CN106760004A - A kind of construction method of the uniform joint bar in guide trough structure surface - Google Patents

A kind of construction method of the uniform joint bar in guide trough structure surface Download PDF

Info

Publication number
CN106760004A
CN106760004A CN201611202132.8A CN201611202132A CN106760004A CN 106760004 A CN106760004 A CN 106760004A CN 201611202132 A CN201611202132 A CN 201611202132A CN 106760004 A CN106760004 A CN 106760004A
Authority
CN
China
Prior art keywords
reinforcing bar
template
sleeve
sections
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611202132.8A
Other languages
Chinese (zh)
Inventor
张笈玮
杨辉
温彦岭
谢任飞
武军
冯忠志
陈志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UNIT 63926 OF PLA
Original Assignee
UNIT 63926 OF PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UNIT 63926 OF PLA filed Critical UNIT 63926 OF PLA
Priority to CN201611202132.8A priority Critical patent/CN106760004A/en
Publication of CN106760004A publication Critical patent/CN106760004A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The present invention is a kind of construction method of the uniform joint bar in guide trough structure surface, and guide trough structure includes concrete and protective refractory layer, a sections of reinforcing bar with the end of thread is screwed into a straight screw sleeve in work progress;The perforate on the template before concrete structure formwork installation;One end that sleeve is not screwed into reinforcing bar is withstood on the inner side of template, sleeve is fixedly connected with template by bolt;Formwork erection in place after, a sections of reinforcing bar and guide trough structure reinforcing bar are fixed;After pouring guide trough structure concrete, the bolt on the outside of template is back-outed, be screwed into the end of thread of b sections of reinforcing bar in the screwed hole for exposing by form removal, a sections of reinforcing bar and b sections of bar connecting is formed complete joint bar.This method ensure that the accuracy of joint bar position;Avoid the difficulty that sleeve is found after form removable;Avoid exposed steel bar from injuring workmen, reduce security risk;And template, bolt etc. are reusable, it is to avoid waste of material.

