CN106759089A - A kind of simple harbour of beach based on junked tire and its construction method - Google Patents

A kind of simple harbour of beach based on junked tire and its construction method Download PDF

Info

Publication number
CN106759089A
CN106759089A CN201710073936.0A CN201710073936A CN106759089A CN 106759089 A CN106759089 A CN 106759089A CN 201710073936 A CN201710073936 A CN 201710073936A CN 106759089 A CN106759089 A CN 106759089A
Authority
CN
China
Prior art keywords
steel
junked tire
beach
harbour
balancing weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710073936.0A
Other languages
Chinese (zh)
Inventor
刘金龙
刘洁群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei University
Original Assignee
Hefei University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei University filed Critical Hefei University
Priority to CN201710073936.0A priority Critical patent/CN106759089A/en
Publication of CN106759089A publication Critical patent/CN106759089A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels

Abstract

The invention discloses a kind of simple harbour of the beach based on junked tire and its construction method, including junked tire balancing weight, two kinds of I-steel, connecting plate, concrete slab etc., I-steel one is squeezed into specified location according to field design, one big junked tire balancing weight is inserted on each I-steel one, multiple small junked tire balancing weights are gradually inserted in again, tie-beam is inserted in based on set hole again the top of each I-steel one, tie-beam and I-steel two are connected by connector, I-steel two is set to form parallel girder steel, and the set borehole jack at connecting plate two ends is lived on the I-steel one of each parallel distribution, concrete slab one and concrete slab two are laid on each parallel girder steel again, connected by connector and safety barrier is formed at the top that column and railing are fixed on I-steel one, thus the simple harbour in beach area is constituted.Simple structure of the present invention, easy construction, speed of application is fast, and cost is relatively low, can on demand be reconstructed or be removed.

