CN106759475A - 一种钢结构综合管廊 - Google Patents
一种钢结构综合管廊 Download PDFInfo
- Publication number
- CN106759475A CN106759475A CN201611097858.XA CN201611097858A CN106759475A CN 106759475 A CN106759475 A CN 106759475A CN 201611097858 A CN201611097858 A CN 201611097858A CN 106759475 A CN106759475 A CN 106759475A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- main body
- steel plate
- lane main
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611097858.XA CN106759475B (zh) | 2016-12-03 | 2016-12-03 | 一种钢结构综合管廊 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611097858.XA CN106759475B (zh) | 2016-12-03 | 2016-12-03 | 一种钢结构综合管廊 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106759475A true CN106759475A (zh) | 2017-05-31 |
CN106759475B CN106759475B (zh) | 2020-01-31 |
Family
ID=58882805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611097858.XA Active CN106759475B (zh) | 2016-12-03 | 2016-12-03 | 一种钢结构综合管廊 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759475B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110617079A (zh) * | 2019-10-28 | 2019-12-27 | 中铁二院工程集团有限责任公司 | 盾构综合管廊管线安装棚架系统 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101072470B1 (ko) * | 2010-12-07 | 2011-10-12 | 홍익컨스텍(주) | 지지보 설치 후에 굴착을 수행하는 지하터널 시공방법 |
CN205276317U (zh) * | 2016-01-05 | 2016-06-01 | 孙成业 | 一种地下综合管廊的钢结构 |
CN205329722U (zh) * | 2016-01-22 | 2016-06-22 | 孙成业 | 一种多仓钢结构管廊 |
CN105821903A (zh) * | 2016-04-15 | 2016-08-03 | 南京联众建设工程技术有限公司 | 框架式组合结构综合管廊 |
CN205475318U (zh) * | 2016-01-08 | 2016-08-17 | 孙成业 | 一种波纹钢的综合管廊 |
CN205557566U (zh) * | 2016-02-29 | 2016-09-07 | 衡水益通管业股份有限公司 | 一种城市地下钢结构综合管廊 |
CN205604290U (zh) * | 2016-04-29 | 2016-09-28 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种外翻框架消能式地下综合管廊结构 |
-
2016
- 2016-12-03 CN CN201611097858.XA patent/CN106759475B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101072470B1 (ko) * | 2010-12-07 | 2011-10-12 | 홍익컨스텍(주) | 지지보 설치 후에 굴착을 수행하는 지하터널 시공방법 |
CN205276317U (zh) * | 2016-01-05 | 2016-06-01 | 孙成业 | 一种地下综合管廊的钢结构 |
CN205475318U (zh) * | 2016-01-08 | 2016-08-17 | 孙成业 | 一种波纹钢的综合管廊 |
CN205329722U (zh) * | 2016-01-22 | 2016-06-22 | 孙成业 | 一种多仓钢结构管廊 |
CN205557566U (zh) * | 2016-02-29 | 2016-09-07 | 衡水益通管业股份有限公司 | 一种城市地下钢结构综合管廊 |
CN105821903A (zh) * | 2016-04-15 | 2016-08-03 | 南京联众建设工程技术有限公司 | 框架式组合结构综合管廊 |
CN205604290U (zh) * | 2016-04-29 | 2016-09-28 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种外翻框架消能式地下综合管廊结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110617079A (zh) * | 2019-10-28 | 2019-12-27 | 中铁二院工程集团有限责任公司 | 盾构综合管廊管线安装棚架系统 |
Also Published As
Publication number | Publication date |
---|---|
CN106759475B (zh) | 2020-01-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107574930B (zh) | 一种设置h型钢和u形钢的再生块体混凝土连接节点 | |
CN106351258B (zh) | 一种全预制拼装钢混凝土组合地下综合管廊 | |
CN106381885B (zh) | 一种带骨架的钢结构地下综合管廊 | |
CN205421616U (zh) | 具有钢管砼边缘构件的装配整体式剪力墙 | |
CN105603843A (zh) | 一种装配式钢筋混凝土预制路面板及其施工方法 | |
CN107012887B (zh) | 弧顶综合管廊分块预制拼装式节点 | |
CN106381886B (zh) | 一种部分预制拼装钢混凝土组合地下综合管廊 | |
CN202273169U (zh) | 栈桥 | |
CN207739388U (zh) | 预制装配式房屋建筑 | |
WO2017071111A1 (zh) | 地下管廊防护结构 | |
CN105256836A (zh) | 一种地下工程施工中快速恢复路面交通的施工方法 | |
CN110541485A (zh) | 一种装配式楼板与梁的连接节点 | |
CN106759475A (zh) | 一种钢结构综合管廊 | |
CN211286028U (zh) | 一种装配式楼板与梁的连接节点 | |
CN103850162B (zh) | 桥式组合结构路面体系及其施工方法 | |
CN202324155U (zh) | 可调式波纹预应力抗污染排水涵管 | |
CN203768753U (zh) | 桥式钢板路面体系 | |
CN104746791A (zh) | 半刚性框架—内填再生混凝土墙板及制作方法 | |
CN103850163B (zh) | 桥式钢板路面体系及其施工方法 | |
CN211523226U (zh) | 一种基坑内支撑系统 | |
CN105971017A (zh) | 支撑式管廊结构 | |
CN210163936U (zh) | 桩涵整体装配式钢骨混凝土综合管廊 | |
CN205776356U (zh) | 卡接式管廊结构 | |
CN106869403B (zh) | 多层预制方钢管混凝土连梁 | |
CN206090943U (zh) | 一种复合墙板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee after: China Construction Engineering Group Co.,Ltd. Address before: 518000 Guangdong Shenzhen Futian District Che Kung Temple Riverfront Avenue deep industry Tien pine building 17 floor 17A Patentee before: China Construction Steel Structure Corp.,Ltd. |
|
CP03 | Change of name, title or address | ||
TR01 | Transfer of patent right |
Effective date of registration: 20221109 Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000 Patentee after: China Construction Steel Engineering Co.,Ltd. Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province Patentee before: China Construction Engineering Group Co.,Ltd. |
|
TR01 | Transfer of patent right |