CN106670395B - A kind of heavy castings air cavity sand core rod - Google Patents
A kind of heavy castings air cavity sand core rod Download PDFInfo
- Publication number
- CN106670395B CN106670395B CN201710051822.6A CN201710051822A CN106670395B CN 106670395 B CN106670395 B CN 106670395B CN 201710051822 A CN201710051822 A CN 201710051822A CN 106670395 B CN106670395 B CN 106670395B
- Authority
- CN
- China
- Prior art keywords
- main rod
- skeleton
- fixedly connected
- spokes
- spoke
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005266 casting Methods 0.000 title claims abstract description 26
- 210000000988 bone and bone Anatomy 0.000 claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 229910001018 Cast iron Inorganic materials 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22C—FOUNDRY MOULDING
- B22C9/00—Moulds or cores; Moulding processes
- B22C9/10—Cores; Manufacture or installation of cores
- B22C9/106—Vented or reinforced cores
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Molds, Cores, And Manufacturing Methods Thereof (AREA)
Abstract
本发明公开了一种大型铸件气腔砂芯芯骨,属于芯骨领域。包括六根主杆和十二根连接骨架;所述主杆间相互平行且其沿主杆方向上的投影为直角梯形,所述直角梯形上下底边分别对应着三根主杆,所述主杆上下端分别通过所述连接骨架固定连接,所述连接骨架组成两个和所述投影一样的直角梯形,所述连接骨架与主杆互相垂直;所述芯骨还设六根辐条,所述直角梯形底边所对应的主杆上下端分别通过所述辐条与对侧的主杆固定连接,所述辐条与所述连接骨架在同一个平面。本发明在于提供一种对于大型铸件砂芯起重力足,吊装平稳,强度和刚性强,易于脱模的芯骨。
The invention discloses a large casting air cavity sand core bone, which belongs to the field of core bone. It includes six main rods and twelve connecting skeletons; the main rods are parallel to each other and their projection along the direction of the main rods is a right-angled trapezoid. The ends are respectively fixedly connected by the connecting skeleton, and the connecting skeleton forms two right-angled trapezoids that are the same as the projection, and the connecting skeleton and the main rod are perpendicular to each other; the core skeleton is also provided with six spokes, and the bottom of the right-angled trapezoid The upper and lower ends of the main rod corresponding to the sides are respectively fixedly connected to the main rod on the opposite side through the spokes, and the spokes and the connecting frame are on the same plane. The invention aims to provide a mandrel with sufficient lifting force for large-scale casting sand cores, stable hoisting, strong strength and rigidity, and easy demoulding.
Description
技术领域technical field
本发明涉及芯骨领域,特别是一种大型铸件气腔砂芯芯骨。The invention relates to the core bone field, in particular to a large casting air cavity sand core core bone.
背景技术Background technique
大型中速船机箱体气腔砂芯形状复杂,砂芯长度达22米以上,宽14米,大型柴油机机体气腔砂芯由于尺寸太长,无法适用射芯机,所以制芯,吊装砂芯,脱模困难。现有的芯骨结构简单,起重力不强,吊装过程中不稳定,对于大型铸件气腔砂芯的吊装过程容易脱落,强度和刚性不强,易于损坏。The shape of the air cavity sand core of the large medium-speed ship engine box is complex, the length of the sand core is more than 22 meters, and the width is 14 meters. The air cavity sand core of the large diesel engine body is too long to be suitable for the core shooter, so the core making and hoisting of the sand core , Difficult to demould. The existing mandrel structure is simple, the lifting force is not strong, and the hoisting process is unstable. For the hoisting process of the large-scale casting air cavity sand core, it is easy to fall off, the strength and rigidity are not strong, and it is easy to be damaged.
因此,开发一种能同时规避综上缺陷的芯骨,是亟待解决的技术问题。Therefore, it is an urgent technical problem to develop a core bone that can avoid the above-mentioned defects at the same time.