Description

A kind of simple harbour of beach based on junked tire and its construction method
Technical field:
Technology, more particularly to a kind of simple code of beach based on junked tire are built the present invention relates to the simple harbour in beach area Head and its construction method.
Background technology:
Beach, refers to tide leaching area or the beach between high tide level and low tide, appellation " intertidal zone " on geomorphology.During beach is The important reserve land resources of state, with area it is big, distribution is concentrated, regional conditions are good, farming, animal husbandry and fishery multi-purpose development potential is big Feature.Beach is the important base of aquaculture and developing agricultural production, is exploitation ocean, a preciousness of Development of Marine industry Wealth.
Beach area soft soil, is unfavorable for the carrying of the current and simple goods and materials of personnel.Therefore carrying out agriculture and animal husbandry using beach During fish production, the important location in part need to build simple harbour, facilitate walk.Such harbour, the load for bearing is not Greatly, it is normally only current for pedestrian and non-motor vehicle, and SEA LEVEL VARIATION and seasonal fish production factor need to be considered and had interim Property, intermittence use feature, therefore should not build into permanent form using armored concrete.
And on the other hand, the junked tire that China produces every year is at the forefront in the world, China's junked tire yield in 2013 2.99 hundred million are reached, weight reached 10,800,000 tons, and increased with every year about 8% ~ 10% speed.To the year two thousand twenty, China gives up Old tire annual production will be up to 20,000,000 tons.How safe and environment-friendly treatment junked tire growing day by day, be urgently to be resolved hurrily asking Topic.
If junked tire can be used for the construction of the simple harbour in beach area, beach area on the one hand can be reduced convenience-for-people The cost and difficulty of construction of harbour, on the other hand also for the recycling of junked tire provides new way, it is clear that meet resource sharp again Growth requirement.
It can be seen that, it is necessary to the method for designing that the simple harbour of beach is built using junked tire is inquired into, promotes prior art Innovation and progress.
The content of the invention:
In order to make up the deficiency of prior art problem, it is an object of the invention to provide a kind of simple code of the beach based on junked tire Head and its construction method, its resistance to overturning is high, easy construction, is that building for the regional simple harbour of beach provides a kind of new think of Road.
Technical scheme is as follows:
The simple harbour of beach based on junked tire, it is characterised in that including junked tire balancing weight, two kinds of I-steel, connections Plate, concrete slab, after designing simple harbour size according to space enrironment and geological conditions, design specified location squeeze into longitudinal direction and Horizontal multiple I-steel one, each two row of vertical and horizontal,
A big junked tire balancing weight is set with every I-steel one, is laminated successively on big junked tire balancing weight and is set with Multiple small junked tire balancing weights, each row junked tire balancing weight is pressed into beach to no longer sinking;
Tie-beam is inserted in the every upper end of I-steel one, with the tie-beam two ends on row's I-steel one or one end connection I-steel Two constitute support beam;
Covered on laterally corresponding two in two row's I-steel one position are upper, the longitudinal direction positions of two row's I-steel one are corresponding two Equipped with connecting plate, connecting plate is pressed in tie-beam upper surface;
Laterally the connecting plate upper surface on two row's I-steel one is equipped with concrete slab one, and adjacent concrete plate one is in close contact structure It is open into passage;
Connecting plate upper surface on two row's I-steel one of longitudinal direction is equipped with concrete slab two, and adjacent concrete plate two is in close contact structure Into vertical passage;
The upper end of I-steel one is mounted on column, often arranges transverse upright, often to arrange and be mounted on guardrail on longitudinal column.
The described simple harbour of the beach based on junked tire, it is characterised in that described junked tire balancing weight is useless Simultaneously casting concrete is formed colligation distributing bar in old tire interior grooves space, and is provided with rectangular opening, rectangular opening in center Web height of the length more than I-steel one, the wing plate length of the width of rectangular opening more than I-steel one.
The described simple harbour of the beach based on junked tire, it is characterised in that the middle part of described tie-beam sets set Hole, two ends are provided with fixing hole, cover the web height of the length more than I-steel one in hole, cover the wing of the width more than I-steel one in hole Plate length.
The described simple harbour of the beach based on junked tire, it is characterised in that the two ends of described connecting plate set set Hole, the centre distance in two ends set hole is equal to the centre distance of two row's I-steel one.
The described simple harbour of the beach based on junked tire, it is characterised in that the two ends of described I-steel two are set Fixing hole, it is mutually matched with the fixing hole on tie-beam.
