CN106758704A - A kind of gutter disposal molding construction equipment and construction method - Google Patents

A kind of gutter disposal molding construction equipment and construction method Download PDF

Info

Publication number
CN106758704A
CN106758704A CN201710102527.9A CN201710102527A CN106758704A CN 106758704 A CN106758704 A CN 106758704A CN 201710102527 A CN201710102527 A CN 201710102527A CN 106758704 A CN106758704 A CN 106758704A
Authority
CN
China
Prior art keywords
gutter
concrete
punching block
limiting platform
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710102527.9A
Other languages
Chinese (zh)
Inventor
郑康瑜
朱树坤
褚晓辉
王海叶
傅重阳
宁轲
张龙
崔晓智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201710102527.9A priority Critical patent/CN106758704A/en
Publication of CN106758704A publication Critical patent/CN106758704A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/4886Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ for forming in a continuous operation kerbs, gutters, berms, safety kerbs, median barriers or like structures in situ, e.g. by slip-forming, by extrusion

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

The invention belongs to gutter technical field of construction, specifically a kind of gutter disposal molding construction equipment and construction method, described construction equipment includes placed side by side in the walking track on the side slope top of gutter two, the roller for coordinating is rolled with walking track, it is supported in the limiting platform between all rollers, generator, shake table and the feeding warehouse being fixed on above limiting platform, the console for controlling shake table are fixed on limiting platform lower section and the sizing punching block being engaged with gutter.The present invention realizes cloth, paves, vibrates, flattening etc. that multiple working procedure is disposably completed, and saves manpower, improves the quality and efficiency for paving.The present invention realizes gutter continuous concreting, and one-shot forming, the concreting of the completion subgrade drainage ditch of high-quality and high-efficiency effectively ensure that the globality of concrete structure.