发明内容Contents of the invention
针对上述问题,提供一种大型铸件气腔砂芯芯骨。该芯骨结构设计合理,有效解决了对于大型砂芯起重力不足,吊装不稳定,吊装过程容易脱落,脱模困难,强度和刚性不强,易于损坏的问题。In view of the above problems, a large-scale casting air cavity sand core bone is provided. The mandrel structure design is reasonable, which effectively solves the problems of insufficient lifting force for large sand cores, unstable hoisting, easy falling off during hoisting, difficult demoulding, weak strength and rigidity, and easy damage.
为达到上述目的,本发明所采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:
一种大型铸件气腔砂芯芯骨,包括主杆和连接骨架,所述主杆包括相互平行的第一主杆、第二主杆、第三主杆、第四主杆、第五主杆和第六主杆,所述连接骨架包括第一连接骨架、第二连接骨架、第三连接骨架、第四连接骨架、第五连接骨架、第六连接骨架、第七连接骨架、第八连接骨架、第九连接骨架、第十连接骨架、第十一连接骨架和第十二连接骨架;所述主杆且其沿主杆方向上的投影为直角梯形,所述第四主杆、第五主杆、第六主杆对应着投影短底边,所述第一主杆、第二主杆、第三主杆对应着投影长底边,所述第三主杆和第六主杆对应着所述直角梯形直角端点;所述连接骨架与主杆垂直,所述连接骨架组成两个相同的直角梯形,所述第一连接骨架、第八连接骨架分别与第一主杆、第二主杆固定连接,所述第二连连接骨架、第九连接骨架分别与第二主杆、第三主杆固定连接,所述第三连接骨架、第七连接骨架分别与第一主杆、第四主杆固定连接,所述第四连接骨架、第十二连接骨架分别与第四主杆、第五主杆固定连接,所述第五连接骨架、第十一连接骨架分别与第五主杆、第六主杆固定连接,所述第六连接骨架、第十连接骨架分别与第三主杆、第六主杆固定连接。A large-scale casting air cavity sand core core bone, including a main rod and a connecting skeleton, the main rod includes a first main rod, a second main rod, a third main rod, a fourth main rod, and a fifth main rod parallel to each other And the sixth main rod, the connecting skeleton includes a first connecting skeleton, a second connecting skeleton, a third connecting skeleton, a fourth connecting skeleton, a fifth connecting skeleton, a sixth connecting skeleton, a seventh connecting skeleton and an eighth connecting skeleton , the ninth connecting skeleton, the tenth connecting skeleton, the eleventh connecting skeleton and the twelfth connecting skeleton; The rod and the sixth main rod correspond to the short bottom of the projection, the first main rod, the second main rod, and the third main rod correspond to the long bottom of the projection, and the third and sixth main rods correspond to the long bottom of the projection. Described right-angled trapezoidal right-angled endpoint; Described connecting skeleton is perpendicular to main rod, and described connecting skeleton forms two identical right-angled trapezoids, and described first connecting skeleton, the eighth connecting skeleton are respectively fixed with first main rod, second main rod connection, the second connecting frame and the ninth connecting frame are fixedly connected to the second main rod and the third main rod respectively, and the third connecting frame and the seventh connecting frame are respectively connected to the first main rod and the fourth main rod fixedly connected, the fourth connecting frame and the twelfth connecting frame are fixedly connected to the fourth main rod and the fifth main rod respectively, and the fifth connecting frame and the eleventh connecting frame are respectively connected to the fifth main rod and the sixth main rod The main rod is fixedly connected, and the sixth connecting frame and the tenth connecting frame are respectively fixedly connected to the third main rod and the sixth main rod.
该结构设计合理,起重力足,吊装砂芯过程平稳,易于脱模,强度和刚性强,不易于损坏,可重复使用,降低铸造成本。The structure design is reasonable, the lifting force is sufficient, the process of hoisting the sand core is stable, easy to demould, strong in strength and rigidity, not easy to be damaged, can be reused, and reduces casting cost.
