CN106760071A - A kind of 3D printing wall and preparation method thereof - Google Patents
A kind of 3D printing wall and preparation method thereof Download PDFInfo
- Publication number
- CN106760071A CN106760071A CN201611085705.3A CN201611085705A CN106760071A CN 106760071 A CN106760071 A CN 106760071A CN 201611085705 A CN201611085705 A CN 201611085705A CN 106760071 A CN106760071 A CN 106760071A
- Authority
- CN
- China
- Prior art keywords
- metope
- main body
- suspension ring
- printing
- inlet part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
Abstract
The invention discloses a kind of 3D printing wall, the main body that 3D printing is made is included, the 3D printing wall also includes inlet part and suspension ring;The inlet part is arranged at the body interior;The inlet part is fixedly connected with the main body;The suspension ring are connected with the inlet part.The invention also discloses a kind of preparation method of 3D printing wall, 3D printing wall can be produced using the method.3D printing wall fastness is strong, easily lifting.
Description
Technical field
The present invention relates to build making field, more particularly to a kind of 3D printing wall and preparation method thereof.
Background technology
With science and technology and the development of urbanization, construction area is continuously increased.Assembling is produced, because its speed of application is fast,
The low advantage of cost, occupies certain share in construction market, is also the developing direction of construction in future.
The wall hoisting difficulty that prior art is made is high.
The content of the invention
A kind of defect it is an object of the invention to overcome prior art, there is provided 3D printing wall and preparation method thereof, solution
Certainly the problems of the prior art.
To solve the above problems, the invention discloses following first technical scheme:A kind of 3D printing wall, includes 3D and beats
The main body being printed to,
The 3D printing wall also includes inlet part and suspension ring;
The inlet part is arranged at the body interior;
The inlet part is fixedly connected with the main body;
The suspension ring are connected with the inlet part.
Used as the further improvement of above-mentioned technical proposal, the inlet part is reinforcing bar.
Used as the further improvement of above-mentioned technical proposal, the suspension ring include anchored end and lifting end;
The anchored end is fixedly connected with the lifting end;
The anchored end is connected with the inlet part;
Loop configuration is provided with the lifting end;
The lifting end is arranged at outside the main body.
Used as the further improvement of above-mentioned technical proposal, the main body is provided with multiple suspension ring.
Used as the further improvement of above-mentioned technical proposal, the quantity of the suspension ring is even number;
The structure of the main body is symmetrical structure.
Used as the further improvement of above-mentioned technical proposal, the main body includes the first metope and the second metope;
Casting space is formed between first metope and second metope.
Used as the further improvement of above-mentioned technical proposal, the main body also includes truss;
The truss is arranged in the casting space;
The truss is connected with first metope;
The truss is connected with second metope.
Used as the further improvement of above-mentioned technical proposal, the structure of first metope is symmetrical structure;
The structure of second metope is symmetrical structure.
Used as the further improvement of above-mentioned technical proposal, first metope is parallel to each other with second metope.
To solve the above problems, the invention discloses following second technical scheme:A kind of preparation method of 3D printing wall,
The 3D printing wall includes inlet part and suspension ring, and the preparation method comprises the following steps:
Main body is printed by 3D technology, wherein, the main body includes the first metope, the second metope and truss;
The truss is set between first metope and second metope, wherein, the truss and described first
Metope is connected, and the truss is connected with second metope;
Casting space is formed between first metope and second metope;
The inlet part is connected with the suspension ring;
The inlet part is placed in the casting space formed between first metope and the second metope;
The casting concrete in the casting space.
