CN109129883A - A kind of method for manufacturing for filling out extra large unit - Google Patents

A kind of method for manufacturing for filling out extra large unit Download PDF

Info

Publication number
CN109129883A
CN109129883A CN201811169827.XA CN201811169827A CN109129883A CN 109129883 A CN109129883 A CN 109129883A CN 201811169827 A CN201811169827 A CN 201811169827A CN 109129883 A CN109129883 A CN 109129883A
Authority
CN
China
Prior art keywords
extra large
large unit
pressure
internal bladder
out extra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811169827.XA
Other languages
Chinese (zh)
Other versions
CN109129883B (en
Inventor
励土峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshan Xingqi Electric Appliance Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811169827.XA priority Critical patent/CN109129883B/en
Publication of CN109129883A publication Critical patent/CN109129883A/en
Application granted granted Critical
Publication of CN109129883B publication Critical patent/CN109129883B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of method for manufacturing for filling out extra large unit, comprising the following steps: customized elastic internal bladder, waterproof membrane sealing pressing form casting model, lay reserved hole location, manufacture casting mold, casting shell, pipe laying, filling pressurising medium installation valve to form pressurized sealed container.The valve switch can be controlled the pressurising medium by the variation of pressure and pass in and out the inner cavity, to adjust the pressure of inner cavity to remain described and fill out extra large unit and extraneous pressure equilibrium.Extra large unit is filled out using hollow design, leak resistance is good, inside perfusion seawater, filling rubbish and pressurized air, make the structure such as pneumatic tire for entirely filling out extra large unit, it is pressurized to fill out extra large unit by interior hydraulic pressure effect bulging, increasing whole rigidity makes its bearing capacity be far longer than isometric common sandy soil, and the valve switch can be controlled pressurising medium by the variation of pressure and pass in and out the liner, to adjust the internal pressure of liner to remain described and fill out extra large unit and extraneous pressure equilibrium.

Description

A kind of method for manufacturing for filling out extra large unit
Technical field
The invention belongs to production of construction materials manufacturing technology field, it is primarily intended to fill out sea, reclaiming land around sea material manufacturing skill A kind of art field, and in particular to method for manufacturing for filling out extra large unit.
Background technique
It is measured according to scientific instrument, earth surface ocean possesses about 71%, and land area only accounts for about 29%, totally comes It says, land concentrates on east, the Northern Hemisphere, and ocean concentrates on west, the Southern Hemisphere, if the earth is divided into water hemisphere and the continental hemisphere, and land It is still ocean area on hemisphere more than land.Human lives are in land, however land resources are limited, and due to going through The development factors problem such as history, country causes Crowds Distribute uneven, and the land per capita of many countries and regions is per capita well below the world Land-used level.The even each macroplate in land is relatively stable, and ocean is to surround landing field, therefore the land area of coastal area lacks it It is again few.However, the superior items such as the weather conditions of coastal area, natural environment, communications and transportation are that inland is not had, because This, many countries all take much count of the utilization or bay marine reclamation land of beach.
China's Perioperative cardiac events activity since last century five, the sixties, to last century Mo, coastal area Perioperative cardiac events make ground Product is up to 1.2 ten thousand square kilometres, and 230 to 240 square kilometres of Perioperative cardiac events, national then in view of protecting the marine environment every year on average Perioperative cardiac events scale is all controlled at more than 100 square kilometres or so every year.Bohai Sea Gulf reclamation, South Sea straits reclamation, platform Gulf straits reclamation, the construction of this three large-engineering are impeded, economy, nationality in no chains so that coastal area of china is iron-plated Great unity and military meaning are very big.
But reclamation is great, difficulty is heavy, arrives engineering proposal and overall structure, as low as material reclamation and construction greatly Step directly affects and fills stability and practicability that waters builds the land come.Currently, marine reclamation land engineering It is main using blow sand, cofferdam, the methods of cut into a mountain whole landfill, material, equipment and its source needed for great engineering transport, apply The engineering process such as the spare placement of work processing are arduous, time-consuming consumption wealth effort.Therefore simplify manufacture fill out extra large operation substrate caisson, Save reclamation resource, shorten fill out sea construction working hour will be of great significance.
Summary of the invention
The invention aims to solve above-mentioned technical problem, a kind of pre-manufactured is provided manufactures and fill out extra large unit material, Connection combine it is multiple fill out the formation of extra large unit material and fill out extra large quality, be conducive to simplify the manufacturing work for filling out extra large operation unit material Skill saves reclamation resource, shortens and fills out sea construction working hour.
To solve the above-mentioned problems, the present invention is achieved by following technical scheme:
A kind of method for manufacturing for filling out extra large unit of the present invention, comprising the following steps:
The inner hollow of S1, the customized elastic internal bladder of the shape according to needed for filling out extra large unit, the elastic internal bladder are formed in one The internal chamber wall of chamber, elastic internal bladder is processed by sealing and anti-leakage, and the inner cavity of the liner is for accommodating pressurising medium;
S2, pressurization is sealed using outer surface of the waterproof membrane to elastic internal bladder;
S3, the several bulk steel meshes of establishment, the steel mesh are connect by auxiliary bar with elastic internal bladder, and by steel mesh Be fixed on the periphery of elastic internal bladder, and by all steel meshes be spliced into it is described fill out extra large unit needed for shape cylinder mould, form casting Model forms casting ring cavity between cylinder mould and elastic internal bladder;
S4, several reserved hole locations are laid on the casting model, the reserved hole location is used for pipe laying, the inner cavity It can be connected to by the pipeline with the external world, the pipeline is for filling and discharging pressurising medium;
S5, manufacture casting mold, the casting mold shape size matches with the casting model, and casting mold is opened Mouth is upwards;
S6, the casting model is hung onto the casting mold, toward the intracavitary fill concrete of the pouring loop, and is supported For shield to its solidification, what the concrete setting was formed is the shell for filling out extra large unit;
S7, the shell is separated into the casting mold, the pipe laying in the reserved hole location;
S8, by the pipeline toward the lumen loading pressurising medium of the liner, and valve switch is installed on pipeline, Pressurized sealed container is formed, makes described to fill out extra large unit there is certain internal pressure before construction;The valve switch can be by The variation of pressure passes in and out the inner cavity to control the pressurising medium, to adjust the pressure of inner cavity to remain described and fill out Hai Dan Member and extraneous pressure equilibrium.
Preferably, the pressurising medium includes pressurized air, rubbish and seawater.Air can be obtained with seawater from nature It takes, rubbish can be shipped from soot or construction site (containing discarded building materials or waste material etc.), cheap manufacturing cost and in a steady stream not Disconnected resource acquisition, the problem of shortage of resources can be alleviated, while garbage disposal can be efficiently solved the problems, such as again.Rubbish In liner, there is extra large water and air, it may occur that the chemical reaction such as decomposition, the gas of generation can supplement the pressurizing air consumed Gas, so that liner internal pressure keeps stablizing, this is a technical essential of adjustment with the overall stability for guaranteeing to fill out extra large unit.
Preferably, the step S7: further including that several pressure release passages, the pressure release passage are installed in the reserved hole location The inner cavity can be in communication with the outside, and pressure release passage is located on cylinder mould corresponding to described fill out at the top of extra large unit, the pressure release Channel is provided with limiting device;
It is corresponding, the step S8 further include: pressure regulator matched with pressure release passage, the tune are installed in pressure release passage Depressor is limited to pass in and out sliding in pressure release passage, so as to by changing pressurization by the liner and extraneous pressure action Medium reaches the pressure equilibrium of liner and the external world in the interior space of the liner.Air and seawater can be from natures Obtained in boundary, rubbish can be shipped from soot or construction site (containing discarded building materials or waste material etc.), cheap manufacturing cost and Endlessly resource acquisition, the problem of shortage of resources can be alleviated, while garbage disposal can be efficiently solved again and asked Topic.Rubbish has extra large water and air in liner, it may occur that the chemical reaction such as decomposes, the gas of generation, which can supplement, to be consumed Pressurized air, so that liner internal pressure keeps stablizing, this is that adjustment is wanted with a technology for guaranteeing the overall stability for filling out extra large unit Point.
Preferably, step S4, pipeline described in S7, S8 includes: water inlet pipe, gas-guide tube and big flow water inlet tube body;
It is corresponding, the step S8 further include:
I) tube body intake toward the lumen loading rubbish of the liner by big flow, the volume of the rubbish is no more than liner The 50% of space after rubbish is filled, installs compression spring switch and interior sealing cover in big flow water inlet pipe body, described Interior sealing cover is located at big flow water inlet tube body at one end port at liner center, switchs elastic connection using compression spring Interior sealing cover makes compression spring switch elastic deformation be occurred by ambient pressure to control the interior sealing cover and block or open The big flow water inlet tube body;
II) drain valve is first installed on water inlet pipe one way stop peturn valve is installed again, the drain valve be mounted on it is described it is unidirectional only It returns on the water inlet pipe between valve and the shell;
III) boost charge-air mouth to be first installed on gas-guide tube exhaust valve is installed again, the boost charge-air mouth is mounted on the row Between air valve and the shell for filling out extra large unit.
The big flow water inlet pipe body can when extra large unit is filled out in reclamation construction and installation, rapidly irrigated for seawater into The liner, and big flow water inlet tube body bore is larger, the process carried out inside the liner can be from big flow water inlet tube body Place enters processing;In view of Gravity Problem, the big flow water inlet tube body is mounted on the top for filling out extra large unit or top week The place enclosed, the engagement edge between big flow water inlet tube body and the shell, the liner are needed with cement and waterproof material Sealing sutures, also very high crack resistence performance and preventing water leakage performance;
Drain valve can be opened manually come the pressurising medium for draining liner, and one way stop peturn valve is only when external pressure is greater than When liner internal pressure, seawater washes valve open and enters liner, and the pressurising medium inside liner can not be from the one-way non-return on drainpipe Valve is discharged into the external world;
Boost charge-air mouth is used to inculcate into liner air high speed for external pressurization pump, makes to fill out extra large unit plenum and rouse It is swollen;Exhaust valve is gas unidirectional check-valves, and when liner internal pressure is excessively high, gas washes the exhaust valve portion gas discharge external world open to protect The inside and outside pressure equilibrium for filling out extra large unit is held, to guarantee its stability.
Preferably, the step S4 further include: when laying reserved hole location, on elastic internal bladder on the corresponding channel opened up, Its conduit wall is brushed or is sprayed one layer of waterproof material, rubber coating, plastic paint and tree can be used in the waterproof material One kind in grease coating material at least within.It prevents shell from slight crack occur or is easily damaged liner from pipeline edge infiltration long-time.
Preferably, the specific operation for being sealed pressurization to the outer surface of elastic internal bladder in the step S2 is: first existing It is brushed on the outer surface of elastic internal bladder or sprays one layer of waterproof material, rubber coating, plastic paint can be used in the waterproof material With one kind in cold coating at least within, then the waterproof membrane applied into certain pulling force it is wrapped in the elastic internal bladder and apply Have on the outer surface of waterproof material, the outer surface of the elastic internal bladder can be completely covered in the waterproof membrane.It is wrapped up in by waterproof membrane Tight elastic internal bladder, but the general shape of liner is constant, and small deformation only occurs, it is intermolecular by having compressed elastic internal bladder Spacing, improve its bearing capacity;In the outer surface of elastic internal bladder, multilayer flashing processing is logical for waterproof material and waterproof membrane Leak resistance has been crossed, has guaranteed the durability for filling out extra large unit.
Preferably, the waterproof membrane in the step S2 can be used in rubber material, plastic material or resin material at least Waterproof membrane made of one such material;The material of resin or rubber or plastic foamed formation can be used in the elastic internal bladder It is processed into;A kind of liquid material in rubber, plastics and resin material at least within can be used in the internal chamber wall of the elastic internal bladder Material is sealed leakproof processing with the processing method for spraying or brushing.So that liner high resilience, can adapt to inside and outside pressure Deformation caused by variation and deformation restore.
Preferably, after completing above-mentioned steps S6, then it is sequentially repeated primary described step S4, S5, S6, to be poured to be formed One layer of thicker shell, then followed by the completion step S7 and step S8.The shell of different-thickness is outpoured according to required pour, Period can also add reinforcing bar, to improve load-bearing and the anti-deformation of shell.
Preferably, the step S8 further include: using external pressure pump forced air and pass through boost charge-air mouth toward liner Forced air is inculcated, to improve liner internal pressure.Pressurized air is one of technical point of the invention, like the tire of inflation, enhancing Load-bearing capacity.
Preferably, further include step S9: several connection rings, the connection ring root being installed using bolt on the housing Deep to be inserted into the shell, connection ring is made of stainless steel, carbon steel, carbon fiber or other corrosion-resistant and hard materials.Fill out sea Unit long service needs strong corrosion resistance in seabed, and billow its pulling force in seabed is strong, and connection ring is used to adjacent fill out sea Unit links together, and improves the stability of reclamation.
Compared with prior art, the beneficial effects of the present invention are:
1, the production method provided through the invention large batch of can produce it is above-mentioned fill out extra large unit, can effectively contract The Practical Project time of short reclamation, and production procedure is not difficult, resource needed for saving great reclamation, utilizes It is above-mentioned fill out extra large unit and fill out sea the effects of physical mechanics is dexterously utilized, greatly reduce engineering difficulty, save many constructions Step effectively saves transport of materials cost using buoyant of sea water.Meanwhile even more important utilization seawater, rubbish and air Raw material that equal natures can be obtained inexpensively replace a large amount of sandy soil and structural framing required for traditional reclamation, have Alleviate resource scarcity problem in effect ground.
2, secondly, using the production method provided by the invention for filling out extra large unit produce it is above-mentioned fill out extra large unit, fill out Hai Dan Member is whole to use hollow design, and the air of inside perfusion seawater, the rubbish of filling and increase implantation makes entirely to fill out extra large unit Structure and use principle such as pneumatic tire, it is pressurized to fill out extra large unit bulging is acted on by interior hydraulic pressure, it is whole rigid to increase it Property so that its bearing capacity is far longer than isometric common sandy soil, and elastic internal bladder and concrete reinforcement shell are poured to form one, In conjunction with the function pipeline and adjuster of installation, the disengaging of pressurising medium is controlled by setting valve, to adjust the pressure of liner By force to maintain the internal pressure for filling out extra large unit and extraneous pressure equilibrium to ensure that the stability of reclamation, using rubber or plastics Or the product that resin is derived is as liner and waterproof material, so that filling out extra large unit has good leak resistance and durable Property, it ensure that long-time stability for reclamation.
Detailed description of the invention
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing, in which:
Specific embodiments of the present invention will be described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is manufacturing flow chart of the invention;
Fig. 2 is the structural schematic diagram that elastic internal bladder 1 of the present invention is wrapped waterproof membrane 13;
Fig. 3 is the schematic diagram of the step S3 of the invention;
Fig. 4 is the schematic diagram of the step S4 of the invention;
Fig. 5 is the schematic diagram of the step S6 of the invention;
Fig. 6 is to manufacture the structural schematic diagram for filling out extra large unit obtained by method for manufacturing of the present invention.
In figure: 1 elastic internal bladder;11 inner cavities;12 pressurising mediums;13 waterproof membranes;2 shells;21 steel meshes;22 auxiliary bars; 23 cylinder moulds;3 casting models;31 reserved hole locations;32 casting ring cavities;4 casting molds;5 pipelines;51 pressure release passages;511 pressure regulators; 52 water inlet pipes;521 drain valves;522 one way stop peturn valves;53 gas-guide tubes;531 boost charge-air mouths;532 exhaust valves;54 big flows into Water pipe body;541 compression springs switch;Sealing cover in 542;6 connection rings.
Specific embodiment
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
As shown in Fig. 1~Fig. 6, a kind of method for manufacturing for filling out extra large unit of the present invention, comprising the following steps:
The inner hollow of the customized elastic internal bladder 1 of S1, the shape according to needed for filling out extra large unit, the elastic internal bladder 1 forms one The internal chamber wall of inner cavity 11, elastic internal bladder 1 is processed by sealing and anti-leakage, and the inner cavity 11 of the elastic internal bladder 1 is situated between for accommodating pressurization Matter 12;
As a preferred embodiment, resin or rubber can be used in the elastic internal bladder 1 or the material of plastic foamed formation adds Work is made, and using the elastic internal bladder 1 that foamed material is customized in the present embodiment, but the material of elastic internal bladder of the present invention 1 is not only It is only limitted to foamed material, it can also be using other elasticity and with the material of certain stable state volume;
As a preferred embodiment, the internal chamber wall of the elastic internal bladder 1 can be used in rubber, plastics and resin material at least One such liquid material is sealed leakproof processing with the processing method for spraying or brushing;In the present embodiment, spraying Or the tool brushed puts in elastic internal bladder 1 resin material that one layer of liquid is first brushed to its internal chamber wall, then sprays one layer of liquid Rubber material, double-layer seal leakproof coating ensure that the leak resistance of elastic internal bladder 1, and also strengthening elastic internal bladder 1 can restore The elastic deformation ability of property.
S2, pressurization is sealed using outer surface of the waterproof membrane 13 to elastic internal bladder 1;
As a preferred embodiment, rubber material, plastic material or resin material can be used in the waterproof membrane 13 in step S2 In a kind of material at least within made by waterproof membrane 13, the waterproof membrane 13 in the present embodiment uses highdensity plastic cement Waterproof membrane 13, with a thickness of 1~8mm;
As a kind of specific embodiment, the tool of pressurization is sealed in the step S2 to the outer surface of elastic internal bladder 1 The operation of body is: first brushing or spray the waterproof material of one layer of liquid, the waterproof material on the outer surface of elastic internal bladder 1 One kind at least in rubber coating, plastic paint and cold coating can be used, then the waterproof membrane 13 applied certain Pulling force is wrapped on the outer surface of 1 coated with waterproof material of elastic internal bladder, and the bullet can be completely covered in the waterproof membrane 13 Property liner 1 outer surface, that is, each circle waterproof membrane 13 for being wrapped on elastic internal bladder 1 needs to have weight with adjacent waterproof membrane 13 Folded part, to realize that the outer surface of the elastic internal bladder 1 can be completely covered in waterproof membrane 13, according to processing effect, in elasticity The outer surface of liner 1 can wind at least one layer of waterproof membrane 13.
S3, the several bulk steel meshes 21 of establishment, the steel mesh 21 are connect by auxiliary bar 22 with elastic internal bladder 1, and Steel mesh 21 is fixed on to the periphery of elastic internal bladder 1, and by all steel meshes 21 be spliced into it is described fill out extra large unit needed for shape Cylinder mould 23, forms casting model 3, and casting ring cavity 32 is formed between cylinder mould 23 and elastic internal bladder 1;It inserts one end of auxiliary bar 22 Enter in elastic internal bladder 1, but do not surpass the inner cavity 11 into elastic internal bladder 1, the other end of auxiliary bar 22 is welded or fixed by other Mode is connected on cylinder mould 23, in the present embodiment, 2/3rds of the thickness of one end insertion elastic internal bladder 1 of auxiliary bar 22 In, the other end offers hole location, pierces into hole location by steel wire and the binding reinforcing bars on cylinder mould 23 are secured;Moreover, cylinder mould 23 and bullet Property liner 1 between the spacing thickness that can be poured out needed for the shell 2 for filling out extra large unit depending on, in casting ring cavity 32 Auxiliary bar 22 in (gap i.e. between cylinder mould 23 and elastic internal bladder 1) can be surrounded and be poured by concrete in casting process Note is inside the shell 2 for filling out extra large unit, in order to improve waterproof performance, is inserted at elastic internal bladder 1 in auxiliary bar 22, utilizes liquid State waterproof material sprays moisture when sealing fine gap in turn to prevent casting in concrete from gap leakage, Huo Zhefu It is inserted into elastic internal bladder 1 after helping 22 outer surface of reinforcing bar to stick liquid repellent material all over, so that in auxiliary bar 22 and elasticity There is waterproof layer on the contact surface of gallbladder 1.
S4, several reserved hole locations 31 are laid on the casting model 3, the reserved hole location 31 is used for pipe laying 5, institute Stating inner cavity 11 can be connected to the external world by the pipeline 5, and the pipeline 5 is for filling and discharging pressurising medium 12;It can be first institute The mold that hole location 31 need to be reserved is tied up or other connection types are fixed on cylinder mould 23, one end of the mold of required reserved hole location 31 The hole opened up from cylinder mould 23 penetrates in casting ring cavity 32, and opens up from the outer surface of elastic internal bladder 1 corresponding with reserved hole location 31 Channel, then the mold of required reserved hole location 31 is inserted into elastic internal bladder 1 from channel, and pass through the internal chamber wall of elastic internal bladder 1, The other end then extends to outside cylinder mould 23;The mold of required reserved hole location 31 and the contact surface of elastic internal bladder 1 and edge need benefit Water-proofing treatment is carried out with liquid water-proof material, so that the moisture in concrete will not penetrate into elastic internal bladder 1 when being poured;
As a kind of specific embodiment, the step S4 further include: right in elastic internal bladder 1 when laying reserved hole location 31 On the channel that should be opened up, its conduit wall is first brushed or is sprayed one layer of waterproof material, rubber can be used in the waterproof material One kind in coating, plastic paint and cold coating at least within more comprehensively reduces the place for being possible to leak infiltration.
S5, manufacture casting mold 4,4 shape size of casting mold matches with the casting model 3, and casting moulds Have 4 opening upwards;Casting mold 4 is that five metopes surround, and removably combine, and separate on each metope Device facilitates and the extra large unit of filling out of board finished product is separated mold after casting complete, and mold can be adjusted according to the size for filling out extra large unit Its assembled position, can utilize more repeatedly;Casting mold 4 in the present embodiment is to be poured to be formed by concrete, and surface is pasted with Plastic plate and dissembling device is installed, assembly is carried out by mechanical component and is formed by connecting.
S6, the casting model 3 is hung onto the casting mold 4, the fill concrete in the casting ring cavity 32, And conserve to its solidification, what the concrete setting was formed is the shell 2 for filling out extra large unit;Manufacturing works are settable multiple It is poured station, casting mold 4 is provided on each station, boom is provided with above station and is added between each process to operate The semi-finished product that work comes out;Concrete decentralization mouth is additionally provided with above casting station, worker, which observes and fiddles at decentralization mouth, to be made to mix Solidifying soil (spacing gap i.e. between cage net and elastic internal bladder 1) in the casting ring cavity 32 is evenly distributed, and observes preformed hole Whether position 31 is impacted, if there is displacement is then adjusted.
As a kind of specific embodiment, after completing above-mentioned steps S6, then be sequentially repeated the primary step S4, S5, S6, to be poured to form one layer thicker of shell 2, then followed by completing the step S7 and step S8.Complete step S6 Afterwards, the extra large unit of filling out of semi-finished product is separated the casting mold 4, adjusts the mold of reserved hole location 31, guarantee reserved hole location 31 not It is impacted, it is the bigger mold for filling out extra large unit periphery for being trapped among semi-finished product die adjustment, continues to fill up concrete and complete two Secondary casting, so that the thickness of thickening casing 2, first can also tie up one layer of reinforcing bar on completing the shell 2 of casting for the first time and fill out again It fills concrete and realizes second pouring.
S7, the shell 2 is separated into the casting mold 4, the pipe laying 5 in the reserved hole location 31;On pipeline 5 also The valve of self-regulation is installed, after several reclamations of the present invention for filling out extra large unit construction completion, respectively fills out Hai Dan Member is deposited in seabed, is discharged or filled pressurising medium 12 by the pipeline 5, is to realize self-regulation main path;
As a preferred embodiment, the pressurising medium 12 includes pressurized air, rubbish and seawater;Described in step S7 Pipeline 5 is also to fill out what extra large unit internal breakup generated for filling and discharging pressurized air, rubbish and seawater and rubbish Gas.
S8, pressurising medium 12 is filled toward the inner cavity 11 of the elastic internal bladder 1 by the pipeline 5, and pacified on pipeline 5 Valve switch is filled, pressurized sealed container is formed, makes described to fill out extra large unit there is certain internal pressure before construction;The valve Switch can be controlled the pressurising medium 12 by the variation of pressure and pass in and out the inner cavity 11, thus adjust the pressure of inner cavity 11 with Extra large unit and extraneous pressure equilibrium are filled out described in maintenance.
As a kind of specific embodiment, step S7 further includes installing several pressure release passages in the reserved hole location 31 51, the pressure release passage 51 can be in communication with the outside the inner cavity 11, and pressure release passage 51 fills out institute at the top of extra large unit positioned at described On corresponding cylinder mould 23, the pressure release passage 51 is provided with limiting device;
It is corresponding, the step S8 further include: pressure regulator matched with pressure release passage 51 is installed in pressure release passage 51 511, the pressure regulator 511 is limited to pass in and out sliding in pressure release passage 51 by the elastic internal bladder 1 and extraneous pressure action, So as to reach elastic internal bladder 1 and extraneous in the interior space of the elastic internal bladder 1 by changing pressurising medium 12 Pressure equilibrium;
Specifically, pressure release passage 51 is fixedly mounted directly in reserved hole location 31, reserve hole location 31 and pressure release passage 51 it Between can pass through the coagulators Adherents junction such as glue, cement, the pressure release passage 51 setting as above-mentioned pipeline 5 the installation Method, the pressure release passage 51 in the present embodiment use plastic tube, and pressure release passage 51 far from one end port of elastic internal bladder 1 at It is provided with limiting device, prevents pressure regulator 511 to be detached from the pressure release passage 51 filled out on extra large unit, specifically, can let out described The bore of one end port of the pressure passageway 51 far from elastic internal bladder 1 is set smaller than pressure regulator 511 close to one end of elastic internal bladder 1 The bore of port limits pressure regulator 511 so as to card, but its material is not limited only to the shape of plastic tube and pressure release passage 51 Formula is not limited only to separately add pipeline 5, can also open up again pressure release passage 51 after above-mentioned elastic internal bladder 1 and 2 casting complete of shell And other etc. other equivalent efficacies form;The pressure regulator 511 is a cock body, and the both ends of the cock body are connected with cap, The exposed cap in the external world limits cock body card in 2 outer surface of shell, and the bore of the cap of the other end is slightly less than pressure release The internal diameter in channel 51 and the internal diameter for being greater than limiting device.
As a kind of specific embodiment, step S4, pipeline 5 described in S7, S8 includes: water inlet pipe 52, gas-guide tube 53 With big flow water inlet tube body 54;It is corresponding, the step S8 further include:
I) by big flow intake tube body 54 toward the elastic internal bladder 1 inner cavity 11 fill rubbish, the volume of the rubbish No more than the 50% of 1 space of elastic internal bladder, after rubbish is filled, installation compression spring is opened in big flow water inlet tube body 54 541 and interior sealing cover 542 are closed, the interior sealing cover 542 is located at big flow water inlet tube body 54 close to the one of 1 center of elastic internal bladder It holds at port, using sealing cover 542 in 541 elastic connection of compression spring switch, makes compression spring switch 541 by ambient pressure And elastic deformation occurs to control the interior sealing cover 542 and block or open the big flow water inlet tube body 54;Interior sealing cover 542 diameter is greater than or equal to big flow water inlet tube body 54 close to the port bore of one end of elastic internal bladder 1, and compression spring is opened It closes 541 to be fixed in big flow water inlet tube body 54, fills out the internal pressure of extra large unit and big when filling out the seawater hydraulic pressure outside extra large unit and being greater than When the pressure that the specified elastic deformation of compression spring switch 541 is born, compression spring switch 541 is washed open by external seawater To which seawater irrigation is into elastic internal bladder 1;
II) drain valve 521 to be first installed on water inlet pipe 52 one way stop peturn valve 522 is installed again, the drain valve 521 is mounted on On water inlet pipe 52 between the one way stop peturn valve 522 and the shell 2;Excretion elastic internal bladder can be opened manually in drain valve 521 1 pressurising medium 12, one way stop peturn valve 522 only when external pressure be greater than 1 internal pressure of elastic internal bladder when, seawater wash open valve into Enter elastic internal bladder 1, and the pressurising medium 12 inside elastic internal bladder 1 can not be discharged into outside from the one way stop peturn valve 522 on drainpipe Boundary;
III) boost charge-air mouth 531 to be first installed on gas-guide tube 53 exhaust valve 532 is installed again, the boost charge-air mouth 531 is pacified Between the exhaust valve 532 and the shell 2 for filling out extra large unit;Boost charge-air mouth 531 is used to pump for external pressurization empty Gas high speed is inculcated into elastic internal bladder 1, makes to fill out extra large unit plenum and bulging;Exhaust valve 532 is gas unidirectional check-valves, when Gas washes the extraneous inside and outside pressure to keep filling out extra large unit of 532 portion gas of exhaust valve discharge open when 1 internal pressure of elastic internal bladder is excessively high Balance, to guarantee its stability.
As a kind of specific embodiment, the step S8 further include: pump forced air using external pressure and pass through increasing Inflating port 531 is pressed to inculcate forced air toward elastic internal bladder 1, to improve 1 internal pressure of elastic internal bladder, so that filling out extra large unit integrally has The ability to bear of extra large unit entirety is filled out in certain internal pressure, enhancing.
As a preferred embodiment, several anticorrosion stainless steel connection rings 6, institute are installed using bolt on the shell 2 It states 6 root of connection ring and is inserted into the shell 2 deeply, such as using the connection ring 6 for being welded with explosion screw, its root is deeply outer In shell 2, anticreep performance is improved;Connection ring 6 is using stainless steel, carbon steel, carbon fiber or other corrosion-resistant and hard material systems At;The position of connection ring 6 can be adjusted laying according to specific sea conditions, described to fill out extra large unit and sink to sea when engineering construction It is stacked gradually behind bottom together, by steel wire or other connecting elements the adjacent stainless steel wire connection ring 6 filled out on extra large unit It ties up and securely connects together.
Process is manufactured according to appeal to summarize such as Fig. 1, required 8 step summaries are as follows: the customized elastic internal bladder of S1, S2 waterproof Film sealing pressing, S3 form casting model, S4 lays reserved hole location, S5 manufacture casting mold, S6 are poured shell, S7 installing pipe Road, S8 filling pressurising medium installation valve are to form pressurized sealed container.
A kind of method for manufacturing working principle for filling out extra large unit of the present invention is:
1, extra large unit is filled out using what method for manufacturing of the present invention produced, uses hollow design, inside fills The air of seawater injection, the rubbish of filling and pressurization implantation makes the structure for entirely filling out extra large unit and uses principle such as inflated wheel Tire, it is pressurized to fill out extra large unit by interior hydraulic pressure effect bulging, increase its whole rigidity and load-bearing capacity;Secondly, ensure that Whole weight can sink down into seabed while save a large amount of material resources and production cost;Moreover, hollow design makes to fill out With certain floating marine power when seawater is not perfused for extra large unit, can be reduced using seawater transport when being conducive to installation Engineering difficulty and transportation cost is saved.
2, elastic internal bladder 1 and the casting of concrete casing 2 form one, and the elasticity and waterproof performance of elastic internal bladder 1 ensure that The durability of extra large unit long service is filled out, concrete casing 2 combines the pipeline 5 for being used to fill discharge pressurising medium 12 and lets out Pressure regulator 511 on pressure passageway 51 can be realized self-regulation, thus ensure that using it is several this fill out that extra large unit completes fill out marine worker The long-time stability of journey.
3, it fills out extra large unit making above-mentioned by production plant and comes out, then hung into seashore, pass through external pressurization It pumps and is pressurized to 53 aerating of gas-guide tube, making to fill out extra large unit integrally has certain internal pressure, and the receiving of extra large unit entirety is filled out in enhancing Ability.Originally it fills out 11 structure of the hollow formation inner cavity of extra large unitary elasticity liner 1 to make it have the property of buoyancy and float on sea, lead to Ship is crossed to fill out extra large unit by required amount of and draw onto sea corresponding to wanted riding position, then by caisson operation by its Deep-sea is sunk to, during sinking, seawater is quick from the one way stop peturn valve 522 and big flow of water inlet pipe 52 water inlet tube body 54 It is poured into the hollow cavity 11, has the function of pressure difference inside and outside certain self-regulation, simultaneously as the pressure of hydraulic pressure is big In the pressure for the hollow cavity 11 for filling out extra large unit, and it is greater than the natural envelope of compression spring switch 541 on big flow water inlet tube body 54 Elastic force under closed state, seawater open the interior sealing cover 542 of big flow water inlet tube body 54 toward 11 direction of hollow cavity, seawater 54 quick filling of tube body is intake into hollow hollow cavity 11 by big flow;
The position of sinking is controlled, then passes through wire hawser or connecting elements for the adjacent stainless steel wire filled out on extra large unit Connection ring 6 bundles, and all extra large units of filling out is made to link together, and does not move and migrates vulnerable to bottom wave;
The pressure regulator 511 being arranged in the pressure release passage 51, when 11 pressure of the inner cavity of elastic internal bladder 1 is lower than the external world, by The effect of gravity and pressure, closely plug is got lodged in the pressure release passage 51 pressure regulator 511, and the cap of pressure regulator 511 is used for will be whole A card of pressure regulator 511 limit is on 2 surface of shell;When 11 pressure of the inner cavity of elastic internal bladder 1 is higher than the external world, high pressure is pressure regulator 511 Cock body opens a distance outward, increases pressurising medium 12 in the accommodating space of elastic internal bladder 1, rubbish divides in elastic internal bladder 1 Oxygen in solution consumed cabin air can also decomposite other other simultaneously, if gas makes total pressure be higher than extraneous hydraulic pressure, pressure regulator 511 when being not enough to adjust, and pressure can wash the 532 drain portion gas of exhaust valve on gas-guide tube 53 open;If elastic internal bladder 1 is interior Portion's pressure is far below external water pressure, and hydraulic pressure can wash the interior of one way stop peturn valve 522 on drainpipe or big flow water inlet tube body 54 open Sealing cover 542 irrigates seawater and enters elastic internal bladder 1 until inside and outside pressure equilibrium, fills out the outside of extra large unit to play and be self-regulated With the pressure equilibrium of therein.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, therefore Without departing from the technical solutions of the present invention, according to the technical essence of the invention it is to the above embodiments it is any modification, Equivalent variations and modification, all of which are still within the scope of the technical scheme of the invention.

Claims (10)

1. a kind of method for manufacturing for filling out extra large unit, which comprises the following steps:
The inner hollow of S1, the customized elastic internal bladder of the shape according to needed for filling out extra large unit, the elastic internal bladder form an inner cavity, bullet Property liner internal chamber wall processed by sealing and anti-leakage, the inner cavity of the liner is for accommodating pressurising medium;
S2, pressurization is sealed using outer surface of the waterproof membrane to elastic internal bladder;
S3, the several bulk steel meshes of establishment, the steel mesh is connect by auxiliary bar with elastic internal bladder, and steel mesh is fixed In the periphery of elastic internal bladder, and by all steel meshes be spliced into it is described fill out extra large unit needed for shape cylinder mould, form casting model, Casting ring cavity is formed between cylinder mould and elastic internal bladder;
S4, several reserved hole locations are laid on the casting model, the reserved hole location is used for pipe laying, the inner cavity and outer Boundary can be connected to by the pipeline, and the pipeline is for filling and discharging pressurising medium;
S5, manufacture casting mold, the casting mold shape size matches with the casting model, and casting mold be open to On;
S6, the casting model is hung onto the casting mold, toward the intracavitary fill concrete of the pouring loop, and conserve to It is solidified, and what the concrete setting was formed is the shell for filling out extra large unit;
S7, the shell is separated into the casting mold, the pipe laying in the reserved hole location;
S8, by the pipeline toward the lumen loading pressurising medium of the liner, and valve switch is installed on pipeline, is formed Pressurized sealed container makes described to fill out extra large unit and have certain internal pressure before construction;The valve switch can be by pressure Variation pass in and out the inner cavity to control the pressurising medium, to adjust the pressure of inner cavity to maintain the extra large unit and outer filled out The pressure equilibrium on boundary.
2. a kind of method for manufacturing for filling out extra large unit according to claim 1, which is characterized in that the pressurising medium packet Include pressurized air, rubbish and seawater.
3. a kind of method for manufacturing for filling out extra large unit according to claim 2, which is characterized in that the step S7: also Including installing several pressure release passages in the reserved hole location, the pressure release passage can be in communication with the outside the inner cavity, and let out Pressure passageway is located on cylinder mould corresponding to described fill out at the top of extra large unit, and the pressure release passage is provided with limiting device;
It is corresponding, the step S8 further include: pressure regulator matched with pressure release passage, the pressure regulator are installed in pressure release passage By the liner and extraneous pressure action, it is limited to pass in and out sliding in pressure release passage, so as to by changing pressurising medium Reach the pressure equilibrium of liner and the external world in the interior space of the liner.
4. a kind of method for manufacturing for filling out extra large unit according to claim 2, which is characterized in that step S4, in S7, S8 The pipeline includes: water inlet pipe, gas-guide tube and big flow water inlet tube body;
It is corresponding, the step S8 further include:
I) tube body intake toward the lumen loading rubbish of the liner by big flow, the volume of the rubbish is no more than liner space 50%, rubbish fill after, in big flow water inlet pipe body install compression spring switch and interior sealing cover, the interior sealing Lid is located at big flow water inlet tube body at one end port at liner center, is switched in elastic connection and is sealed using compression spring Lid makes compression spring switch elastic deformation be occurred by ambient pressure to control the interior sealing cover and block or open the big stream Amount water inlet tube body;
II) drain valve to be first installed on water inlet pipe one way stop peturn valve is installed again, the drain valve is mounted on the one way stop peturn valve On water inlet pipe between the shell;
III) boost charge-air mouth to be first installed on gas-guide tube exhaust valve is installed again, the boost charge-air mouth is mounted on the exhaust valve Between the shell for filling out extra large unit.
5. a kind of method for manufacturing for filling out extra large unit according to claim 3 and 4, which is characterized in that the step S4 Further include: when laying reserved hole location, on the corresponding channel opened up of elastic internal bladder, its conduit wall is brushed or is sprayed one layer One kind in rubber coating, plastic paint and cold coating at least within can be used in waterproof material, the waterproof material.
6. a kind of method for manufacturing for filling out extra large unit according to claim 1, which is characterized in that right in the step S2 The specific operation that the outer surface of elastic internal bladder is sealed pressurization is: first brushing or spray one on the outer surface of elastic internal bladder One kind in rubber coating, plastic paint and cold coating at least within can be used in layer waterproof material, the waterproof material, then will The waterproof membrane applies certain pulling force and is wrapped on the outer surface of the elastic internal bladder coated with waterproof material, the waterproof membrane energy The outer surface of the elastic internal bladder is enough completely covered.
7. a kind of method for manufacturing for filling out extra large unit according to claim 6, which is characterized in that in the step S2 Waterproof membrane made of a kind of material at least in rubber material, plastic material or resin material can be used in waterproof membrane;Institute State that resin or rubber can be used in elastic internal bladder or the material of plastic foamed formation is processed into;The internal chamber wall of the elastic internal bladder can Using a kind of liquid material in rubber, plastics and resin material at least within, carried out with the processing method for spraying or brushing close Seal leakproof processing.
8. a kind of method for manufacturing for filling out extra large unit according to claim 5, which is characterized in that complete above-mentioned steps S6 Afterwards, then it is sequentially repeated primary described step S4, S5, S6, to be poured to form one layer of thicker shell, then followed by completion The step S7 and step S8.
9. a kind of method for manufacturing for filling out extra large unit according to claim 4, which is characterized in that the step S8 is also wrapped It includes: forced air is inculcated toward liner using external pressure pump forced air and by boost charge-air mouth, to improve liner internal pressure.
10. a kind of method for manufacturing for filling out extra large unit according to claim 1, which is characterized in that further include step S9: Several connection rings are installed using bolt on the housing, the shell is inserted into the connection ring root deeply, and connection ring is not using Rust steel, carbon steel, carbon fiber or other corrosion-resistant and hard materials are made.
CN201811169827.XA 2018-10-08 2018-10-08 Production and manufacturing method of sea reclamation unit Expired - Fee Related CN109129883B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811169827.XA CN109129883B (en) 2018-10-08 2018-10-08 Production and manufacturing method of sea reclamation unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811169827.XA CN109129883B (en) 2018-10-08 2018-10-08 Production and manufacturing method of sea reclamation unit

Publications (2)

Publication Number Publication Date
CN109129883A true CN109129883A (en) 2019-01-04
CN109129883B CN109129883B (en) 2020-11-27

Family

ID=64810570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811169827.XA Expired - Fee Related CN109129883B (en) 2018-10-08 2018-10-08 Production and manufacturing method of sea reclamation unit

Country Status (1)

Country Link
CN (1) CN109129883B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113670656A (en) * 2021-08-27 2021-11-19 中建华宸(海南)建设集团有限公司 Visual exploration sampling equipment in deep sea

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2219904Y (en) * 1995-01-09 1996-02-14 彭振宏 Rubbish and waste tyre block for reclamation of land from water
CN201309658Y (en) * 2008-09-09 2009-09-16 河北理工大学 Bottle cap capable of reducing negative pressure in plastic water cup
CN101748705A (en) * 2008-12-22 2010-06-23 王锦文 Method for reclaiming land around sea
CN104093910A (en) * 2012-01-11 2014-10-08 道格拉斯·魏 A tire assembly and a method of building a support structure in a marine environment using tires
CN205116200U (en) * 2015-10-23 2016-03-30 天津市北斗海洋信息科技有限公司 Caisson for sea reclamation
CN106049555A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring device of marine large-diameter pile foundation and construction method thereof
CN106609506A (en) * 2015-10-23 2017-05-03 天津市北斗海洋信息科技有限公司 Method for sea reclamation by using caissons
CN106828834A (en) * 2017-03-17 2017-06-13 王晓航 A kind of deep unmanned bathyscaph in full sea
CN106836134A (en) * 2017-02-10 2017-06-13 合肥学院 A kind of utilization junked tire builds the construction method of man-made island in extra large reef area
CN206554127U (en) * 2016-12-26 2017-10-13 杭州博牛建筑设计咨询有限公司 A kind of basement water buoyancy pressure release automatic safety device
CN107268536A (en) * 2017-06-15 2017-10-20 罗朝钦 A kind of fill encloses sea, draining, does not fill to make somebody a mere figurehead and make ground construction process
CN107761738A (en) * 2017-10-11 2018-03-06 中国建筑第六工程局有限公司 The mask gabion string bag is without throwing construction method of colliding with

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2219904Y (en) * 1995-01-09 1996-02-14 彭振宏 Rubbish and waste tyre block for reclamation of land from water
CN201309658Y (en) * 2008-09-09 2009-09-16 河北理工大学 Bottle cap capable of reducing negative pressure in plastic water cup
CN101748705A (en) * 2008-12-22 2010-06-23 王锦文 Method for reclaiming land around sea
CN104093910A (en) * 2012-01-11 2014-10-08 道格拉斯·魏 A tire assembly and a method of building a support structure in a marine environment using tires
CN205116200U (en) * 2015-10-23 2016-03-30 天津市北斗海洋信息科技有限公司 Caisson for sea reclamation
CN106609506A (en) * 2015-10-23 2017-05-03 天津市北斗海洋信息科技有限公司 Method for sea reclamation by using caissons
CN106049555A (en) * 2016-08-02 2016-10-26 合肥学院 Anti-scouring device of marine large-diameter pile foundation and construction method thereof
CN206554127U (en) * 2016-12-26 2017-10-13 杭州博牛建筑设计咨询有限公司 A kind of basement water buoyancy pressure release automatic safety device
CN106836134A (en) * 2017-02-10 2017-06-13 合肥学院 A kind of utilization junked tire builds the construction method of man-made island in extra large reef area
CN106828834A (en) * 2017-03-17 2017-06-13 王晓航 A kind of deep unmanned bathyscaph in full sea
CN107268536A (en) * 2017-06-15 2017-10-20 罗朝钦 A kind of fill encloses sea, draining, does not fill to make somebody a mere figurehead and make ground construction process
CN107761738A (en) * 2017-10-11 2018-03-06 中国建筑第六工程局有限公司 The mask gabion string bag is without throwing construction method of colliding with

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113670656A (en) * 2021-08-27 2021-11-19 中建华宸(海南)建设集团有限公司 Visual exploration sampling equipment in deep sea

Also Published As

Publication number Publication date
CN109129883B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
Slocum et al. Ocean renewable energy storage (ORES) system: Analysis of an undersea energy storage concept
CN102767157A (en) Diking method through filling sludge into mold bags and vacuum preloading
CN102777313A (en) Method of collection and storage of wave energy and pressure seawater scheduling system thereof
CN103290805A (en) Method for regulating river water by utilizing sea power
CN109129883A (en) A kind of method for manufacturing for filling out extra large unit
CN109137699A (en) A method of repairing dell
CN110155264B (en) Marine fan composite cylinder foundation towing structure and towing method
CN214613890U (en) Integral flexible water-filling surrounding well for piping emergency
CN109287187B (en) Vegetation recovery system based on satellite remote sensing image and monitoring method thereof
KR101552520B1 (en) Construction method of compressed air storage unit using suction pile
CN108430863B (en) Controllable relocatable module, modularization Offshore Structures component and its on-site assembly method
CN112302056A (en) Sand filling bag for protecting foundation of deep sea fan against scouring and ballasting
CN109113025A (en) A kind of manufacturing method for filling out extra large unit
CN100535251C (en) Earth pit for prefabricating members for use in hydraulic engineering, float transferring device therefore, and their using method
CN101023225B (en) Submarine water reservoir
CN109853572B (en) Concrete anchor in-situ pouring process method and floating structure
CN201162240Y (en) Sand-taking device of sand taking equipment under deep water covering layer
KR101596711B1 (en) Down Hole Control Valve For Artificial Recharge And Operation Method Of Same
CN210947845U (en) Cement pole is consolidated and is reinforced structure with quick reinforcement of carbon fiber
CN1307350C (en) Self-desilting and dredging method and apparatus for reservoir
CN109162252A (en) It is a kind of it is adjustable in hydraulic pressure fill out extra large unit
CN209258345U (en) A kind of marine power generation booster station structure
CN206173912U (en) Escape canal prefab with activated carbon powder concrete shell body and strain dirty immature soil of planting and pack
CN114382054B (en) Hydraulic engineering ecological environment-friendly slope protection structure, slope protection system and construction method
CN109162253A (en) Extra large unit is filled out in a kind of pressure stabilizing being self-regulated

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201106

Address after: 315725 22 Dongxi Park Road, Xinqiao Town, Xiangshan County, Ningbo, Zhejiang

Applicant after: XIANGSHAN XINGQI ELECTRICAL APPLIANCE TECHNOLOGY Co.,Ltd.

Address before: In the village of new town in Xiangshan County of Zhejiang Province, Ningbo City, 315725

Applicant before: Earth peak

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201127

Termination date: 20211008