Description

A kind of construction method of the uniform joint bar in guide trough structure surface
Technical field
The invention belongs to civil construction project technical field of construction, more particularly to launching site water conservancy diversion groove construction method, specifically It is related to the construction method of the guiding gutter uniform joint bar of normal concrete body structure surface,.
Background technology
For high temperature gas flow causes to damage to launching site guiding gutter normal concrete structure when preventing rocket or arm discharge, lead to Often will normal concrete body structure surface lay one layer of refractory concrete overcoat, for ensure refractory concrete overcoat with it is common Concrete structure is firmly connected, and prevents from coming off, and to be uniformly arranged between protective refractory layer and normal concrete structure sheaf a large amount of Connection reinforcing bar, i.e., in the uniform pre- doweling of body structure surface in normal concrete structure construction, the every part embedment of joint bar In normal concrete structure, another part whne protective refractory layer construct when, embedment refractory concrete overcoat in.Due to the joint bar Temperature higher can be contacted, causes chemically-planted steel bar glue to fail, the construction method of chemically-planted steel bar is not applied to.Commonly mixed for guiding gutter The facade of Xtah Crude Clay structure, beam slab bottom surface, supporting module is needed during due to concrete construction, it is impossible to reinforcing bar directly is inserted in into concrete knot Structure surface, joint bar construction is relatively difficult, and the existing method in the ordinary construction layer surface uniform joint bar of construction mainly has following several Kind:
1st, whole joint bar is fixed on normal concrete structure reinforcing bars by design attitude, the part of body structure surface will be stretched out, led to The mode for crossing 90-degree bent is placed on stay in place form inner side, and form removal after casting concrete then looks for the pre-buried position of reinforcing bar Put, pick chisel concrete, the bending part of joint bar is exposed, and joint bar is stretched.Every joint bar is constructed in this way.The method Reinforcing bar is bent and is stretched again, after damaging reinforced steel bar strength, and form removable, found joint bar position difficulty, picked chisel concreter Work amount is big, waste of materials, pollution scene.
2 is similar with method 1, and simply pre-buried joint bar is shorter, shortens bending part, and chisel amount, kink to be exposed are picked in reduction After dividing and stretching, the reinforcing bar exposed by welding manner spreading.Welding sequence is this method increase, and welding can reduce reinforcing bar Bonding strength.
3rd, in guiding gutter normal concrete structure construction, according to the design attitude of joint bar, uniformly opened on stay in place form Hole, after formwork erection is good, by the hole in the certain length of joint bar insertion template, then casting concrete.Due to joint bar distribution Comparatively dense, joint bar quantity is more, and every joint bar has certain length to be exposed at template outside, and security is poor during construction, template Remove difficult, often needing to damage template could be by form removable.
Therefore there is certain technological deficiency in above-mentioned construction method.
The content of the invention
It is an object of the invention to provide a kind of construction method of the uniform joint bar in guide trough structure surface, to solve above-mentioned inserting The defect problem of muscle construction method, plays its operational advantage, meets construction high standard, high efficiency requirement, reduces artificial and material Waste.The purpose of the present invention is achieved through the following technical solutions.
A kind of construction method of the uniform joint bar in guide trough structure surface, the guide trough structure include concrete and Protective refractory layer, the protective refractory layer is layed in concrete structure layer surface, and the joint bar part is embedded into concrete knot Structure layer in, joint bar another part whne protective refractory layer construct when, embedment protective refractory layer in:Including construction procedure in detail below:
1)Processing straight screw sleeve, processing treat the b in a sections of reinforcing bar and protective refractory to be imbedded layer in embedded concrete structure layer One end of section reinforcing bar, a sections of reinforcing bar and b sections of reinforcing bar is processed as the end of thread;
2)The end of thread of a sections of reinforcing bar is screwed into the sleeve;
3)After the completion of guide trough structure reinforcing bar colligation, before concrete structure formwork installation, according to the cloth of the joint bar being pre-designed Seated position, the perforate in the template;
4)One end that the sleeve is not screwed into reinforcing bar is withstood on the inner side of the template, the screwed hole of sleeve and the perforate pair of template Together, take bolt and pierce into perforate and be screwed into the screwed hole of the sleeve, consolidate with the template so as to a sections of sleeve of reinforcing bar will be connected to Fixed connection;
5)Sleeve will be connected to be installed in place with the model sheetinstallat of a sections of reinforcing bar, a sections of reinforcing bar is led to the guide trough structure reinforcing bar Cross colligation or electric welding is fixed;
6)Guide trough structure concrete is poured, guiding gutter concrete is formed;
7)Bolt on the outside of the template is back-outed, form removal;
8)After form removable, the end face and screwed hole of the described sleeve one end in Transducers Embedded in Concrete expose concrete structural surface, The end of thread of b sections of reinforcing bar is screwed into the screwed hole for exposing, a sections of reinforcing bar and b sections of bar connecting is formed the complete joint bar;
9)Protective refractory layer is set.
Further, a sections of length of the end of thread of the end of thread and b section reinforcing bar of reinforcing bar is not less than screw shell length Half.
Further, the template is aluminum alloy mould plate, template inner side brushing releasing agent.
Further, the perforate in the template is circular hole, and Circularhole diameter is less than the external diameter of the sleeve, more than sleeve The diameter of screwed hole.
Further, step 4)The outside of template position corresponding with the perforate sets pad, and bolt passes through pad Perforate is pierced into after piece again to be screwed into the screwed hole of the sleeve.
