3b composition, the fixing piece 3a is embedded in the concrete walls of elevator, the support otic placode 3b and Fixing piece 3a is fixedly connected and is placed in outside elevator concrete walls, is provided with jack on the support otic placode 3b, when installation, institute The positioning pin 2b of the company's of stating wall member 2 is inserted into the jack of support otic placode 3b from top to bottom, and the attachment base 2a of the even wall member 2 is placed in Support the upper surface of otic placode 3b.The even wall member is vertically spaced corresponding arrangement with preburied component along stair, passes through even wall member It with the connection of preburied component, can guarantee that stair will not free shaking in elevator, guarantee that stair are steady in elevator shaft safety Fixed use.
In the present invention, the concrete construction method that the tool type stairs are installed in the elevator of assembled architecture is:
Firstly, preburied component is installed in advance before elevator casting concrete, and if being installed from one layer or basement, correction It can be installed after the structural framing of tool type stairs;If being installed from two layers, first vertically it is laid at least in elevator with lift port The upright bar of three I-steel, the I-steel and tool type stairs is corrected in same plane, then displacement structure frame.
Secondly, the company's wall member being arranged on structural framing and the preburied component being arranged in elevator are correspondingly connected with, and Staircase boards, half space and guard rail are installed on structural framing.
Finally, stair assembly is connected and fixed with structural framing, the stair assembly forms construction in elevator Channel.
As shown in Fig. 5,6 and 7, the collapsible operation and discharging platform include stacking platform 9, in the stacking platform 9 Top two sides are provided with protective fence 14, and the protective fence 14 is constituted with stacking platform 9 stacks space, in the stacking platform 9 both ends are symmetrically provided with foldable clinch 10 hinged therewith, distinguish in the two sides of the bottom edge of the stacking platform 9 It is welded with platform support 12, is respectively welded and platform support in the two sides of the bottom edge of the foldable clinch 10 12 corresponding clinch supporting elements 13, the platform support 12 and clinch supporting element 13 are I-steel, the stacking 9 both ends of platform pass through articulation piece 15 respectively and connect with foldable clinch 10, and the articulation piece 15 includes two to be hinged A connecting plate, the other end of described two connecting plates are connect with platform support 12 and clinch supporting element 13 respectively, the hinge Fitting 15 is whole V-shaped.
Collapsible operation and discharging platform are hung in staircase by tower crane, when the collapsible operation and discharging platform When in hoisting process, the foldable clinch 10 at 9 both ends of stacking platform is naturally drooped, and when the collapsible operation and is unloaded When material platform is hung to respective storey in staircase, the foldable clinch 10 at 9 both ends of stacking platform is overlapped on prefabricated respectively On the corresponding terraced beam 11 of stair, the clinch supporting element 13 at the platform support 12 and its both ends on the same line, i.e., this When stacking platform and foldable clinch be in same plane, the foldable clinch 10 at the stacking platform 9 and its both ends is total to With composition operation and discharging table top.The operation and discharging platform structure and traditional method are entirely different, both without built-in fitting or have not had There is wirerope.
In order to guarantee that operation and discharging platform snap into terraced Liang Shanghou, and in the case where bearing certain load, heap is laid flat Platform does not deform with foldable clinch hinged place, 12 both ends of the surface of platform support and corresponding clinch supporting element 13 End face is cooperated using bevel structure, i.e., corresponds to when the foldable clinch 10 at 9 both ends of stacking platform is overlapped on precast stair Terraced beam 11 on when, end face of the both ends of the surface of the platform support 12 respectively with clinch supporting element 13 is bonded to each other, and is passed through Platform support 12 both ends bevel structure limitation clinch supporting element 13 further rotate, with guarantee stacking platform with it is foldable Clinch remains at same plane.
In order to avoid operation and discharging platform snap into terraced Liang Shanghou, displacement is generated in the horizontal direction, in the overlap joint Supporting element 13 bottom in portion's is provided with installation site adjustably limiter 16, when the foldable clinch at 9 both ends of stacking platform 10 when being overlapped on the corresponding terraced beam 11 of precast stair, and limiter 16 is mounted on clinch supporting element 13 and makes limiter 16 It bears against at the inner side end of corresponding terraced beam 11, so that operation and discharging platform realize positioning in the horizontal direction.
In the present embodiment, the stacking platform 9 is spliced by two parts platform structure, in every Partial flats structure Two sides of the bottom edge is provided with platform support 12, and every Partial flats structure both ends are rolled over corresponding width respectively It is hinged to be stacked with socket part 10, is provided with clinch supporting element 13, institute in the two sides of the bottom edge of the foldable clinch 10 of correspondence State the upper outside edge that two parts platform structure is arranged in protective fence 14.In staircase, between adjacent two layers building Stair generally use left and right two parts stair composition, by the way that stacking platform is designed as two parts, in lifting staircase on one side Precast stair when, staircase another side, which continues on for taking, puts operation and discharging platform.
It is fixed as shown in figure 8, being provided with folded end in the hinged place lower part of the stacking platform 9 and foldable clinch 10 Device 17, it is described fold end fixator 17 include the fixing seat 18 that is arranged in platform support 12 and clinch supporting element 13 and Support bolt 19, be disposed radially positioning protrusion 20 on the support bolt 19, be provided in the fixing seat 19 and The positioning groove 21 of 20 corresponding matching of positioning protrusion, when the foldable clinch 10 at 9 both ends of stacking platform be overlapped on it is prefabricated When on the corresponding terraced beam 11 of stair, support bolt 19 is inserted at fixing seat 18, and make to position by rotational support bolt 19 Protrusion 20 is placed in corresponding positioning groove 21, so that the support bolt 19 is cooperatively connected with fixing seat 18 and is guaranteed support bolt 19 will not move, or even the phenomenon that fall off, and left and right two parts of the support bolt 19 are respectively used to support stacking platform 9 It is effectively avoided with foldable clinch 10 so that the hinged place further progress to stacking platform and foldable clinch supports When foldable clinch is opened, and the problem of deform after by compared with big load, guarantee operation and discharging platform Safety in utilization.
When construction, first collapsible operation and discharging platform are lifted to staircase, and snap into the corresponding ladder of precast stair Liang Shang is finished to be carried out the turnover of construction workpiece using collapsible operation and discharging platform to floor overall structure construction Afterwards, then by the operation of staircase and discharging platform it hangs, the precast stair of the floor is finally hung in into staircase and carries out construction peace Dress.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (7)

