- Publication number
- CN206173819U CN206173819U CN201621062818.7U CN201621062818U CN206173819U CN 206173819 U CN206173819 U CN 206173819U CN 201621062818 U CN201621062818 U CN 201621062818U CN 206173819 U CN206173819 U CN 206173819U
- Authority
- CN
- China
- Prior art keywords
- main longitudinal
- typhoon
- hanging basket
- continuous beam
- basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility creatively provides a stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring, including hanging basket and truss system, truss system includes two levels and mutual parallel arrangement's main longitudinal grider, each the main longitudinal grider is equipped with two landing legs along its length direction at least it is equipped with the front beam to connect between two main longitudinal grider front ends, it includes centre form system, external mold system and die block system to hang the basket, external mold system configuration is on the landing leg. The utility model discloses create a stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring, the utility model discloses the creation sets up truss system having pour under the roof beam face of section when being under construction, and in the work progress, the position relation who controls centre form system, external mold system and die block intersystem through lifting device realizes section pouring of section bridge, and the construction is simply quick, and what the assurance was under construction goes on smoothly.
Description
Technical field
The invention belongs to bridge construction field, Anti-Typhoon quick more particularly, to a kind of continuous beam cantilever placing installation
The stealthy Hanging Basket of construction.
Background technology
In bridge construction, continuous rigid frame (continuous beam) cantilever pouring equipment typically uses Hanging Basket, commonly has Hanging Basket and presses structure
Appearance formula can be divided into truss-like (including flat string is without balance weight type, rhombus, bowstring type), cable-stayed type, shaped steel formula and hybrid four kinds,
Several structure type Hanging Baskets have problem is:When strong wind weather is suffered from, it is higher by beam face and causes because trussing is located at
Suffered wind-force increase, in turn results in constructional difficulties.
The content of the invention
In view of this, the invention is directed to a kind of stealthy extension of the Anti-Typhoon rapid construction of continuous beam cantilever placing installation
Basket, even if to meet the requirement of the construction operation under strong wind weather underbeam face.
To reach above-mentioned purpose, what the technical scheme of the invention was realized in:
A kind of Anti-Typhoon rapid construction stealth Hanging Basket of continuous beam cantilever placing installation, including Hanging Basket and trussing, it is described
Trussing includes two main longitudinal griders being arranged horizontally and mutually in parallel, and each described main longitudinal grider at least sets along its length
There are two supporting legs, front beam is connected between described two main longitudinal grider front ends, between the Hanging Basket is arranged on two main longitudinal griders,
The Hanging Basket includes inner formwork system, outer modular system and bed die system, and the outer modular system is arranged on supporting leg, in the main longitudinal grider
Front end is provided with preceding suspension rod, and the bed die system front end is hung on front beam by preceding suspension rod, after the bed die System Back-end passes through
Suspension rod is hung on sections concrete has been poured, and the inner formwork system is located in outer modular system, and the inner formwork system is suspended in and has poured
Build on the inner slide beam that sections concrete front end and main longitudinal grider are set in the same direction.
Further, two main longitudinal griders just to side be respectively equipped with cross spacing jack, and be arranged in one
Cross spacing jack on individual main longitudinal grider is with the cross spacing jack being arranged on another main longitudinal grider just to setting.
Further, each described main longitudinal grider is the two i shaped steels composition just to setting.
Further, the inner formwork system is welded by shaped steel and steel plate.
Further, the outer modular system is welded by shaped steel and steel plate.
Further, the bed die system is welded by shaped steel and steel plate.
Relative to prior art, a kind of Anti-Typhoon rapid construction of continuous beam cantilever placing installation described in the invention is hidden
Shape Hanging Basket has the advantage that:
The Anti-Typhoon rapid construction stealth Hanging Basket of a kind of continuous beam cantilever placing installation described in the invention, present invention wound
Make and be arranged on trussing under the beam face for having poured sections in construction, in work progress, by hanging device control
Position relationship between inner formwork system, outer modular system and bed die system realizes the cast of sections bridge, constructs simple and quick, it is ensured that apply
Work is smoothed out.
Brief description of the drawings
The accompanying drawing for constituting the part of the invention is used for providing further understanding the invention, present invention wound
The schematic description and description made does not constitute the improper restriction to the invention for explaining the invention.
In accompanying drawing:
Fig. 1 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment
Basket front view;
Fig. 2 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment
Basket right view;
Fig. 3 is the stealthy extension of the Anti-Typhoon rapid construction of a kind of continuous beam cantilever placing installation described in the invention embodiment
Cross spacing jack installing structure figure in basket.
Description of reference numerals:
1- main longitudinal griders;2- cross spacing jack;Suspension rod before 3-;4- rear suspension bars;
5- front beams;6- inner formwork systems;7- bed die systems;The outer modular systems of 8-;
9- supporting legs.
Specific embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the invention can
To be mutually combined.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " on ", D score,
The orientation or position relationship of the instruction such as "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", " outward " are
Based on orientation shown in the drawings or position relationship, it is for only for ease of description the invention and simplifies description, rather than instruction
Or imply that the device or element of meaning with specific orientation, with specific azimuth configuration and operation, therefore must not be understood that
It is the limitation to the invention.Additionally, term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicating
Or imply relative importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined
Feature can express or implicitly include one or more this feature.In the description of the invention, unless separately
It is described, " multiple " is meant that two or more.
, it is necessary to explanation, unless otherwise clearly defined and limited, term " is pacified in the description of the invention
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected, or be detachably connected, or integratedly
Connection;Can mechanically connect, or electrically connect;Can be joined directly together, it is also possible to be indirectly connected to by intermediary,
Can be two connections of element internal.For the ordinary skill in the art, can be by concrete condition understanding
State concrete meaning of the term in the invention.
Describe the invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As Figure 1-3, the Anti-Typhoon rapid construction stealth Hanging Basket of a kind of continuous beam cantilever placing installation, including Hanging Basket and purlin
Frame system, the trussing includes two main longitudinal griders 1 being arranged horizontally and mutually in parallel, and two main longitudinal griders 1 symmetrically set
Each described main longitudinal grider 1 is put for two i shaped steels just to setting are constituted.Each described master, during construction, longeron 1 is located at
Poured below the edge of a wing of beam sections face, each main longitudinal grider 1 along its length at least provided with two supporting legs 9, described two
Front beam 5 is connected between the front end of individual main longitudinal grider 1, between the Hanging Basket is arranged on two main longitudinal griders 1, the Hanging Basket includes internal model
System 6, outer modular system 8 and bed die system 7, the inner formwork system 6 are welded by shaped steel and steel plate, the outer modular system 8 by
Shaped steel and steel plate are welded, and the bed die system 7 is welded by shaped steel and steel plate;The outer modular system 8 is arranged on supporting leg 9
On, the suspension rod 3 before the front end of the main longitudinal grider 1 is provided with, the front end of bed die system 7 is hung on front beam 5 by preceding suspension rod 3,
The rear end of bed die system 7 is hung on sections concrete has been poured by rear suspension bar 4, and the inner formwork system 6 is located at outer modular system 8
Interior, the inner formwork system 6 is suspended in and has poured on the inner slide beam that sections concrete front end and main longitudinal grider 1 are set in the same direction.
In the present embodiment, in order to ensure the centering of beam sections, two main longitudinal griders 1 just to side be respectively equipped with
Cross spacing jack 2, and the cross spacing jack 2 being arranged on a main longitudinal grider 1 and be arranged on another main longitudinal grider 1
Cross spacing jack 2 just to set;During construction, by adjust cross spacing jack 2 adjust two main longitudinal griders 1 between position
Relation is put, and then ensures to be arranged on the Hanging Basket on girder 1 in the middle of two main longitudinal griders 1, and then ensure the right of cast beam sections
It is neutral.
The preferred embodiment of the invention is the foregoing is only, creation is not intended to limit the invention, it is all at this
Within the spirit and principle of innovation and creation, any modification, equivalent substitution and improvements made etc. should be included in the invention
Protection domain within.