The described simple harbour of the beach based on junked tire, it is characterised in that the top of described I-steel one is set Fixing hole, it is mutually matched with the fixing hole on column.
The described simple harbour of the beach based on junked tire, it is characterised in that described concrete slab one and concrete The length of plate two is more than the outer rim distance of the girder steel of I-steel two that is parallel to each other.
The described simple harbour of the beach based on junked tire, it is characterised in that absolute altitude is set on described interconnection Different low water level job platforms and high water level job platform.
The described simple harbour of the beach based on junked tire, it is characterised in that described interconnection is in lowest water level The exposed face shotcrete of junked tire balancing weight above is simultaneously wiped one's face.
The construction method of the simple harbour of a kind of beach based on junked tire, it is characterised in that comprise the following steps:
1), design simple harbour configuration:
According to factors such as Geological condition, topography and geomorphology, working load, fluctuation of water table scopes, the design simple harbour of beach Configuration, determines the absolute altitude of low water level job platform and high water level job platform, determines the embedded depth of position I-steel one And total height;
2), squeeze into I-steel one:
According to design, I-steel one is squeezed into beach specified location, I-steel one should be squeezed into intensity stratum higher, respectively I-steel one is in vertical state;In addition to low water level job platform position, the top surface absolute altitude phase of each I-steel one at remaining position Together;
3), be inserted in junked tire balancing weight:
One big junked tire balancing weight is inserted on each I-steel one based on rectangular opening, then is gradually inserted in multiple small junked tires Balancing weight, each row junked tire balancing weight be pressed into beach to no longer sink;In addition to low water level job platform position, remaining position The elevation of top of each row junked tire balancing weight at place is consistent;
4), connection I-steel two:
Tie-beam is inserted in based on set hole the top of each I-steel one, is connected and the fixing hole being fixedly connected on beam by connector With the fixing hole on I-steel two, the two ends of I-steel two are made to be connected to form parallel girder steel with I-steel one successively;
5), be inserted in connecting plate:
The set borehole jack at connecting plate two ends is lived on the I-steel one of each parallel distribution and form horizontal fixed structure;
6), laying concrete slab:
Concrete slab one and concrete slab two are carried based on hole for hoist, neat, the parallel paving of concrete slab is made according to position difference It is located on the girder steel of I-steel two of parallel distribution, constitutes road surface and the job platform of harbour;In low water level job platform and Gao Shui Position job platform junction should overlap step for connection;
7), assembling safety barrier:
Connect the fixing hole on column by connector makes to interfix with the fixing hole on the top of I-steel one, then by connector Fix and be connected column and railing, thus constitute harbour channel security guardrail;
8), cement sand plaster:
Exposed face shotcrete to junked tire more than lowest water level is simultaneously wiped one's face.
The beneficial effects of the invention are as follows:
1st, the present invention makes balancing weight using junked tire, and one side junked tire can save template for outer framework, on the other hand Junked tire can be protected effectively only matches somebody with somebody a small amount of distributing bar in the armored concrete in its inside groove, concrete, and can be suitable Building waste, rubble of degree particle diameter etc. are admixed in concrete, and convenient material drawing, overall price is cheap.
2nd, vertical load of the invention makes balancing weight and undertakes and be transferred in stratum by junked tire, and horizontal loading is by each Squeeze into I-steel in the earth formation to undertake, bulk strength is big, the farming, animal husbandry and fishery Production requirement in beach area under general condition can be met.
3rd, the present invention is used generally as provisional, transitional structures, and each component is connected by connector, can basis Needs are shifted and rebuild, according to the opposite operation of construction, quick dismounting and the reconstruction of achievable carried harbour.
4th, simple structure of the present invention, easy construction, fast, the overall cost of mutually piling up speed of application of junked tire balancing weight It is relatively low.
Brief description of the drawings:
Fig. 1 is junked tire counterweight block structure schematic diagram of the invention.
Fig. 2 is that junked tire balancing weight of the invention and I-steel take one and connect schematic diagram.
Fig. 3 is the structural representation of concrete slab of the invention.
Fig. 4 is the structural representation of concrete slab of the invention two.
Fig. 5 is connecting board structure schematic diagram of the invention.
Fig. 6 is tie-beam structural representation of the invention.
Fig. 7 is the structural representation of I-steel of the invention two.
Fig. 8 is pillar construction schematic diagram of the invention.
Fig. 9 is rail structure schematic diagram of the invention.
Figure 10 is corresponding relation schematic diagram before each component assembling of the invention.