The beneficial effects of the invention are as follows:The present invention proposes a kind of 3D printing wall and preparation method thereof, using the present invention
The 3D printing wall fastness that the preparation method of proposition is made by force, is easily lifted.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, with reference to the accompanying drawings in conjunction with specific embodiments to this
Invention is further described.It should be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore it is not to be seen as
It is the restriction to scope, for those skilled in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 a are a kind of schematic diagram of 3D printing wall in the embodiment of the present invention 1;
Fig. 1 b are the top view of Fig. 1 a in the embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of inlet part in the embodiment of the present invention;
Fig. 3 is a kind of schematic diagram of suspension ring in the embodiment of the present invention 1;
Fig. 4 is the partial schematic diagram of 3D printing wall in the embodiment of the present invention 1;
Fig. 5 be Fig. 4 in A to sectional view;
Fig. 6 be Fig. 4 in B to sectional view;
Fig. 7 is the schematic diagram of the first metope and the second metope in the embodiment of the present invention 1;
Fig. 8 is the lifting schematic diagram of 3D printing wall in the embodiment of the present invention 1;
Fig. 9 a are a kind of schematic diagram of 3D printing wall in the embodiment of the present invention 2;
Fig. 9 b are the top view of Fig. 9 a in the embodiment of the present invention;
Figure 10 is a kind of schematic diagram of suspension ring in the embodiment of the present invention 2;
Figure 11 is the partial schematic diagram of 3D printing wall in the embodiment of the present invention 2;
Figure 12 is the A of Figure 11 to sectional view;
Figure 13 is the B of Figure 11 to sectional view;
Figure 14 is the schematic diagram of the first metope and the second metope in the embodiment of the present invention 2;
Figure 15 is the lifting schematic diagram of 3D printing wall in the embodiment of the present invention 2.
Main element symbol description:
100-3D prints wall;1100- main bodys;1200- inlet parts;1300th, 1400- suspension ring;The metopes of 1101- first;
The metopes of 1102- second;1103- truss;1301- anchored ends;1302- lifts by crane end;1303- is latched;1304- steel bushings;2001- coagulations
Soil.
Specific embodiment
Below with reference to the accompanying drawing for showing the embodiment of the present invention, the present invention is hereinafter described more fully.But,
The present invention can occur with many different forms, and should not be construed as being limited to the embodiments set forth herein, by implementing
Example, the present invention becomes more complete;Conversely, these embodiments for providing by way of example are so that the disclosure is by model of the invention
Enclose and convey to those skilled in the art of the present technique.Additionally, identical numeral represents same or similar element or part all the time.
In the present invention, one of ordinary skill in the art is it is to be appreciated that indicating position or position relationship in text
Term be based on orientation shown in the drawings or position relationship, be for only for ease of description the present invention and simplify describe, without
Be indicate or imply meaning device or element must have specific orientation, with specific azimuth configuration and operation, therefore
It is not considered as limiting the invention.
In the present invention, unless otherwise clearly regulation and definition, the term such as " installation ", " connection ", " fixation " should do extensively
Reason and good sense solution, for example, it may be being fixedly connected, can also be detachably connected or be integrally connected;Can mechanically connect,
It can also be electrical connection;Can be directly connected to, also can be by intermediary and be indirectly connected to;Can be two element internals
Connection.For the ordinary skill in the art, can as the case may be understand above-mentioned term in the present invention
Concrete meaning.
In the present invention, unless otherwise clearly regulation and define, all technologies used herein and scientific terminology with
Belong to the implication that those skilled in the art of the invention are generally understood that identical.The term for using specifically described herein is only description
The purpose of specific embodiment, it is not intended that the limitation present invention.
The following is specific embodiment of the invention, technical scheme is further described, but invention is not
It is limited to these embodiments.
Embodiment 1
3D printing is one kind of rapid shaping technique, and it is a kind of based on mathematical model file, with powdered gold
Category or plastics etc. can jointing material, change, the digitlization increasing material manufacturing skill of manufacture three-dimensional body are successively added by material
Art.It permeates the technological incorporation such as new, material, biology, control, and weight is produced to manufacturing industry production model and human life style
Influence.