优选的,所述芯骨还设六根辐条,所述辐条包括第一辐条、第二辐条、第三辐条、第四辐条、第五辐条和第六辐条,所述辐条与所述连接骨架在同一个平面;所述第一辐条、第四辐条分别与第二主杆、第四主杆固定连接,所述第二辐条、第五辐条分别与第二主杆、第五主杆固定连接,所述第三辐条、第六辐条分别与第三主杆、第五主杆固定连接。Preferably, the core bone is also provided with six spokes, the spokes include a first spoke, a second spoke, a third spoke, a fourth spoke, a fifth spoke and a sixth spoke, and the spokes are at the same time as the connecting skeleton. a plane; the first spoke and the fourth spoke are fixedly connected with the second main rod and the fourth main rod respectively, and the second spoke and the fifth spoke are fixedly connected with the second main rod and the fifth main rod respectively, so The third spoke and the sixth spoke are respectively fixedly connected with the third main rod and the fifth main rod.
此结构能增加芯骨的强度和刚性,能将拉力有效分散到辐条上,避免某处拉力过大导致芯骨损坏。This structure can increase the strength and rigidity of the core bone, effectively disperse the tension to the spokes, and avoid damage to the core bone due to excessive tension somewhere.
优选的,所述第一主杆、第三主杆中间分别设一吊环板与其固定连接。Preferably, a ring plate is fixedly connected to the first main rod and the third main rod respectively.
优选的,所述吊环板形状为长方形,中间位置设有圆形起吊孔。Preferably, the ring plate is rectangular in shape, and a circular lifting hole is provided in the middle.
长方形有效增大焊接面积,增加抗拉强度,中心位置开设有起吊孔,能方便起吊钩穿过吊装。The rectangular shape can effectively increase the welding area and increase the tensile strength. There is a lifting hole in the center, which can facilitate the lifting hook to pass through the hoisting.
优选的,所述固定连接都为焊接。Preferably, the fixed connections are all welded.
优选的,所述主杆、连接骨架和辐条均为钢管。Preferably, the main rod, the connecting frame and the spokes are all steel pipes.
优选的,所述主杆、连接骨架和辐条均设有排气孔。Preferably, the main rod, the connecting frame and the spokes are all provided with air vents.
优选的,所述主杆、连接骨架和辐条均设有排气通道与排气孔相通。Preferably, the main rod, the connecting frame and the spokes are provided with exhaust passages communicating with the exhaust holes.
有利于铸造过程中气体的排出,提高铸件质量。It is conducive to the discharge of gas during the casting process and improves the quality of castings.
优选的,所述第四主杆、第五主杆和第六主杆底部分别设两个圆形凸台,所述凸台等高且组成一个长方形。Preferably, the bottoms of the fourth main rod, the fifth main rod and the sixth main rod are respectively provided with two circular bosses, and the bosses are equal in height and form a rectangle.
有利于芯骨的放置,避免芯骨主体部分的磨损。It is beneficial to the placement of the mandrel and avoids the wear of the main part of the mandrel.
由于采用上述技术方案,本发明具有以下有益效果:Owing to adopting above-mentioned technical scheme, the present invention has following beneficial effect:
1.本发明结构合理,起重力强,吊装搬运砂芯过程中平稳,易于脱模。1. The invention has reasonable structure, strong lifting force, stable process of hoisting and transporting the sand core, and easy demoulding.
2.本发明强度好,刚性好,能反复利用,减低铸件制造成本。2. The invention has good strength and rigidity, can be used repeatedly, and reduces the manufacturing cost of castings.
3.本发明铸造过程中易于排气,提高铸件质量。3. The invention is easy to exhaust during the casting process and improves the quality of castings.
附图说明Description of drawings
图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2是本发明的吊环板示意图。Fig. 2 is a schematic diagram of the ring plate of the present invention.
图3是本发明的砂芯正面示意图。Fig. 3 is a schematic front view of the sand core of the present invention.
图4是本发明砂芯背面示意图。Fig. 4 is a schematic diagram of the back side of the sand core of the present invention.
图5是本发明的芯骨安装使用示意图。Fig. 5 is a schematic diagram of the installation and use of the mandrel of the present invention.