Figure 11 is the detail drawing after each component assembling of the invention.
Figure 12 is local assembling schematic diagram of the invention.
Figure 13 is that concrete slab of the invention lays schematic diagram.
Figure 14 is simple dock structure schematic diagram of the invention.
Figure 15 is simple harbour longitudinal plane structure schematic diagram of the invention.
Figure 16 is simple harbour cross-sectional configuration schematic diagram of the invention.
Figure 17 is simple harbour bridge pier completion schematic diagram of the invention.
Figure 18 is simple harbour girder steel completion schematic diagram of the invention.
Figure 19 is that simple harbour of the invention hides concrete board constructions schematic diagram.
Description of reference numerals:1st, small junked tire balancing weight;2nd, armored concrete;3rd, rectangular opening;4th, big junked tire is matched somebody with somebody Pouring weight;5th, I-steel one;6th, fixing hole;7th, concrete slab one;8th, hole for hoist;9th, concrete slab two;10th, connecting plate;11st, cover Hole;12nd, tie-beam;13rd, I-steel two;14th, column;15th, railing;A, low water level job platform;B, high water level job platform;C、 Beach mud face;D, water level face.
Specific embodiment:
Referring to accompanying drawing:
The simple harbour of beach based on junked tire, including junked tire balancing weight, two kinds of I-steel, connecting plates 10, concrete Plate etc., after designing simple harbour according to space enrironment and geological conditions, squeezes into I-steel 1, based on square in design specified location Shape hole 3 is inserted in a big junked tire balancing weight on each I-steel 1, then is gradually inserted in multiple small junked tire balancing weights, Each row junked tire balancing weight be pressed into beach to no longer sink, then based on set hole 11 tie-beam 12 is inserted in each I-steel 1 Top, by connector connect with the fixing hole 6 on the fixing hole 6 that is fixedly connected on beam 12 and I-steel 2 13, make I-shaped Steel 2 13 is connected to form parallel girder steel with I-steel 1 successively, and the set hole 11 at the two ends of connecting plate 10 is entangled each parallel point Horizontal fixed structure is formed on the I-steel 1 of cloth, then concrete slab 1 and concrete slab 29 are laid in each parallel girder steel On, connected by connector and safety barrier is formed at the top that column 14 and railing 15 are fixed on I-steel 1, thus constitute beach Apply the simple harbour in area.
Junked tire balancing weight is for colligation distributing bar in junked tire interior grooves space and casting concrete 2 is formed, And rectangular opening 3 is provided with center, the web height of the length more than I-steel 1 of rectangular opening 3, the width of rectangular opening 3 is more than The wing plate length of I-steel 1;The armored concrete in its inside groove can be effectively protected due to junked tire, therefore can be mixed in concrete Enter building waste and rubble of particle diameter appropriateness etc., further reduce cost;The configuration of junked tire balancing weight is as shown in Figure 1.
Especially, in order to increase contact area, the bottommost of each row junked tire uses big junked tire balancing weight 4, its Yu Jun uses small junked tire balancing weight 1.A diameter of 1m of big junked tire balancing weight 4 or so, and small junked tire balancing weight 1 A diameter of 0.6m ~ 0.7m or so.Bottommost is placed in using big junked tire balancing weight 4, contact area is big, and base pressure becomes It is small, settlement of foundation can be effectively reduced, the planarization to improving simple harbour is favourable.Fig. 2 give each junked tire balancing weight with The connection of I-steel 1.
Two kinds of I-steel are used in carried harbour:Similar to bridge pier, I-steel 2 13 is equivalent to bridge for the effect of I-steel 1 Girder steel between pier.Model and size of the model of I-steel 2 13 with size more than I-steel 1.As I-steel 1 is optional With the I-steel of specification 10 or 12, the I-steel of the optional specification 36a or 40a of I-steel 2 13.The configuration of I-steel 2 13 is such as Shown in Fig. 3.
The two ends of I-steel 2 13 set fixing hole 6, and it is mutually matched with the fixing hole 6 on tie-beam 12.I-steel 1 Top set fixing hole 6, it is mutually matched with the fixing hole 6 on column 14.Each component is connected with each other by connector, convenient Follow-up reconstruction or dismounting.I-steel 2 13 should be designed to full-length, lead between the I-steel 2 13 of each adjacent modular length Cross tie-beam 12 to be fixed with connector, be connected with each other and extension so as to reach.Figure 10 and Figure 11 gives the mutually interconnection of each component Connect corresponding relation.
The middle part of tie-beam 12 sets set hole 11, two ends and is provided with fixing hole 6, covers the length in hole 11 more than I-steel 1 Web height, covers the wing plate length of the width more than I-steel 1 in hole 11.The effect of tie-beam 12 is each I-steel 2 13 of connection Girder steel is formed, and is secured at the position of I-steel 1.The configuration of tie-beam 12 is as shown in Figure 6.
The two ends of connecting plate 10 set set hole 11, and the centre distance in two ends set hole 11 is equal to the center of two row's I-steel 1 Distance.The effect of connecting plate 10 is the connection I-steel one 5 adjacent, parallel with fixation, connects each I-steel 1 and forms overall. The configuration of connecting plate 10 is as shown in Figure 5.
Concrete slab 1 sets hole for hoist 5 with the two ends of concrete slab 29, is used with carrying for lifting.Concrete slab one 7 with the equal length of concrete slab 29, and more than the outer rim distance of the girder steel of I-steel 2 13 that is parallel to each other.Concrete slab 1 with The difference of concrete slab 29 is that the two ends of the side of concrete slab 29 set certain breach, it is to avoid with exposing for I-steel 1 There are Steric clashes in top.The configuration of concrete slab 1 and concrete slab 29 as shown in Figure 3 and Figure 4, the overlap joint of concrete slab It is as shown in figure 13 with distribution.
Fixing hole 6 on column 14 is mutually matched with the fixing hole 6 on the top of I-steel 1, can be mutually solid by connector It is fixed.Column 14 is also mutually matched with the fixing hole of railing 15, can be interfixed by connector.It can be seen that, at simple harbour passage Safety barrier connected by connector and formed with fixed, facilitate follow-up reconstruction or dismounting.The configuration of column 14 and railing 15 As shown in Fig. 8 and Fig. 9, the connection of safety barrier is as shown in figure 11.
Safety barrier is normally only set at the passage of harbour, and for the convenience of operation, at dock operation platform not Safety barrier is set.Figure 14 gives the 3-D view of simple harbour.
In view of the change of beach area tide water level, application of the harbour under various water levels for convenience, spy sets two Different low water level job platform A and high water level job platform B, as shown in figure 14.The passage and high water level job platform B of harbour The absolute altitude for locating concrete slab is consistent, and more than the concrete slab absolute altitude of low water level job platform A.As can be seen here, the passage of harbour And the junked tire balancing weight at high water level job platform B piles up elevation of top unanimously, and given up more than at low water level job platform A Absolute altitude at the top of old tire balancing weight.
Low water level job platform A and high water level job platform B junctions, to form step, shape by piling up for concrete slab Into interconnected passages.When water level is relatively low, fishing boat can be rested in and carry out operation at low water level job platform A;When water level is higher, fishing Ship can be rested in and carry out operation at high water level job platform B.The specific mark of low water level job platform A and high water level job platform B Height should carry out comprehensive determination according to the hydrologic condition in proposed place.
The vertical load bang path for carrying simple harbour is:It is parallel that working load effect is passed to both sides by concrete slab The girder steel of I-steel 2 13, load passes to each row junked tire balancing weight by I-steel 2 13 again, and it is waste and old that load is based on each row Tire weight block passes to beach stratum.The contact area of big junked tire balancing weight is larger, load can be delivered to larger face In long-pending soil layer, base stress is smaller, and advantage is had more for accumulating less base form with respect to other conventional cross-sections.Due to even Outer profile size of the set size of hole 11 more than I-steel 1 on fishplate bar 10 and tie-beam 12, thus I-steel 1 will not constrain, The sinking of I-steel 2 13 and junked tire balancing weight is prevented, I-steel 1 does not undertake vertical traffic loading.
Working load causes each row junked tire balancing weight further to sink, be absorbed in beach stratum, and then causes I-shaped The sinking of steel 2 13.As long as the vertical displacement that each row junked tire balancing weight sinks is identical, then simple harbour still is able to keep flat Whole property.Certainly, if the junked tire balancing weight of some positions sink it is excessive when causing concrete slab irregularity, can be at the position Junked tire balancing weight between add cushion block, compensate its deflection, safeguard the planarization of concrete slab.Harbour should be carried out periodically Safeguard, add cushion block to compensate the excessive position that sinks.After carried harbour is using a period of time, its sedimentation reaches maximum Value, junked tire balancing weight no longer sinks, and now harbour is in the relatively stable stage.
The horizontal loading of carried harbour is undertaken by I-steel 1.Because I-steel 1 is squeezed into intensity stratum higher, Its globality is higher, can bear larger horizontal loading.Each I-steel 1 is connected formation by connecting plate 10 with I-steel 2 13 It is overall, mutually constrain and pin down, constitute stability structure.
Exposed face shotcrete to junked tire more than lowest water level carries out protection of wiping one's face, and prevents it special Condition is burnt, and can also delay the aging of rubber.
The construction method of the simple harbour of beach based on junked tire, is described in detail as follows:
1), design simple harbour configuration:
According to factors such as Geological condition, topography and geomorphology, working load, fluctuation of water table scopes, the design simple harbour of beach Configuration, determines the absolute altitude of low water level job platform A and high water level job platform B, determines the depth of burying of position I-steel 1 Degree and total height.
The parameter of harbour includes passage length, width, absolute altitude, the embedded depth of I-steel 1 and spacing, concrete slab Absolute altitude and intercommunication mode of size, low water level job platform A and high water level job platform B etc..The size of each component answers mutual Match somebody with somebody, can assemble integral.
2), squeeze into I-steel one:
According to design, I-steel 1 is squeezed into beach specified location, I-steel 1 should be squeezed into intensity stratum higher, Each I-steel 1 is in vertical state.In addition to low water level job platform location A, the top surface mark of each I-steel 1 at remaining position It is high identical.
Usually, the length of the I-steel 1 at the larger beach of mud face fluctuation ratio from different places position is differed.One It should insert intensity soil layer formation rock-steady structure higher to aspect, and on the other hand its elevation of top should be identical, can just make to build just Platform absolute altitude at road and high water level job platform B is consistent.
During practice of construction, it is also normal that there is certain error the position of I-steel 1.Because the size for covering hole 11 is omited More than the outline of I-steel 1, it can adapt to the skew within the specific limits of I-steel 1.If but the position of I-steel 1 Skew is too big, and when leading to not assembling, need to construct I-steel 1 again.Therefore ensure construction precision in work progress as far as possible. I-steel 1 should be squeezed into intensity beach stratum higher, just can ensure that the resistance to overturning of harbour.
3), be inserted in junked tire balancing weight:
A big junked tire balancing weight is inserted on each I-steel 1 based on rectangular opening 3, then is gradually inserted in multiple small waste and old wheels Tire balancing weight, each row junked tire balancing weight be pressed into beach to no longer sink.In addition to low water level job platform location A, remaining The elevation of top of each row junked tire balancing weight at position is consistent.
Junked tire balancing weight is for colligation distributing bar in junked tire interior grooves space and casting concrete 2 is formed. By taking common car tyre model 195/60R15 as an example, its cavity volume is about 0.055 m3, after inside groove pouring reinforcement concrete Overall weight is about 130kg.2 ~ 4 people can lift the junked tire balancing weight of the weight and be inserted in I-steel 1.Same engineering In should select same specification small junked tire balancing weight make configuration block.Should junked tire counterweight less as far as possible in construction Collision of the block to I-steel 1, to safeguard overall stability and security.Fig. 2 gives junked tire balancing weight and is inserted in respectively The schematic diagram of I-steel 1.
4), connection I-steel two:
Tie-beam 12 is inserted in based on set hole 11 top of each I-steel 1, connects and be fixedly connected on beam 12 by connector Fixing hole 6 and I-steel 2 13 on fixing hole 6, make I-steel 2 13 two ends be connected to form with I-steel 1 successively it is flat Capable girder steel.
After construction terminates, I-steel 2 13 constitutes the parallel girder steel of two row, for overlap joint and support concrete slab.Figure 18 is given I-steel 2 13 is constructed the structural representation after terminating.
5), be inserted in connecting plate:
The set hole 11 at the two ends of connecting plate 10 is entangled and formed on the I-steel 1 of each parallel distribution horizontal fixed structure.
Figure 12 gives detailed bonding state, and Figure 18 illustrates I-steel 1 and the signal after terminating is assembled with connecting plate 10 Figure.
6), laying concrete slab:
Concrete slab 1 and concrete slab 29 are carried based on hole for hoist 8, makes concrete slab neat, parallel according to position difference It is laid on the girder steel of I-steel 2 13 of parallel distribution, constitutes road surface and the job platform of harbour.Low water level job platform A with High water level job platform B junctions should overlap step for connection.
It is as closely coupled as possible between adjacent concrete plate, improve the ride comfort and comfortableness of platform.Each concrete slab Paving location is as shown in figure 13.
7), assembling safety barrier:
Connect the fixing hole 6 on column 14 by connector makes to interfix with the fixing hole 6 on the top of I-steel 1, then passes through Connector is fixed and is connected column 14 and railing 15, is consequently formed the safety barrier of harbour passage.
Column 14 should meet related specifications requirement with the height of railing 15 with spacing, should have enough intensity, can meet Daily current demand for security.
8), cement sand plaster:
Exposed face shotcrete to junked tire more than lowest water level carries out protection of wiping one's face, and prevents junked tire in spy Burnt in the case of different, also can effectively delay the aging of rubber in junked tire.
Under special circumstances, such as under thunderbolt, the naked light effect of igniting, junked tire may burn, and cause harbour Failure.Therefore junked tire exposed face shotcrete that should be more than lowest water level is formed and wiped one's face, and prevents junked tire in spy Burnt in the case of different.In construction, cement mortar can be made in junked tire surface attachment, fixation, parcel auxiliary geotextile Can firm, the effective protective layer for wrapping junked tire outer surface, forming stabilization.
The present invention is not limited to above-mentioned specific embodiment, according to the above, according to the ordinary technical knowledge of this area And customary means, under the premise of above-mentioned basic fundamental thought of the invention is not departed from, the present invention can also make other diversified forms Equivalent modifications, replace or change, be within the scope of the present invention.

Claims (10)

1. the simple harbour of a kind of beach based on junked tire, it is characterised in that including junked tire balancing weight, two kinds of I-shapeds Steel, connecting plate, concrete slab, after designing simple harbour size according to space enrironment and geological conditions, beat in design specified location Enter multiple I-steel one of vertical and horizontal, each two row of vertical and horizontal,
A big junked tire balancing weight is set with every I-steel one, is laminated successively on big junked tire balancing weight and is set with Multiple small junked tire balancing weights, each row junked tire balancing weight is pressed into beach to no longer sinking;
Tie-beam is inserted in the every upper end of I-steel one, with the tie-beam two ends on row's I-steel one or one end connection I-steel Two constitute support beam;
Covered on laterally corresponding two in two row's I-steel one position are upper, the longitudinal direction positions of two row's I-steel one are corresponding two Equipped with connecting plate, connecting plate is pressed in tie-beam upper surface;
Laterally the connecting plate upper surface on two row's I-steel one is equipped with concrete slab one, and adjacent concrete plate one is in close contact structure It is open into passage;
Connecting plate upper surface on two row's I-steel one of longitudinal direction is equipped with concrete slab two, and adjacent concrete plate two is in close contact structure Into vertical passage;
The upper end of I-steel one is mounted on column, often arranges transverse upright, often to arrange and be mounted on guardrail on longitudinal column.
2. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described junked tire Balancing weight is for colligation distributing bar in junked tire interior grooves space and casting concrete is formed, and is provided with rectangle in center Hole, the web height of the length more than I-steel one of rectangular opening, the wing plate length of the width more than I-steel one of rectangular opening.
3. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described tie-beam Middle part sets set hole, two ends and is provided with fixing hole, covers the web height of the length more than I-steel one in hole, and the width for covering hole is more than work The wing plate length of word steel one.
4. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described connecting plate Two ends set set hole, and the centre distance in two ends set hole is equal to the centre distance of two row's I-steel one.
5. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described I-steel two Two ends set fixing hole, it is mutually matched with the fixing hole on tie-beam.
6. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described I-steel one Top set fixing hole, it is mutually matched with the fixing hole on column.
7. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described concrete slab The one outer rim distance for being more than the girder steel of I-steel two that is parallel to each other with the length of concrete slab two.
8. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described interconnection It is upper that the different low water level job platform of absolute altitude and high water level job platform are set.
9. the simple harbour of the beach based on junked tire according to claim 1, it is characterised in that described interconnection The exposed face shotcrete of the junked tire balancing weight more than lowest water level is simultaneously wiped one's face.
10. the construction method of the simple harbour of a kind of beach based on junked tire, it is characterised in that comprise the following steps:
1), design simple harbour configuration:
According to factors such as Geological condition, topography and geomorphology, working load, fluctuation of water table scopes, the design simple harbour of beach Configuration, determines the absolute altitude of low water level job platform and high water level job platform, determines the embedded depth of position I-steel one And total height;
2), squeeze into I-steel one:
According to design, I-steel one is squeezed into beach specified location, I-steel one should be squeezed into intensity stratum higher, respectively I-steel one is in vertical state;In addition to low water level job platform position, the top surface absolute altitude phase of each I-steel one at remaining position Together;
3), be inserted in junked tire balancing weight:
One big junked tire balancing weight is inserted on each I-steel one based on rectangular opening, then is gradually inserted in multiple small junked tires Balancing weight, each row junked tire balancing weight be pressed into beach to no longer sink;In addition to low water level job platform position, remaining position The elevation of top of each row junked tire balancing weight at place is consistent;
4), connection I-steel two:
Tie-beam is inserted in based on set hole the top of each I-steel one, is connected and the fixing hole being fixedly connected on beam by connector With the fixing hole on I-steel two, the two ends of I-steel two are made to be connected to form parallel girder steel with I-steel one successively;
5), be inserted in connecting plate:
The set borehole jack at connecting plate two ends is lived on the I-steel one of each parallel distribution and form horizontal fixed structure;
6), laying concrete slab:
Concrete slab one and concrete slab two are carried based on hole for hoist, neat, the parallel paving of concrete slab is made according to position difference It is located on the girder steel of I-steel two of parallel distribution, constitutes road surface and the job platform of harbour;In low water level job platform and Gao Shui Position job platform junction should overlap step for connection;
7), assembling safety barrier:
Connect the fixing hole on column by connector makes to interfix with the fixing hole on the top of I-steel one, then by connector Fix and be connected column and railing, thus constitute harbour channel security guardrail;
8), cement sand plaster:
Exposed face shotcrete to junked tire more than lowest water level is simultaneously wiped one's face.
CN201710073936.0A 2017-02-10 2017-02-10 A kind of simple harbour of beach based on junked tire and its construction method Pending CN106759089A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710073936.0A CN106759089A (en) 2017-02-10 2017-02-10 A kind of simple harbour of beach based on junked tire and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710073936.0A CN106759089A (en) 2017-02-10 2017-02-10 A kind of simple harbour of beach based on junked tire and its construction method

Publications (1)

Publication Number Publication Date
CN106759089A true CN106759089A (en) 2017-05-31

Family

ID=58955886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710073936.0A Pending CN106759089A (en) 2017-02-10 2017-02-10 A kind of simple harbour of beach based on junked tire and its construction method

Country Status (1)

Country Link
CN (1) CN106759089A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104066A (en) * 2017-12-27 2018-06-01 浙江大学 A kind of anticollision device, collision-prevention device suitable for harbour
CN110485266A (en) * 2019-08-22 2019-11-22 浙江工业大学 A kind of road-bridge transition section road structure and construction method based on waste tire

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061678A (en) * 2009-11-13 2011-05-18 王锦文 Method for building seaport wharf on soft soil base of coastal beach
CN205636671U (en) * 2016-05-19 2016-10-12 中国电建集团成都勘测设计研究院有限公司 A stake woods dam for mud -rock flow protection
CN206562592U (en) * 2017-02-10 2017-10-17 合肥学院 A kind of simple harbour of beach based on junked tire

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102061678A (en) * 2009-11-13 2011-05-18 王锦文 Method for building seaport wharf on soft soil base of coastal beach
CN205636671U (en) * 2016-05-19 2016-10-12 中国电建集团成都勘测设计研究院有限公司 A stake woods dam for mud -rock flow protection
CN206562592U (en) * 2017-02-10 2017-10-17 合肥学院 A kind of simple harbour of beach based on junked tire

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104066A (en) * 2017-12-27 2018-06-01 浙江大学 A kind of anticollision device, collision-prevention device suitable for harbour
CN110485266A (en) * 2019-08-22 2019-11-22 浙江工业大学 A kind of road-bridge transition section road structure and construction method based on waste tire

Similar Documents

Publication Publication Date Title
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN102352590B (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
CN105350526B (en) Method for setting up steel platform
CN102943440A (en) Method for constructing bridges
CN106869145A (en) Highway embankment partial collapse quick-speed first-aid repair method based on junked tire
CN106088131A (en) Armored concrete cross tower crane and construction method thereof
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN206562592U (en) A kind of simple harbour of beach based on junked tire
CN106759089A (en) A kind of simple harbour of beach based on junked tire and its construction method
CN107558489A (en) The construction method of existing building is worn under a kind of shield
CN106065564B (en) A kind of seamless bridge of steel-concrete combined structure monoblock type
CN110629770A (en) Reservoir side slope hydro-fluctuation belt seepage-proofing slope protection structure and construction method thereof
CN106836134A (en) A kind of utilization junked tire builds the construction method of man-made island in extra large reef area
CN206828906U (en) A kind of temporary pavement bedding structure for Metro Deep Excavation
CN106759471A (en) Arched retaining wall structure and its construction method that a kind of junked tire is constituted
CN110258600B (en) Vertical cofferdam construction method suitable for deepwater area
CN106320184A (en) Novel fabricated bridge construction method
CN110205982A (en) Improve the channel design and its construction method of existing river levee flood control standard
CN110258221A (en) A kind of box frame roadbed
CN105735056A (en) Method for reinforcing railway through piling girders combined with I-steel cross girders
CN206800434U (en) A kind of bridge pile foundation composite reinforcing structure
CN106894302A (en) Sidewalk structure and its construction method that a kind of beach area is built using junked tire
CN110219248B (en) Anti-overturning simple temporary bridge pier construction method and anti-overturning simple temporary bridge construction method
CN113026469A (en) Stress relieving pavement
CN206562550U (en) The sidewalk structure that a kind of beach area is built using junked tire

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531