3D printing is typically to be printed by 3D printer to realize, with the development of 3D printing technique, 3D printing is being built
Field is built also to be widely used.
As illustrated in figs. 1A and ib, a kind of 3D printing wall 100.
3D printing wall 100 includes main body 1100, and main body 1100 is made by 3D printing technique.
3D printing wall 100 also includes inlet part 1200 and suspension ring 1300.3D printing wall 100 is needed if lifting, can
It is connected with suspension ring 1300 with by suspender, carries out lifting work.
Suspender, is to hang the device for taking weight in hoisting machinery.Common suspender has suspension hook, suspender belt, clamp etc..
Inlet part 1200 is arranged inside main body 1100, and inlet part 1200 is fixedly connected with main body 1100.Inlet part 1200
Can be reinforcing bar, by casting concrete 2001, inlet part 1200 is anchored inside main body 1100.
Suspension ring 1300 are connected with inlet part 1200.
3D printing wall 100 has certain gravity, and inlet part 1200 can improved and connected between suspension ring 1300 and main body 1100
Reliability so that main body 1100 will not be released in hoisting process with suspension ring 1300.
As shown in Fig. 2 inlet part 1200 can be reinforcing bar.Specifically, in the present embodiment, inlet part 1200 can be used
The reinforcing bar of U-shaped structure., can be made up for the bar bending of vertical bar type of angle-bender by the reinforcing bar of U-shaped structure.
As shown in figure 3, being a kind of structure of suspension ring 1300, suspension ring 1300 include anchored end 1301 and lifting end 1302.This
In embodiment, suspension ring 1300 can have steel wire rope and lock 1303 to be made:Steel wire rope head and the tail are fixedly connected, and form a closing
Ring, lock 1303 is connected with the centre of closed-loop, and closed-loop is divided into upper and lower two loop configuration, suspension ring 1300 by lock 1303
Structure similar to the figure of eight.As shown in figure 3, top is divided into lifting end 1302, bottom is divided into anchored end 1301.
As shown in figure 3, being provided with loop configuration on lifting end 1302, the ring on lifting end 1302 with suspender in order to match
Close.
As shown in Figure 4, Figure 5 and Figure 6, suspension ring 1300 are connected with inlet part 1200, by casting concrete 2001, make suspension ring
1300 are connected with main body 1100.Referring to shown in 3, Fig. 5 and Fig. 6, the connection inlet part 1200 of anchored end 1301, anchored end 1301 is fixed
Within main body 1100, lifting end 1302 is arranged at outside the main body 1100.
The quantity of suspension ring 1300 and distribution, stability when influencing whether that 3D printing wall 100 is lifted.If only one of which is hung
Ring 1300, is difficult to ensure that the balance of 3D printing wall 100 when lifting.
Smoothly lifted to ensure that 3D printing wall 100 can guarantee that, multiple suspension ring are provided with main body 1100
1300。
The quantity of suspension ring 1300 is even number, specifically, in the present embodiment, the quantity of suspension ring 1300 is 4.At other
In specific embodiment, the quantity of suspension ring 1300 can also be other quantity.
As shown in Figure 1a, the structure of main body 1100 is symmetrical structure.In the present embodiment, the structure of main body 1100 is in " recessed "
Shape, corner's circular arc transition.4 suspension ring 1300 are symmetrically distributed in the both sides of main body 1100.
Main body 1100 includes the first metope 1101 and the second metope 1102.Between first metope 1101 and the second metope 1102
Casting space is formed, can be with casting concrete 2001 in casting space.
As shown in figure 4, main body 1100 also includes truss 1103.Truss 1103 by straight-bar constitute with triangular unit
Plane or space structure, using triangle stability planar, while mitigating deadweight, also increase the intensity of structure.
Truss 1103 is arranged in casting space, and truss 1103 is connected with the first metope 1101, the wall of truss 1103 and second
Face 1102 connects.