附图中,11-第一主杆、12-第二主杆、13-第三主杆、14-第四主杆、15-第五主杆、16-第六主杆、21-第一连接骨架、22-第二连接骨架、23-第三连接骨架、24-第四连接骨架、25-第五连接骨架、26-第六连接骨架、27-第七连接骨架、28-第八连接骨架、29-第九连接骨架、210-第十连接骨架、211-第十一连接骨架、212-第十二连接骨架、31-第一辐条、32-第二辐条、33-第三辐条、34-第四辐条、35-第五辐条、36-第六辐条、4-吊环板、41-吊孔、5-砂芯、6-砂芯模具、7-自硬砂,8-凸台。In the accompanying drawings, 11-first main rod, 12-second main rod, 13-third main rod, 14-fourth main rod, 15-fifth main rod, 16-sixth main rod, 21-first Connection skeleton, 22-second connection skeleton, 23-third connection skeleton, 24-fourth connection skeleton, 25-fifth connection skeleton, 26-sixth connection skeleton, 27-seventh connection skeleton, 28-eighth connection Skeleton, 29-ninth connecting skeleton, 210-tenth connecting skeleton, 211-eleventh connecting skeleton, 212-twelfth connecting skeleton, 31-first spoke, 32-second spoke, 33-third spoke, 34-the fourth spoke, 35-the fifth spoke, 36-the sixth spoke, 4-hanging ring plate, 41-hanging hole, 5-sand core, 6-sand core mold, 7-self-setting sand, 8-boss.
具体实施方式Detailed ways
以下结合附图对发明的具体实施进一步说明。The specific implementation of the invention will be further described below in conjunction with the accompanying drawings.
如图1所示,一种大型铸件气腔砂芯芯骨,包括主杆和连接骨架,主杆包括相互平行的第一主杆11、第二主杆12、第三主杆13、第四主杆14、第五主杆15和第六主杆16,连接骨架包括第一连接骨架21、第二连接骨架22、第三连接骨架23、第四连接骨架24、第五连接骨架25、第六连接骨架26、第七连接骨架27、第八连接骨架28、第九连接骨架29、第十连接骨架210、第十一连接骨架211和第十二连接骨架212。主杆沿主杆方向上的投影为直角梯形,第四主杆14、第五主杆15、第六主杆16对应着投影短底边,第一主杆11、第二主杆12、第三主杆13对应着投影长底边,第三主杆13和第六主杆16对应着直角梯形直角端点,连接骨架与主杆垂直,连接骨架组成两个相同的直角梯形。第一连接骨架21、第八连接骨架28分别与第一主杆11、第二主杆12固定连接;第二连连接骨架22、第九连接骨架29分别与第二主杆12、第三主杆13固定连接;第三连接骨架23、第七连接骨架27分别与第一主杆11、第四主杆14固定连接;第四连接骨架24、第十二连接骨架212分别与第四主杆14、第五主杆15固定连接;第五连接骨架25、第十一连接骨架211分别与第五主杆15、第六主杆16固定连接;第六连接骨架26、第十连接骨架210分别与第三主杆13、第六主杆16固定连接。As shown in Figure 1, a large-scale casting air cavity sand core core includes a main rod and a connecting skeleton. The main rod includes a first main rod 11, a second main rod 12, a third main rod 13, and a fourth main rod parallel to each other The main rod 14, the fifth main rod 15 and the sixth main rod 16, the connecting skeleton includes a first connecting skeleton 21, a second connecting skeleton 22, a third connecting skeleton 23, a fourth connecting skeleton 24, a fifth connecting skeleton 25, a The sixth connecting skeleton 26 , the seventh connecting skeleton 27 , the eighth connecting skeleton 28 , the ninth connecting skeleton 29 , the tenth connecting skeleton 210 , the eleventh connecting skeleton 211 and the twelfth connecting skeleton 212 . The projection of the main rod along the direction of the main rod is a right-angled trapezoid. The fourth main rod 14, the fifth main rod 15, and the sixth main rod 16 correspond to the short base of the projection. The first main rod 11, the second main rod 12, the second main rod The three main rods 13 correspond to the projected long base, the third main rod 13 and the sixth main rod 16 correspond to the right-angled endpoints of the right-angled trapezoid, the connecting skeleton is perpendicular to the main rod, and the connecting skeleton forms two identical right-angled trapezoids. The first connecting frame 21 and the eighth connecting frame 28 are fixedly connected with the first main rod 11 and the second main rod 12 respectively; the second connecting frame 22 and the ninth connecting frame 29 are respectively connected with the second main rod 12 and the third main rod The rod 13 is fixedly connected; the third connecting frame 23 and the seventh connecting frame 27 are fixedly connected to the first main rod 11 and the fourth main rod 14 respectively; the fourth connecting frame 24 and the twelfth connecting frame 212 are respectively connected to the fourth main rod 14. The fifth main rod 15 is fixedly connected; the fifth connecting frame 25 and the eleventh connecting frame 211 are respectively fixedly connected to the fifth main rod 15 and the sixth main rod 16; the sixth connecting frame 26 and the tenth connecting frame 210 are respectively It is fixedly connected with the third main rod 13 and the sixth main rod 16 .
本实施例采用直角梯形,与砂芯5外形轮廓保持一定的距离,避免碰穿砂芯5的表面。该芯骨结构以六根主杆为支撑,分为上下两部分,使砂芯5的重量均匀分担到六根主杆上,并由十二根连接骨架相连接,加大了该芯骨的承重力。从而芯骨该构设计合理,起重力足,吊装砂芯过程平稳,易于脱模,强度和刚性强,不易于损坏,可重复使用,降低铸造成本。In this embodiment, a right-angled trapezoid is adopted to keep a certain distance from the outline of the sand core 5 to avoid touching the surface of the sand core 5 . The core frame structure is supported by six main rods and is divided into upper and lower parts, so that the weight of the sand core 5 is evenly distributed to the six main rods, and is connected by twelve connecting frames, which increases the bearing capacity of the core frame. . Therefore, the mandrel structure has a reasonable design, enough lifting force, a smooth process of hoisting the sand core, easy demoulding, strong strength and rigidity, not easy to be damaged, and can be reused to reduce casting costs.
该芯骨还设六根辐条,包括第一辐条31、第二辐条32、第三辐条33、第四辐条34、第五辐条35和第六辐条36,辐条与所述连接骨架在同一个平面。第一辐条31、第四辐条34分别与第二主杆12、第四主杆14固定连接;第二辐条32、第五辐条35分别与第二主杆12、第五主杆15固定连接;第三辐条33、第六辐条36分别与第三主杆13、第五主杆15固定连接。The core frame also has six spokes, including a first spoke 31, a second spoke 32, a third spoke 33, a fourth spoke 34, a fifth spoke 35 and a sixth spoke 36, and the spokes are on the same plane as the connecting skeleton. The first spoke 31 and the fourth spoke 34 are respectively fixedly connected with the second main rod 12 and the fourth main rod 14; the second spoke 32 and the fifth spoke 35 are respectively fixedly connected with the second main rod 12 and the fifth main rod 15; The third spoke 33 and the sixth spoke 36 are fixedly connected with the third main rod 13 and the fifth main rod 15 respectively.
辐条增加芯骨的强度和刚性,能将拉力有效分散到辐条上,避免某处拉力过大导致芯骨损坏。Spokes increase the strength and rigidity of the core bone, which can effectively distribute the tension to the spokes, and avoid damage to the core bone due to excessive tension somewhere.
以上固定连接可以是螺接、铆接、焊接,本实施例采取了焊接,焊接的固定方式更为牢靠,使用时间更长。主杆、连接骨架和辐条均为钢管且设有排气孔,铸铁芯骨脆性大,容易损坏,使用铸铁芯骨成本比较高,钢管刚性强,不易损坏,可反复使用;排气孔与主杆、连接骨架和辐条中的排气管道相通,有利于铸造过程有气体排出,提高铸件质量。第四主杆、第五主杆和第六主杆底部分别设两个圆形凸台8,六个凸台8等高且组成一个长方形。从而方便芯骨的存放,防止芯骨的磨损。The above fixed connection can be screwed, riveted, or welded. In this embodiment, welding is adopted, and the fixing method of welding is more reliable and has a longer service life. The main rod, the connecting frame and the spokes are all steel pipes with vent holes. The cast iron core is brittle and easy to damage. The cost of using cast iron core is relatively high. The exhaust pipes in the rods, the connecting frame and the spokes are connected, which is beneficial to the gas discharge during the casting process and improves the quality of the castings. The bottoms of the fourth main rod, the fifth main rod and the sixth main rod are respectively provided with two circular bosses 8, and the six bosses 8 are of the same height and form a rectangle. Thereby, the storage of the core bone is facilitated, and the wear of the core bone is prevented.
如图2所示,第一主杆11和第三主杆13中间分别设一吊环板,吊环板4位于该主杆中心位置,通过焊接连接,能使芯骨的重心位于中心,有利于吊装平衡。As shown in Figure 2, a ring plate is respectively arranged between the first main rod 11 and the third main rod 13, and the ring plate 4 is located at the center of the main rod, connected by welding, so that the center of gravity of the core bone can be located at the center, which is beneficial to hoisting balance.
吊环板4形状为长方形,能有效增大焊接面积,增加抗拉强度,中心位置开设有起吊孔41,能方便起吊钩穿过吊装。The ring plate 4 is rectangular in shape, which can effectively increase the welding area and increase the tensile strength. The central position is provided with a lifting hole 41, which can facilitate the lifting hook to pass through the lifting.
使用时,如图5所示,首先将芯骨用绳索固定于两根固定杆上,将固定杆抬起置于砂芯模具6顶面,放平固定。芯骨就悬挂于模具内部相应位置。将自硬砂7填入砂芯模具6,直到填满为止。经过几个小时的自硬砂硬化,芯骨已经牢牢固定在自硬砂7内部,将固定杆拆除,拆除模具,使用起吊机即可吊起芯骨,砂芯5即被吊起。During use, as shown in Figure 5, at first the mandrel is fixed on two fixed rods with ropes, the fixed rods are lifted and placed on the top surface of the sand core mold 6, and fixed flat. The mandrel hangs at the corresponding position inside the mould. Fill the self-hardening sand 7 into the sand core mold 6 until it is full. After several hours of self-setting sand hardening, the mandrel has been firmly fixed inside the self-setting sand 7, the fixing rod is removed, the mold is removed, and the mandrel can be lifted with a hoist, and the sand core 5 is lifted.
上述说明是针对本发明较佳可行实施例的详细说明,但实施例并非用以限定本发明的专利申请范围,凡本发明所提示的技术精神下所完成的同等变化或修饰变更,均应属于本发明所涵盖专利范围。The above description is a detailed description of the preferred feasible embodiments of the present invention, but the embodiments are not used to limit the scope of the patent application of the present invention. All equivalent changes or modifications completed under the technical spirit suggested by the present invention shall belong to The scope of patents covered by the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710051822.6A CN106670395B (en) | 2017-01-20 | 2017-01-20 | A kind of heavy castings air cavity sand core rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710051822.6A CN106670395B (en) | 2017-01-20 | 2017-01-20 | A kind of heavy castings air cavity sand core rod |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106670395A CN106670395A (en) | 2017-05-17 |
CN106670395B true CN106670395B (en) | 2018-10-12 |
Family
ID=58860696
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710051822.6A Expired - Fee Related CN106670395B (en) | 2017-01-20 | 2017-01-20 | A kind of heavy castings air cavity sand core rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106670395B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107824746B (en) * | 2017-11-02 | 2022-06-07 | 广西玉柴机器股份有限公司 | Core bar assembly of ship engine horizontal pouring channel core |
CN110142379A (en) * | 2019-04-18 | 2019-08-20 | 共享铸钢有限公司 | A kind of profile-followed arbor structure of the high intensity of blade of large-sized water turbine sand core |
CN110465624B (en) * | 2019-09-19 | 2024-05-03 | 广西玉柴机器股份有限公司 | Ultra-large manual core box die of V-shaped engine cylinder block and core manufacturing method |
CN110899641B (en) * | 2019-12-18 | 2021-07-16 | 北京机科国创轻量化科学研究院有限公司 | Digital flexible extrusion sand mould type bone structure and lift by crane mechanism |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0199742A (en) * | 1987-10-13 | 1989-04-18 | Daido Steel Co Ltd | Method for preventing crack in mold for precision casting |
CN202411345U (en) * | 2012-01-04 | 2012-09-05 | 昆山市昌坚铸造有限公司 | Mud-core framework for casting |
CN204353425U (en) * | 2014-12-19 | 2015-05-27 | 扬州峰明金属制品有限公司 | A kind of core shaft structure of core |
CN104907496A (en) * | 2015-05-28 | 2015-09-16 | 共享装备有限公司 | Removable combination core rod |
CN204700244U (en) * | 2015-04-23 | 2015-10-14 | 辽宁福鞍重工股份有限公司 | A kind of endless belt sand core rod bridge-type connects anti-deforming structure |
CN206425488U (en) * | 2017-01-20 | 2017-08-22 | 百色学院 | A kind of heavy castings air cavity sand core rod |
-
2017
- 2017-01-20 CN CN201710051822.6A patent/CN106670395B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0199742A (en) * | 1987-10-13 | 1989-04-18 | Daido Steel Co Ltd | Method for preventing crack in mold for precision casting |
CN202411345U (en) * | 2012-01-04 | 2012-09-05 | 昆山市昌坚铸造有限公司 | Mud-core framework for casting |
CN204353425U (en) * | 2014-12-19 | 2015-05-27 | 扬州峰明金属制品有限公司 | A kind of core shaft structure of core |
CN204700244U (en) * | 2015-04-23 | 2015-10-14 | 辽宁福鞍重工股份有限公司 | A kind of endless belt sand core rod bridge-type connects anti-deforming structure |
CN104907496A (en) * | 2015-05-28 | 2015-09-16 | 共享装备有限公司 | Removable combination core rod |
CN206425488U (en) * | 2017-01-20 | 2017-08-22 | 百色学院 | A kind of heavy castings air cavity sand core rod |
Non-Patent Citations (1)
Title |
---|
重型燃气轮机排气缸铸件热裂纹的预防措施;马斌等;《中国铸造装备与技术》;20141231(第6期);7-9 * |
Also Published As
Publication number | Publication date |
---|---|
CN106670395A (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106670395B (en) | A kind of heavy castings air cavity sand core rod | |
CN201300190Y (en) | Sand mold device for cluster casting of hammer heads | |
CN104942236A (en) | Molding method for vertical pouring production of blade without sand box | |
CN205341916U (en) | Production line is used in casting of V method | |
CN102166620B (en) | Molding method of copper alloy propeller resin sand | |
CN206425488U (en) | A kind of heavy castings air cavity sand core rod | |
CN211028007U (en) | Molding sand box casting device for wind power circular ring castings | |
CN209886621U (en) | Sand box | |
CN205466673U (en) | Forming mold for concrete pontoon | |
CN202946193U (en) | Tunnel center gutterway formwork | |
CN220807874U (en) | A prefabricated basic forming mold | |
CN202207775U (en) | Reinforcement tool used in large-scale investment cast piece coating | |
CN207119767U (en) | Heavy castings moulding jack die lifter | |
CN211028010U (en) | Casting weight supporting device for wind power product casting | |
CN206859250U (en) | Combined tower seat | |
CN205217946U (en) | Large -scale thin wall copper sand box for casting | |
CN213671725U (en) | Sand box for casting wind power main shaft casting | |
CN204778565U (en) | Well lid handling device | |
CN212884859U (en) | Sand-saving efficient casting molding sand box device for wind power hub castings | |
CN213671726U (en) | Sand box special for casting and molding wind power base castings | |
CN103042172A (en) | Upward gas discharge method of lower sand core of complicate connected cast | |
CN104028697B (en) | A kind of laying method of running gate system | |
CN202808165U (en) | Steel ladle hanging beam | |
CN205684664U (en) | A kind of locking device of casting sand type | |
CN105537501A (en) | Application method of modeling sand substituting blocks in casting of large cast steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181012 Termination date: 20210120 |