Further, step 4)Described in template inner side, the position of sleeve and opening contacts is provided with rubber blanket.
Further, step 3)Perforate in middle template is set to equally distributed plum blossom-shaped.
The beneficial effects of the invention are as follows:
1)Joint bar is passed through screw shell and is bolted in template by the method according to the position being pre-designed, in work progress In will not shift, it is ensured that the positional accuracy of joint bar;
2)It is connected with template by by joint bar, it is ensured that after form removable, screw shell one end can expose concrete structural surface, Avoid finding the difficulty of sleeve;
3)During model sheetinstallat, no lengths of rebar is exposed on the outside of template, it is to avoid exposed steel bar injures workmen, reduces safety wind Danger;
4)Aluminum alloy mould plate is removed not to be influenceed by joint bar, removes convenient, will not damage template, and bolt, pad can make repeatedly With, it is to avoid waste of material.
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in more detail.
Brief description of the drawings
Fig. 1 is joint bar of the present invention and stay in place form connection diagram.
Fig. 2 is the schematic diagram after the completion of joint bar construction of the present invention.
Reference:
1.a sections of reinforcing bar;2. sleeve;3. rubber blanket;4. template;5. pad;6. bolt;7. guide trough structure surface;8.b sections of steel Muscle.
Specific embodiment
As shown in Figure 1, 2, a kind of construction method of the uniform joint bar in guide trough structure surface, the guide trough structure includes mixed Xtah Crude Clay structure layer and protective refractory layer, the protective refractory layer are layed in concrete structure layer surface, and the joint bar part is pre- In embedded concrete structure layer, joint bar another part when protective refractory layer is constructed, in embedment protective refractory layer, including following tool Body construction step:
1)Processing straight screw sleeve 2, processing are treated in a sections of reinforcing bar 1 and protective refractory to be imbedded layer in embedded concrete structure layer B sections of reinforcing bar 8, one end of a sections of reinforcing bar and b sections of reinforcing bar is processed as the end of thread;
2)The end of thread of a sections of reinforcing bar 1 is screwed into the sleeve 2;
3)After the completion of guide trough structure reinforcing bar colligation, before the installation of concrete structure formwork 4, according to the cloth of the joint bar being pre-designed Seated position, the perforate in the template;
4)One end that the sleeve 2 is not screwed into reinforcing bar is withstood on the inner side of the template 4, the screwed hole of sleeve 2 and opening for template 4 Hole is alignd, and is taken bolt 6 and is pierced into perforate and is screwed into the screwed hole of the sleeve 2, so as to be connected to a sections of sleeve of reinforcing bar 12 and institute Template 4 is stated to be fixedly connected;
5)Sleeve 2 will be connected to be installed in place with the installation of template 4 of a sections of reinforcing bar 1, by a sections of reinforcing bar 1 and the guide trough structure steel Muscle is fixed by colligation or electric welding;
6)Guide trough structure concrete is poured, guiding gutter concrete is formed;
7)The bolt 6 in the outside of the template 4 is back-outed, form removal 4;
8)After template 4 is removed, the end face and screwed hole of the one end of the sleeve 2 in Transducers Embedded in Concrete expose concrete structure table Face, the end of thread of b sections of reinforcing bar 8 is screwed into the screwed hole for exposing, and a sections of reinforcing bar 1 and the b sections of connection of reinforcing bar 8 is formed complete institute State joint bar;
9)Protective refractory layer is set.
The a sections of length of the end of thread of the end of thread and b section reinforcing bar of reinforcing bar 1 is not less than the half of screw shell length.Mould Plate 4 is aluminum alloy mould plate, template inner side brushing releasing agent.Perforate in template 4 is circular hole, and Circularhole diameter is less than the sleeve External diameter, more than the diameter of the screwed hole of sleeve.The outside of template 4 position corresponding with the perforate sets pad 5, and bolt 6 is worn Cross after pad 5 and pierce into perforate again and be screwed into the screwed hole of the sleeve 2.
Step 4)Described in template 4 inner side, the position of sleeve 2 and opening contacts is provided with rubber blanket 3.
Step 3)Perforate in middle template 4 is set to equally distributed plum blossom-shaped.
Before concreting, the hole of plum blossom-shaped is evenly arranged in template, embedded bar one and supporting straight thread Sleeve couples, and uses 2mm pads 5 on omnipotent adhesive plaster in the other end of straight screw sleeve, then be connected with template with bolt(Accompanying drawing 1).
Attempt for a sections of threaded one section of reinforcing bar to be screwed into straight screw sleeve in research process of the invention, will be covered using stopper The remaining hole of cylinder is clogged.Then by a for connecting together sections of reinforcing bar and sleeve, it is fixed on structure reinforcing bars according to design attitude, is covered Outwards, during installation form, sleeve one end withstands on template inner side, after every reinforcing bar is installed according to the method described above, branch for cylinder one end If template and casting concrete.After form removal, sleeve portion is found, stopper is taken out, there is screw thread one end to be screwed into b sections of reinforcing bar Sleeve, completes construction.Because guiding gutter normal concrete structural volume is larger, one-time-concreting height is higher, and die plate pressure is larger, Somewhat swollen mould screw shell is just buried in people's concrete completely, and under concreting impact, part joint bar can be shifted, Form removal after sleeve finds difficult easily by inside concrete of nuzzling, and sleeve portion deviation is big, causes joint bar to be buried uneven.Cause The fixation of bolt plays an important role in this present invention, before model sheetinstallat is installed, using bolt first by sleeve and a sections Bar connecting is in template, then supporting module, and the fixation to joint bar position is extremely important, it is ensured that the accuracy of joint bar position, Construction quality is greatly improved, the time of searching joint bar after form removal is also substantially shortened, the duration is saved.