Participate in shown in Fig. 1 a and Fig. 7, because the structure of main body 1100 is symmetrical structure, the structure of the first metope 1101
Also all it is symmetrical structure with the structure of the second metope 1102.
First metope 1101 is arranged in parallel with the second metope 1102, is connected with each other by truss 1103, collectively forms
The main body 1100 of 3D printing wall 100.
To produce 3D printing wall 100, present invention also offers a kind of preparation method of 3D printing wall 100.
3D printing wall 100 includes inlet part 1200 and suspension ring 1300, and the preparation method of 3D printing wall 100 is including as follows
Step:
(1) go out the model of main body 1100 of 3D printing wall 100 by Software on Drawing, main body is printed by 3D technology
1100。
Main body 1100 includes the first metope 1101, the second metope 1102 and truss 1103, the first metope 1101, the second wall
Face 1102 and truss 1103 are all made using 3D printing technique.
In view of 3D printing time and other costs, the first metope 1101, the second metope 1102 and truss 1103 can be with one
Body printing shaping, it is also possible to individually print the first metope 1101, the second metope 1102 and purlin three links together again.
Specifically, as shown in figure 4, be the partial schematic diagram of main body 1100, truss 1103 set with the first metope 1101 and
Between second metope 1102, truss 1103 is connected with the first metope 1101, and truss 1103 is connected with the second metope 1102.
Casting space is formd between first metope 1101 and the second metope 1102.
(2) inlet part 1200 is fixedly connected with suspension ring 1300.
(3) predeterminated position in casting space places inlet part 1200.
(4) casting concrete 2001 in casting space.
By above step, 3D printing wall 100 completes.
As shown in figure 8, the schematic diagram of the lifting of 3D printing wall 100.The suspension ring of 3D printing wall 100 are connected by suspender
1300,3D printing wall 100 is steadily lifted by crane gear.
Embodiment 2
As shown in figures 9 a and 9b, a kind of 3D printing wall 100.
3D printing wall 100 includes main body 1100, and main body 1100 is made by 3D printing technique.
3D printing wall 100 also includes inlet part 1200 and suspension ring 1400.3D printing wall 100 is needed if lifting, can
It is connected with suspension ring 1400 with by suspender, carries out lifting work.
Suspender, is to hang the device for taking weight in hoisting machinery.Common suspender has suspension hook, suspender belt, clamp etc..
Inlet part 1200 is arranged inside main body 1100, and inlet part 1200 is fixedly connected with main body 1100.Inlet part 1200
Can be reinforcing bar, by casting concrete 2001, inlet part 1200 is anchored inside main body 1100.
Suspension ring 1400 are connected with inlet part 1200.
3D printing wall 100 has certain gravity, and inlet part 1200 can improved and connected between suspension ring 1400 and main body 1100
Reliability so that main body 1100 will not be released in hoisting process with suspension ring 1400.
As shown in Fig. 2 inlet part 1200 is reinforcing bar.In order to ensure between suspension ring 1400 and main body 1100 connect it is firm
Property, in the present embodiment, employ many reinforcing bars.Reinforcing bar can be using the reinforcing bar of U-shaped structure.
As shown in Figure 10, it is a kind of structure of suspension ring 1400, suspension ring 1400 include anchored end 1301 and lifting end 1302.Anchor
Fixed end 1301 is the reinforcing bar with warp architecture, and lifting end 1302 is steel wire rope head and the tail connection, anchored end 1301 and lifting end
1302 are connected by steel bushing 1304.
As shown in Figure 10, loop configuration is provided with lifting end 1302, the ring on lifting end 1302 with suspender in order to match
Close.
As shown in Figure 11, Figure 12 and Figure 13, suspension ring 1400 are connected with inlet part 1200, by casting concrete 2001, make
Suspension ring 1400 are connected with main body 1100.Referring to shown in 10, Figure 12 and Figure 13, anchored end 1301 is fixed within main body 1100, is risen
End 1302 is hung to be arranged at outside the main body 1100.