  1. The combination constructing method thereof of collapsible operation and discharging platform and tool type stairs lifting 1. assembled architecture is constructed, feature It is: the mounting tool type stair in the elevator of the assembled architecture, for for the channel above and below construction personnel, described In the staircase of assembled architecture, before the precast stair of corresponding floor does not lift placement, collapsible operation and discharging are put down Platform is hung to respective storey in staircase, and the both ends of the collapsible operation and discharging platform are overlapped on the corresponding terraced beam of precast stair On, for for workpiece turnover and operating platform, it is described it is collapsible operation and discharging platform include stacking platform, in the stacking Platform both ends are symmetrically provided with foldable clinch hinged therewith, are hung to collapsible operation and discharging platform by tower crane In staircase, when it is described it is collapsible operation and discharging platform in hoisting process when, the foldable of stacking platform both ends is taken Socket part naturally droops, when it is described it is collapsible operation and discharging platform be hung to respective storey in staircase when, the stacking platform two The foldable clinch at end is overlapped on respectively on the corresponding terraced beam of precast stair, and the stacking platform and its foldable of both ends are taken Socket part collectively forms operation and discharging table top.
  2. 2. assembled architecture according to claim 1 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: the tool type stairs include structural framing and stair assembly, the structural framing by Upright bar and cross bar composition, the concrete construction method that the tool type stairs are installed in the elevator of assembled architecture is:
    Firstly, preburied component is installed in advance before elevator casting concrete, if installing from one layer or basement, aligning tool It can be installed after the structural framing of formula stair;If installing from two layers, at least three are vertically first laid with lift port in elevator The upright bar of I-steel, the I-steel and tool type stairs is corrected in same plane, then displacement structure frame;
    Secondly, the company's wall member being arranged on structural framing and the preburied component being arranged in elevator are correspondingly connected with, and in structure Staircase boards, half space and guard rail are installed on frame;
    Finally, stair assembly is connected and fixed with structural framing, the stair assembly forms construction channel in elevator.
  3. 3. assembled architecture according to claim 2 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: the even wall member is made of attachment base and positioning pin, the attachment base and structural framing It is fixedly connected, the positioning pin is vertically arranged and upper end is fixedly connected with attachment base, and the preburied component is by fixing piece and branch Support otic placode composition, the fixing piece is embedded in the concrete walls of elevator, the support otic placode be fixedly connected with fixing piece and Be placed in outside elevator concrete walls, be provided with jack on the support otic placode, when installation, the positioning pin of the even wall member from On down insertion support otic placode jack, it is described even wall member attachment base be placed in support otic placode upper surface.
  4. 4. assembled architecture according to claim 1 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: it is respectively welded platform support in the two sides of the bottom edge of the stacking platform, The two sides of the bottom edge of the foldable clinch is respectively welded clinch supporting element corresponding with platform support, when When the collapsible operation and discharging platform are overlapped on terraced beam, the clinch supporting element at the platform support and its both ends exists On same straight line.
  5. 5. assembled architecture according to claim 4 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: clinch supporting element bottom is provided with installation site adjustably limiter, works as institute When stating the foldable clinch at stacking platform both ends and being overlapped on the corresponding terraced beam of precast stair, limiter is mounted on clinch On supporting element and bear against limiter at the inner side end of corresponding terraced beam.
  6. 6. assembled architecture according to claim 4 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: the stacking platform is spliced by two parts platform structure, in every Partial flats structure Two sides of the bottom edge be provided with platform support, every Partial flats structure both ends are rolled over corresponding width respectively It is stacked with that socket part is hinged, clinch supporting element is provided in the two sides of the bottom edge of the foldable clinch of correspondence, described two The upper outside edge of Partial flats structure is provided with protective fence, when lifting the precast stair on one side in staircase, building Another side, which continues on for taking, between ladder puts operation and discharging platform.
  7. 7. assembled architecture according to claim 4 is constructed, collapsible operation and discharging platform and tool type stairs are lifted Combination constructing method thereof, it is characterised in that: the hinged place lower part of the stacking platform and foldable clinch is provided with folded end Fixator, the end fixator that folds includes platform support and fixing seat on clinch supporting element being arranged in and support is inserted Pin, has been disposed radially positioning protrusion on the support bolt, has been provided with match corresponding with positioning protrusion on the fixing seat The positioning groove of conjunction will when the foldable clinch at the stacking platform both ends is overlapped on the corresponding terraced beam of precast stair Support bolt is inserted at fixing seat, and is placed in positioning protrusion in corresponding positioning groove by rotational support bolt, makes institute It states support bolt to be cooperatively connected with fixing seat and guarantee that support bolt will not move, left and right two parts of the support bolt It is respectively used to support stacking platform and foldable clinch;After to floor overall structure construction, then by the folding of staircase Stacked operation and discharging platform are hung, and the precast stair of the floor is finally hung in staircase and carries out construction and installation.
CN201611023019.3A 2016-11-21 2016-11-21 Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof Active CN106760451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611023019.3A CN106760451B (en) 2016-11-21 2016-11-21 Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611023019.3A CN106760451B (en) 2016-11-21 2016-11-21 Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof

Publications (2)

Publication Number Publication Date
CN106760451A CN106760451A (en) 2017-05-31
CN106760451B true CN106760451B (en) 2019-03-26

Family

ID=58968095

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611023019.3A Active CN106760451B (en) 2016-11-21 2016-11-21 Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof

Country Status (1)

Country Link
CN (1) CN106760451B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502235A (en) * 2020-05-13 2020-08-07 中建二局第一建筑工程有限公司 Scaffold mounting device

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107795133B (en) * 2017-11-30 2024-03-22 中建四局第六建筑工程有限公司 Integral protective frame platform and construction method thereof
CN108266000A (en) * 2018-03-29 2018-07-10 常熟市港城不锈钢装饰有限责任公司 Steel structure stairway
CN109057401A (en) * 2018-09-11 2018-12-21 中国建筑第四工程局有限公司 Assembled architecture hoistway regularization protection and vertical passageway device and construction method
CN109138499A (en) * 2018-10-26 2019-01-04 中建五局华东建设有限公司 A kind of precast stair regularization construction protecting rack
CN112554579A (en) * 2020-12-22 2021-03-26 中建四局第六建设有限公司 Movable platform of unloading of assembled building utilization elevator well
CN112854729B (en) * 2021-01-19 2021-09-10 广州峻岭建设有限公司 Building scaffold supporting structure and using method thereof
CN113757020A (en) * 2021-08-31 2021-12-07 国网新源控股有限公司 Water pump turbine overhauls work platform with ring hangs function
CN114108996B (en) * 2021-11-26 2023-06-06 中煤西安设计工程有限责任公司 Construction device and method for building filling wall without floor bricks
CN114263362A (en) * 2021-12-30 2022-04-01 上海建工五建集团有限公司 Assembled stair protection frame and method
CN114991531A (en) * 2022-05-30 2022-09-02 江苏省华建建设股份有限公司 Temporary stair for prefabricated concrete structure and construction method thereof
CN114893002A (en) * 2022-06-22 2022-08-12 中国建筑第二工程局有限公司 Recyclable construction channel structure for lined villas and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002161637A (en) * 2000-11-24 2002-06-04 Alinco Inc Scaffolding board
CN2732897Y (en) * 2004-06-01 2005-10-12 上海市第七建筑有限公司 Lifting platform for elevator hoistway
CN202544410U (en) * 2012-06-29 2012-11-21 重庆一建建设集团有限公司 Assembled type discharging platform
CN202866289U (en) * 2012-09-11 2013-04-10 李大泽 Combined type discharging platform
CN103321397A (en) * 2013-05-03 2013-09-25 武济群 Folding scaffold
CN103422662A (en) * 2013-09-10 2013-12-04 湖南长大建设集团股份有限公司 Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN203821814U (en) * 2014-05-12 2014-09-10 杭州通达集团有限公司 Movable type operation platform device used for lift shaft construction
CN204112696U (en) * 2014-09-23 2015-01-21 河北亿安工程技术股份有限公司 For the electric hoist elevator shaft platform of main building construction
CN205243054U (en) * 2015-12-11 2016-05-18 中建三局第一建设工程有限责任公司 Unwrapping wire entrance to a cave protector
CN205466057U (en) * 2016-04-12 2016-08-17 天津飞恒科技有限公司 Portable automatic device structure platform

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002161637A (en) * 2000-11-24 2002-06-04 Alinco Inc Scaffolding board
CN2732897Y (en) * 2004-06-01 2005-10-12 上海市第七建筑有限公司 Lifting platform for elevator hoistway
CN202544410U (en) * 2012-06-29 2012-11-21 重庆一建建设集团有限公司 Assembled type discharging platform
CN202866289U (en) * 2012-09-11 2013-04-10 李大泽 Combined type discharging platform
CN103321397A (en) * 2013-05-03 2013-09-25 武济群 Folding scaffold
CN103422662A (en) * 2013-09-10 2013-12-04 湖南长大建设集团股份有限公司 Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN203821814U (en) * 2014-05-12 2014-09-10 杭州通达集团有限公司 Movable type operation platform device used for lift shaft construction
CN204112696U (en) * 2014-09-23 2015-01-21 河北亿安工程技术股份有限公司 For the electric hoist elevator shaft platform of main building construction
CN205243054U (en) * 2015-12-11 2016-05-18 中建三局第一建设工程有限责任公司 Unwrapping wire entrance to a cave protector
CN205466057U (en) * 2016-04-12 2016-08-17 天津飞恒科技有限公司 Portable automatic device structure platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502235A (en) * 2020-05-13 2020-08-07 中建二局第一建筑工程有限公司 Scaffold mounting device

Also Published As

Publication number Publication date
CN106760451A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106760451B (en) Assembled architecture construct it is collapsible operation and discharging platform and tool type stairs lifting combination constructing method thereof
AU2017221870B2 (en) Improved frame for climbing screen
CN215291318U (en) Mounting structure of attached lifting scaffold
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
US20210324642A1 (en) Method of erecting a multi-storey structure and facade
US20130263549A1 (en) Safety screen system for steel erection work
CN105926918A (en) Foldable elevator shaft operation steel platform device and erecting method
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
JP4247851B2 (en) How to use a climbing crane
CN210659200U (en) High-rise building elevator shaft operation platform
CN106401210A (en) Tool type vertical traffic stair for assembled building elevator shaft
AU2008323613A1 (en) Perimeter screening system
CN206205488U (en) The vertical traffic stair of assembled architecture elevator tool-type
CN215670931U (en) Operating platform for steel structure elevator
JP2004044298A (en) Built-up scaffolding and method of building up the same
CN212671301U (en) Movable construction safety steel stair for assembly type building stairwell
CN216840490U (en) Multi-functional platform of assembly type structure stairwell
CN116335398B (en) Multilayer rapid construction method
CN219548345U (en) PC stairwell construction formwork protection platform
CN116181041B (en) Building machine of multilayer quick construction
JP2690822B2 (en) Steel construction method for low-rise buildings
CN211369648U (en) Temporary transfer hoisting and moving stair supporting system for mounting prefabricated reinforced concrete stairs
CN211647403U (en) Steel gallery integral lifting high-altitude translation installation safety protection structure
EP1941114A2 (en) Overhead beam assembly
CN117211535A (en) Construction method for building cantilever scaffold free of core tube structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 610031 No. 111 Babao Street, Qingyang District, Chengdu City, Sichuan Province

Applicant after: Chengdu Construction Industry Group Co., Ltd.

Applicant after: Chengdu Construction Engineering No. 7 Construction Engineering Co., Ltd.

Address before: 610031 No. 111 Babao Street, Qingyang District, Chengdu City, Sichuan Province

Applicant before: Chengdu Construction Engineering Group Corp.

Applicant before: Chengdu No.7 Construction Engineering Co., Ltd.

GR01 Patent grant