Claims (6)
1. a kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket, it is characterised in that:Including Hanging Basket and truss
System, the trussing includes two main longitudinal griders being arranged horizontally and mutually in parallel (1), each described main longitudinal grider (1) edge
Its length direction is connected with front beam (5), institute at least provided with two supporting legs (9) between two main longitudinal grider (1) front ends
State between Hanging Basket is arranged on two main longitudinal griders (1), the Hanging Basket includes inner formwork system (6), outer modular system (8) and bed die system (7),
The outer modular system (8) is arranged on supporting leg (9), and preceding suspension rod (3), the bed die system are provided with the main longitudinal grider (1) front end
(7) front end is hung on front beam (5) by preceding suspension rod (3), and bed die system (7) rear end is hung by rear suspension bar (4)
Pour on sections concrete, in outer modular system (8), the inner formwork system (6) is suspended in and has poured section the inner formwork system (6)
On the inner slide beam that section concrete front end and main longitudinal grider (1) are set in the same direction.
2. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature
It is:Two main longitudinal griders (1) just to side be respectively equipped with cross spacing jack (2), and be arranged in a master and indulge
Cross spacing jack (2) on beam (1) and the cross spacing jack (2) that is arranged on another main longitudinal grider (1) just pair are setting
Put.
3. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature
It is:Each described main longitudinal grider (1) is that two i shaped steels just to setting are constituted.
4. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature
It is:The inner formwork system (6) is welded by shaped steel and steel plate.
5. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature
It is:The outer modular system (8) is welded by shaped steel and steel plate.
6. a kind of continuous beam cantilever placing installation according to claim 1 Anti-Typhoon rapid construction stealth Hanging Basket, its feature
It is:The bed die system (7) is welded by shaped steel and steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621062818.7U CN206173819U (en) | 2016-09-18 | 2016-09-18 | Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621062818.7U CN206173819U (en) | 2016-09-18 | 2016-09-18 | Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206173819U true CN206173819U (en) | 2017-05-17 |
Family
ID=58676511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621062818.7U Active CN206173819U (en) | 2016-09-18 | 2016-09-18 | Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206173819U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192778A (en) * | 2016-09-18 | 2016-12-07 | 中国铁建大桥工程局集团有限公司 | A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket |
-
2016
- 2016-09-18 CN CN201621062818.7U patent/CN206173819U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192778A (en) * | 2016-09-18 | 2016-12-07 | 中国铁建大桥工程局集团有限公司 | A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209583387U (en) | Be used for adjustable hoist of assembled stair hoist and mount | |
CN205076713U (en) | Crane with at least one crane beam | |
CN204454226U (en) | A kind of welded suspension centre adjustable and balancing beam of I-shaped steel | |
CN206173819U (en) | Stealthy basket of hanging of anti -Typhoon quick construction of continuous beam cantilever equipment of pouring | |
CN205314586U (en) | Prefabricated element slings | |
CN207267961U (en) | A kind of bridge pier shaft pours operating platform | |
CN107419665A (en) | A kind of method of large-span steel girder hoisting appliance and its hoisting steel beam | |
CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
CN106192778A (en) | A kind of continuous beam cantilever placing installation Anti-Typhoon rapid construction stealth Hanging Basket | |
CN208666889U (en) | A kind of adjustable beam type suspender of suspension centre | |
CN203668857U (en) | Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates | |
CN207890943U (en) | The combined attachment device of tower crane | |
CN205802766U (en) | A kind of framework of steel reinforcement integral hoisting tool | |
CN215858986U (en) | Crane beam operation cage | |
CN207143742U (en) | A kind of large-span steel girder hoisting appliance | |
CN209568537U (en) | A kind of suspension type floor structure | |
CN207974502U (en) | Operation platform in a kind of combined electrical stair shaft | |
CN204282816U (en) | A kind of girder template | |
CN208294101U (en) | Large-span girder steel installation slides and promotes combination device | |
CN208310300U (en) | Hoisting structure and hanging device | |
CN203529707U (en) | Double-plate-hole type H-steel balance beam with bending moment | |
CN206735623U (en) | Framework of steel reinforcement hanging apparatus | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN208120533U (en) | A kind of moveable super large precast slab hanging device | |
CN203559334U (en) | Reinforcing structure for suspended carrying part of aluminum alloy overhead bridge escalator |
Legal Events