The quantity of suspension ring 1400 and distribution, stability when influencing whether that 3D printing wall 100 is lifted.If only one of which is hung
Ring 1400, is difficult to ensure that the balance of 3D printing wall 100 when lifting.
Smoothly lifted to ensure that 3D printing wall 100 can guarantee that, multiple suspension ring are provided with main body 1100
1400。
The quantity of suspension ring 1400 is even number, specifically, in the present embodiment, the quantity of suspension ring 1400 is 2.At other
In specific embodiment, the quantity of suspension ring 1400 can also be other quantity.
As illustrated in fig. 9, the structure of main body 1100 is symmetrical structure.In the present embodiment, the structure of main body 1100 is in cuboid
Shape.2 suspension ring 1400 are symmetrically distributed in the both sides of main body 1100.
Main body 1100 includes the first metope 1101 and the second metope 1102.Between first metope 1101 and the second metope 1102
Casting space is formed, can be with casting concrete 2001 in casting space.
As shown in figure 11, main body 1100 also includes truss 1103.Truss 1103 by straight-bar constitute with triangular unit
Plane or space structure, using triangle stability planar, while mitigating deadweight, also increase the strong of structure
Degree.
Truss 1103 is arranged in casting space, and truss 1103 is connected with the first metope 1101, the wall of truss 1103 and second
Face 1102 connects.
As shown in Fig. 9 a and Figure 14, because the structure of main body 1100 is symmetrical structure, the structure of the first metope 1101
Also all it is symmetrical structure with the structure of the second metope 1102.
First metope 1101 is arranged in parallel with the second metope 1102, is connected with each other by truss 1103, collectively forms
The main body 1100 of 3D printing wall 100.
To produce 3D printing wall 100, present invention also offers a kind of preparation method of 3D printing wall 100.
3D printing wall 100 includes inlet part 1200 and suspension ring 1400, and the preparation method of 3D printing wall 100 is including as follows
Step:
(1) go out the model of main body 1100 of 3D printing wall 100 by Software on Drawing, main body is printed by 3D technology
1100。
Main body 1100 includes the first metope 1101, the second metope 1102 and truss 1103, the first metope 1101, the second wall
Face 1102 and truss 1103 are all made using 3D printing technique.
In view of 3D printing time and other costs, the first metope 1101, the second metope 1102 and truss 1103 can be with one
Body printing shaping, it is also possible to individually print the first metope 1101, the second metope 1102 and truss 1103, then three is connected to
Together.
Specifically, being the partial view of 3D printing wall 100 as shown in figure 11, truss 1103 is set and the first metope
1101 and second between metope 1102, and truss 1103 is connected with the first metope 1101, and truss 1103 is connected with the second metope 1102.
Casting space is formd between first metope 1101 and the second metope 1102.
(2) inlet part 1200 is fixedly connected with suspension ring 1400.
(3) predeterminated position in casting space places inlet part 1200.
(4) casting concrete 2001 in casting space.
By above step, 3D printing wall 100 completes.
Specifically, foamed polystyrene can also be pre-placed in casting space, afterwards before casting concrete 2001
Work is poured carry out concrete 2001.Foamed polystyrene can increase the incubation and thermal insulation function of 3D printing wall 100.
As shown in figure 15, the schematic diagram of the lifting of 3D printing wall 100.The suspension ring of 3D printing wall 100 are connected by suspender
1400,3D printing wall 100 is steadily lifted by crane gear.
In the description of this specification, the description of reference term " the present embodiment ", " specific embodiment " etc. is intended to combine and is somebody's turn to do
The features such as specific features, structure of embodiment description, is contained at least one embodiment of the invention.In description of the invention
In, the schematic representation to above-mentioned term is necessarily directed to identical embodiment or example.And, the specific spy of description
Levy, structure, feature etc. can in an appropriate manner be combined in any one or more embodiments or example.Additionally, in not phase
In the case of mutual contradiction, those skilled in the art can by the different embodiments or example described in this specification and not
It is combined and combines with the feature of embodiment or example.
Although an embodiment of the present invention has been shown and described, it will be understood by those skilled in the art that:Do not taking off
In the case of principle of the invention and objective, various changes, modification, replacement and modification can be carried out to these embodiments.
Claims (10)
1. a kind of 3D printing wall, includes the main body that 3D printing is made, it is characterised in that the 3D printing wall also includes burying
Enter part and suspension ring;
The inlet part is arranged at the body interior;
The inlet part is fixedly connected with the main body;
The suspension ring are connected with the inlet part.
2. 3D printing wall according to claim 1, it is characterised in that the inlet part is reinforcing bar.
3. 3D printing wall according to claim 1, it is characterised in that the suspension ring include anchored end and lifting end;
The anchored end is fixedly connected with the lifting end;
The anchored end is connected with the inlet part;
Loop configuration is provided with the lifting end;
The lifting end is arranged at outside the main body.
4. 3D printing wall according to claim 1, it is characterised in that the main body is provided with multiple suspension ring.
5. 3D printing wall according to claim 4, it is characterised in that the quantity of the suspension ring is even number;
The structure of the main body is symmetrical structure.
6. 3D printing wall according to claim 1, it is characterised in that the main body includes the first metope and the second wall
Face;
Casting space is formed between first metope and second metope.
7. 3D printing wall according to claim 6, it is characterised in that the main body also includes truss;
The truss is arranged in the casting space;
The truss is connected with first metope;
The truss is connected with second metope.
8. 3D printing wall according to claim 6, it is characterised in that the structure of first metope is symmetrical structure;
The structure of second metope is symmetrical structure.
9. 3D printing wall according to claim 6, it is characterised in that first metope is mutual with second metope
It is parallel.
10. a kind of preparation method of 3D printing wall, it is characterised in that the 3D printing wall includes inlet part and suspension ring, institute
Preparation method is stated to comprise the following steps:
Main body is printed by 3D technology, wherein, the main body includes the first metope, the second metope and truss;
The truss is set between first metope and second metope, wherein, the truss and first metope
Connection, the truss is connected with second metope;
Casting space is formed between first metope and second metope;
The inlet part is connected with the suspension ring;
The inlet part is placed in the casting space formed between first metope and the second metope;
The casting concrete in the casting space.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611085705.3A CN106760071A (en) | 2016-11-30 | 2016-11-30 | A kind of 3D printing wall and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611085705.3A CN106760071A (en) | 2016-11-30 | 2016-11-30 | A kind of 3D printing wall and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760071A true CN106760071A (en) | 2017-05-31 |
Family
ID=58914024
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611085705.3A Pending CN106760071A (en) | 2016-11-30 | 2016-11-30 | A kind of 3D printing wall and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760071A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487916A (en) * | 2019-01-09 | 2019-03-19 | 盈创新材料(苏州)有限公司 | 3D printing soundproof plate and soundproof wall |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2307854Y (en) * | 1997-03-06 | 1999-02-17 | 北京市建筑工程研究院 | Energy-saving side fascia with thermal insulating layer |
KR20000002458A (en) * | 1998-06-19 | 2000-01-15 | 박건영 | Wall body construction method for building and structure frame thereof |