Description

A kind of gutter disposal molding construction equipment and construction method
Technical field
The invention belongs to gutter technical field of construction, specifically a kind of gutter disposal molding construction equipment and construction Method.
Background technology
The construction of subgrade drainage ditch generally uses formwork method construction technology, and gutter is repaiied using excavators digging groove, manually The method of whole groove, backbreak, owe dig phenomenon it is serious;Concrete is poured at twice simultaneously, is first poured base plate and is poured side wall again, overall Property it is poor, and easy leakage is shaken forms voids and pits or rotten when vibrating, and causes secondary doing over again.Accordingly, it would be desirable to be arranged using one kind Ditch efficient construction method, solution Traditional foundations gutter formwork method construction efficiency index is low, tedious process, quality hardly possible are controlled, The problems such as resource input is big.
The content of the invention
The present invention is in order to solve the problems that existing subgrade drainage ditch construction is present, there is provided a kind of gutter is disposable Molding construction equipment and construction method.
The present invention is achieved by the following technical solutions:A kind of gutter disposal molding construction equipment, including side by side The walking track on the side slope top of gutter two is positioned over, the roller for coordinating is rolled with walking track, be supported between all rollers Limiting platform, the generator being fixed on above limiting platform, shake table and feeding warehouse, the control for controlling shake table Platform, is fixed on limiting platform lower section and the sizing punching block being engaged with gutter,
The rotation that the console passes through propeller control roller, the output end of shake table is connected with sizing punching block, positioned at fixed The discharging opening being connected with feeding warehouse is offered under the limiting platform of shaped steel mould both sides, on the limiting platform above gutter It is fixed with par.
Further, the sizing punching block is inverted trapezoidal structure.
Equipment of the present invention has the following advantages that compared with existing gutter construction technology:
1st, it is of the invention compared with traditional formwork support process, 6 times high or so of efficiency of construction.
2nd, compared with traditional formwork construction technique, the present invention is equal from series of processes such as smooth location, fluting, placement tracks It is accurate measurement, line style and absolute altitude can be accomplished very precisely, in the absence of the mould that rises, race mould and leakage is shaken phenomenon in casting process, Construction quality is high.
3rd, can be recycled.
4th, the present invention realizes cloth, paves, vibrates, flattening etc. that multiple working procedure is disposably completed, and saves manpower, improves The quality and efficiency for paving.The present invention realizes gutter continuous concreting, one-shot forming, the completion roadbed of high-quality and high-efficiency The concreting in gutter, effectively ensure that the globality of concrete structure.
A kind of construction method in gutter, is realized by above-mentioned gutter disposal molding construction equipment, described The step of construction method, includes:
1. the original ground in the range of the boundary of a piece of land is cleared up and is flattened, setting-out is carried out according to gutter design attitude, using configuration The excavator excavation pit of special-shaped bucket;
2. walking track is laid on the side slope top of gutter two;
3. starter-generator, hydraulic system is started by console, first using operation manually, after determining that propeller is working properly Automatic running gear is switched to, suspends hydraulic system;
4. concrete is added in feeding warehouse, starts hydraulic work system, propeller automatic running is made by hydraulic system, will entered Concrete extrusion in feed bin, is entered between groove and sizing punching block by discharging opening, after concrete surface reaches par, is completed Concrete is laid;
5. shake table is opened, punching block uninterruptedly vibrates to concrete by shaping, concrete reaches after vibrating and extruding repeatedly To closely knit.
When specifically used, the laying speed of the concrete is in 1m/min.
Construction method of the present invention has the advantages that compared with the prior art:Simplify gutter construction work Sequence, instead of conventional excavators and excavates groove, the method for manual amendment groove, it is to avoid backbreaks, owe to dig the generation of phenomenon, it is ensured that Ditch disposable excavation quality;Cloth is realized, is paved, is vibrated, flattening etc. that multiple working procedure is disposably completed, line style and absolute altitude can Accomplish precise control;Avoid template and rise and mould or run mould phenomenon and leakage is shaken and cause concrete comb pitted skin or rotten problem Generation, high-quality and high-efficiency completion subgrade drainage ditch concreting.
Brief description of the drawings
Fig. 1 is a kind of structural representation of gutter disposal molding construction equipment of the present invention.
In figure:1- pars, 2- rollers, 3- walkings track, 4- feeding warehouses, 5- discharging openings, 6- sizings punching block, 7- vibrations Platform, 8- consoles.
Specific embodiment
A kind of gutter disposal molding construction equipment, including it is placed side by side in the walking track on the side slope top of gutter two 3, the roller 2 for coordinating is rolled with walking track 3, the limiting platform between all rollers 2 is supported in, it is fixed on limiting platform top Generator 8, shake table 7 and feeding warehouse 4, the console 8 for controlling shake table 7, be fixed on limiting platform lower section and with The sizing punching block 6 that gutter is engaged,
The rotation that the console 8 passes through propeller control roller 2, the output end of shake table 7 is connected with sizing punching block 6, position In offering the discharging opening 5 that is connected with feeding warehouse 4, the limit above gutter under the limiting platform of sizing punching block 6 both sides Par 1 is fixed with bit platform.
Can be according to the shape in gutter come the shape of design typification punching block 6, such as inverted trapezoidal structure during specific implementation.
In addition, the invention provides a kind of construction method in gutter, being constructed by above-mentioned gutter disposal molding What equipment was realized, include the step of described construction method:
1. the original ground in the range of the boundary of a piece of land is cleared up and is flattened, setting-out is carried out according to gutter design attitude, using configuration It is special-shaped(Shape is engaged with required groove shape)The excavator excavation pit of bucket;
2. walking track 3 is laid on the side slope top of gutter two;
3. starter-generator 8, hydraulic system is started by console 8, first using operation manually, determines that propeller is working properly After switch to automatic running gear, suspend hydraulic system;
4. concrete is added in feeding warehouse 4, starts hydraulic work system, propeller automatic running is made by hydraulic system, will Concrete extrusion in feeding warehouse 4, is entered between groove and sizing punching block 6 by discharging opening 5, and concrete surface reaches par 1 Afterwards, concrete laying is completed;
5. shake table 7 is opened, punching block 6 uninterruptedly vibrates to concrete by shaping, concrete is after vibrating and extruding repeatedly Reach closely knit.
In order to improve construction quality, the laying speed of the concrete is in 1m/min.

Claims (4)

1. a kind of gutter disposal molding construction equipment, it is characterised in that including placed side by side on the side slope top of gutter two Walking track(3), with walking track(3)Roll the roller for coordinating(2), it is supported in all rollers(2)Between limiting platform, The generator being fixed on above limiting platform(8), shake table(7)And feeding warehouse(4), for controlling shake table(7)Control Platform(8), it is fixed on limiting platform lower section and the sizing punching block being engaged with gutter(6),
The console(8)By propeller control roller(2)Rotation, shake table(7)Output end with sizing punching block(6)Phase Connection, positioned at sizing punching block(6)Offered under the limiting platform of both sides and feeding warehouse(4)The discharging opening being connected(5), positioned at row Par is fixed with limiting platform above ditch(1).
2. a kind of gutter disposal molding construction equipment according to claim 1, it is characterised in that the sizing punching block (6)It is inverted trapezoidal structure.
3. a kind of construction method in gutter, it is characterised in that be by gutter disposal molding described in claim 1 or 2 What construction equipment was realized, include the step of described construction method:
1. the original ground in the range of the boundary of a piece of land is cleared up and is flattened, setting-out is carried out according to gutter design attitude, using configuration The excavator excavation pit of special-shaped bucket;
2. walking track is laid on the side slope top of gutter two(3);
3. starter-generator(8), by console(8)Start hydraulic system, first using operation manually, determine that propeller works Automatic running gear is switched to after normal, suspends hydraulic system;
4. in feeding warehouse(4)Middle addition concrete, starts hydraulic work system, and propeller automatic running is made by hydraulic system, By feeding warehouse(4)In concrete extrusion, by discharging opening(5)Into groove and sizing punching block(6)Between, concrete surface reaches Par(1)Afterwards, concrete laying is completed;
5. shake table is opened(7), by punching block of shaping(6)Concrete is uninterruptedly vibrated, concrete is by vibrating and squeezing repeatedly Reached after pressure closely knit.
4. a kind of construction method in gutter according to claim 3, it is characterised in that the laying speed of the concrete It is in 1m/min.
CN201710102527.9A 2017-02-24 2017-02-24 A kind of gutter disposal molding construction equipment and construction method Pending CN106758704A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102527.9A CN106758704A (en) 2017-02-24 2017-02-24 A kind of gutter disposal molding construction equipment and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102527.9A CN106758704A (en) 2017-02-24 2017-02-24 A kind of gutter disposal molding construction equipment and construction method

Publications (1)

Publication Number Publication Date
CN106758704A true CN106758704A (en) 2017-05-31

Family

ID=58959643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102527.9A Pending CN106758704A (en) 2017-02-24 2017-02-24 A kind of gutter disposal molding construction equipment and construction method

Country Status (1)

Country Link
CN (1) CN106758704A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905279A (en) * 2017-12-11 2018-04-13 江苏红旗种业股份有限公司 Field groover
CN108755336A (en) * 2018-05-23 2018-11-06 陈国彦 A kind of municipal highway constructing device that can prevent waterlogging disaster
CN109024192A (en) * 2018-08-03 2018-12-18 尚鹏军 Trapezoidal ditch slip-form machine
CN109577453A (en) * 2018-11-27 2019-04-05 杭州江润科技有限公司 Integrally formed gutter and its construction method
CN109868795A (en) * 2019-01-14 2019-06-11 江苏建筑职业技术学院 Bilateral concrete drain tank disposal molding system and forming method
CN110158423A (en) * 2019-06-10 2019-08-23 刘凌晓 Cement pavement template fitting machine
CN110952642A (en) * 2019-11-29 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Construction equipment and construction method for rapid working drainage ditch
CN113863226A (en) * 2021-10-29 2021-12-31 尚鹏军 Trapezoidal ditch synovial membrane machine of accurate cloth

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2041324U (en) * 1988-10-19 1989-07-19 江苏省如皋县拖拉机修配厂 Ladder-shaped ditcher attached to walking tractor
CN201354454Y (en) * 2009-01-22 2009-12-02 史根彦 Large section track-type U-shaped channel concrete lining machine
CN203487517U (en) * 2013-09-26 2014-03-19 中铁二十二局集团第六工程有限公司 Drainage ditch formwork movement vehicle system
CN204401675U (en) * 2014-12-31 2015-06-17 中铁十二局集团有限公司 Rearmounted disc type drainage groove ditching machine
US20160194856A1 (en) * 2013-02-14 2016-07-07 Sink Ring, Llc Biodegradable sink ring
CN106223159A (en) * 2016-09-22 2016-12-14 中铁建大桥工程局集团第六工程有限公司 Subgrade drainage structures former and forming method
US20170051460A1 (en) * 2015-08-19 2017-02-23 George Guilmette Aggregate Spreading System

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2041324U (en) * 1988-10-19 1989-07-19 江苏省如皋县拖拉机修配厂 Ladder-shaped ditcher attached to walking tractor
CN201354454Y (en) * 2009-01-22 2009-12-02 史根彦 Large section track-type U-shaped channel concrete lining machine
US20160194856A1 (en) * 2013-02-14 2016-07-07 Sink Ring, Llc Biodegradable sink ring
CN203487517U (en) * 2013-09-26 2014-03-19 中铁二十二局集团第六工程有限公司 Drainage ditch formwork movement vehicle system
CN204401675U (en) * 2014-12-31 2015-06-17 中铁十二局集团有限公司 Rearmounted disc type drainage groove ditching machine
US20170051460A1 (en) * 2015-08-19 2017-02-23 George Guilmette Aggregate Spreading System
CN106223159A (en) * 2016-09-22 2016-12-14 中铁建大桥工程局集团第六工程有限公司 Subgrade drainage structures former and forming method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905279A (en) * 2017-12-11 2018-04-13 江苏红旗种业股份有限公司 Field groover
CN108755336A (en) * 2018-05-23 2018-11-06 陈国彦 A kind of municipal highway constructing device that can prevent waterlogging disaster
CN109024192A (en) * 2018-08-03 2018-12-18 尚鹏军 Trapezoidal ditch slip-form machine
CN109577453A (en) * 2018-11-27 2019-04-05 杭州江润科技有限公司 Integrally formed gutter and its construction method
CN109868795A (en) * 2019-01-14 2019-06-11 江苏建筑职业技术学院 Bilateral concrete drain tank disposal molding system and forming method
CN109868795B (en) * 2019-01-14 2024-02-09 江苏建筑职业技术学院 Disposable molding system and molding method for double-sided concrete drainage tank
CN110158423A (en) * 2019-06-10 2019-08-23 刘凌晓 Cement pavement template fitting machine
CN110158423B (en) * 2019-06-10 2021-08-06 陕西专壹知识产权运营有限公司 Cement pavement template mounting machine
CN110952642A (en) * 2019-11-29 2020-04-03 中国电建集团华东勘测设计研究院有限公司 Construction equipment and construction method for rapid working drainage ditch
CN110952642B (en) * 2019-11-29 2021-08-31 中国电建集团华东勘测设计研究院有限公司 Construction equipment for rapidly processing drainage ditch and construction method thereof
CN113863226A (en) * 2021-10-29 2021-12-31 尚鹏军 Trapezoidal ditch synovial membrane machine of accurate cloth

Similar Documents

Publication Publication Date Title
CN106758704A (en) A kind of gutter disposal molding construction equipment and construction method
CN206143569U (en) Formula of stirring of shaking is slipform by oneself
CN109577453B (en) Integrally-formed drainage ditch construction system and construction method thereof
CN111350259B (en) Construction method of assembled slip-form cast-in-situ drainage ditch
CN110424208A (en) The construction method in cast-in-place gutter
CN109454746B (en) Concrete pouring device for building construction and construction method thereof
CN102191761B (en) Water ditch concrete pouring machine
CN213038402U (en) Integrated construction device for rapid pouring of embankment side slope
CN107012992A (en) A kind of construction method of the waterproof integrated system of foam concrete roof heat insulation
CN112814116A (en) Construction method of cast-in-situ drainage ditch
CN111074852B (en) Channel lining concrete cast-in-place method and nonlinear channel lining construction method
CN109371910A (en) Pad ground raising protection and construction method
CN106284789B (en) Construction technology for controlling cast-in-situ floor Forming Quality
CN109268042B (en) Small pilot tunnel advanced support equipment and construction method
CN112359792B (en) Cement-improved soil replacement and filling canal slope and construction method
CN107542065B (en) Construction method for overturning and lifting small steel die of high-steep-clearance groove
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN103541443B (en) Post-cast strip structure and construction method thereof
CN105544561B (en) The construction method of friction pile breast wall concrete Quick pouring
CN104499481B (en) A kind of prestressing force screw stake and preparation method thereof
CN207727733U (en) The spliced gutter that can be had enough to meet the need
CN109797630A (en) A kind of full-automatic numerical control slip-form machine roadbed gutter construction method
CN211714145U (en) Concrete construction equipment for drainage ditch
CN110258514A (en) A kind of steel of diaphram wall leads wall and its construction method
CN212052740U (en) Structure for supporting plate type quick support replacement in deep foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531