Claims (7)

1. a kind of construction method of the uniform joint bar in guide trough structure surface, the guide trough structure includes concrete and resistance to Fiery overcoat, the protective refractory layer is layed in concrete structure layer surface, and the joint bar part is embedded into concrete structure Layer in, joint bar another part whne protective refractory layer construct when, embedment protective refractory layer in, it is characterised in that:Including in detail below Construction procedure:
1)Processing straight screw sleeve, processing treat the b in a sections of reinforcing bar and protective refractory to be imbedded layer in embedded concrete structure layer One end of section reinforcing bar, a sections of reinforcing bar and b sections of reinforcing bar is processed as the end of thread;
2)The end of thread of a sections of reinforcing bar is screwed into the sleeve;
3)After the completion of guide trough structure reinforcing bar colligation, before concrete structure formwork installation, according to the cloth of the joint bar being pre-designed Seated position, the perforate in the template;
4)One end that the sleeve is not screwed into reinforcing bar is withstood on the inner side of the template, the screwed hole of sleeve and the perforate pair of template Together, take bolt and pierce into perforate and be screwed into the screwed hole of the sleeve, consolidate with the template so as to a sections of sleeve of reinforcing bar will be connected to Fixed connection;
5)Sleeve will be connected to be installed in place with the model sheetinstallat of a sections of reinforcing bar, a sections of reinforcing bar is led to the guide trough structure reinforcing bar Cross colligation or electric welding is fixed;
6)Guide trough structure concrete is poured, guiding gutter concrete is formed;
7)Bolt on the outside of the template is back-outed, form removal;
8)After form removable, the end face and screwed hole of the described sleeve one end in Transducers Embedded in Concrete expose concrete structural surface, The end of thread of b sections of reinforcing bar is screwed into the screwed hole for exposing, a sections of reinforcing bar and b sections of bar connecting is formed the complete joint bar;
9)Protective refractory layer is set.
2. construction method according to claim 1, it is characterised in that:The a sections of end of thread of the end of thread and b section reinforcing bar of reinforcing bar Length not less than screw shell length half.
3. construction method according to claim 1, it is characterised in that:The template is aluminum alloy mould plate, and template inner side applies Brush releasing agent.
4. construction method according to claim 1, it is characterised in that:Perforate in the template is circular hole, Circularhole diameter Less than the external diameter of the sleeve, more than the diameter of the screwed hole of sleeve.
5. construction method according to claim 1, it is characterised in that:Step 4)The outside of the template and the perforate pair The position answered sets pad, and bolt is screwed into the screwed hole of the sleeve through piercing into perforate again after pad.
6. construction method according to claim 1, it is characterised in that:Step 4)Described in template inner side, sleeve with open The position of hole contact is provided with rubber blanket.
7. construction method according to claim 1, it is characterised in that:Step 3)Perforate in middle template is set to uniform point The plum blossom-shaped of cloth.
CN201611202132.8A 2016-12-23 2016-12-23 A kind of construction method of the uniform joint bar in guide trough structure surface Pending CN106760004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611202132.8A CN106760004A (en) 2016-12-23 2016-12-23 A kind of construction method of the uniform joint bar in guide trough structure surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611202132.8A CN106760004A (en) 2016-12-23 2016-12-23 A kind of construction method of the uniform joint bar in guide trough structure surface

Publications (1)

Publication Number Publication Date
CN106760004A true CN106760004A (en) 2017-05-31

Family

ID=58897432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611202132.8A Pending CN106760004A (en) 2016-12-23 2016-12-23 A kind of construction method of the uniform joint bar in guide trough structure surface

Country Status (1)

Country Link
CN (1) CN106760004A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013040A (en) * 2017-06-02 2017-08-04 杭州宥盛建筑科技有限公司 The construction method of floor is poured after a kind of sleeve built-in type
CN109159280A (en) * 2018-08-17 2019-01-08 中国人民解放军63926部队 A kind of launching workplace diversion trench i.e. dress formula ablation prefabricated component resistant to high temperatures and protective refractory layer construction method
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN109779022A (en) * 2019-02-22 2019-05-21 重庆大学 A kind of node that can be rotated under fire
CN114108836A (en) * 2021-11-08 2022-03-01 中国一冶集团有限公司 Pre-buried installation device and installation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5050364A (en) * 1990-03-21 1991-09-24 Anchor Bolt, Inc. Two-part anchor bolt holder
JPH10115013A (en) * 1996-10-08 1998-05-06 Akagi:Kk Insert for constructing scalfold
CN101475381A (en) * 2008-01-04 2009-07-08 郑州登峰熔料有限公司 Diversion trench high-strength low ablation rate castable concrete for launching rocket
CN202689344U (en) * 2012-05-11 2013-01-23 江苏时代建设工程有限公司 Tensioning bar connecting device
CN204001720U (en) * 2014-08-08 2014-12-10 中建七局(上海)有限公司 Service sleeve in a kind of constructional column
CN204919996U (en) * 2015-07-23 2015-12-30 中国新兴保信建设总公司 Pre -buried connection structure of secondary structure reinforcing bar sleeve
CN105735487A (en) * 2016-03-24 2016-07-06 天津住宅集团建设工程总承包有限公司 Wall tied reinforcement component