CN101831985A (en) * | 2010-06-04 | 2010-09-15 | 北京万科企业有限公司 | Precast concrete wallboard and preparation method thereof |
CN202081900U (en) * | 2011-06-17 | 2011-12-21 | 晋城宏圣科威矿用材料有限公司 | Safety protection device of anchor rope |
CN104532986A (en) * | 2014-12-23 | 2015-04-22 | 中国建筑第八工程局有限公司 | 3D printing internal parting wall and construction method of 3D printing internal parting wall |
CN104652424A (en) * | 2015-02-12 | 2015-05-27 | 中国水利水电第五工程局有限公司 | Movable lifting hook for lifting reinforcing cage |
CN204510519U (en) * | 2015-01-20 | 2015-07-29 | 常熟建工建设集团有限公司 | A kind of prefabricated metope containing window framework |
CN204873403U (en) * | 2015-07-20 | 2015-12-16 | 中博农畜牧科技股份有限公司 | A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin |
-
2016
- 2016-11-30 CN CN201611085705.3A patent/CN106760071A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2307854Y (en) * | 1997-03-06 | 1999-02-17 | 北京市建筑工程研究院 | Energy-saving side fascia with thermal insulating layer |
KR20000002458A (en) * | 1998-06-19 | 2000-01-15 | 박건영 | Wall body construction method for building and structure frame thereof |
CN101831985A (en) * | 2010-06-04 | 2010-09-15 | 北京万科企业有限公司 | Precast concrete wallboard and preparation method thereof |
CN202081900U (en) * | 2011-06-17 | 2011-12-21 | 晋城宏圣科威矿用材料有限公司 | Safety protection device of anchor rope |
CN104532986A (en) * | 2014-12-23 | 2015-04-22 | 中国建筑第八工程局有限公司 | 3D printing internal parting wall and construction method of 3D printing internal parting wall |
CN204510519U (en) * | 2015-01-20 | 2015-07-29 | 常熟建工建设集团有限公司 | A kind of prefabricated metope containing window framework |
CN104652424A (en) * | 2015-02-12 | 2015-05-27 | 中国水利水电第五工程局有限公司 | Movable lifting hook for lifting reinforcing cage |
CN204873403U (en) * | 2015-07-20 | 2015-12-16 | 中博农畜牧科技股份有限公司 | A supplementary steel pipe that is used for hoisting simultaneously room roof beam purlin |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109487916A (en) * | 2019-01-09 | 2019-03-19 | 盈创新材料(苏州)有限公司 | 3D printing soundproof plate and soundproof wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204326300U (en) | A kind of collar tie beam shell for building steel tube Combined concrete system | |
CN208934393U (en) | For the flip beam in hydraulic climbing formwork platform | |
CN106760071A (en) | A kind of 3D printing wall and preparation method thereof | |
CN106670395B (en) | A kind of heavy castings air cavity sand core rod | |
CN206457163U (en) | Concrete hollow square suspender | |
CN107116179A (en) | Annular frock and the formative method using annular frock reduction sand using amount | |
CN207330117U (en) | Pre-install stair suspender | |
CN207330116U (en) | Pre-install stair connection structure | |
CN206663605U (en) | A kind of Slippers mould | |
CN205973441U (en) | Lifting device is contained to precast box | |
CN206941395U (en) | Bilateral hoist cable arranges shaping pin joint formula cord clip | |
CN108607958B (en) | A kind of mark cored structure and its application method | |
CN210916963U (en) | Ultra-high performance concrete bridge structure | |
CN208716672U (en) | Prefabricated case beam roof steel bar mesh sheet suspender | |
CN207877077U (en) | A kind of electromagnetic lifter magnet hanging beam | |
CN203306914U (en) | Steel ladle hoisting device | |
CN206189427U (en) | Prolonged service life, | |
CN206797629U (en) | A kind of keel structure of ship | |
CN213231247U (en) | Steel wire rope winding system with shaking prevention and leveling functions | |
CN220393071U (en) | Construction lifting appliance | |
CN206173819U (en) | Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring | |
CN108750915A (en) | Prefabricated case beam roof steel bar mesh sheet suspender and operating method | |
CN217621300U (en) | Cement preheater inner tube mould is with hanging installed part and mould unit | |
CN204823651U (en) | But balancing area bolt location hoist | |
CN212099750U (en) | Electric motor car T4 work or material rest |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |