CN106836134A - Construction method for building artificial island in reef area by using waste tires - Google Patents
Construction method for building artificial island in reef area by using waste tires Download PDFInfo
- Publication number
- CN106836134A CN106836134A CN201710073647.0A CN201710073647A CN106836134A CN 106836134 A CN106836134 A CN 106836134A CN 201710073647 A CN201710073647 A CN 201710073647A CN 106836134 A CN106836134 A CN 106836134A
- Authority
- CN
- China
- Prior art keywords
- junked tire
- balancing weight
- tire balancing
- man
- guide pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- 239000010920 waste tyre Substances 0.000 title abstract 8
- 239000002689 soil Substances 0.000 claims abstract description 28
- 238000004519 manufacturing process Methods 0.000 claims abstract description 10
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 6
- 239000004567 concrete Substances 0.000 claims description 17
- 238000013461 design Methods 0.000 claims description 14
- 238000004062 sedimentation Methods 0.000 claims description 7
- 238000005266 casting Methods 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims description 4
- 239000011378 shotcrete Substances 0.000 claims description 4
- 230000006641 stabilisation Effects 0.000 claims description 4
- 238000011105 stabilization Methods 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 239000013589 supplement Substances 0.000 claims description 4
- 239000011505 plaster Substances 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 239000011083 cement mortar Substances 0.000 abstract 2
- 238000005507 spraying Methods 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 6
- 239000000463 material Substances 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 230000001965 increasing effect Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002245 particle Substances 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 208000034189 Sclerosis Diseases 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007664 blowing Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- 230000001795 light effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- APTZNLHMIGJTEW-UHFFFAOYSA-N pyraflufen-ethyl Chemical compound C1=C(Cl)C(OCC(=O)OCC)=CC(C=2C(=C(OC(F)F)N(C)N=2)Cl)=C1F APTZNLHMIGJTEW-UHFFFAOYSA-N 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/18—Reclamation of land from water or marshes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
- E02B3/066—Quays
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses a construction method for building an artificial island in a marine reef area by using waste tires, which comprises the following steps: designing a bank protection scheme, and determining the position and parameters of the bank protection project of the artificial island; manufacturing a waste tire balancing weight; driving a positioning pile to enable the positioning pile to be inserted into a seabed soil layer with higher strength; sleeving the waste tire balancing weights, sleeving the waste tire balancing weights on the positioning piles, wherein the top elevations of the waste tire balancing weights in each row are consistent; pouring a crown beam, wherein the crown beam connects all the positioning piles to form a whole; implementing hydraulic filling operation, and filling soil gradually to form a stable artificial island platform; and (3) plastering cement mortar, namely spraying the cement mortar on the exposed surface of the waste tire above the lowest water level and plastering. The waste tire balancing weight is simple to manufacture, low in overall price, simple and convenient to construct, high in construction speed and capable of resisting large wind and wave loads, and each positioning pile penetrates through a potential slip crack surface and is driven into a deep soil layer, so that the overall rigidity is high, and large soil pressure can be resisted.
Description
Technical field:
Build artificial in extra large reef area using junked tire the present invention relates to civil engineering fill placement technique field, more particularly to one kind
The construction method on island.
Background technology:
Man-made island is manually to build and inorganic island, is built typically on the basis of island and submerged reef, is to fill in the sea to grow grain
One kind.With population growth and economic development the need for, increasing coastal state is carried out to the islands and reefs of extent of territorial waters
Fill out sea, increase, the requirement even military to meet sea fishery.The man-made island engineering of current Hai Jiao disks is mainly using skill of blowing sand
Art, designated area is blown into by sea sand, and the level land for being higher by sea level is formed by consolidation settlement.
Man-made island reclamation work typically has after first throwing shore protection and fills two kinds of construction methods after first enclosing sea.Protected after first throwing
Bank is that earth and stone material direct throwing at sea is sent in Landed by Lighter, finally builds croy, is primarily adapted for use in and shelters preferable marine site.
First to enclose that fill behind sea be first, by dykes and dams corral in waters needed for man-made island, to stay necessary breach, so that barge transports native stone
Material carries out throwing or carries out waterpower hydraulic reclamation with dredger, is primarily adapted for use in the larger marine site of stormy waves.The structural shape of shore protection is often adopted
With ramp type and stalk formula;Ramp type shore protection uses artificial sand slope, and with block stone, concrete block or artificial special-shaped block bank protection;
Stalk formula shore protection uses steel sheet pile or reinforced concrete sheet pile wall, steel sheet pile lattice structure or caisson, open caisson etc..
On the other hand, the junked tire that China produces every year is at the forefront in the world, and China junked tire yield in 2013 is
Through reaching 2.99 hundred million, weight reached 10,800,000 tons, and increased with every year about 8% ~ 10% speed.To the year two thousand twenty, China is waste and old
Tire annual production will be up to 20,000,000 tons.How safe and environment-friendly treatment junked tire growing day by day, be urgently to be resolved hurrily asking
Topic.
If junked tire can be used for the bank protection structure pattern of manufacturing artificial island reclamation work, shield on the one hand can be reduced
Bank construction costs, raising speed of application, on the other hand also for the recycling of junked tire provides new way, it is clear that meet resource again
The growth requirement for utilizing.
It can be seen that, it is necessary to inquire into and build the construction method of man-made island in extra large reef area using junked tire, promote existing skill
The innovation and progress of art.
The content of the invention:
In order to make up the deficiency of prior art problem, repaiied in extra large reef area using junked tire it is an object of the invention to provide one kind
The construction method of man-made island is built, its simple to operate, speed of application is fast, for man-made island bank-protection works provides a kind of reliable construction skill
Art.
Technical scheme is as follows:
The construction method of man-made island is built in extra large reef area, it is characterised in that comprise the following steps using junked tire:
1), design shore protection scheme:
The factors such as geological conditions, sea level altitude, surging height, dredge fill orientation according to proposed man-made island area, design
The position of man-made island bank-protection works and parameter, determine the embedded depth of guide pile;
2), manufacture junked tire balancing weight:
Stand-by according to design requirement manufacture junked tire balancing weight, junked tire balancing weight uses junked tire interior grooves space
Interior colligation distributing bar and casting concrete composition, and the preformed hole being engaged with guide pile outer wall is provided with center;
3), squeeze into guide pile:
According to design, guide pile is squeezed into upwards in walking for bank-protection works, guide pile uses I-steel, insert guide pile strong
In degree sea bed soil layer higher, and in vertical state;
3), be inserted in junked tire balancing weight:
Junked tire balancing weight uniformly, is symmetrically enclosed within each guide pile based on preformed hole, makes each row junked tire balancing weight
, to no longer sinking, and the elevation of top of each row junked tire balancing weight is consistent for press-in sea bed;
4), pour Guan Liang:
In the top assembling reinforcement of each row junked tire balancing weight, part principal rod can be connected with the welded top of guide pile, pour
Build concrete and constitute Guan Liang;
5), implement hydraulic reclamation operation:
The inside of the bank-protection works formed to junked tire balancing weight carries out hydraulic reclamation operation, progressively fills the soil body, and soil solidifying sinks
Carry out being filled with supplement after drop, gradually form the less stabilization man-made island platform of sedimentation;
6), cement sand plaster:
The sedimentation of the man-made island soil body reaches requirement and after large-scale main body construction terminates, to the outer of lowest water level above junked tire
Show up shotcrete and protection of wiping one's face.
Described utilization junked tire builds the construction method of man-made island in extra large reef area, it is characterised in that described is useless
The preformed hole at old tire balancing weight center is in I-shaped shape, outer profile size of its size more than guide pile.
Described utilization junked tire builds the construction method of man-made island in extra large reef area, it is characterised in that described hat
Beam is made up of reinforcing bar casting concrete, and the top of each row junked tire balancing weight connects and composes entirety by Guan Liang.
The beneficial effects of the invention are as follows:
1st, the present invention makes balancing weight using junked tire, and one side junked tire can save template for outer framework, on the other hand
Junked tire can be protected effectively only matches somebody with somebody a small amount of distributing bar in the armored concrete in its inside groove, concrete, and can be suitable
Building waste, rubble of degree particle diameter etc. are admixed in concrete, and convenient material drawing, overall price is cheap.
2nd, each guide pile of the invention is squeezed into deeper soil layer through Potential failure surface, and its top carries out " lock by Guan Liang
Mouthful ", overall bending resistance is big with shearing strength, can resist the soil pressure of man-made island reclamation work generation, and can bear larger stormy waves
Load, can effectively safeguard the shape of man-made island.
3rd, the present invention is inserted in the bank-protection works that guide pile forms closing by junked tire balancing weight, constructs simple and convenient,
Speed of application is fast, and construction is influenceed smaller by marine harsh weather.
Brief description of the drawings:
Fig. 1 is junked tire block structure schematic diagram of the invention.
Fig. 2 is the assembling schematic diagram of junked tire building block of the invention and guide pile.
Fig. 3 is man-made island structural representation of the invention.
Fig. 4 is N-N profiles.
Fig. 5 is double contour junked tire assembling mode profile of the invention.
Fig. 6 is double not contour junked tire assembling mode profile of the invention.
Fig. 7 is the not contour junked tire assembling mode profile of three row of the invention.
Description of reference numerals:1st, junked tire;2nd, armored concrete;3rd, preformed hole;4th, guide pile;5th, Guan Liang;6th, fill out
Soil;A, sea bed;B, sea level.
Specific embodiment:
Referring to accompanying drawing:
The construction method of man-made island is built in extra large reef area using junked tire, specific implementation step is described in detail as follows:
1), design shore protection scheme:
The factors such as geological conditions, sea level altitude, surging height, dredge fill orientation according to proposed man-made island area, design
The position of man-made island bank-protection works and parameter, determine the embedded depth of guide pile 4.
Fig. 4 gives the schematic diagram that single junked tire balancing weight constitutes bank protection structure.Also can use double contour, double
The not contour, combination that three rows are not contour, as shown in Fig. 5 ~ Fig. 7.When the filled height of islands and reefs is little, can be using single useless
The bank protection structure of old tire balancing weight composition;When the filled height of islands and reefs is larger, the soil pressure that it is produced is larger, can use many
The bank protection structure of waste discharge old tire balancing weight composition, its overall lateral deformation stiffness is big, can effectively safeguard the stability of man-made island.
2), manufacture junked tire balancing weight:
Stand-by according to design requirement manufacture junked tire balancing weight, junked tire balancing weight uses junked tire interior grooves space
Interior colligation distributing bar and casting concrete composition, and the preformed hole being engaged with guide pile outer wall is provided with center;
3), squeeze into guide pile:
According to design, guide pile 4 is squeezed into upwards in walking for bank-protection works, guide pile 4 is inserted intensity seabed soil higher
In layer, and in vertical state.
Guide pile 4 should be squeezed into intensity foundation soil higher through Potential failure surface position, and it can play similar antiskid
The effect of stake;Man-made island fills usually subregion, piecemeal iterative method, therefore guide pile 4 also answers subregion, piecemeal progressively to apply
Work, to meet the demand of construction space arrangement.
4), be inserted in junked tire balancing weight:
Junked tire balancing weight uniformly, is symmetrically enclosed within each guide pile 4 based on preformed hole 3, makes each row junked tire counterweight
Block is pressed into sea bed to no longer sinking, and the elevation of top of each row junked tire balancing weight is consistent.
Junked tire balancing weight is for colligation distributing bar in the interior grooves space of junked tire 1 and casting concrete 2 is formed.
By taking common car tyre model 195/60R15 as an example, its cavity volume is about 0.055 m3, after inside groove pouring reinforcement concrete
Overall weight is about 130kg.2 ~ 4 people can lift the junked tire balancing weight of the weight and be inserted in guide pile 4.In same engineering
The junked tire of same specification should be selected to make configuration block.In construction should junked tire balancing weight less as far as possible to guide pile
4 collision, to safeguard overall stability and security.Fig. 2 gives the detailed feelings that junked tire balancing weight is inserted in guide pile 4
Condition.
One side junked tire can save template for outer framework, and another aspect junked tire can be protected effectively in its inside groove
Only match somebody with somebody a small amount of distributing bar in armored concrete, concrete, and the building waste of appropriate particle diameter, rubble etc. can be admixed mixed
In solidifying soil, convenient material drawing, overall price is cheap.
If extra large reef surficial geology is soft, each row junked tire balancing weight will sink into the soil layer of certain depth under Gravitative Loads
In, by certain depth of further sinking during the use of subsequent artefacts island.Make junked tire balancing weight complete as far as possible in construction
Into certain settling amount.The elevation of top of each row junked tire balancing weight is typically difficult to strict conformance, can be in junked tire balancing weight
Between add different-thickness bed course mode, make the elevation of top of each row junked tire balancing weight basically identical.
5), pour Guan Liang:
In the top assembling reinforcement of each row junked tire balancing weight, part principal rod can be connected with the welded top of guide pile 4, pour
Build concrete and form Guan Liang 5.
Guan Liang 5 connects all of guide pile 4 to form entirety, and the ability of soil pressure is kept out in enhancing jointly.Guan Liang 5 is often
Curve, broken line shape, it is identical with the profile of man-made island, and Fig. 3 gives the distribution situation of Guan Liang 5.
6), implement hydraulic reclamation operation:
The inside of the bank-protection works formed to junked tire balancing weight carries out hydraulic reclamation operation, progressively fills the soil body, and soil solidifying sinks
Carry out being filled with supplement after drop, gradually form the less stabilization man-made island platform of sedimentation.
Compactness, Water drainage system design of man-made island etc. are filled, is performed according to related specifications requirement.General implementation is repeatedly filled out
Build, carry out being filled with supplement after the closely knit sedimentation of constructing soil, through consolidation and sclerosis after a while, ultimately form man-made island soil layer with ground
Face.
7), cement sand plaster:
The sedimentation of the man-made island soil body reaches requirement and after large-scale main body construction terminates, to the outer of lowest water level above junked tire
Shotcrete of showing up carries out protection of wiping one's face, and prevents junked tire from burning under special circumstances, also can effectively delay to give up
Rubber is aging in old tire.
Under special circumstances, such as under thunderbolt, the naked light effect of igniting, junked tire may burn, and cause shore protection work
The failure of journey.Therefore junked tire exposed face shotcrete that should be more than lowest water level is formed and wiped one's face, and prevents junked tire
Burn under special circumstances.In construction, cement can be made in junked tire surface attachment, fixation, parcel auxiliary geotextile
Mortar can firm, the effective protective layer for wrapping junked tire outer surface, forming stabilization.
Man-made island bank-protection works suffers from storm at sea, wave and washes away, and the shore protection that junked tire balancing weight is formed
Engineering, its attack that can be effective against stormy waves, overall expenses is low, is a kind of economic design.
The present invention compared with prior art, with advantages below:Junked tire makes balancing weight and makes simple, overall price
It is cheap, easy to use, economical and practicality;Each guide pile is squeezed into deeper soil layer through Potential failure surface, thereon
Portion is carried out " fore shaft " by Guan Liang, and overall bending resistance is big with shearing strength, can resist the soil pressure of man-made island reclamation work generation, and
Larger stormy waves load can be born, the shape of man-made island can be effectively safeguarded;Guide pile is inserted in by junked tire balancing weight to be formed
The bank-protection works of closing, is constructed simple and convenient, and speed of application is fast, and construction is influenceed smaller by marine harsh weather.
The present invention is not limited to above-mentioned specific embodiment, according to the above, according to the ordinary technical knowledge of this area
And customary means, under the premise of above-mentioned basic fundamental thought of the invention is not departed from, the present invention can also make other diversified forms
Equivalent modifications, replace or change, be within the scope of the present invention.
Claims (3)
1. a kind of utilization junked tire builds the construction method of man-made island in extra large reef area, it is characterised in that comprise the following steps:
1), design shore protection scheme:
The factors such as geological conditions, sea level altitude, surging height, dredge fill orientation according to proposed man-made island area, design
The position of man-made island bank-protection works and parameter, determine the embedded depth of guide pile;
2), manufacture junked tire balancing weight:
Stand-by according to design requirement manufacture junked tire balancing weight, junked tire balancing weight uses junked tire interior grooves space
Interior colligation distributing bar and casting concrete composition, and the preformed hole being engaged with guide pile outer wall is provided with center;
3), squeeze into guide pile:
According to design, guide pile is squeezed into upwards in walking for bank-protection works, guide pile uses I-steel, insert guide pile strong
In degree sea bed soil layer higher, and in vertical state;
3), be inserted in junked tire balancing weight:
Junked tire balancing weight uniformly, is symmetrically enclosed within each guide pile based on preformed hole, makes each row junked tire balancing weight
, to no longer sinking, and the elevation of top of each row junked tire balancing weight is consistent for press-in sea bed;
4), pour Guan Liang:
In the top assembling reinforcement of each row junked tire balancing weight, part principal rod can be connected with the welded top of guide pile, pour
Build concrete and constitute Guan Liang;
5), implement hydraulic reclamation operation:
The inside of the bank-protection works formed to junked tire balancing weight carries out hydraulic reclamation operation, progressively fills the soil body, and soil solidifying sinks
Carry out being filled with supplement after drop, gradually form the less stabilization man-made island platform of sedimentation;
6), cement sand plaster:
The sedimentation of the man-made island soil body reaches requirement and after large-scale main body construction terminates, to the outer of lowest water level above junked tire
Show up shotcrete and protection of wiping one's face.
2. utilization junked tire according to claim 1 builds the construction method of man-made island in extra large reef area, and its feature exists
In the preformed hole at described junked tire balancing weight center is in I-shaped shape, outer profile size of its size more than guide pile.
3. utilization junked tire according to claim 1 builds the construction method of man-made island in extra large reef area, and its feature exists
In described Guan Liang is made up of reinforcing bar casting concrete, and the top of each row junked tire balancing weight is connected and composed whole by Guan Liang
Body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073647.0A CN106836134A (en) | 2017-02-10 | 2017-02-10 | Construction method for building artificial island in reef area by using waste tires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710073647.0A CN106836134A (en) | 2017-02-10 | 2017-02-10 | Construction method for building artificial island in reef area by using waste tires |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836134A true CN106836134A (en) | 2017-06-13 |
Family
ID=59121580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710073647.0A Pending CN106836134A (en) | 2017-02-10 | 2017-02-10 | Construction method for building artificial island in reef area by using waste tires |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836134A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109129883A (en) * | 2018-10-08 | 2019-01-04 | 励土峰 | A kind of method for manufacturing for filling out extra large unit |
CN109162253A (en) * | 2018-10-08 | 2019-01-08 | 励土峰 | Extra large unit is filled out in a kind of pressure stabilizing being self-regulated |
CN110230318A (en) * | 2019-06-25 | 2019-09-13 | 中交上海航道勘察设计研究院有限公司 | Raft foundation structure for the construction of lake region man-made island |
CN110952572A (en) * | 2019-11-08 | 2020-04-03 | 江苏科技大学 | Waste tire strip reinforced soft slope structure and construction method thereof |
CN112814198A (en) * | 2021-02-26 | 2021-05-18 | 贵州锦丰矿业有限公司 | Simple partition wall for ore yard |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5035541A (en) * | 1990-07-30 | 1991-07-30 | Mobil Oil Corporation | Rubble-spray ice island |
CN101581086A (en) * | 2009-06-12 | 2009-11-18 | 中交二航局第三工程有限公司 | Positioning riprapping method for constructing island breakwater of artificial island |
CN104120699A (en) * | 2014-05-20 | 2014-10-29 | 中交第二航务工程局有限公司 | Steel sheet pile bucket foundation artificial island dado structure |
CN104652392A (en) * | 2014-12-22 | 2015-05-27 | 中交第三航务工程局有限公司 | Multifunctional tooling bracket for assembling and disassembling main lattice cylinder positions of large cylinders of lattice steel sheet piles |
CN205636671U (en) * | 2016-05-19 | 2016-10-12 | 中国电建集团成都勘测设计研究院有限公司 | A stake woods dam for mud -rock flow protection |
-
2017
- 2017-02-10 CN CN201710073647.0A patent/CN106836134A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5035541A (en) * | 1990-07-30 | 1991-07-30 | Mobil Oil Corporation | Rubble-spray ice island |
CN101581086A (en) * | 2009-06-12 | 2009-11-18 | 中交二航局第三工程有限公司 | Positioning riprapping method for constructing island breakwater of artificial island |
CN104120699A (en) * | 2014-05-20 | 2014-10-29 | 中交第二航务工程局有限公司 | Steel sheet pile bucket foundation artificial island dado structure |
CN104652392A (en) * | 2014-12-22 | 2015-05-27 | 中交第三航务工程局有限公司 | Multifunctional tooling bracket for assembling and disassembling main lattice cylinder positions of large cylinders of lattice steel sheet piles |
CN205636671U (en) * | 2016-05-19 | 2016-10-12 | 中国电建集团成都勘测设计研究院有限公司 | A stake woods dam for mud -rock flow protection |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109129883A (en) * | 2018-10-08 | 2019-01-04 | 励土峰 | A kind of method for manufacturing for filling out extra large unit |
CN109162253A (en) * | 2018-10-08 | 2019-01-08 | 励土峰 | Extra large unit is filled out in a kind of pressure stabilizing being self-regulated |
CN110230318A (en) * | 2019-06-25 | 2019-09-13 | 中交上海航道勘察设计研究院有限公司 | Raft foundation structure for the construction of lake region man-made island |
CN110952572A (en) * | 2019-11-08 | 2020-04-03 | 江苏科技大学 | Waste tire strip reinforced soft slope structure and construction method thereof |
CN112814198A (en) * | 2021-02-26 | 2021-05-18 | 贵州锦丰矿业有限公司 | Simple partition wall for ore yard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836134A (en) | Construction method for building artificial island in reef area by using waste tires | |
CN102518135B (en) | Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method | |
CN105697021B (en) | The prefabricated tunnel and construction method in the shallow earthing riverbed of shield crossing | |
CN101250868B (en) | Precipitation prepressing association motive power induration deep densification method | |
CN205530114U (en) | To drawing formula steel pipe sheet pile wharf structure | |
CN101509261B (en) | Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation | |
CN103696784B (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN102995602A (en) | Structure and construction method of muddy coast sheet pile wharf | |
CN103374900B (en) | Build the gravity type quay on muddy foundation and construction method thereof | |
CN103334450B (en) | Construction method of pile precast slab retaining wall with drainage ditch | |
CN105780719A (en) | Heightened construction method for active service stone building bank protecting wall | |
CN110374111A (en) | A kind of slope cooperates with support system with steel pipe piled anchor | |
CN101260664A (en) | Soft soil foundation large scale steel float lock head construction method | |
CN106869145A (en) | Rapid rush-repair method for local collapse of highway embankment based on waste tires | |
CN102296591A (en) | Rapid drainage solidifying treatment method of soft soil foundation | |
CN202626934U (en) | Gravity wharf built on silty foundation | |
CN206385525U (en) | A kind of timber structure for preventing the high backfill earthwork from sinking | |
CN113047215A (en) | Middle plate pile high pile wharf structure | |
CN209873819U (en) | Prevention and control structure of ultrahigh steep rock slope system | |
CN201502065U (en) | Anchor rod joint excavation compound basis | |
CN206800314U (en) | Rubble-mound foundation gravity type quay | |
CN203247580U (en) | Construction structure of cast-in-place concrete pile of deep soft soil foundation bridge girder | |
CN206562592U (en) | Simple mudflat wharf based on waste tires | |
CN213709501U (en) | Temporary pile applied to hard riverbed | |
CN105568871B (en) | A kind of method based on using the interim abutment construction of container progress emergency bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |
|
RJ01 | Rejection of invention patent application after publication |