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5050364A (en) * 1990-03-21 1991-09-24 Anchor Bolt, Inc. Two-part anchor bolt holder
JPH10115013A (en) * 1996-10-08 1998-05-06 Akagi:Kk Insert for constructing scalfold
CN101475381A (en) * 2008-01-04 2009-07-08 郑州登峰熔料有限公司 Diversion trench high-strength low ablation rate castable concrete for launching rocket
CN202689344U (en) * 2012-05-11 2013-01-23 江苏时代建设工程有限公司 Tensioning bar connecting device
CN204001720U (en) * 2014-08-08 2014-12-10 中建七局(上海)有限公司 Service sleeve in a kind of constructional column
CN204919996U (en) * 2015-07-23 2015-12-30 中国新兴保信建设总公司 Pre -buried connection structure of secondary structure reinforcing bar sleeve
CN105735487A (en) * 2016-03-24 2016-07-06 天津住宅集团建设工程总承包有限公司 Wall tied reinforcement component

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013040A (en) * 2017-06-02 2017-08-04 杭州宥盛建筑科技有限公司 The construction method of floor is poured after a kind of sleeve built-in type
CN109159280A (en) * 2018-08-17 2019-01-08 中国人民解放军63926部队 A kind of launching workplace diversion trench i.e. dress formula ablation prefabricated component resistant to high temperatures and protective refractory layer construction method
CN109159280B (en) * 2018-08-17 2023-12-05 中国人民解放军63926部队 Ready-to-install high-temperature ablation-resistant prefabricated member for launching station diversion trench and construction method of fire-resistant protective layer
CN109610737A (en) * 2018-12-06 2019-04-12 中铁十四局集团大盾构工程有限公司 One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN109779022A (en) * 2019-02-22 2019-05-21 重庆大学 A kind of node that can be rotated under fire
CN109779022B (en) * 2019-02-22 2024-02-02 重庆大学 Node capable of rotating under fire disaster
CN114108836A (en) * 2021-11-08 2022-03-01 中国一冶集团有限公司 Pre-buried installation device and installation method thereof

Similar Documents

Publication Publication Date Title
CN106760004A (en) A kind of construction method of the uniform joint bar in guide trough structure surface
CN105887702A (en) Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete
CN106088537B (en) A kind of window auxiliary frame pre-embedded construction method
CN108824117B (en) Asphalt pavement pit slot repairing construction process
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN206233413U (en) A kind of constructing structure of new shear wall vertical construction joint
CN109457690A (en) A kind of application static(al) abolishes pile crown system and its restructuring bankrupt
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN107227860B (en) Brick wall prestressed reinforcement structure
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN109610737A (en) One kind being molded into concrete embedded reinforcing bar connector and construction technology
CN206800646U (en) A kind of post stretching bonded prestress indent sealing off and covering anchorage built-in fitting
CN206706844U (en) A kind of alter-pouring strips mould plate installs construction
CN106337530B (en) A kind of construction of frame beam seams stifled construction method
CN105332375B (en) Anchor jacked pile stake machine base fixing means
CN104831924B (en) Construction method for PVC piping of incoming and outgoing lines of distribution box at beam bottom
CN105735487A (en) Wall tied reinforcement component
CN206143608U (en) Assembled T beam bridge hogging moment district anchorage sealing system
CN216076481U (en) Concrete side wall hole shutoff construction equipment
CN205637571U (en) Do not have outside secret building wall who is detained pipe and pour template
CN206233404U (en) The attachment structure of shear wall and after-pouring concrete secondary beam
CN205444484U (en) Wall lacing wire subassembly
CN107740592A (en) A kind of protection device of prestressed pore passage pore-forming
CN207453121U (en) A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts
CN211143053U (en) Pretensioned prestressed concrete pipe pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication